  • Krasny Bor: May – October 2016Monitoring: facts and opinion

  • Summary of the previous reports

    The landfill is a potentially dangerous object

    Of most concern are the following:

    - open pits No. 64, 68 (the inflow of rainwater/a small reserve of free volume; defects of pits dam);

    - The main way of pollution spreading is the transport of pollutants via surface and surface-drainage waters;

    - the necessity of regular environmental monitoring within the boundaries of the landfill and around it.

  • Schedule :МАY : PILOT WORK AT THE OPEN PITS

    JUNE: PILOT WORK AT THE CLOSED PITS

    JULY: MONITORING 1 PHASE

    AUGUST: MONITORING 1 PHASE

    DESIGN OF MONITORING PROGRAM 2 PHASE

    SEPTEMBER: MONITORING 1 PHASE– FINISHED

    MONITORING 2 PHASE - START

    OCTOBER: MONITORING 2 PHASE

    CLAY TESTING AT NEW PITS

    NOVEMBER И ETC… MONITORING, RESEARCH , PROTECT

  • МАY :PILOT WORK AT THE OPEN PITS

    SAMPLING

    DEPTH MEASURMENT

    TECHNOLOGICAL TEST

    GEOPHISICAL INVESTIGATION

    IDENTIFICATION OF THE DAMS DEFECTS

  • Geophysical INVESTIGATION

    Geoelectric profile:

    Pit #68

    Pit #64

    ВЭЗ 9 – ВЭЗ 11Pit #70

    ΔU, мВ

    ΔU, мВ

    Filtration model

  • MAY : depth measurement

  • MAY : sampling

  • MAY : bottom sediment samplingExperimental and methodical work at the closed pits

  • МАY: test of the waste Substance Pit № 68 Pit № 64 рН 4,6 3,1dry residue, 4997 14867

    Fe, mg/dm3 36,6 2040Мn, mg/dm3 4,7 >50,0 (53,0)Аl, mg/dm3 4,06 >5,0 (420)Na, mg/dm3 765 >1000Mg, mg/dm3 47,2 >100 (316)Hg, mg/dm3 100 (163) >100 (824)Ca, mg/dm3 314 481Cd, mg/dm30,250 (2,14) >0,250 20,9Cu, mg/dm3 5,0 (74,0)Pb, mg/dm3 40 (184) NO2-ion, mg/dm4 12,5 0,76 NO3-ion, mg/dm5 0,95 5,0 (8,6) >5,0 (13,9)

    Лист1

    SubstancePit № 68Pit № 64

    рН4.63.1

    dry residue, mg/dm3 499714867

    Fe, mg/dm3 36.62040

    Мn, mg/dm34.7>50,0 (53,0)

    Аl, mg/dm34.06>5,0 (420)

    Na, mg/dm3765>1000

    Mg, mg/dm347.2>100 (316)

    Hg, mg/dm3100 (163)>100 (824)

    Ca, mg/dm3314481

    Cd, mg/dm3>0,250 (2,14)>0,250 20,9

    Cu, mg/dm35,0 (74,0)

    Pb, mg/dm340 (184)

    NO2-ion, mg/dm412.50.76

    NO3-ion, mg/dm50.955,0 (8,6)>5,0 (13,9)

  • MAY: defects of the dam

  • MAY: defects of the dam

  • JUNE: soil air (gas)

  • JUNE 1 phase: points of monitoring

    Ground water

    Surface water

    Technological water

    Fir

  • Monitoring: parameters 1 phase Water ( surface, ground water)

    Soil

    Air

    Noise

    Heavy metals end chemical elements

    Anions

    Biological oxygen demand

    Chemical oxygen demand

    pH, dry reside

    DDT

    PCB

    3,4-Benz[a]pyrene

    Phenol

    Mineral oil

    Benzen, Toluol, Ethylbenzen, Xelen

    Dioxin

  • JULAY:1 phase

    Определяемые компоненты

    NO2HClSO2H2SBenzenXylenePhenolФормальдегидH2SO4Бенз(а)пирен

  • Ground water sampling from the borehole

  • Dynamics of water level in the borehole

    Диаграмма1

    42531

    42541

    42551

    42561

    42571

    42581

    42591

    42601

    42611

    42621

    42631

    42641

    42651

    metr

    Уровень грунтовых вод

    4.2

    4

    2.2

    1.8

    1.1

    0.6

    0

    0

    0

    0.6

    1.2

    1.4

    3

    Лист1

    Столбец1metr

    6/10/164.2

    6/20/164

    6/30/162.2

    7/10/161.8

    7/20/161.1

    7/30/160.6

    8/9/160

    8/19/160

    8/29/160

    9/8/160.6

    9/18/161.2

    9/28/161.4

    10/8/163

  • Summary statistical characteristics of the pollutants ofgroundwater

    Elements Min-Max(range) Average Мо Мe V, %

    Al 12,9-0,045(12,855) 3,63 * 6,428 129

    Cu 0,0287-0,0006(0,0281) 0,01 0,0006 0,014 105

    Zn 27,7-0,0052(27,69) 5,08 * 13,85 170

    K 14,2-2,41(10,88) 7,28 8,3 5,44 53

    V 0,0466-0,0005(0,0461) 0,01 * 0,0231 85

    Mn 3,16-0,005(3,1317) 0,89 0,811 1,566 101

    Pb (0,047-0,0002)0,0468 0,01 0,0002 0,0234 188

  • AUGUST:Border channel1 phase

    Разработка Программы мониторинга 2 этапа

  • SEPTEMBER:Monitoring 1 phase – finished

    Monitoring 2 phase

  • Monitoring: parameters 1/2 phase Water ( surface)

    Water (ground water at the outside of the landfill)

    Air

    Water ( surface)

    Water (ground water at the outside of the landfill)

    Technological water

    Water (ground water at the landfill)

    Soil

    Flora

    Phytoplankton and zooplankton

    Air

    Noise

  • Monitoring: components 1/2 phaseComponents

    Surfacewater

    Grundwater

    Technol.water

    Phase 1 2 1 2 1 2∑polition 58 40 53 42 63 52Be, Tl + - + - + -Bensapyren + - + - + -Benzen, Toluol, Ethylbenzen, Xilene + - + - + -

    BOD + - +PCB 15, 18, 28, 52, 101, 118, 180 + ∑PCB + ∑PCB + ∑PCB

    Fitoplancton - + - - - -

    Zooplancton - + - - - -

    Zoobentos - + - - - -

    D-Cl + - + - + -

    Toxi - + + - + -

  • Contamination of surface water - Low concentration: H2S, sulfides, formaldehyde, benzo(a)pyrene, Cu, As,

    Zn, Cd, Ni, Pb, Co, Tl, Cr, and 2,4-DDТ, 4,4-DDТ, PCB 28, 52, 101, 118, 138, 153, 180, Cl3ethylen, chloroform, Cl4CH4, Cl4CH6, tetrachloroethylene, chlorinated dioxins, volatile and semivolatile organic substances (Toluol, Benzen, Xelen, Ethylbenzen).

    Comparison of surface water samples taken at different distances from the landfill allows to conclude the following:

    - concentration of such substances, as detergents, Cl-ion, NH4 and N-ion, NO2-ion, F-ion, phenol, mineral oil, Al, Fe, Mn increases as the distance from the polygon, which presumably suggests that the source of contamination of these substances is not the landfill, and facilities located outside its boundaries.

    - concentration of pollutants: PCB, SO4-ion, NO3 ion, Mg, V, Hg, Bedecreases with distance from the landfill, which may indicate that the source of contamination is the landfill.

    .

  • OCTOBER: Temporal Pits

    Контроль грунтов временных карт

  • OCTOBER: Temporal PitsSample № / material

    As Cd Cu Hg Ni Pb Zn Benzapyren Mineral oil

    pH

    1-226Clay 100%

  • OCTOBER : 2 phase

    0,0000

    0,0200

    0,0400

    0,0600

    0,0800

    0,1000

    0,1200

    0,1400

    0,1600

    Network of channels in the landfillBorder chennelsurrounding area

    Phenol, mg/dm3

    Mineral oil,mg/dm3 *10

    Benzen, mg/dm3

    Toluol, mg/dm4

    Ethylbenzen,mg/dm3

    Xelen, mg/dm3

    0

    0,02

    0,04

    0,06

    0,08

    0,1

    0,12

    0,14

    3,4-Benz[a]pyrene,mg/dm3

    Phenol,mg/dm3*10 0

    Mineral oil,mg/dm3 *100

    Toluol, mg/dm4

    2,4-DDТ, mg/dm3

  • OCTOBER : 2 phase

    0

    50

    100

    150

    200

    250

    300

    Hg *1000

    Cr (VI) *1000

    Cd *10000

    Ni *1000

    Pb *10000

    As *10000

    Co *10000

    0

    200

    400

    600

    800

    1000

    1200

    borehole, Смах

    boreholsin thelandfill

    boreholsin the

    outsideborder

    borehols50 m fromthe landfill

    borehols350 m

    from thelandfill

    Na

    Mg

    К

    Ca

  • OCTOBER : discussionMINERAL company results 2014: TECHNOTERRA company results 2016:

    Groundwater. the concentration of the analyzed components appear to be stable. Excessive the maximum permissible concentration fixed only for the following components –phenols, manganese, iron, COD, sometimes revealed excess oil.

    Groundwater. the concentration of the analyzed components appear to be stable. Excessive the maximum permissible concentration fixed only for the following components –phenols, manganese, iron, COD, some anions, sometimes revealed excess oil.

    The surface water. Excessive concentrations marked by the same elements as in groundwater

    The surface water. Excessive concentrations marked by the same elements as in groundwater

    Soil. Identified excessive concentrations of soils of all the analyzed components. The most polluted area is located between the landfill Krasny Bor and old landfill.

    Soil. We are have not full information, but 2 sample of clay take from subsurface layer, is «clean»

  • OCTOBER : discussionComponent, mg/l GREENPIACE results 2015: TECHNOTERRA

    company results 2016:

    Mineral oil 0,71 0,0093 – 0,175Cd 0,0093 0,0063 – 0,0215Ni 0,17 0,005 – 0,05Sb 0,0051 0,0063 – 0,021Hg 0,00056

  • Summary of the previous reports

    The landfill is a potentially dangerous object

    Of most concern are the following:

    - open pits No. 64, 68 (the inflow of rainwater/a small reserve of free volume; defects of pits dam);

    - The main way of pollution spreading is the transport of pollutants via surface and surface-drainage waters;

    - the necessity of regular environmental monitoring within the boundaries of the landfill and around it.

  • Opinion

    Feel #1

    Step/ problem Recomendation 1. The beginning of the work It is right!!! To continue the works

    2. Plan of the work : strategic aims, tactic steps, safety measures

    To continue the consultation of scientific and technical Council

    Upgrade or new construction of multistage wastewater treatment plant

    3. Monitoring plan To continue the works

    4. Monitoring components Use HELCOM recommendation ( for example : CCl4 ?)

    5. A lot of contractors - a lot of information about pollution and the environment – need one data base

    Design GIS project,mathematical modeling of the «multivariation accident»

    6. See information distributed in time and space Prepare and publication articles (magazine, web)

    7. Revision deep monitoring well at the landfill To close a deep boreholle or made a small hole (3-5 m)

    Krasny Bor: May – October 2016Summary of the previous reportsSchedule :МАY :PILOT WORK AT THE OPEN PITS�Slide Number 5MAY : depth measurementMAY : samplingMAY : bottom sediment sampling МАY: test of the wasteMAY: defects of the damMAY: defects of the damJUNE: soil air (gas)JUNE 1 phase: �points of monitoringMonitoring: parameters 1 phaseJULAY:Ground water sampling from the boreholeDynamics of water level in the borehole��� Summary statistical characteristics of the pollutants of groundwaterAUGUST:Border channelSEPTEMBER:Monitoring: parameters 1/2 phase�Monitoring: components 1/2 phaseContamination of surface waterOCTOBER: Temporal PitsOCTOBER: Temporal PitsOCTOBER : 2 phaseOCTOBER : 2 phaseOCTOBER : discussionOCTOBER : discussionSummary of the previous reportsOpinion