西九龍總站介紹 - legco.gov.hk · 2009.11.17 p. 2 柯士甸站 九龍站 西九文化區...
TRANSCRIPT
-
2009.11.17 P. 1
Briefing on the Planning of the West Kowloon Terminus
CB(1)423/09-10(01)
-
2009.11.17 P. 2
Location of the West Kowloon Terminus
-
2009.11.17 P. 3
Location of the West Kowloon Terminus
-
2009.11.17 P. 4
Transportation Modes to the WKT
WKT
Concourse
/Taxi/ Private Car
//
Bus/ GMB/ Coach
33% 12%
40%10%
Walk
5%
Departure Hall
Arrival Hall
KOW
AUS
50%
Platform
-
2009.11.17 P. 5
To PTI/ Bus / GMB/ Coach
To Taxipick up
To AUS
Platform Level
Departure Level
Arrival Level
Ticket Hall
Ground Floor
To WKCD
Station Arrival & Departure Flow
ARRIVAL PEDESTRIAN FLOW
PLATFORM AREA
CIQ HALL & OFFICES
BACK OF HOUSE
PROPERTY CARPARK
STATION CARPARK
DEPARTURE PEDESTRIAN FLOW
-
2009.11.17 P. 6
From AUS
From Taxi drop off
To PTI/ Bus / GMB/ Coach
Platform Level
Departure Level
Arrival Level
Ticket Hall
Ground Floor
To WKCD
Station Arrival & Departure Flow
ARRIVAL PEDESTRIAN FLOW
PLATFORM AREA
CIQ HALL & OFFICES
BACK OF HOUSE
PROPERTY CARPARK
STATION CARPARK
DEPARTURE PEDESTRIAN FLOW
-
2009.11.17 P. 7
11-Nov-09
The Depressed Road System
Legend:
At grade traffic within the WK Reclamation Area
Underground Through-Lane bypassing WK Reclamation Area
Underpass connecting Primary Distributors
WKT Site
Lin
Che
ung
Roa
d U
nder
pass C
anton Road
Road D
1A(N
)Road D1A(S)
Road D
1
Austin Road West Underpass
At Grade Traffic
Lin
Che
ung
Roa
d U
nder
pass C
anton Road
Road D
1A(N
)Road D1A(S)
Road D
1
Austin Road West Underpass
Undergrounf Through-LaneBypassing WK Reclamation Area
Lin
Che
ung
Roa
d U
nder
pass C
anton Road
Road D
1A(N
)Road D1A(S)
Road D
1
Austin Road West Underpass
Underpass Connecting Primary Distributors
-
2009.11.17 P. 8
Forecourt of the Entrance Hall
-
2009.11.17 P. 9
BLandscaped Deck covering the PTI at Site B
Site B: Permanent PTI/
Landscape Deck
Site A:West Kowloon
Terminus (WKT)
Jordan Road
Austin Road
Lin
Che
ung
Roa
d
Road D1A
Road D1
Austin Road
Northern OpenSpace
To WKT
Open Space
Landscaped Deck
To Jordan
To existing residential
blocks
To Sorrento
N
AA
Section A-A
Reprovisioned PTI
Lin Cheung
Road
Landscaped Deck
-
2009.11.17 P. 10
Jordan Road
Austin Road
Lin
Che
ung
Roa
d
Road D1A
Road D1
Austin Road
7
4
5
6
3
2
1
S2
S1
PTI and Man Cheong Buildings etc
WKT and the south of AUS
WKT and the north of AUS
WKT and PTI at north of Jordan Road
WKT and the northeast corner of Elements
WKT and the east part of Elements
WKT and the southeast corner of Elements
Connecting Location
Footbridge
1
2
3
4
5
6
7
Connectivity Network
Footbridge Subway
At-grade Walkway
-
2009.11.17 P. 11
Connectivity Network
-
2009.11.17 P. 12
To Austin Station
AUS
AUS
FB6
FB5
Subway
At-grade Link
WKT
-
2009.11.17 P. 13
FB6
(/)To Austin Station (Footbridge / At-grade Routes)
FB6
FB5
FB5
At-grade
-
2009.11.17 P. 14
()To Austin Station (Subway)
Subway
Subway3 affected Station kiosks to be vacated when required for subway construction
-
2009.11.17 P. 15
()To Kowloon Station (Footbridges)
-
2009.11.17 P. 16
()At-grade Connectivity (Traffic Free)
-
2009.11.17 P. 17
Thank You