INTERNATIONAL MINING CO. S.A.
G RUPO MINERO LA CHOJLLA
SECCION - PROYECTO
1.- MEDICION LINEAL Mineral 2.8N MEDIDO CONTRA AVANCE AREA VOLUMEN
Ctto (m) (m) (m) (m2) (m3)
-150 VETA - 8c N CHIM. Corta S/RAJO V-8 Explotacin WILMER HUANCA 3.60 0.00 3.60 1.10 3.97 11 Concluido Med, 30 Enero 2016 - ORE-150 VETA - 8c N INTERM. S/RAJO V-8 Explotacin WILMER HUANCA 1.40 0.00 1.40 1.94 2.71 8 Concluido Med, 30 Enero 2016 - ORE
-150 V. CUADRO NIV-150 RECONOC. - CRD NORTE Rec.Horizontal ANDRES QUISPE 4.40 0.00 4.40 4.40 19.36 54 6.50m ceja del XC Cuadro Med, 01 Feb. 2016 - Waste
9.40 TOTAL 26.04 73
2.- RAJOS SHRINKAGE P.E. Mineral 2.8N AREA ANCHO FACTOR VOL.
Ctto (m2) (m) INCLIN. (Total)
-1 50 VET A - 8 c N Rajo- Longitudinal-Shrinkage Explotacin Wilmer Huanca M. 35.60 0.81 90 28.84 Med, 30 Enero 2016 - ORE
-150 VETA - 8c N Rajo- Longitudinal-Shrinkage Explotacin Lus Quispe 50.00 0.54 90 27.00 Med, 01 Febrero 2016 - ORE
VETA - 8c N Rajo- Longitudinal-Shrinkage Explotacin Lus Quispe 24.34 0.86 90 20.93 Med, 01 Febrero 2016 - ORE
-120 VETA- 4cc Rajo- Longitudinal-Shrinkage Explotacin Juan Carrizales M. 13.20 0.80 90 10.56 Med, 30 Enero 2016 - ORE
TOTAL 87.33
V ol um en Mi ne ra l E st r il T ot al O +W
113 263 54 317
Chojlla 01 Febrero de 2016
. .
Vo. Bo. GENERENTE MINA CHOJLLA SECCION PROYECTO
Ing. Waldo Paita
Cc.Arch.
Cc.Gerencia Mina
RESUMEN MOVIMIENTO DE CARGA EN
TONELADAS METRICAS
Ing. Daro Ajomado I.
Obs.Mineral
80.74
75.60
29.57
244.52
58.61
NIVEL VETA PARAJE LABOR CONTRATISTATMBH
INFORME MEDICION ENERO - 2016"SECCION MINA"
NIVEL VETA PARAJE LABOR CONTRATISTATMBH
MineralCONTRA NUEVA Obs.
Pgina 1