Use of Phasor (PMU) Measurements in State EstimatorMani Subramanian

ABB Network Management

©AB

B In

c.

5/11

/200

7-Sl

ide

2

ABB - Proprietary and Confidential Information

State EstimatorWith PMU Data

ExistingState Estimator

PMU

RTU

RTU

PMU

PMUSCADA

Front-End/PCU400 SCADA RTDB

PHASORS

WAMS

⎥⎦

⎤⎢⎣

⎥⎥⎥

⎢⎢⎢

⎡−−−−=

⎥⎥⎥

⎢⎢⎢

⎡−−−

H

H

z

z

PMU

TRAD

PMU

TRAD

Phasor Data Models

Transmission of Phasor Data into SCADA RTDB

PhasorData

Technological Solution to Phasor DataIntegration in State Estimation

Application Integration

Use of Phasor (PMU) Measurements in State Estimator

©AB

B In

c.

5/11

/200

7-Sl

ide

3

ABB - Proprietary and Confidential Information

Wide Area Monitoring - Local Measurements in Substations

Example: 400 kV S/Sdouble line / double busbar

CT‘s: high accuracy in small current values requires connection to measurement cores

©AB

B In

c.

5/11

/200

7-Sl

ide

4

ABB - Proprietary and Confidential Information

One PMU heregives state of 4 buses.

EII

I

SE using state vectors

CONFIDENTIAL

©AB

B In

c.

5/11

/200

7-Sl

ide

5

ABB - Proprietary and Confidential Information

Timestamp accuracy: 1 microsecondAbsolute angle accuracy error: < 0.1 degreeCT/VT: 0.2 …0.5%

Highly accurate Phasor Measurements…

…provide the basis for WAM / WAP

©AB

B In

c.

5/11

/200

7-Sl

ide

6

ABB - Proprietary and Confidential Information

Technical Highlight Time-aligned and synchronized PMU data are used by SE.

Integrated the following PMU data in SE:Voltage angle on a bus 1/

Voltage angular difference between two buses 2/

Voltage magnitude on a bus

Current angle on a branch 1/

Power factor angle on a branch 2/

Current magnitude on a branch

Estimated the artificial reference angle for the PMU measurementsystem 1/

Integrated PMU in the robust Orthogonal SE solution algorithm1/ An invention disclosure has been filed on this feature2/ Another invention disclosure has been filed on this feature

©AB

B In

c.

5/11

/200

7-Sl

ide

7

ABB - Proprietary and Confidential Information

Addition of PMUs

PMUs were artificially deployed in the baseline power system with increasing levels of penetrations (LOPP).

PMUs were installed in higher voltage substations. The rationale behind this approach is to mimic the way utilities will deploy PMUs.

A total of 143 PMUs were deployed corresponding to 470 phasordata analog points defined in the Oracle data source DB.

This consists of mixture of absolute values such as voltage and current angles, and difference values such as voltage angle difference and power factor angles. Current magnitudes were also defined.

©AB

B In

c.

5/11

/200

7-Sl

ide

8

ABB - Proprietary and Confidential Information

Improved Accuracy in State Estimation

Number of PMUs

Stan

dard

Dev

iatio

n of

PO

WER

FLO

W E

RR

OR

S

Traditional State Estimator

Immediate Improvement inState Estimation Accuracy

Phasor-Assisted State Estimator

PMUPMU

PMUPMU