06 millau 2005 - add beton d...millau viaduct maurer söhne head office frankfurter ring 193,...

1
Millau Viaduct Maurer Söhne Head Office Frankfurter Ring 193, D-80807 München P.O. Box 44 01 45, D-80750 München Phone: ++49/89/32394-0 Fax: ++49/89/32394-306 eMail: [email protected] Internet: www.maurer-soehne.de Maurer Söhne Main Branch Office Zum Holzplatz 2, D-44536 Lünen Postfach 63 40, D-44520 Lünen Phone: ++49/231/43401-0 Fax: ++49/231/43401-11 Maurer Söhne Subsidiary Plant Kamenzer Str. 4-6, D-02994 Bernsdorf Postfach 55, D-02992 Bernsdorf Phone: ++49/35723/237-0 Fax: ++49/35723/237-20 photo: EIFFAGE TP photo: EIFFAGE TP Motorway A75 in France / crossing of the river Tarn valley MAURER Launching devices: 64 synchronically controlled MSM ® launching devices to forward the two parts of the superstructure from the abut- ments with a step size of 600 mm into their final position MAURER Bearing system: 32 MSM ® and CM1 spherical bearings, vertical load = 120,000kN each, equipped with a special sliding material MAURER Expansion joints: 2 Swivel Joist Expansion Joints type DS1040 respectively DS1200 movements: transverse ± 50 mm / longitudinal ± 520 mm, resp. ± 600 mm 06_Millau_2005 11.08.2005 8:14 Uhr Seite 1

Upload: others

Post on 25-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 06 Millau 2005 - ADD BETON D...Millau Viaduct Maurer Söhne Head Office Frankfurter Ring 193, D-80807 München P.O. Box 44 01 45, D-80750 München Phone: ++49/89/32394-0 Fax: ++49/89/32394-306

Millau Viaduct

Maurer Söhne Head Office

Frankfurter Ring 193, D-80807 München

P.O. Box 44 01 45, D-80750 München

Phone: ++49/89/32394-0

Fax: ++49/89/32394-306

eMail: [email protected]

Internet: www.maurer-soehne.de

Maurer Söhne Main Branch Office

Zum Holzplatz 2, D-44536 Lünen

Postfach 63 40, D-44520 Lünen

Phone: ++49/231/43401-0

Fax: ++49/231/43401-11

Maurer Söhne Subsidiary Plant

Kamenzer Str. 4-6, D-02994 Bernsdorf

Postfach 55, D-02992 Bernsdorf

Phone: ++49/35723/237-0

Fax: ++49/35723/237-20

ph

oto

: EIF

FAG

E T

P

ph

oto

: EIF

FAG

E T

P

Motorway A75 in France/crossing of the river Tarn valley

MAURER Launching devices:

64 synchronically controlled MSM® launching devices to

forward the two parts of the superstructure from the abut-

ments with a step size of 600mm into their final position

MAURER Bearing system:

32 MSM® and CM1 spherical bearings,

vertical load=120,000kN each, equipped with

a special sliding material

MAURER Expansion joints:

2 Swivel Joist Expansion Joints

type DS1040 respectively DS1200

movements:

transverse ±50mm/

longitudinal ±520mm, resp. ± 600mm

06_Millau_2005 11.08.2005 8:14 Uhr Seite 1