SPECIFICATION for
INDUCTION MOTOR(2300kW)
2012.10.24 For Approval
APPROVED BYCHECKED BY
-
7/23/2019 07 HM-20120718RPH051052_1
2/17
[ ]
( IP )
V
A
%
( )
/
CW CCW BI-Direction
\
HHI W230-131-1 A4(210mm X 297mm)
0
2
Rev. No.
2300 kW
DRILL SHIP TIRGER PROJECT Project No. 20120718RPH051~2 Quantity
Model No.or RFQ No HK-7711-05105/05106 Item No.
AC INDUCTION MOTOR DATA SHEET
Squirrel Cage
sets/Shi
GENERAL SPECIFICATION PERFORMANCE DATA
Frame Size 630
Enclosure(Protection)
Rated Output
Project Name
Type HRN3 635-88Y Number of Poles 8
Rated Voltage
TEWAC 55 Rotor Type
Method of Cooling IC86W Starting Method* VVVF(0~792rpm)
Current Full Load 2,495.0
660
Efficiency
96.0 %
95.6 %50% Load
Altitude
Rated Frequency 44.4
F Class
Less than
Temp. Rise at full load (by resistance method)
Number of Phases 3
Hz
600
95.9 %
at 1.0 S.F
Motor Location Indoor Outdoor 75% Load
50% Load
Insulation Class F B H Locked-rotor**
100% Load--
Relative Humidity Less than 95 %
Service Factor 1.0
Ambient Temp. 50 deg.C (Max.)
Duty Type Continuous S1
Power Factor(p.u)
0.84100% Load
0.71
75% Load 0.80
V10 Speed at Full Load
75 %
7336B
r.p.m
Full Load 3,394.2
%
Mounting B3 B5 V1
6044C3
660
External Thrust Not applicable Breakdown** 230
Bearing
Type Anti-friction Torque
DE/N-DE
kgm
kgm
Lubricant Grease(Gadus S2 V100 3) Locked-rotor**
Coupling Method Direct V-Belt Moment of Inertia (J)
Double
kgm
-- dB(A)
Load --
Applicable Standard
Aux. Yes
Application MAIN PROPULSION
Main Steel Cast Iron
No
Shaft Extension Single
Vibration
Area classification Non-Hazardous, Non-Seismic Permissible number of
Terminal
Box
Motor
Sound Pressure Level (No-load & mean value at 1m from motor)
time
Rotation(Viewed from DE)
HM-086078 14500 kg
time8 B 4.5/3.25
2.8 mm/sec(r.m.s)
IEC,ABS Paint
Cold --
Type of Ex-Protection N/A consecutive starts Hot --
ACCESSORIES SUBMITTAL DRAWING
1. Winding Temp. Detector (Pt 100 ) : 3EA / Phase Outline Dimension Drawing Motor Weight(Approx.)
2. Bearing Temp. Detector (Pt 100 ) : 2EA / Bearing V10
3. Space Heater : 230V, 800W
4. Water Leakage Detector : 1EA / Motor
REMARK
SPARE PARTS
1. Bearing (DE & N-DE) : 1Set / Ship
Date DSND CHKD CHKD
Note: Others not mentioned in this data sheet shall be in accordance with maker standard.
Above technical data are only design values and shall be guaranteed with tolerance of applicable standard.
Inspection and performance test shall be maker standard, if not mentioned.
* In case of Inverter-Fed Motor, performance data is based on sine wave tests.
** The data are based on rated voltage & frequency, and data are expressed as a percentage of full load value.
APPD
2011.04.23 J.C.SEOK - S.H.KO Y.S.KIM
-
7/23/2019 07 HM-20120718RPH051052_1
3/17
-
7/23/2019 07 HM-20120718RPH051052_1
4/17
-
7/23/2019 07 HM-20120718RPH051052_1
5/17
-
7/23/2019 07 HM-20120718RPH051052_1
6/17
-
7/23/2019 07 HM-20120718RPH051052_1
7/17
-
7/23/2019 07 HM-20120718RPH051052_1
8/17
-
7/23/2019 07 HM-20120718RPH051052_1
9/17
-
7/23/2019 07 HM-20120718RPH051052_1
10/17
-
7/23/2019 07 HM-20120718RPH051052_1
11/17
-
7/23/2019 07 HM-20120718RPH051052_1
12/17
-
7/23/2019 07 HM-20120718RPH051052_1
13/17
1/4
1. SCOPE
This procedure defines the painting and rust prevention procedure at shop.
But non-ferrous metal will not be painted.
2. SURFACE PREPARATION
2.1 Oil, grease and crayon marks will be cleaned off with solvent solution.
2.2 Shot blast cleaning will be carried out in accordance with provision of
"The steel structure painting council's specification SSPC-SP10/NACE NO.2
blast cleaning(Near White). 2.3 The surface profile height is defined as distance between the tops of
the highest peak and lowest adjacent rough, measured in a direction
perpendicular to the mean surface height plane.
2.4 Surface to be coated will be cleaned and dried before coating is applied.
2.5 Rust, weld spatter, mill scale and other surface contaminants will be
removed by the power tools and shot blasting.
2.6 The compressed air used for nozzle blasting will be free from the liquid
water or oil. Adequate separators and driers will be used so as to get
rid of condensation.
2.7 In principle, shot or sand blasting will be done only when the weather
condition allow the surface to remain dry after blasting and coating
for several hours (Min.4 Hours).
3. PROCEDURE
3.1 Detail painting procedures refer to attached data sheet.
3.2 Painting conditions.
3.2.1 The metal temperature shall be minimum 3 deg. C above the dew point temperature.
Air temperature : 5 ~ 40 deg. C
Air relative humidity : less than 85%
3.3 Related conditions
No paintings shall be applied outdoor when it is foggy, rainy or excessive
wind. If chemical contamination occurs in paint it should be removed by
by washing with water or solvent before painting.
No. : P-20120718/Rev.0PAINTING PROCEDURE FOR MOTOR
-
7/23/2019 07 HM-20120718RPH051052_1
14/17
2/4
4. APPLICATION DETAILS
4.1 Preparation of paintings
Paintings should be prepared for application according to the instructions.
Individual components of multi-component paintings must be stirred before
mixing. If the thinner is required, only designated thinner should be used
and thinning rate may be adjusted according to the job condition.
4.2 Application method
4.2.1 Airless spray may be most effective in obtaining specified thickness at once.
4.2.2 Keep the spray gun at constant distance and perpendicular to the surfaces.
4.2.3 Brush or roller should not be used. Required thickness shall be achieved by applying
several coats at indoor. No outdoor painting shall be allowed.
4.3 Application work
4.3.1 Welding seams, corners and edges should always receive a stripe coat
before full coating in order to obtain adequate film built.
4.3.2 Bolt jointing surroundings and flange matching faces should be blanked
off or otherwise protected from painting unless otherwise accepted.
4.3.3 Special care should be taken to gain uniform thickness.
4.3.4 Each coat should be allowed enough to dry and interval between coats.
4.4 Cleaning of tools
The application tools and equipments should be cleaned with the thinner
immediately after use.
5. INSPECTION
Before painting, the surfaces shall be inspected as following items.
- Surface cleaning as per SSPC SP1 - Surface preparations as per SSPC-SP10/NACE No.2
- Environmental condition (Air temperature, Air relative humidity)
After painting, the surfaces shall be inspected visually for wrinkle, swelling
and other harmful defects. Also the dry film thickness shall be measured according to SSPC PA2.
If repair coating is required, applicable surfaces shall be arranged by sand
paper and re coated with the same paint. Also repairing shall be in compliance with paint manufacturer
recommendation.
No. : P-20120718/Rev.0PAINTING PROCEDURE FOR MOTOR
-
7/23/2019 07 HM-20120718RPH051052_1
15/17
3/4
6. COATING REPAIR
6.1 Defective paint work will be removed, and the surface re-prepared and
repainted according to the original specifications.
6.2 Damaged parts on the coated surface will be cleaned by power tool and
touch-up with the same coating system as applied initially.
7. STORAGE OF PAINT
The storage area should be well ventilated and protected from sparks, flame,
direct exposure to sun or excessive heat, preferably located in isolated room.
Storage place shall have a temperature ranging from 10 to 40 deg.C.
No. : P-20120718/Rev.0PAINTING PROCEDURE FOR MOTOR
-
7/23/2019 07 HM-20120718RPH051052_1
16/17
4/4
8. PAINTING SYSTEM
8.1 Item : Motor ( Include Platform)
8.2 Painting schedule
POLYURETHANE
First or External and Brand : Korethan Primer UP171
Prime coat. internal Maker : KOREA CHEMICAL CO., LTD
surface of motor Dry film thickness : 35 micro-meter
Coating time : After preparation
surface
Coating method : spray and/or brush
POLYURETHANE
Finish coat. External surface Brand : Korethan Enamel UT 2578
of motor Maker : KOREA CHEMICAL CO., LTD
Color : 8 B 4.5/3.25
Dry film thickness : 40 micro-meter
Coating method : spray and/or brush
Curing method : Self Curing
Total Dry film thickness Min. 75 micro-meter
No. : P-20120718/Rev.0PAINTING PROCEDURE FOR MOTOR
-