1 southern hemisphere automated snow/ice (asi) gate 3 review appendix a september 14, 2010 southern...

24
1 Southern Hemisphere Southern Hemisphere Automated Snow/Ice (ASI) Automated Snow/Ice (ASI) Gate 3 Review Gate 3 Review Appendix A Appendix A September 14, 2010 September 14, 2010 Prepared By: Peter Romanov 1 and Ken Jensen 2 1 UMD/CICS 2 Raytheon MOS

Upload: sharleen-heath

Post on 18-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

1

Southern Hemisphere Southern Hemisphere Automated Snow/Ice (ASI) Automated Snow/Ice (ASI)

Gate 3 ReviewGate 3 ReviewAppendix AAppendix A

September 14, 2010September 14, 2010

Prepared By: Peter Romanov1 and Ken Jensen2

1 UMD/CICS2 Raytheon MOS

Page 2: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

2

ASI Gate 3 Review ASI Gate 3 Review Appendix A –Appendix A –

Review Entry and Review Entry and Exit Criteria Exit Criteria

Page 3: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

3

Entry # 1 - A Development Project Plan (DPP) has been written. The Gate 3 reviewers have access to the review version of the DPP.

Entry # 2 - A Project Status Report (PSR) has been written. The Gate 3 reviewers have access to the review version of the PSR.

Entry # 3 - A Gate 3 Document (G3D) has been written. The Gate 3 reviewers have access to the review version of the G3D.

Entry # 4 - A Project Baseline Report (PBR) has been written. The Gate 3 reviewers have access to the review version of the PBR.

ASI Gate 3 Review ASI Gate 3 Review Entry CriteriaEntry Criteria

Page 4: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

4

Exit # 1 - Project plan and DPP are satisfactory

Exit # 2 - Project status and PSR are satisfactory

Exit # 3 - Project baseline and PBR are satisfactory

Exit # 4 - Project risks are acceptable

Exit # 5 - Status of risk mitigation actions is acceptable

Exit # 6 - Project is ready for the Design phase

ASI Gate 3 Review ASI Gate 3 Review Exit CriteriaExit Criteria

Page 5: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

5

Entry # 1 - A Gate 3 Review Report (G3RR) has been written. The CDR reviewers have access to the review version of the PDRR.

Entry # 2 - A Development Project Plan (DPP) has been written. The CDR reviewers have access to the review version of the DPP.

Entry # 3 - An Operations Concept Document (OCD) has been written. The CDR reviewers have access to the review version of the OCD.

Entry # 4 - A Requirements Allocation Document (RAD) has been written. The CDR reviewers have access to the review version of the RAD.

Entry # 5 - An Algorithm Theoretical Basis Document (ATBD) has been written. The CDR reviewers have access to the review version of the ATBD.

Entry # 6 - A Software Architecture Document (SWA) has been written. The CDR reviewers have access to the review version of the SWA.

ASI Stage 1 CDR –ASI Stage 1 CDR –Entry Criteria # 1-6Entry Criteria # 1-6

Page 6: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

6

Entry # 7 - A Detailed Design Document (DDD) has been written for each software unit in the software architecture. The CDR reviewers have access to the review version of each DDD.

Entry # 8 - A Verification and Validation Plan (VVP) has been written. The CDR reviewers have access to the review version of the VVP.

Entry # 9 - A Project Status Report (PSR) has been written. The CDR reviewers have access to the review version of the PSR.

Entry # 10 - A Critical Design Document (CDD) has been written. The CDR reviewers have access to the review version of the CDD.

Entry # 11 - A Project Baseline Report (PBR) has been written. The CDR reviewers have access to the review version of the PBR.

ASI Stage 1 CDR –ASI Stage 1 CDR –Entry Criteria # 7-11Entry Criteria # 7-11

Page 7: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

7

Exit # 1 - G3 G3R "Conditional Pass" items have been satisfactorily disposed of.

Exit # 2 – G3R "Defer" items have been satisfactorily disposed of.

Exit # 3 – Stage 1 Operations concept and OCD are satisfactory.

Exit # 4 – Stage 1 requirements identification is satisfactory.

Exit # 5 - Stage 1 requirements analysis is satisfactory.

Exit # 6 - Stage 1 requirements traceability is satisfactory.

ASI Stage 1 CDR –ASI Stage 1 CDR –Exit Criteria # 1-6Exit Criteria # 1-6

Page 8: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

8

Exit # 7 - Stage 1 requirements tracking plan is satisfactory

Exit # 8 – Stage 1 algorithm theoretical basis and ATBD are satisfactory.

Exit # 9 – Stage 1 software architecture and SWA are satisfactory.

Exit # 10 – Stage 1 external interfaces are satisfactory.

Exit # 11 – Stage 1 s software detailed design and DDDs are satisfactory.

Exit # 12 – Stage 1 verification and validation plan and VVP are satisfactory

ASI Stage 1 CDR –ASI Stage 1 CDR –Exit Criteria # 7-12Exit Criteria # 7-12

Page 9: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

9

Exit # 13 – Stage 1 requirements allocation and RAD are satisfactory.

Exit # 14 – Stage 1 baseline and PBR are satisfactory.

Exit # 15 - Project risks and actions are acceptable.

Exit # 16 - Project status and PSR are satisfactory.

Exit # 17 - Project is ready for the Stage 1 Build phase

ASI Stage 1 CDR –ASI Stage 1 CDR –Exit Criteria # 13-17Exit Criteria # 13-17

Page 10: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

10

Entry # 1 - A Stage 1 Critical Design Review Report (CDRR) has been written. The SRR reviewers have access to the review version of the Stage 1 CDRR.

Entry # 2 - A Development Project Plan (DPP) has been written. The SRR reviewers have access to the review version of the DPP.

Entry # 3 - An Operations Concept Document (OCD) has been written. The SRR reviewers have access to the review version of the OCD.

Entry # 4 - A Requirements Allocation Document (RAD) has been written. The SRR reviewers have access to the review version of the RAD.

Entry # 5 - An Algorithm Theoretical Basis Document (ATBD) has been written. The CDR reviewers have access to the review version of the ATBD.

Entry # 6 - A Software Architecture Document (SWA) has been written. The SRR reviewers have access to the review version of the SWA.

Entry # 7 - A Detailed Design Document (DDD) has been written for each software unit in the software architecture. The SRR reviewers have access to the review version of the DDDs.

ASI Stage 1 SRR – ASI Stage 1 SRR – Entry Criteria # 1-7Entry Criteria # 1-7

Page 11: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

11

Entry # 8 - A Verification and Validation Plan (VVP) has been written. The CTR reviewers have access to the review version of the VVP.

Entry # 9 - A Users Manual (UM) has been written. The SRR reviewers have access to the review version of the UM.

Entry # 10 - An Operations Manual (OM) has been written. The SRR reviewers have access to the review version of the OM.

Entry # 11 - An Interface Control Document (ICD) has been written. The SRR reviewers have access to the review version of the ICD.

Entry # 12 - A System Description Document (SDD) has been written. The SRR reviewers have access to the review version of the SDD.

Entry # 13 - A System Maintenance Manual (SMM) has been written. The SRR reviewers have access to the review version of the SMM.

Entry # 14 - Pre-operational code units, external interfaces, ancillary data, and system test data have been integrated into a Stage 1 product processing system in the development environment. The SRR reviewers have access to the product processing system.

ASI Stage 1 SRR - ASI Stage 1 SRR - Entry Criteria # 8-14Entry Criteria # 8-14

Page 12: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

12

Entry # 15 - A Unit Test Plan (UTP) has been written. The SRR reviewers have access to the review version of the UTP.

Entry # 16 - A Unit Test Report (UTR) has been written. The SRR reviewers have access to the review version of the UTR.

Entry # 17 - A System Test Plan (STP) has been written. The SRR reviewers have access to the review version of the STP.

Entry # 18 - A Verification and Validation Report (VVR) has been written. The SRR reviewers have access to the review version of the VVR.

Entry # 19 - A System Readiness Document (SRD) has been written. The SRR reviewers have access to the review version of the SRD.

Entry # 20 - A Project Baseline Report (PBR) has been written. The SRR reviewers have access to the review version of the PBR.

ASI Stage 1 SRR - ASI Stage 1 SRR - Entry Criteria # 15-20Entry Criteria # 15-20

Page 13: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

13

Exit # 1 – Stage 1 CDR "Conditional Pass" items have been satisfactorily disposed of.

Exit # 2 – Stage 1 CDR "Defer" items have been satisfactorily disposed of.

Exit # 3 - The project plan and DPP are satisfactory

Exit # 4 - The Stage 1 requirements allocation and RAD are satisfactory.

Exit # 5 - The Stage 1 algorithm and ATBD are satisfactory.

Exit # 6 - The Stage 1 design documents (SWA and DDDs) are satisfactory.

ASI Stage 1 SRR –ASI Stage 1 SRR –Exit Criteria # 1-6Exit Criteria # 1-6

Page 14: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

14

Exit # 7 - The Stage 1 operations documents (UM, OM, ICD, SDD, SMM) are satisfactory.

Exit # 8 - The Stage 1 delivery procedures, tools, training, support services, and documentation available to the users are satisfactory.

Exit # 9 – Stage 1 system test results and VVR are satisfactory.

Exit # 10 - The Stage 1 project baseline and PBR are satisfactory.

Exit # 11 - The Stage 1 SRRR documents updated status of project risks and actions. The risk status is acceptable.

Exit # 12 - The integrated Stage 1 product processing system is ready for delivery to operations.

ASI Stage 1 SRR –ASI Stage 1 SRR –Exit Criteria # 7-12Exit Criteria # 7-12

Page 15: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

15

Entry # 1 - A Stage 1 System Readiness Review Report (SRRR) has been written. The CDR reviewers have access to the review version of the SRRR.

Entry # 2 - A Development Project Plan (DPP) has been written. The CDR reviewers have access to the review version of the DPP.

Entry # 3 - An Operations Concept Document (OCD) has been written. The CDR reviewers have access to the review version of the OCD.

Entry # 4 - A Requirements Allocation Document (RAD) has been written. The CDR reviewers have access to the review version of the RAD.

Entry # 5 - An Algorithm Theoretical Basis Document (ATBD) has been written. The CDR reviewers have access to the review version of the ATBD.

Entry # 6 - A Software Architecture Document (SWA) has been written. The CDR reviewers have access to the review version of the SWA.

ASI Stage 2 CDR –ASI Stage 2 CDR –Entry Criteria # 1-6Entry Criteria # 1-6

Page 16: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

16

Entry # 7 - A Detailed Design Document (DDD) has been written for each software unit in the software architecture. The CDR reviewers have access to the review version of each DDD.

Entry # 8 - A Verification and Validation Plan (VVP) has been written. The CDR reviewers have access to the review version of the VVP.

Entry # 9 - A Project Status Report (PSR) has been written. The CDR reviewers have access to the review version of the PSR.

Entry # 10 - A Critical Design Document (CDD) has been written. The CDR reviewers have access to the review version of the CDD.

Entry # 11 - A Project Baseline Report (PBR) has been written. The CDR reviewers have access to the review version of the PBR.

ASI Stage 2 CDR –ASI Stage 2 CDR –Entry Criteria # 7-11Entry Criteria # 7-11

Page 17: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

17

Exit # 1 - Stage 1 SR Stage 1 SRR "Conditional Pass" items have been satisfactorily disposed of.

Exit # 2 – Stage 1 SRR "Defer" items have been satisfactorily disposed of.

Exit # 3 – Stage 2 Operations concept and OCD are satisfactory.

Exit # 4 – Stage 2 requirements identification is satisfactory.

Exit # 5 - Stage 2 requirements analysis is satisfactory.

Exit # 6 - Stage 2 requirements traceability is satisfactory.

ASI Stage 2 CDR –ASI Stage 2 CDR –Exit Criteria # 1-6Exit Criteria # 1-6

Page 18: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

18

Exit # 7 - Stage 2 requirements tracking plan is satisfactory

Exit # 8 – Stage 2 algorithm theoretical basis and ATBD are satisfactory.

Exit # 9 – Stage 2 software architecture and SWA are satisfactory.

Exit # 10 – Stage 2 external interfaces are satisfactory.

Exit # 11 – Stage 2 s software detailed design and DDDs are satisfactory.

Exit # 12 – Stage 2 verification and validation plan and VVP are satisfactory

ASI Stage 2 CDR –ASI Stage 2 CDR –Exit Criteria # 7-12Exit Criteria # 7-12

Page 19: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

19

Exit # 13 – Stage 2 requirements allocation and RAD are satisfactory.

Exit # 14 – Stage 2 baseline and PBR are satisfactory.

Exit # 15 - Project risks and actions are acceptable.

Exit # 16 - Project status and PSR are satisfactory.

Exit # 17 - Project is ready for the Stage 2 Build phase

ASI Stage 2 CDR –ASI Stage 2 CDR –Exit Criteria # 13-17Exit Criteria # 13-17

Page 20: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

20

Entry # 1 - A Stage 2 Critical Design Review Report (CDRR) has been written. The SRR reviewers have access to the review version of the Stage 2 CDRR.

Entry # 2 - A Development Project Plan (DPP) has been written. The SRR reviewers have access to the review version of the DPP.

Entry # 3 - An Operations Concept Document (OCD) has been written. The SRR reviewers have access to the review version of the OCD.

Entry # 4 - A Requirements Allocation Document (RAD) has been written. The SRR reviewers have access to the review version of the RAD.

Entry # 5 - An Algorithm Theoretical Basis Document (ATBD) has been written. The CDR reviewers have access to the review version of the ATBD.

Entry # 6 - A Software Architecture Document (SWA) has been written. The SRR reviewers have access to the review version of the SWA.

ASI Stage 2 SRR – ASI Stage 2 SRR – Entry Criteria # 1-6Entry Criteria # 1-6

Page 21: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

21

Entry # 7 - A Detailed Design Document (DDD) has been written for each software unit in the software architecture. The SRR reviewers have access to the review version of the DDDs.

Entry # 8 - A Verification and Validation Plan (VVP) has been written. The CTR reviewers have access to the review version of the VVP.

Entry # 9 – An External Users Manual (EUM) has been written. The SRR reviewers have access to the review version of the EUM.

Entry # 10 - A System Maintenance Manual (SMM) has been written. The SRR reviewers have access to the review version of the SMM.

Entry # 11 - Pre-operational code units, external interfaces, ancillary data, and system test data have been integrated into a Stage 2 product processing system in the development environment. The SRR reviewers have access to the product processing system.

ASI Stage 2 SRR - ASI Stage 2 SRR - Entry Criteria # 7-11Entry Criteria # 7-11

Page 22: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

22

Entry # 12 - A Unit Test Plan (UTP) has been written. The SRR reviewers have access to the review version of the UTP.

Entry # 13 - A Unit Test Report (UTR) has been written. The SRR reviewers have access to the review version of the UTR.

Entry # 14 - A System Test Plan (STP) has been written. The SRR reviewers have access to the review version of the STP.

Entry # 15 - A Verification and Validation Report (VVR) has been written. The SRR reviewers have access to the review version of the VVR.

Entry # 16 - A System Readiness Document (SRD) has been written. The SRR reviewers have access to the review version of the SRD.

Entry # 17 - A Project Baseline Report (PBR) has been written. The SRR reviewers have access to the review version of the PBR.

ASI Stage 2 SRR - ASI Stage 2 SRR - Entry Criteria # 12-17Entry Criteria # 12-17

Page 23: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

23

Exit # 1 – Stage 2 CDR "Conditional Pass" items have been satisfactorily disposed of.

Exit # 2 – Stage 2 CDR "Defer" items have been satisfactorily disposed of.

Exit # 3 - The project plan and DPP are satisfactory

Exit # 4 - The Stage 2 requirements allocation and RAD are satisfactory.

Exit # 5 - The Stage 2 algorithm and ATBD are satisfactory.

Exit # 6 - The Stage 2 design documents (SWA and DDDs) are satisfactory.

ASI Stage 2 SRR –ASI Stage 2 SRR –Exit Criteria # 1-6Exit Criteria # 1-6

Page 24: 1 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010 Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix

24

Exit # 7 - The Stage 2 operations documents (EUM and SMM) are satisfactory.

Exit # 8 - The Stage 2 delivery procedures, tools, training, support services, and documentation available to the users are satisfactory.

Exit # 9 – Stage 2 system test results and VVR are satisfactory.

Exit # 10 - The Stage 2 project baseline and PBR are satisfactory.

Exit # 11 - The Stage 2 SRRR documents updated status of project risks and actions. The risk status is acceptable.

Exit # 12 - The integrated Stage 2 product processing system is ready for delivery to operations.

ASI Stage 2 SRR –ASI Stage 2 SRR –Exit Criteria # 7-12Exit Criteria # 7-12