1 Должность 18.10.2011 Mike Garcia CEO Franz Holy - COO 10 year Corporate Strategy

Upload: others

Post on 10-Aug-2020

20 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

1

Должность 18.10.2011Mike Garcia – CEO

Franz Holy - COO

10 year Corporate Strategy

Page 2: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

2Content

Vision-Status-Targets

Executive Summary

Description of Assets

Strategy for Asset Development

Overview

Iron Making

CoGeneration

Steel Plant

Structural Mill

Flat Mill

Page 3: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

3

Vision - Status - Targets VISION

Leading Producer of Vanadium

Profitable producer of Steel products

Produce Steel and Vanadium in a safe, clean and efficient way

STATUS1. Right Size for the Market, vertically integrated

(except coal)

2. Vanadium Products , unique and leading position

3. Steel Products

Optimize Capacities for Steel and Vanadium, Secure Mine Capacity 20 years+

Increase Output from 8 kt to 11 kt V

TARGET

Profitable at Import Parity price

Page 4: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

4

ACTION TIME,

Years

TARGET Output,

MT

PHASE 1

Increase production and sales

efficiency

2 Fixed costs lower 15%,

yield up 5%

0,9

Optimize and align capacity 5 3 of 6 Furnaces and 2 of

3 BOFs

1,1

PHASE 2

Double capacity 10 6 IP Furnaces and 3

BOFs

1,8

Executive SummaryTwo factors will mainly influence Evraz Highveld’s (EH) future development: Local market pegged to import parity

Forecasted development of South African and neighboring steel markets will experience moderate 5% yearly growth for the next 5-10 years

Strategy: achieve profitable steel product operations through increasing efficiency and doubling capacity in 10 years.

Page 5: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

5Major risks and mitigation plan

Risk Negative impact Mitigation plan

Labour Shortage of skills and strong unions

may lead to significant increase of

labour costs

Continue with in-house training and

retention programs as well as improvement

of safety and working conditions to become

employer of choice

Electricity Potential lack of energy, including the

risk of blackouts in the next 3-4 years.

Currently announced steep price

increases (75% over 3 years) may be

followed by more price increases

Co-generation project should insure near

self-sufficiency in electricity supply as well

as significantly improve emissions profile

Environmental Failure to comply with water/air/waste

regulations may result in temporary or

even permanent plant shutdown

Visible progress, sound environmental

plans as well as close co-operation with the

environmental authorities

Page 6: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

6

Description of the assetThe asset comprises a mine, Mapochs Mine (at Roossenekal, about 120 km northeast of theSteelworks) and the Steelworks itself (located in eMalahleni/Witbank, about 100 km east of Pretoria)

Evraz Highveld’s iron and steel works annually produce ~ 800 kt of steel blocks, where as

35% to manufacture structural sections and rails

50% to manufacture plates and coiled plates and sheets.

15% of the steel blocks is converted to cast billets/slabs to be sold for re-rolling

Other products of the iron and steel works are:

High grade vanadium slag used to produce Vanadium products

Titaniferous slag used in blast furnace operations to prolong furnace life

The mine and the Iron and Steel works consists of:

Mapochs Mine

A mining of high TiO2 (~12,8%) and V2O5 (~1,5%) bearing

Magnetite Ore with about 53% Fe

A new mining plan is presently under preparation

Page 7: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

7Description of the asset

Iron making:

13 pre-reduction kilns

7 electric smelting furnaces (3 OSB, 4 SAF), 6 in use

Steel plant:

4 Shaking ladles for vanadium extraction

3 Basic oxygen furnaces

2 Ladle Furnaces

4 Continuous casters

Vanadium Slag Processing Plant (grinding and packing)

Rolling Mills

1 Universal Structural Mill (330 kt/yr)

Combined Plate/Steckel Mill (480 kt/yr)

Due to the high titanium content of the magnetite ore it cannot be smelted in conventional blast furnaces.Evraz Highveld developed its own method of smelting the magnetite by pre-reduction in the Kilns (~ 45%),smelting and final reduction in Electric Furnaces with separation of Titanium Oxides and De-Vanadisation inthe Shaking Ladles. Then conventional BOF-Shop practice follows.

Page 8: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

8

Iron Plant

The main activities executed as part of the project have been:

Improving raw material qualities

Hot metal handling crane upgrade

Rail alignments in Hot Charge Area

Upgrade of Ironmaking Rail Infrastructure

Installation of Kiln Raw Gas Stack Caps

All work as per this project finished

Plant predictability & performance improvement

Page 9: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

9

Steel Plant

The main activities executed as part of the project have been:

Reline no.3 BOF

Replace lower hood section of no.3 BOF

Replace no1. BOF hood

Relign and align no.1 BOF trunnion and drive system

Crane gantry and rail repairs throughout the steel plant

Hot metal and block handling crane refurbishment

Refurbish Water Treatment Plants

Refurbish various Casting Machines

All work finished except BOF 3 hood change, which is still in progress

Plant predictability & performance improvement

Page 10: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

10

Structural Mill

The main activities executed as part of the project have been:

Machine URM Mill Stand, replace liners

Replace obsolete DC drives at the Roughing Mill area

Replace obsolete DC drives on RSM motors in 2011

All work as per this project finished

Flat Mill

The main activities executed as part of the project have been:

Hot shear modification and repairs

Refurbish cooling beds

Extensive cold shear maintenance

Exchange of obsolete high pressure pipe systems

All work as per this project finished

Plant predictability & performance improvement

Page 11: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

11

Plant predictability & performance improvement

Engineering Division

The main activities executed as part of the project have been:

Transformer, circuit breaker, income feeder upgrade and maintenance

Upgrade east 1 and 2 substations

Upgrade interplant rail infrastructure to 57 kg rails

Improvements in drainage systems and road repairs

All work as per this project done except rail upgrade which is about 50% finished

Rail upgrade was scheduled to commence till December

Page 12: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

12

Total costs within approved budget

All set targets within expected ranges, plants are ramping up. Improvements are permanently

monitored

Below as an example performance monitoring in Steel Plant

Plant predictability & performance improvement

86%

88%

90%

92%

94%

96%

98%

100%

Jan/1

0

Feb/1

0

Mar/1

0

Apr/1

0

May/1

0

Jun/1

0

Jul/1

0

Aug/1

0

Sep/1

0

Oct/1

0

Nov/1

0

Dec/1

0

Jan/1

1

Feb/1

1

Mar/1

1

Apr/1

1

May/1

1

Jun/1

1

Jul/1

1

Aug/1

1

Sep/1

1

% C

asts

to o

rder

Specification attainment

Cast to order Target (97% to order)

94.1

6%

94.4

9%

97.1

9%

96.5

7%

94.1

1%

95.1

2%

96.2

7%

95.8

3%

97.8

2%

70.00%

75.00%

80.00%

85.00%

90.00%

95.00%

100.00%

Steelplant Average Availability

Average Steelplant Availability

Target

Page 13: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

13

Strategy for Asset Development

Page 14: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

14

Re-shape Sales Channel Structure

Build new customer relations

Drastically improve process efficiencies and optimize production

portfolio and capacities

Overview of Strategy and Asset Development

Grow in South and southern Africa

Increase Market Share in growing ZA Market

Re-establish competitiveness based on Import parity prices

Re-establish and Improve Customer relationship

Market

Increase

Efficiencies

Implement Continuous Improvement and Lean Management Systems

Improve Ore quality delivered to Iron Plant

Improve Through-Yield losses by 5% (2 years)

Decrease Fixed Costs by 15% in 2 years (20% in 5 years)

Install proper monitoring and reporting tools

Improve Production Planning between Steel Plant and Mills

Optimize

Capacity and

Production

Costs for

maximum Mill

Output

De-bottleneck Mills for 1 mtpa rolled products

Match and optimize Mine, Iron and Steel capacities

Install CoGeneration (up to100 MW) to decrease costs,

dependancies and environmental footprint

Improve Quality of Steel and Final Product

Install preheating furnaces in front of IP to increase throughput and

reduce Energy consumption (only 3 Furnaces necessary for this

production level)

Convert Shaking Ladle Process to „NTMK“ Process (only 1-2

necessary for this production level)

Install De-S Unit

Operate 2 BOF‘s only for 1,1 Mio. t/a cast steel production

Add Cooling Beds and Dispatch facilities to enhance Mill Output

Double (initial)

Capacity

Increase Iron Production up to 1,9 mtpa

Increase CoGeneration up to 200 MW

Increase Mill output to 1,4 mtpa

Improve Product Portfolio to support Warehouse and

Direct Sales Initiatives

Install preheating furnaces for remaining IP Furnaces

Install additional De-S Unit

Operate 3rd (existing) BOF

Install Degassing Unit (RH or VD)

Built additional rolling capacity

Area/Phases Target Measure

Control and balance material flow throughout whole process

Improve yields and production efficiency

Minimize losses and out-of-aim production

Optimize Purchasing and Contractors handling

Phase 1

Phase 2

Page 15: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

15Iron Making

Steel Plant

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

10 9 1 2 3 4 5 6 7

8

Kilns

OSBSAF OSB OSBSAF SAF

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

SAF

Kilns

11 12

13

Steel Plant

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

10 9 1 2 3 4 5 6 7

8

OSB

Kilns

11 12

13

Kilns

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

1 2 3 4 5 6

Preheat Furnaces

OSB OSB OSB OSBOSB SAF2 3 4 5 61

Raw Material Blending Facility

КБ 5, 6 КБ 9, 10

ДП 5 ДП 6

П/п К-4

К-1 К-2 К-3

П/К-1 П/К-2 П/К-3

В/К-1 В/К-2

МНЛЗ-1 МНЛЗ-2 МНЛЗ-3 МНЛЗ-4

РБЦКСЦЦПШБ

ШПСБС КПС

Р ы н о к

7

Iron Mixer

Ladle on

Rail Save

~9 min.

Iron Ore

Metallization 10% ->

60%

Energy

Substantial

reduction

(1600->1000 kWh/t)

Output

0.86 -> ~1.9 Mtpa

Ecological

Solves emission

problem

Page 16: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

16

Co-Generation Project Evraz Highveld has the possibility of generating electrical power by means of energy rich flue gasses produced in its

operation.

Benefits at full (up to 200 MW) Capacity (Preliminary findings prior to full FS results):

Electrical Energy at a discounted rate

Reduction in water usage (13 Kilns) – 3000 Ml per year

Reduction/elimination in particulate matter (PM) emissions

Possibility to supply Hot Water for heating/sanitary/Water Treatment

Reduction in NOx and SOx emissions.

Project to be completed in 3 phases

Phase 1 : Pre Feasibility Study (PFS) (completed)

Basic engineering / concept generation

30% accurate cost estimate

Phase 2 : Definitive Feasibility Study (DFS)

Detailed Engineering Design

10% accurate cost estimate

Phase 3 : Project Execution

Procurement

Construction

Commissioning

Phase 1 Schedule

Flue Gas

Page 17: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

17

Blooms/Blocks

CCM #3 CCM #4 CCM #5CCM #2

LF #1

BOF #3BOF #1 BOF #2

SL #2 SL #3 SL #4SL #1

LF #2

Blooms/Blocks Blooms/Biilets Slabs

Flat millMarket salesStructural mill

Scrap

Blooms/Blocks

CCM #3 CCM #4 CCM #5CCM #2

LF #1

BOF #3BOF #1 BOF #2

SL DeV SL DeV

SL DeS/ReCSL DeS/ReC

LF #2

Blooms/Blocks Blooms/Biilets Slabs

Flat millMarket salesStructural mill

Scrap

Steelmaking development Target – to increase productivity/capacity by reducing tap-to-tap time

Main changes:

Exclusion of scrap from SL charge (decrease time spent to charge scrap into SL and decrease time spent to dissolve

scrap)

Launch of parallel processes of DeS/ReC/heating with BOF steelmaking

tap-to-tap

72 min -> 50 min

quality

-> additional

secondary steelmaking

abilities

SL scrap consumption

0.1 t /t -> 0 t /t

BOF scrap

consumption

0.15 t /t -> 0.2 t /t

Page 18: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

18Blooms from

continuous casting

Re-heat furnace

Break down mill

Hot saw mill

Dispatch Billets

Structural roughing

mill

Universal Roughing

mill

Edger

Combination

universal and

structural finishing

mill

Cooling Bed

Roller Straightening

machine

Rail gag press

Inspection Bed

Rail Dispatch

Section gag press

Piling Machines

Sections Dispatch

Hot Saw 1 & 2

Additional

Cooling Bed

Additional Piling

Machine

Additional

Crane

Structural Mill Long-Term Configuration

Capacity: 330 to 420 ktpa

The objective is to increase the plant capacity to

420 ktpa, by eliminating the designed

bottlenecks of the plant.

In order to achieve this, investment will be

needed to increase the capacity of the following

equipment:

one additional primary cooling bed

one additional automatic piling machine

one additional crane in the section bays

Future

Bottlenecks?

Page 19: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

19Flat Products Mill (480 to600 ktpa)

Requirements

Hot shear will need some work and

CAPEX to make it more reliable.

One burning bed will have to be converted

to a super heavy bed. Another super heavy

bed will have to be installed.

A large +15 ton forklift will have to be

purchased for handling of the extra

heavies, preferably with magnet power.

Steel quality would have to improve to

avoid extensive slow cooling. (Better

control throughout the steel making

process could cut it by half (to about

~35%)

180 mm and 250 mm

slabs from steel plant

slab caster

3 Flame cutting

beds:

Priest Pusher furnace

for plate rollingPriest walking beam furnace:

for coil rolling

High Pressure

Descaler

Tippins

4-High reversing plate mill

Cooling

bed

4-High hot leveller

Double side

trimmer & scrap

choppers:

Cutting width

4.76-16mm

Cross cut shear:

Cutting length

4-High cold

leveller

Plate for

dispatch

Cooling

bed

Hot Shear:

Cutting to

ordered length

Plate for

dispatch

Plate for

dispatch

Normalising

furnace:

normalising

Stock

3 Burning

Beds:

Flame cutting

to ordered size

Plasma Bed:

Flame cutting

to ordered

size

Vertical edging mill

Rotary Crop shear

Tippins 4-High reversing

Steckel mill with AGC,

coiler furnaces, coiler

drums and pinch rolls

50m laminar

flow cooling

system

Tippins upcoiler with

762mm mandrel

Coil for

dispatch

Tippins 2-high

temper mill:

Skinpassing and

inspection

Coil for

dispatch

16mm

2 Super

Heavy

Beds

15 ton Forklift

(pref. Magnet power)

Plate Line

Coil Line

Shear Line

Page 20: 10 year Corporate Strategy - Evraz Highveldevrazhighveld.co.za/annual_reports/191011 - Evraz... · 10 year Corporate Strategy. Content 2 ... Strategy: achieve profitable steel product

20

Thanks!