  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    1/15

    PIPE-SHOP

    JET

    PINTURA

    Manufacturing process of pipes

    The crane moves materials the courtyardfrom back room to easels in the entrance of

    the Jet, transports the materials of saida Jetcabin for entry of the pipe shop (easels andtrolley on Rails) and carries the pipe shopspool s to the storage yard.

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    2/15

    Entry and exit

    pipe Shop

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    3/15

    Project Pipe-Shop/Jet and painting

    Is a unit of manufacture of piping where the final product isspooling, that is the Union of tubes and connections performed on amanufacturing workshop (Pipe-Shop), with an innovative layoutdesign, focused on the concept of production line.

    Pipe-Shop

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    4/15

    O Jet system is intended for Painting and surface treatment ofpipes in continuous process, without aggressions to the healthof members and the environment.

    Project Pipe-Shop/Jet and painting

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    5/15

    Assumptions Adopted

    Fabrication of the largest possible quantities of piping in workshop (Pipe-

    Shop) minimizing the fieldwork. Computerization of the process through the use of specific software,

    integrating engineering, procurement, planning and quality assurance(SPOOLGEN/SISEPC).

    Manufacturing planning, matching the needs of the field using the materialsalready available.

    Enabling increased productivity and reduced costs for the customer, takinginto account the schedules with quality and safety.

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    6/15

    Implantao

    Incorporation of the Painting to the area of Jet-Pipe Shop.

    Deploy the following sequence of manufacture: Jet, painting, cutting,Beveling, pre-assembling, Welding, inspection and storage.

    Physical Division of the Pipe-Shop, according to the diameters of

    pipes and their materials (stainless steel). Functionality due to proximity of facilities.

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    7/15

    Layout of Jet cabins and painting

    Jet cabin shot

    shot through a Gathering of the endless screw.

    Machine supply Jet with bucket elevator cabin of exhaustsystem with Jet spray tank water supply mobile system ofmaterial

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    8/15

    Layout of Jet cabins and painting

    Painting cabin Painting booth with fume control system

    Mobile system of material supply

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    9/15

    Layout do PIPE-SHOP

    Cut and Bevel Area

    Is the area corresponds to 30% of the area of Pipe-Shop andhas the following equipment:

    Sierra tape Easels with tires for handling tubes

    Biseladeiras pneumatic and electrical Cutting machines and bevel cutting torches

    CORTE COM SERRA FITA CORTE SEMI-AUTOMTICO COM OXI-ACETILENICO

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    10/15

    Layout do PIPE-SHOP

    Area of Pre-Assembly

    Corresponds to 30% of the total area of the Pipe-Shop andis equipped as follows:

    Electric welding machines 250amp. Benches for pre-Assembly of SPOOL S Auxiliary equipment manufacturing

    DET. ACOPLAMENTO FLANGE COM CURVADISPOSITIVO AUXILIAR

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    11/15

    Layout of PIPE-SHOP

    The welding area

    Corresponds to 40% of the total area of the Pipe-Shop and is

    equipped with the following form:

    Welding machine for coated electrode and TIG processes

    Welding machine for MIG-MAG

    welding Machine for the process of milling arco-submerso

    tube type "Pandis Girus" auxiliaries.

    DETALHE DE SOLDA PROCESSO MAGPROCESSO DE SOLDA ARCO-SUBMERSO

    PANDIS GIRUS (EQUIP. PARAGIRAR SPOOL)

    PROCESSO DE SOLDA MAG.COM MESA GIRATRIA

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    12/15

    Comparison of Processes

    ACTIVITIES CONVENTIONAL INNOVATION

    1 Cut With blowtorch With Sierra tape

    2 Bevel With esmerilhadeira With electric andpneumatic biseladeiras

    3 Pr-assembly ofspool.

    Without auxiliary devicesof pre-Assembly

    With auxiliaries of pre-Assembly

    4 Welding Weld in TIGprocess/coated Electrode

    system manual (welder invarious positions)

    MIG-MAG weldingprocesses in

    Arc/Submerged spoolwith rotating with theGirus Pandis

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    13/15

    Advantages

    Benefits to members and to the environment

    Ergonomia

    Observation of aspect of comfort in the workplace, the design of the project of theinstallation;

    Height varied bench avoiding incorrect postures and facilitating the movement andtransport of materials;

    Project recovery lighting adapting the acceptable requirements iluminamento;

    All safety signs-Pipe Shop, warning about the risks;

    Installation of dressing with curtains transparent to non-ionizing radiation protection,solder, allowing you to view the service.

    Hearing health

    Reduction of noise levels as a function of automatic cutting and biselamento tubes,replacing the use of esmerilhadeiras.

    Emission of Particulates

    Deployment of blast cleaning and painting system within the patterns specified in theresolution CONAMA No. 013, which favours the use of steel shot;

    Closed system with reduced fugitive emissions of particulates.

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    14/15

    Advantages

    Benefits of the process

    Reduction of time between processes, depending on the logistics of theintegrated system;

    Elimination of the need to issue Invoices for the transport of materials;

    Optimization of controls and personnel involved in transport of materials;

    Use cycle shot up 100 times;

    Reduction of losses of pipes according to their best advantage by optimizingplans for cuts;

    Total control and traceability of materials applied;Quality assurance of final product, dimensional aspects of applying materials,welding and surface treatment.

  • 8/3/2019 101 PR 2000 PL 90 0001_B_Plano Construcao e Montagem English)

    15/15

    Resultados do Pipe-Shop

    Segurana

    QualidadeAutomatizao

    Reduo de custos