Option 4A
Section 4
Option 3C
Option 3B
Section 3
GILLESPIESWestgate House, 44 Hale Road, Hale, Cheshire, WA14 2EX
T: +44 (0)161 928 7715 E:[email protected]
Client:Key:
132 kV Overhead Line Route Options:Preferred RouteAlternative RoutesSection Separation IndicatorsRoute Options 100m Buffer
Initial Underground Route OptionsOswestry Substation CompoundWem Substation CompoundPossible Site Compound Locations
Project:
Drawing Title:
100m Line Route Options
M5405 North Shropshire Reinforcement Project
Drawn: Checked: Approved: SESGKC
Sheet Size:
Date:
Scale: 1:7,500 @A0
24/06/2016
A0 (1189mm x 841mm)
SP Manweb1 Atlantic QuayRobertson StreetGlasgowG2 8SPw: www.scottishpower.com
Created For:
© Crown copyright and database rights 2016 Ordnance Survey 0100031673 0 1 20.5
km
Drawing Ref: M5405 | 100 | 02
Page 3 of 3