3. sumber daya nasional.ppt

72
DEPARTEMEN DEPARTEMEN ESDM ESDM ENERGI FOSIL SUMBER DAYA CADANGAN PRODUKSI RASIO CAD/PROD (TAHUN)*) Minyak Bumi 56,6 miliar barel 8,4 miliar barel**) 348 juta barel 24 Gas Bumi 334,5 TSCF 165 TSCF 2,79 TSCF 59 Batubara 90,5 miliar ton 18,7 miliar ton 201 juta ton 93 Coal Bed Methane (CBM) 453 TSCF - - - *) Dengan asumsi tidak ada penemuan cadangan baru **) Termasuk Blok Cepu ENERGI NON FOSIL SUMBER DAYA KAPASITAS TERPASANG Tenaga Air 75.670 MW (e.q. 845 juta SBM) 4.200 MW Panas Bumi 27.000 MW (e.q. 219 juta SBM) 1.052 MW Mini/Micro Hydro 450 MW 84 MW Biomass 49.810 MW 300 MW Tenaga Surya 4,80 kWh/m 2 /day 8 MW Tenaga Angin 9.290 MW 0,5 MW Uranium 3.000 MW (e.q. 24,112 ton) untuk 11 tahun *) 30 MW *) Hanya di Kalan – West Kalimantan TSCF = trilyun square cubic feet CADANGAN DAN PRODUKSI ENERGI INDONESIA (2007)

Upload: ikhsan-rinaldi

Post on 17-Nov-2015

12 views

Category:

Documents


0 download

TRANSCRIPT

  • ELECTRIFICATION RATIONAD72,65%Sumut85.76%Sumbar68.75%Riau + Kepri63.15%Sumsel50.75%Bengkulu50.64%Babel69.27%Lampung49.23%Jakarta100%Banten58.44%Jabar63.40%Jateng63.77%Jambi47.03%Jogya74.37%Jatim63.67%Bali78.37%NTB30.48%NTT26.35%Kalbar53.74%Kalteng49.87%Kalsel67.38%Kaltim66%Sulut61.84%Gorontalo43.31%Sulteng51%Sultra43.88%Sulsel60.81%Malut54.15%Maluku58.06%Papua + Irjabar35.35%Rasio Elektrifikasi : 63.9%

    categoriy:

    > 60 % 41 - 60 % 20 - 40 %

    Year19801985199019952000200520062008Electrification Ratio8%16%28%43%53%62%63%64 %

  • PENGEMBANGAN ENERGI ALTERNATIF

  • PENGEMBANGAN ENERGI ALTERNATIFSektor Rumah TanggaPemanfaatan LPG menggantikan minyak tanahPemanfaatan Bahan Bakar GasPemanfaatan Briket Batubara untuk RT besar (asrama, pesantren, dll)Pemanfaatan BiogasPenggunaan BiokeroseneSektor IndustriPemanfaatan BatubaraPemanfaatan Gas (BBG,LPG)Pemanfaatan Bahan Bakar NabatiSektor TransportasiPeningkatan pemanfaatan gas (BBG, LPG)Pemanfaatan Bahan Bakar Nabati Pemanfaatan Energi Baru Terbarukan (Hybrid, Fuel Cell, Hidrogen)Sektor Pembangkitan ListrikPemanfaatan GasPemanfaatan Batubara melalui Program Percepatan Pembangunan PLTU 10.000 MWPemanfaatan Panas BumiPemanfaatan Bahan Bakar Nabati Pemanfaatan Tenaga Mikro Hidro dan Energi Baru Terbarukan lainnya (Tenaga Surya, Tenaga Angin dan Biomass)Pemanfaatan Energi Nuklir di masa depan

    Catatan : Roadmap untuk masing-masing kegiatan telah disusun

    DEPARTEMENESDM

    DESA MANDIRI ENERGI (DME)DME berbasis EBT lain non-BBN pada tahun 2007 sebanyak 79 desa (60% kebutuhan energi dipenuhi oleh EBT non-BBNENERGI SURYA Dikembangkan di seluruh wilayah Indonesia dengan prioritas kawasan Indonesia Timur dan rasio elektrifikasi rendah dengan pola terpusat atau tersebar Pola tersebar (SHS) dikembangkan pada desa-desa yang letak rumah-rumahnya terpencar dan pola terpusat dikembangkan pada desa-desa yang letak rumahnya mengumpul ENERGI ANGINTahun 2007 dikembangkan skala kecil (80 KW) di Nusa Penida (4 unit) dan Sangihe Talaud (2 unit) dan tahun 2008 di Selayar, Susel (2 unit)ENERGI AIR (MIKRO dan PIKOHIDRO)Tahun 2007 dikembangkan di Sulteng, Sumbar, Jateng, Jabar, Banten (7 lokasi)Tahun 2008 dikembangkan Mikrohidro masing-masing 1 unit di Sulbar, Gorontalo, Riau, Bengkulu,Kalsel, Kaltim, dan NTB. Adapun pikohidro mulai dikembangkan oleh beberapa instansi Pemerintah di daerah (TNI, Pemda, dll) dan swasta.

    PENGEMBANGAN ENERGI TERBARUKAN

  • LISTRIK DI ERA GLOBAL

    *

  • PUSAT PEMBANGKITTENAGA LISTRIKSALURANTRANSMISIPROSES PRODUKSI TENAGA LISTRIK DARI PEMBANGKIT TENAGA LISTRIK HINGGA SAMPAI KE KONSUMENGARDU INDUKINDUSTRIBESARJARINGAN TEGANGANRENDAH 220 VTRAFODISTRIBUSIJARINGAN TEGANGANMENENGAH 20 KVINDUSTRI KECILMALL / HOTELINDUSTRISEDANGRUMAH TANGGAPJU500 kV/150 kV/70 kVTrafo Penaik Tegangan pada GI PembangkitTeg.Generator 6 KV, 11 kV, 13,8 kV, 20 kVTrafo Penurun Tegangan

    *

  • *

  • KELISTRIKAN INDONESIA (Tahun 2009)Kapasitas Pembangkitan Tenaga Listrik 31 Maret 2009 : Total 30,268 GW, PLN 25,6 GW (85 %) IPP 4,568 GW (15 %).Saluran Transmisi : 34.000 kmsTrafo Gardu Induk 59.000 MVASaluran Distribusi 620.000 kmsTrafo Distribusi 34.000 MVAJumlah Pelanggan : 39,2 Juta

    Sumber : PT PLN (Persero), Agustus 2009, diolah kembali

  • INDUSTRI

    SISTEM PEMBANGKITGARDUSTEP-UPSISTEM TRANSMISISISTEM DISTRIBUSIGARDUSTEP DOWNRUMAHSOSIAL/PUBLIK

    PLTAPLTDPLTPPLTGPLTUPLTGUKONSUMEN

    TRAFOSTEP DOWN

  • JARINGAN TRANSMISIPanjang SUTET 500 KV : 1.356 KMsPanjang SUTT 150 KV : 3.982 KMsPanjang SUTT 70 KV : 1.503 KMs

    *

  • *

  • Jumlah Gardu Trafo Distribusisebanyak 42.901 buahKapasitas terpasang 6.521 MVA

    *

  • *

  • *

  • Panjang JaringanJTM : 28.474 kms

    Panjang Jaringan JTR : 51.433 kms

    *

  • SUMBER ENERGI FOSIL / TAK TERBARUKAN(Minyak Gas Bumi dan Batubara)

    *

  • SUMBER ENERGI TERBARUKAN(Hidro, Panasbumi, Angin, Matahari, Samudra, dan Sampah)

    *

  • PEMBANGKIT TENAGA LISTRIK

    Hasil Konversi Energi dari energi primer akan menghasilkan Energi sekunder yang berupa energi listrik melalui peralatanyang disebut Pembangkit Tenaga Listrik (PLT). PLT terdiri dari beberapa jenis, sesuai dengan klasifikasinya. Jenis- jenisPLT adalah sbb :

    Berdasarkan Energi yang dipakai :

  • PLTA SUTAMI105 MWPLTGU GRESIK1.578,78 MWPLTU GRESIK600 MWPLTU PERAK100 MW

    18.bin

    *

  • PEMBANGKIT TENAGA LISTRIK

    a. Energi Terbarukan : - Pembangkit Listrik Tenaga Air. - Pembangkit Listrik Tenaga Panas Bumi. - Pembangkit Listrik Tenaga Magma. - Pembangkit Listrik Tenaga Magma. - Pembangkit Listrik Tenaga Fotovoltaic - Pembangkit Listrik Tenaga Gelombang Laut. - Pembangkit Listrik Tenaga Angin. - Pembangkit Listrik Tenaga Pasang Surut. - Pembangkit Listrik Tenaga Biomassa.

  • PEMBANGKIT TENAGA LISTRIK

    b. Energi Tak Terbarukan : - Pembangkit Listrik Tenaga Diesel. - Pembangkit Listrik Tenaga Gas - Pembangkit Listrik Tenaga Uap ( Batubara/minyak ) - Pembangkit Listrik Tenaga Nuklir.

  • PEMBANGKIT TENAGA LISTRIK

    2. Berdasarkan Pembebanan : a. Pembangkit untuk Beban Dasar ( Base Load Plant) b. Pembangkit untuk Beban Puncak ( Peak Load Power Plant).

    3. Berdasarkan Lokasi : a. Central Power Station b. Isolated Power Location.

  • PEMBANGKIT TENAGA LISTRIK

    Setiap Pembangkit Tenaga Listrik akan mengalamipenurunan efisiensi karena pengaruh usia dan waktuoperasi.Secara umum umur yang dapat diandalkan dari pembangkit tenaga listrik berkisar antara 20 sampai25 tahun.PLTD hanya berkisar antara 10 15 tahun.

  • HYDRO POWER PLANT

  • PUSAT LISTRIK TENAGA AIR

    Tenaga Listrik yang dapat dihasilkan tergantung dari :

    1. Debit Air (Q) m/dt. 2. Ketinggian jatuh air ( tinggi terjun ) H ( m ) Air dari reservoir ( bak penampung / bendungan dialirkan melalui penstok ( pipa pesat ). Tenaga Air yang dihasilkan :

    P = W. Q. H W = 1000 Kg/m3 : gravitasi air spesifik. Q = debit air ( m / detik ). H = tinggi terjun ( m ).

  • PUSAT LISTRIK TENAGA AIR ( PLTA )P = 1000 Q H kgm/dt

    = (1000 )/ (75) . Q H Daya Kuda ( HP ) = 13,33 Q H ( HP ) Tenaga tsb untuk memutar turbin air dengan efisiensi turbin t ,maka : Pt = t . 13,33 Q H (HP) Bila untuk memutar Generator dengan efisiensi g, maka Pg = t. g. 13,33 Q H ( HP ) = 0,746 .t. g. 13,33 Q H ( kW ) = 9,9 .t. g. Q H ( kW )

  • PUSAT LISTRIK TENAGA AIR ( PLTA )PERALATAN UTAMA PLTA

    1. Bendungan : - mengatur penyaluran air ke power house - membuat / mengatur tinggi terjun air. - penampung air. 2. Pipa Pesat ( Penstock ). - pipa yang menghubungkan dan mengalirkan air dari bendungan ke power house. - penstock tekanan air tinggi. - penstock tekanan air rendah.

  • PUSAT LISTRIK TENAGA AIR ( PLTA )PERALATAN UTAMA PLTA

    3. Turbin Air : - Turbin Impuls : rotor bekerja krn aliran air diubah kecepatan. - Turbin reaksi : rotor bekerja krn aliran air dengan tinggi terjun bertekanan. 4. Peralatan Listrik : generator dll.

  • TURBINGENERATOR pada PLTA

  • PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH)

  • Pusat-pusat Pembangkit Listrik(1)

    *

  • PUSAT LISTRIK TENAGA UAP ( PLTU )TURBIN UAP memutar GENERATOR LISTRIK.Uap dihasilkan dari Ketel Uap bertekanan tinggi.Bahan bakar didalam Ketel Uap, berupa : padat, cair atau gas.Air dipanaskan uap tekanan tinggi super heater ( pemanas lanjut ) turbin uap mempunyai sudu-sudu berputar karena energi panas yang berubah menjadi energi mekanis memutar generator energi listrik.

  • PUSAT LISTRIK TENAGA UAP ( PLTU )Tekanan uap keluar dari Turbin Uap berkurang dan volume bertambah kondenser air dingin uap basahtekanan rendah pemanas tekanan rendah pemanastekanan tinggi ke ketel uap melalui economizer.

  • PUSAT LISTRIK TENAGA GAS ( PLTG )Udara memasuki kompresor bersama bahan bakar ke ruang bakar proses pembakaran gas panas.Hasil pembakaran berfungsi sebagai fluida kerja memutar sudu-sudu turbin memutar generator yang dikopel dengan turbin tenaga listrik .Temperatur turbin gas ( 1000 C ) turbin uap ( 550 C )Efisiensi (20 30) % beaya modal rendah , beaya bahan bakar tinggi. Berfungsi untuk memikul beban puncak.

  • Pusat-pusat Pembangkit Listrik(2)

    *

  • PLTGU ( PUSAT LISTRIK TENAGA GAS & UAP )

    Ada 2 sistem PLTGU : - Bahan Bakar Gas

    - Bahan Bakar Batubara. Sistem bahan bakar gas : Gas untuk mengoperasikan turbin gas PLTG , Gas yang keluar dari turbin gas PLTG , memanaskan HRSG ( Heat Recovery Steam Generator ) yang nantinya akan menghasilkan uap panas untuk memutar turbin uap dan generator ( siklus PLTU ). ( PLTG Combined Cycle)

  • PLTGU ( PUSAT LISTRIK TENAGA GAS & UAP )

    Sistem Bahan bakar Batubara :

    Batubara dibakar terjadi proses Gasifikasi , gas yang terjadi untuk operasi PLTG. Selanjutnya Gas buang untuk memanaskan air di Ketel Uap sehingga menghasilkan uap air untuk mengoperasikan turbin uap dan memutar generator.

  • PLTN ( PUSAT LISTRIK TENAGA NUKLIR)

    Ada 4 jenis ditinjau dari jenis Reaktornya.

    1. Reaktor nuklir dengan pendingin gas. 2. Reaktor Air : - Air mendidih - Air bertekanan 3. Reaktor Air Berat 4. Reaktor Pembiak Cepat.

  • PLTN ( PUSAT LISTRIK TENAGA NUKLIR)

    Reaktor nuklir dengan Pendingin Gas. High Temperature Gas Cooled Reactors ( HTGCR ) Bahan bakar U 235 U 233 ( fisi )

  • PLTN ( PUSAT LISTRIK TENAGA NUKLIR)

    2. Reaktor Air light water ( H2 O ) a. Reaktor Air Mendidih , Boiling Water Reaktor (BWR) - kemungkinan uap/ air tercemar radiasi nuklir. efisiensi : 32 %. b. Reaktor Air Bertekanan, Pressurized Water Reactors ( PWR ).

  • PLTN ( PUSAT LISTRIK TENAGA NUKLIR)

    Reaktor Air Berat. Pressurized Heavy Water Reactors PHWR Mediatornya Air Berat ( D2O - Deuterium ), 1 proton, 1 elektron dan 1 neutron Harga 1 kg D2O $ 250 ( 1980 )

  • PLTN ( PUSAT LISTRIK TENAGA NUKLIR)

    Reaktor Pembiak Cepat. - Fast Breader Reactor ( FBR ). - Liquid Metal Fast Breader Reactor ( LMFBR ).

    U235 1 % U238 99 % yang ada dialam. U238 menyerap 1 neutron U 239 berubah menjadi Pu 239 menyerap 1 neutron Pu 240 labil pecah reaksi nuklir.

  • Pusat-pusat Pembangkit Listrik(3)CHP : Combined Heat and Power Combined Cycle Plant Diagram

    *

  • *

  • *

  • *

  • *

  • *

  • *

  • Chart2

    989.15705.0220044254425109402.9300377.29464.22

    989.15705.9118844254543109402.9300344.59402.22

    989.15705.9219094254352109402.9300356.69402.22

    989.15705.9318974254351109402.9300297.29279.22

    989.15705.7118994254326109402.9300321.59156.22

    989.15705.5118834254333109402.9300191.59156.22

    989.15706.1418814254411109402.9300122.79156.22

    989.15705.7318984264383109402.9300192.99217.22

    989.15704.9219054254391109402.9300272.29341.22

    989.15705.8218734264546109402.9300269.59526.22

    989.15704.6218734264131109402.9300153.49032.22

    989.15705.4618124263734109402.930008366.36

    989.15705.0417994253475109401.940018.28061.22

    989.1570518354253439110401.948010.67938.22

    989.1570420284253626110400.9520116.68554.22

    989.1570321994253909110400.9590196.38924.36

    989.1570422584304351110400.9600135.99417.36

    989.1570322704864507110400.9600135.79541.22

    989.1569722704874582110400.9600153.49664.22

    989.1569422454894566110404.9600141.19664.22

    989.1569523104894606110400.9600250.79664.22

    989.1569522094884647110400.9600140.99664.22

    989.1570323014884342110400.9600333.89541.22

    989.1570322294884266110400.960013.39179.72

    989.1570421574884159110400.9600218.88933.22

    989.1570422014874483110400.9600140.19155.72

    989.157042334.2495.374677110400.164.80175.559526.22

    989.157022409.7488.744667110434.169.6056.359772.22

    989.157032306.74894471110434.177.80380.859772.22

    989.157032267488.234452110434.1780391.259772.22

    989.157022266.4487.114401110434.178.10461.459772.22

    989.157052282.4498.064418110434.181.10474.559895.22

    989.157052244.6500.214486190434.1100.60486.1510265.22

    989.157032241.7506.984480327434.1150.50619.7510497.22

    989.157062348.6615.954739547557.1169.801037.4511463.22

    989.156502459.5643.054926821561.1200.201251.4512080.36

    989.156512447.1646.384952922.4562.1190.801199.9512141.36

    989.156522452644.444946923.7563.1191.801080.9512203.36

    989.156532459.7642.124922928.4563.1196.801081.512141.36

    989.156542457.2640.294908930.5562.1181.501040.812018.22

    989.156532470.6641.994869773.6562.1170.10977.711710.22

    989.156542459.1641.814836590.3562.1154.50930.111340.36

    989.15654.572454.4642.24399585.4561.1101.8072510985.36

    989.15654.72358.8578.274255566.7529.169.90759.610615.36

    989.15654.942207.3542.094163440453.129.5070410327.22

    989.15655.582182.9477.13960440460.129.60762.510019.22

    989.15653.772169.4469.493940440460.129.60851.49772.36

    989.15656.72093.54703929334460.129.60807.19526.22

    PLTA Dasar

    PLTP

    PLTGU Gas

    PLTU Gas

    B.BARA

    PLTGU BBM

    PLTU Minyak

    PLTG / D

    PLTG GAS

    PLTA Puncak

    Rencana

    1/2 Jam

    MW

    KOMPOSISI PEMAKAIAN ENERGI PRIMER

    Chart4

    989.15705.0220044254425109402.9300377.2

    989.15705.9118844254543109402.9300344.5

    989.15705.9219094254352109402.9300356.6

    989.15705.9318974254351109402.9300297.2

    989.15705.7118994254326109402.9300321.5

    989.15705.5118834254333109402.9300191.5

    989.15706.1418814254411109402.9300122.7

    989.15705.7318984264383109402.9300192.9

    989.15704.9219054254391109402.9300272.2

    989.15705.8218734264546109402.9300269.5

    989.15704.6218734264131109402.9300153.4

    989.15705.4618124263734109402.93000

    989.15705.0417994253475109401.940018.2

    989.1570518354253439110401.948010.6

    989.1570420284253626110400.9520116.6

    989.1570321994253909110400.9590196.3

    989.1570422584304351110400.9600135.9

    989.1570322704864507110400.9600135.7

    989.1569722704874582110400.9600153.4

    989.1569422454894566110404.9600141.1

    989.1569523104894606110400.9600250.7

    989.1569522094884647110400.9600140.9

    989.1570323014884342110400.9600333.8

    989.1570322294884266110400.960013.3

    989.1570421574884159110400.9600218.8

    989.1570422014874483110400.9600140.1

    989.157042334.2495.374677110400.164.80175.55

    989.157022409.7488.744667110434.169.6056.35

    989.157032306.74894471110434.177.80380.85

    989.157032267488.234452110434.1780391.25

    989.157022266.4487.114401110434.178.10461.45

    989.157052282.4498.064418110434.181.10474.55

    989.157052244.6500.214486190434.1100.60486.15

    989.157032241.7506.984480327434.1150.50619.75

    989.157062348.6615.954739547557.1169.801037.45

    989.156502459.5643.054926821561.1200.201251.45

    989.156512447.1646.384952922.4562.1190.801199.95

    989.156522452644.444946923.7563.1191.801080.95

    989.156532459.7642.124922928.4563.1196.801081.5

    989.156542457.2640.294908930.5562.1181.501040.8

    989.156532470.6641.994869773.6562.1170.10977.7

    989.156542459.1641.814836590.3562.1154.50930.1

    989.15654.572454.4642.24399585.4561.1101.80725

    989.15654.72358.8578.274255566.7529.169.90759.6

    989.15654.942207.3542.094163440453.129.50704

    989.15655.582182.9477.13960440460.129.60762.5

    989.15653.772169.4469.493940440460.129.60851.4

    989.15656.72093.54703929334460.129.60807.1

    PLTA Dasar

    PLTP

    PLTGU Gas

    PLTU Gas

    B.BARA

    PLTGU BBM

    PLTU Minyak

    PLTG / D

    PLTG GAS

    PLTA Puncak

    1/2 JAM

    MW

    BEBAN PUNCAK SISTEM JAWA BALI

    Chart1

    989.15705.0220044254425109402.9300377.29464.22

    989.15705.9118844254543109402.9300344.59402.22

    989.15705.9219094254352109402.9300356.69402.22

    989.15705.9318974254351109402.9300297.29279.22

    989.15705.7118994254326109402.9300321.59156.22

    989.15705.5118834254333109402.9300191.59156.22

    989.15706.1418814254411109402.9300122.79156.22

    989.15705.7318984264383109402.9300192.99217.22

    989.15704.9219054254391109402.9300272.29341.22

    989.15705.8218734264546109402.9300269.59526.22

    989.15704.6218734264131109402.9300153.49032.22

    989.15705.4618124263734109402.930008366.36

    989.15705.0417994253475109401.940018.28061.22

    989.1570518354253439110401.948010.67938.22

    989.1570420284253626110400.9520116.68554.22

    989.1570321994253909110400.9590196.38924.36

    989.1570422584304351110400.9600135.99417.36

    989.1570322704864507110400.9600135.79541.22

    989.1569722704874582110400.9600153.49664.22

    989.1569422454894566110404.9600141.19664.22

    989.1569523104894606110400.9600250.79664.22

    989.1569522094884647110400.9600140.99664.22

    989.1570323014884342110400.9600333.89541.22

    989.1570322294884266110400.960013.39179.72

    989.1570421574884159110400.9600218.88933.22

    989.1570422014874483110400.9600140.19155.72

    989.157042334.2495.374677110400.164.80175.559526.22

    989.157022409.7488.744667110434.169.6056.359772.22

    989.157032306.74894471110434.177.80380.859772.22

    989.157032267488.234452110434.1780391.259772.22

    989.157022266.4487.114401110434.178.10461.459772.22

    989.157052282.4498.064418110434.181.10474.559895.22

    989.157052244.6500.214486190434.1100.60486.1510265.22

    989.157032241.7506.984480327434.1150.50619.7510497.22

    989.157062348.6615.954739547557.1169.801037.4511463.22

    989.156502459.5643.054926821561.1200.201251.4512080.36

    989.156512447.1646.384952922.4562.1190.801199.9512141.36

    989.156522452644.444946923.7563.1191.801080.9512203.36

    989.156532459.7642.124922928.4563.1196.801081.512141.36

    989.156542457.2640.294908930.5562.1181.501040.812018.22

    989.156532470.6641.994869773.6562.1170.10977.711710.22

    989.156542459.1641.814836590.3562.1154.50930.111340.36

    989.15654.572454.4642.24399585.4561.1101.8072510985.36

    989.15654.72358.8578.274255566.7529.169.90759.610615.36

    989.15654.942207.3542.094163440453.129.5070410327.22

    989.15655.582182.9477.13960440460.129.60762.510019.22

    989.15653.772169.4469.493940440460.129.60851.49772.36

    989.15656.72093.54703929334460.129.60807.19526.22

    PLTA Dasar

    PLTP

    PLTGU Gas

    PLTU Gas

    B.BARA

    PLTGU BBM

    PLTU Minyak

    PLTG / D

    PLTG GAS

    PLTA Puncak

    Rencana

    1/2 Jam

    MW

    RENCANA & REALISASIBEBAN

    0000000

    Sheet1

    NERACA DAYA DAN ENERGI

    HARI : SELASA, 06 NOVEMBER 2001

    Beban Puncak:12,561MW

    &L&"Arial,Bold"&5Bopk2/&F/pud

    Sheet1

    989.15705.0220044254425109402.9300377.2

    989.15705.9118844254543109402.9300344.5

    989.15705.9219094254352109402.9300356.6

    989.15705.9318974254351109402.9300297.2

    989.15705.7118994254326109402.9300321.5

    989.15705.5118834254333109402.9300191.5

    989.15706.1418814254411109402.9300122.7

    989.15705.7318984264383109402.9300192.9

    989.15704.9219054254391109402.9300272.2

    989.15705.8218734264546109402.9300269.5

    989.15704.6218734264131109402.9300153.4

    989.15705.4618124263734109402.93000

    989.15705.0417994253475109401.940018.2

    989.1570518354253439110401.948010.6

    989.1570420284253626110400.9520116.6

    989.1570321994253909110400.9590196.3

    989.1570422584304351110400.9600135.9

    989.1570322704864507110400.9600135.7

    989.1569722704874582110400.9600153.4

    989.1569422454894566110404.9600141.1

    989.1569523104894606110400.9600250.7

    989.1569522094884647110400.9600140.9

    989.1570323014884342110400.9600333.8

    989.1570322294884266110400.960013.3

    989.1570421574884159110400.9600218.8

    989.1570422014874483110400.9600140.1

    989.157042334.2495.374677110400.164.80175.55

    989.157022409.7488.744667110434.169.6056.35

    989.157032306.74894471110434.177.80380.85

    989.157032267488.234452110434.1780391.25

    989.157022266.4487.114401110434.178.10461.45

    989.157052282.4498.064418110434.181.10474.55

    989.157052244.6500.214486190434.1100.60486.15

    989.157032241.7506.984480327434.1150.50619.75

    989.157062348.6615.954739547557.1169.801037.45

    989.156502459.5643.054926821561.1200.201251.45

    989.156512447.1646.384952922.4562.1190.801199.95

    989.156522452644.444946923.7563.1191.801080.95

    989.156532459.7642.124922928.4563.1196.801081.5

    989.156542457.2640.294908930.5562.1181.501040.8

    989.156532470.6641.994869773.6562.1170.10977.7

    989.156542459.1641.814836590.3562.1154.50930.1

    989.15654.572454.4642.24399585.4561.1101.80725

    989.15654.72358.8578.274255566.7529.169.90759.6

    989.15654.942207.3542.094163440453.129.50704

    989.15655.582182.9477.13960440460.129.60762.5

    989.15653.772169.4469.493940440460.129.60851.4

    989.15656.72093.54703929334460.129.60807.1

    PLTA Dasar

    PLTP

    PLTGU Gas

    PLTU Gas

    B.BARA

    PLTGU BBM

    PLTU Minyak

    PLTG / D

    PLTG GAS

    PLTA Puncak

    1/2 JAM

    MW

    BEBAN PUNCAK SISTEM JAWA BALI

    Sheet2

    34615966.43

    107221490

    17224070

    57053000

    6130400

    12559000

    11110800

    1791229

    0

    NERACA ENERGI

    Sheet4

    9464.229467.27

    9402.229433.46

    9402.229279.57

    9279.229207.18

    9156.229208.26

    9156.229069.06

    9156.229076.89

    9217.229136.68

    9341.229229.17

    9526.229351.37

    9032.228819.07

    8366.368208.51

    8061.227962.29

    7938.227963.65

    8554.228451.65

    8924.368991.35

    9417.369438.95

    9541.229661.75

    9664.229749.45

    9664.229699.15

    9664.229910.75

    9664.229739.95

    9541.229727.85

    9179.729259.35

    8933.229286.85

    9155.729575.15

    9526.229950.17

    9772.229926.64

    9772.229961.6

    9772.229912.73

    9772.229929.31

    9895.229992.36

    10265.2210135.81

    10497.2210452.18

    11463.2211710.05

    12080.3612501.45

    12141.3612560.88

    12203.3612443.14

    12141.3612435.77

    12018.2212363.54

    11710.2212107.24

    11340.3611817.06

    10985.3611112.62

    10615.3610761.22

    10327.2210183.08

    10019.229956.93

    9772.3610002.91

    9526.229769.15

    Rencana

    Realisasi

    1/2 Jam

    MW

    Rencana & Realisasi31 Desember 2000

    Sheet3

    HARI : KAMIS, 20 SEPTEMBER 2001

    Sheet3

    126945014

    70868001.43

    49892940

    PRODUKSI KwH SISTEM

    3423000

    4090000

    2514750

    2217700

    0

    12702490

    12278000

    0

    KwH dari Swasta

    NERACA DAYA DAN ENERGI000

    HARI : SELASA, 06 NOVEMBER 2001000

    Beban Puncak :12,561MWBeban Puncak :

    Beban Puncak :12,561MWBeban Puncak :

    &R&"Arial,Bold Italic"&5Pud/&F/&D

    989.15705.0220044254425109402.9300377.29464.22

    989.15705.9118844254543109402.9300344.59402.22

    989.15705.9219094254352109402.9300356.69402.22

    989.15705.9318974254351109402.9300297.29279.22

    989.15705.7118994254326109402.9300321.59156.22

    989.15705.5118834254333109402.9300191.59156.22

    989.15706.1418814254411109402.9300122.79156.22

    989.15705.7318984264383109402.9300192.99217.22

    989.15704.9219054254391109402.9300272.29341.22

    989.15705.8218734264546109402.9300269.59526.22

    989.15704.6218734264131109402.9300153.49032.22

    989.15705.4618124263734109402.930008366.36

    989.15705.0417994253475109401.940018.28061.22

    989.1570518354253439110401.948010.67938.22

    989.1570420284253626110400.9520116.68554.22

    989.1570321994253909110400.9590196.38924.36

    989.1570422584304351110400.9600135.99417.36

    989.1570322704864507110400.9600135.79541.22

    989.1569722704874582110400.9600153.49664.22

    989.1569422454894566110404.9600141.19664.22

    989.1569523104894606110400.9600250.79664.22

    989.1569522094884647110400.9600140.99664.22

    989.1570323014884342110400.9600333.89541.22

    989.1570322294884266110400.960013.39179.72

    989.1570421574884159110400.9600218.88933.22

    989.1570422014874483110400.9600140.19155.72

    989.157042334.2495.374677110400.164.80175.559526.22

    989.157022409.7488.744667110434.169.6056.359772.22

    989.157032306.74894471110434.177.80380.859772.22

    989.157032267488.234452110434.1780391.259772.22

    989.157022266.4487.114401110434.178.10461.459772.22

    989.157052282.4498.064418110434.181.10474.559895.22

    989.157052244.6500.214486190434.1100.60486.1510265.22

    989.157032241.7506.984480327434.1150.50619.7510497.22

    989.157062348.6615.954739547557.1169.801037.4511463.22

    989.156502459.5643.054926821561.1200.201251.4512080.36

    989.156512447.1646.384952922.4562.1190.801199.9512141.36

    989.156522452644.444946923.7563.1191.801080.9512203.36

    989.156532459.7642.124922928.4563.1196.801081.512141.36

    989.156542457.2640.294908930.5562.1181.501040.812018.22

    989.156532470.6641.994869773.6562.1170.10977.711710.22

    989.156542459.1641.814836590.3562.1154.50930.111340.36

    989.15654.572454.4642.24399585.4561.1101.8072510985.36

    989.15654.72358.8578.274255566.7529.169.90759.610615.36

    989.15654.942207.3542.094163440453.129.5070410327.22

    989.15655.582182.9477.13960440460.129.60762.510019.22

    989.15653.772169.4469.493940440460.129.60851.49772.36

    989.15656.72093.54703929334460.129.60807.19526.22

    PLTA Dasar

    PLTP

    PLTGU Gas

    PLTU Gas

    B.BARA

    PLTGU BBM

    PLTU Minyak

    PLTG / D

    PLTG GAS

    PLTA Puncak

    Rencana

    1/2 Jam

    MW

    RENCANA & REALISASIBEBAN

    34615966.43

    107221490

    17224070

    57053000

    6130400

    12559000

    11110800

    1791229

    0

    PRODUKSI KWH

    J a m00.3001.0001.3002.0002.3003.0003.3004.0004.3005.0005.3006.0006.3007.0007.3008.0008.3009.0009.3010.0010.3011.0011.3012.0012.3013.0013.3014.0014.3015.0015.3016.0016.3017.0017.3018.0018.3019.0019.3020.0020.3021.0021.3022.0022.3023.0023.3024.00

    rata-rata

    PLTA totalArea 1191919191919191919191919191919191919191918181818181818181818191919192227272727272727212117171717478,500474,862Jatiluhur3,423,000

    Area 239.739.739.739.739.739.739.739.739.739.739.739.739.739.736.533292925252525242424242223.823.823.825.525.527.234.23636.536.536.536.536.536.536.5424242424242814,300799,879SALAK S4,090,000

    Sglng60559559054555543037544053553043529025524534035032032533032534532035028034030529527564564565065556752064570069067067065065065059256360666868767311,860,50011,766,000WAYDU2,514,750

    Cirata1931712001852001941851861711881651452132152252972953073243173983094732233683764133143193133473573094737308508117147146986556094585224384895585329,073,0009,459,000DRAJAT 22,217,700

    Jatiluhur1421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421421423,408,0003,423,000DIENG0

    Area 364.0564.2564.1564.0564.0564.0563.4564.0564.3562.1562.0564.0564.3564.3563.5564.1559.9559.8559.7559.8560.1563.9564.1563.6563.8565.9566666565656570708497969696.1595.6569.9569.4569.5569.8570.2569.8569.8565.551,646,6501,685,144JPOWER12,702,490

    Mrica177.6176.7176.9177.6176.9177.9173.7177.3176.3163.8165.8175.4175.3175.7175.7176.3174.1175174.8174.4173.7174.1173.8173.8174.1120.31009864626564176176176177176177176.3172.1176.6173.5176.3175.6175.1121121.9121.93,794,1503,756,080P.PEC12,278,000

    Area 4212121212121212121212121212121212121212121212121212119.919.919.919.919.919.919.919.919.920.320.320.320.420.4202021.521.521.521.521.521.5497,900498,151CKRNG-S0

    Brantas10510593939393939393939393787883836547474757575757575788.888.873.391.7117.2116.3145.2154.8171.7190.8190.3187.3188.3188.3189.8191.8191.8191.8181.3181.3181.3181.32,746,6002,753,850

    1366.351333.651345.751286.351310.651180.651111.851182.051261.351258.651142.55989.151007.35999.751105.751185.451125.051124.851142.551130.251239.851130.051322.951002.451207.951129.251164.71045.513701380.41450.61463.71475.31608.92026.62240.62189.12070.12070.652029.951966.851919.251714.151748.751693.151751.651840.551796.2534,319,60034,615,966

    0

    PLTPSALAK P1581581581581581581581581581581581581581581581581581581581571581581581581581581581581581581581581581581581041061071081081081081081081081091071073,462,5003,687,100

    SALAK S1711711711711711711711711711711711711711711701701711701711701701701701701701701701691691691691701701691701701711711711711711711711711711711711714,091,5004,090,000

    KMJNG1341341341341341341341341341341341341341341341341341341261261261261341341341341341341341341341341341341341341341341341341341341341341341341341343,200,0003,391,320

    DRAJAT52.252.352.452.352.352.352.452.452.252.152.152.352.3525252525252525252525252525252525252525252525252525252525252.35252.252.252.352.21,250,4001,323,200

    WAYDU100.52101.51101.52101.53101.51101.01101.54101.03100.82101.52100.62101.06100.44101101100100100101100100100100100101101101100101101100101102101102101999999100100100100.47100.5100.44100.48100.47102.62,415,7952,514,750

    DRAJAT 289.389.18989.188.989.289.289.388.989.288.989.189.3898989898989898989898989898989898989908989908989898989888988.889.289.388.98989.92,137,8002,217,700

    DIENG00000000000000000000000000000000000000000000000000

    705.02705.91705.92705.93705.71705.51706.14705.73704.92705.82704.62705.46705.04705704703704703697694695695703703704704704702703703702705705703706650651652653654653654654.57654.7654.94655.58653.77656.716,557,99517,224,070

    0

    PLTGU GasPRIOK60760460561760960960760760259659561061064266069770470570370270470370470469871172572570570570370370269573072972372673373173573673473465165365565516,251,50016,535,000

    MKRNG44644544844845045045045144945145340940441444243844043843142742542542242642142441942342142142243443844244044244344244444744944544844644344744945010,491,00014,468,000

    GRESIK951835856832840824824840854826825793785779926106411141127113611161181108111751099103810661190.21261.71180.711411141.41145.41104.61104.71178.61288.51281.112841282.71279.21286.61278.11272.41178.81113.31082.91065.4988.525,458,40026,050,000

    057,053,000

    200418841909189718991883188118981905187318731812179918352028219922582270227022452310220923012229215722012334.22409.72306.722672266.42282.42244.62241.72348.62459.52447.124522459.72457.22470.62459.12454.42358.82207.32182.92169.42093.552,200,900

    0

    PLTU GasMKRNG10310310310310310310310310310310310310310310310310316116216416416416416316316316316316316316216216116116116116216016016016116116197979999993,227,5003,400,000

    GRESIK322322322322322322322323322323323323322322322322327325325325325324324325325324332.37325.74326325.23325.11336.06339.21345.98454.95482.05484.38484.44482.12480.29480.99480.81481.2481.27445.09378.1370.493718,708,9409,159,000

    425425425425425425425426425426426426425425425425430486487489489488488488488487495.37488.74489488.23487.11498.06500.21506.98615.95643.05646.38644.44642.12640.29641.99641.81642.2578.27542.09477.1469.4947011,936,44012,559,000

    0

    B.BARASRLYA24412550235423622335233924092412241125502383219922612276246426792843298830593049308331312989294528392978314431432951293128812895296729583109321132303217319431803146311128772759267326512663265366,936,50069,574,000

    PITON P46046847147246546646646546546647146344344444649449149449749149749249349549049350349349449450049749449650350050951151451451051347947647747747447811,632,00012,667,000

    JPOWER100710101011999100910121020990999101384265845340139941950351051150951051140841240950951051451051050451050950755860160260460160059859950450449832229528414,639,00012,702,490

    P.PEC51751551651851751651651651651743541431831831731751451551551751651345241442150352051751651751651651651956961461161461361461561353951651551050851412,132,50012,278,000

    442545434352435143264333441143834391454641313734347534393626390943514507458245664606464743424266415944834677466744714452440144184486448047394926495249464922490848694836439942554163396039403929105,340,000107,221,490

    0

    PLTGU BBMPRIOK00000000000000000000000000000000000000000000000000

    MKRNG00000000000000000000000000000000000000000000000000

    MTWAR0000000000000000000000000000000007015027127227327627820010010010150505001,120,500659,000

    TBROK1091091091091091091091091091091091091091101101101101101101101101101101101101101101101101101101101902573975505505505525524984154103903903903903345,161,0005,121,400

    GRATI000000000000000000000000000000000000100.4100.7100.4100.575.675.375.475.70000352,000350,000

    GRESIK00

    109109109109109109109109109109109109109110110110110110110110110110110110110110110110110110110110190327547821922.4923.7928.4930.5773.6590.3585.4566.74404404403346,633,5006,130,400

    0

    PLTU MinyakMKRNG1471471471471471471471471471471471471461461451451451451451491451451451451451451441781781781781781781782582582592602602592592592582261501571571574,183,5004,421,000

    PRIOK00000000000000000000000000000000000000000000000000

    TBROK225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.9225.92262262262262262262262262692732732732732732732732732732732732732735,749,7005,929,000

    GRESIK00000000000000000000000000000000000000000000000000

    PERAK303030303030303030303030303030303030303030303030303030.130.130.130.130.130.130.130.130.130.130.130.130.130.130.130.130.130.130.130.130.130.1721,100760,800

    402.9402.9402.9402.9402.9402.9402.9402.9402.9402.9402.9402.9401.9401.9400.9400.9400.9400.9400.9404.9400.9400.9400.9400.9400.9400.9400.1434.1434.1434.1434.1434.1434.1434.1557.1561.1562.1563.1563.1562.1562.1562.1561.1529.1453.1460.1460.1460.110,654,30011,110,800

    0

    PLTG / DPRIOK00000000000000000000000000000000000000000000000000

    PRIOK0

    SRAGI00000000000000000000000000000000034343536363636363637.618.70000187,650175,200

    CILACAP00000000000000000000000000000000001340373836.735.735.535.5000000135,700129,039

    GRESIK00000000000000000000000000000000000000000000000000

    GLTMR00000000000000000000000000000000000000000000000000

    GLMNK00000000000000000000000000000000000000000000000000

    PSGRAN222222222222222222222222324040404040404040404040404064.869.677.87878.181.183.283.285.486.686.786.786.282.175.175.156.443.421.721.721.721.71,141,150341,690

    PSRAN-D8888888888888812192020202020202020202000000017.433.337.438.631.131.137.927.723.57.97.87.87.87.97.97.9338,0001,145,300

    CKRNG-S0000000000000000000000000000000000000000000000000

    303030303030303030303030404852596060606060606060606064.869.677.87878.181.1100.6150.5169.8200.2190.8191.8196.8181.5170.1154.5101.869.929.529.629.629.61,802,5001,791,229

    0

    PLTG GASPRIOK00000000000000000000000000000000000000000000000000

    GRESIK00

    PLTA DASARSRAGI989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.15989.1523,739,6000

    PLTA Puncak377.2344.5356.6297.2321.5191.5122.7192.9272.2269.5153.4018.210.6116.6196.3135.9135.7153.4141.1250.7140.9333.813.3218.8140.1175.5556.35380.85391.25461.45474.55486.15619.751037.451251.451199.951080.951081.51040.8977.7930.1725759.6704762.5851.4807.110,580,0000

    0

    Total Beban9467.279433.469279.579207.189208.269069.069076.899136.689229.179351.378819.078208.517962.297963.658451.658991.359438.959661.759749.459699.159910.759739.959727.859259.359286.859575.159950.179926.649961.69912.739929.319992.3610135.8110452.1811710.0512501.4512560.8812443.1412435.7712363.5412107.2411817.0611112.6210761.2210183.089956.9310002.919769.15239,445,235

    9467.279433.469279.579207.189208.269069.069076.899136.689229.179351.378819.078208.517962.297963.658451.658991.359438.959661.759749.459699.159910.759739.959727.859259.359286.859575.159950.179926.649961.69912.739929.319992.3610135.8110452.1811710.0512501.4512560.8812443.1412435.7712363.5412107.2411817.0611112.6210761.2210183.089956.9310002.919769.15

    000000000000000000000000000000000000000000000000

    PLTA Dasar989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989989PLTA total34,615,96634,319,600

    PLTP705706706706706706706706705706705705705705704703704703697694695695703703704704704702703703702705705703706650651652653654653654655655655656654657B.BARA107,221,490105,340,000

    PLTGU Gas2,0041,8841,9091,8971,8991,8831,8811,8981,9051,8731,8731,8121,7991,8352,0282,1992,2582,2702,2702,2452,3102,2092,3012,2292,1572,2012,3342,4102,3072,2672,2662,2822,2452,2422,3492,4602,4472,4522,4602,4572,4712,4592,4542,3592,2072,1832,1692,094PLTP17,224,07016,557,995

    PLTU Gas425425425425425425425426425426426426425425425425430486487489489488488488488487495489489488487498500507616643646644642640642642642578542477469470PLTGU Gas57,053,00052,200,900

    B.BARA4,4254,5434,3524,3514,3264,3334,4114,3834,3914,5464,1313,7343,4753,4393,6263,9094,3514,5074,5824,5664,6064,6474,3424,2664,1594,4834,6774,6674,4714,4524,4014,4184,4864,4804,7394,9264,9524,9464,9224,9084,8694,8364,3994,2554,1633,9603,9403,929PLTGU BBM6,130,4006,633,500

    PLTGU BBM109109109109109109109109109109109109109110110110110110110110110110110110110110110110110110110110190327547821922924928931774590585567440440440334PLTU Gas12,559,00011,936,440

    PLTU Minyak403403403403403403403403403403403403402402401401401401401405401401401401401401400434434434434434434434557561562563563562562562561529453460460460PLTU Minyak11,110,80010,654,300

    PLTG / D30303030303030303030303040485259606060606060606060606570787878811011511702001911921971821701551027030303030PLTG / D1,791,2291,802,500

    PLTG GAS000000000000000000000000000000000000000000000000PLTG Gas0

    PLTA Puncak3773453572973221921231932722701530181111719613613615314125114133413219140176563813914614754866201,0371,2511,2001,0811,0821,041978930725760704763851807247,705,955239,445,235

    Rencana9,4649,4029,4029,2799,1569,1569,1569,2179,3419,5269,0328,3668,0617,9388,5548,9249,4179,5419,6649,6649,6649,6649,5419,1808,9339,1569,5269,7729,7729,7729,7729,89510,26510,49711,46312,08012,14112,20312,14112,01811,71011,34010,98510,61510,32710,0199,7729,526247,705,955

    Rencana9464.229402.229402.229279.229156.229156.229156.229217.229341.229526.229032.228366.368061.227938.228554.228924.369417.369541.229664.229664.229664.229664.229541.229179.728933.229155.729526.229772.229772.229772.229772.229895.2210265.2210497.2211463.2212080.3612141.3612203.3612141.3612018.2211710.2211340.3610985.3610615.3610327.2210019.229772.369526.22

    Realisasi9467.279433.469279.579207.189208.269069.069076.899136.689229.179351.378819.078208.517962.297963.658451.658991.359438.959661.759749.459699.159910.759739.959727.859259.359286.859575.159950.179926.649961.69912.739929.319992.3610135.8110452.1811710.0512501.4512560.8812443.1412435.7712363.5412107.2411817.0611112.6210761.2210183.089956.9310002.919769.15

    12560.8812,436294PJB 1126,945,014

    PJB 270,868,001

    2,071Swasta49,892,940

    247,705,955

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    0000000000

    PLTA Dasar

    PLTP

    PLTGU Gas

    PLTU Gas

    B.BARA

    PLTGU BBM

    PLTU Minyak

    PLTG / D

    PLTG GAS

    PLTA Puncak

    JAM

    MW

    PEMBEBANAN PEMBANGKIT

    0

    0

    0

    0

    0

    0

    0

    0

    0

    PRODUKSI KWH

    0

    0

    0

    0

    0

    0

    0

    0

    TJ 2000:

    lllll

    0

    0

    0

    xxxxx

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    Rencana

    Realisasi

    1/2 Jam

    MW

    Rencana & Realisasi

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    00000000000

    PLTA Dasar

    PLTP

    PLTGU Gas

    PLTU Gas

    B.BARA

    PLTGU BBM

    PLTU Minyak

    PLTG / D

    PLTG GAS

    PLTA Puncak

    Rencana

    MW

    JAM

    KURVA

    *

  • Beban Residensial

    Jam

    MW

    Beban Penerangan Jalan

    JamMW

    Beban Sistem

    Jam

    MW

    Kurva beban per-golongan tarif

    *

  • *

  • TASIKMALAYABDG SLNMDRCNCLGONBRAJACWANGMTWARBKASI

    A

    ACRATASGLNGUNGRNPDAN

    UKDR BRUNGMBNGKRIAN

    UGRSIKSBY SLT

    U

    PAITON

    GRATI

    CBNG

    CBATU

    G

    UDPOK

    KMBNG

    GDUL

    SRLYATJ. JATI

    RWALOGPETA JARINGAN 500 kV SISTEM KELISTRIKAN PULAU JAWAMADURA

    SUTET 500 kV PAITON - KEDIRISUTET 500 kV KEDIRI - PEDANSUTET 500 kV PEDAN TASIKMALAYASUTET 500 kV TASIKMALAYA DEPOK IIISUTET 500 KV NGIMBANG INCOMER

    SUTET 500 kV ASS. PLTGU MUARA TAWARKETERANGAN :GARDU INDUK (existing)GARDU INDUK (new)SUTET 500 kV (existing)SUTET 500 kV (pelaksanaan & rencana)PLTAPLTGU

    MUARA KARANG REPOWERING MKRG

    UWT. DODOL

    JAWA BALI CROSSINGMUARA TAWAR EXTENTION 600 MW KE GLMNK

    PROYEK-PROYEK TARGET INPRESS NO.5 TAHUN 2003.SUTET 500 KV PEDAN TASIKMALAYA SUTET 500 KV TASIKMALAYA DEPOK IIISUTET 500 KV TJ JATI B PWD UNGSUTET 500 KV GRATI SURABAYA SELATANPLTGU MUARA TAWAR 600 MW

  • IMPLEMENTASI PEMBANGKIT LISTRIK TENAGA ANGIN DAN PEMBANGKIT LISTRIK TENAGA SURYA SEL FOTOVOLTAIK UNTUK MENGGERAKKAN GEDUNG SETINGGI 420 meter 80 LANTAI DI DUBAI

  • *

  • *

  • *

  • Konsep Transportasi RUF(Rapid, Urban, Flexible)Mobil Listrik bisa berjalan diatas jalan biasa dan bisa juga berjalan diatas rel tunggal dengan kecepatan 100 km/jam sambil mengisi baterai (Dual Mode Electric), Mobil yang ramah lingkungan

    *

  • Ini adalah contoh KRL jenis monorail yang mungkin dapat diterapkan dan diadopsi untuk transportasi alternatif di kota yang padat penduduk dengan mobilitas yang cukup tinggi seperti Surabaya.

    *

  • Superspeed Maglev = MAGNETIC LEVITATION

    The superspeed maglev system Transrapid is an innovative track-bound transportation system for passenger and high-value cargo traffic at speeds between 300 to 500 km/h. It is the first fundamental innovation in railroad technology since the construction of the first railroad.

    *

  • The superspeed maglev system is propelled and braked by means of a long-stator linear motor. The method by which the linear motor functions can be derived from a conventional electric motor - the stator is cut open, stretched, and laid out along the entire length of the guideway on both sides.

    *

  • Alternating current in the cable windings generates an electromagnetic wandering field by which the train is pulled along without contact. By changing the intensity of the current, the thrust and speed of the train can be continuously varied. The motor can also be used as a generator which then brakes the train.

    *

  • .Only the route segment in whih a vehicle is moving is supplied with power.

    *

  • The Transrapid maglev system is the most flexible of all known means of transportation. The system can be used to advantage not only for long distances but also for short and medium distances in metropolitan areas with short intervals between stops and still provides short travelling times. And still the Transrapid represents the least additional stress in densely settled regions. The Transrapid is quieter, consumes less energy, carries both, passengers and freight, and can be adapted flexibly to the existing structures.

    *

  • *

    *

    **

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *

    *