Poročilo sekcije za hidrologijoza 2009
dr. Mira Kobold
SLOVENSKO ZDRUŽENJE ZA GEODEZIJO IN GEOFIZIKO
Ljubljana, 21. januar 2010
Analiza hidroloških parametrov porečja Reke za leto 2008
Klivnik in Mola v oktobru 2008PADAVINE ODTOK
0
2
4
6
8
10
12
1.4.2008 1.5.2008 31.5.2008 30.6.2008 30.7.2008 29.8.2008 28.9.2008 28.10.2008
Q (
m3/s
)
bogatenje Q Trnovo (srednji dnevni) Q biol.min. Trnovo sQnp Trnovo Q Iztočni kanal Mola
Reka - v.p. Cerkvenikov m lin
-26
-52
-5
102
-45-26
-15 -11
-70-92
-57
200
3
-210
-140
-70
0
70
140
210
jan feb mar apr maj jun jul avg sep okt nov dec leto
Od
sto
pan
je p
reto
ka (
%)
-13
-50
5061
-31
16
43
6
-16
-48
-17
135
10
-150
-100
-50
0
50
100
150
JAN FEB MAR APR MAJ JUN JUL AVG SEP OKT NOV DEC LETO
Od
sto
pa
nje
pad
av
in (
%)
Agencija RS za okolje
2
Rezultati analize služijo kot podpora pri novelaciji pravilnikov o obratovanju!
Značilni pretoki - v.p. Cerkvenikov mlin
0
2
4
6
8
10
12
14
16
18
1952 1957 1962 1967 1972 1977 1982 1987 1992 1997 2002 2007
Q (
m3/s
)
Qs Qnp Qmin180
Reka - v. p. Trnovo
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
Q0 Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12
Q (
m3/s
)
do leta 1988 po letu 1988 suho leto 2003 leto 2008 sQnp Qbiol. min.
Analiza hidroloških parametrov porečja Reke za leto 2008
.........nadaljevanje
2,4 milj. m31,44 milj. m3Preostanek volumna
4,77 milj. m35,73 milj. m3V iztoka Mole od 2.7. do 28.10.2008
(konec sušnega obdobja)
7,17 milj. m3V iztoka Mole od 2.7. do 17.10.2008
(konec bogatenja zaradi izpraznitve)
0.4640.5570.925
po uredbi o Qessedanji
Qes (m3/s) za v.p. Trnovo
Analiza nizkovodnih hidroloških razmer na porečju Kamniške Bistrice
Kot rezultat hidrološke analize iz oktobra 2008 je
v teku (2009-2010) projektna naloga "Program
opazovanj nizkih pretokov na Kamniški Bistrici in
njenih mlinščicah, na odseku med Kamnikom in
Ihanom, zaradi ugotavljanja dinamike ponikanja
vode in dejanskih pretokov v mlinščicah v sušnih
obdobjih 2009 in 2010“ (izvaja KSH-FGG).
Kamniška Bistrica, 10.10.2008 Merilno mesto Podrečje – Radomeljska mlinščica
3
Dostopnost hidroloških podatkov preko spletne strani ARSO
http://www.arso.gov.si/vode/podatki/
Priprava hidrološkega opozorilnega sistema v barvni skali HIDROALARM
opozorilordeča
opozorilooranžna
predopozorilorumena
zelena
24 podporečij
Opozorilna karta za 25.12.2009 (izdana 23.12.2009)
4
Nadgradnja prognostičnega sistema slovenskih rek: Sava, Soča
Time table
Project: Flood forecasting system upgrade to Sava nad Soča basins
Month
1
Month
2
Month
3
Month
4
Month
5
Month
6
Month
7
Month
8
Month
9
Month
10
Month
11
Month
12
Month
13
Month
14
Month
15
Month
16
Month
17
Month
18
Month
19
Month
20
Month
25
Month
26
Month
21
Month
22
Month
23
Month
24TimeTimeTimeTime
TasksTasksTasksTasks
1. implementation phase on the Sava river basin
Defining the system structure and needed data
Development of the system models and their implementation into the system
(calibration, validation) testing
Operative implementation for testing
2. implementation phase on the Sava river basin
Operational testing phase for reliably check and elimination of possibility
mistakes
Continuously education and cooperation with the EARS hydrological
forecasting personnel within system development and implementation
3.implementation phase on the Soča river basin
Defining the system structure and needed data
Development of the system models and their implementation into the system
(calibration, validation) testing
Operative implementation for testing
4. implementation phase on the Soča river basin
Operational testing phase for reliably check and elimination of possibility
mistakes
Continuously education and cooperation with the EARS hydrological
forecasting personnel within system development and implementation
Project duration: Legend: - report submtal
Forseen project duration os 26 months form contract signiture - task duration - education and colaboration
Month
1
Month
2
Month
3
Month
4
Month
5
Month
6
Month
7
Month
8
Month
9
Month
10
Month
11
Month
12
Month
13
Month
14
Month
15
Month
16
Month
17
Month
18
Month
19
Month
20
Month
25
Month
26
Month
21
Month
22
Month
23
Month
24
Priprava tehnične dokumentacije in izvedba JN
Razvoj modelskih orodij za napoved dinamike morja v Tržaškem zalivu
� Površinsko tokovno polje, izračunano z modelom PcFlowza luko Koper ob SE vetru
� Simulacija razlitja nafte v Gradežu ob kontinuiranem NW vetru 48 ur po razlitju. Izračun narejen z modelom PcFlow - Nafta.
5
Optimizacija delovnih procesov
� Nov hidrološki informacijski sistem HIDROLOG- površinske vode, podzemne vode, izviri, morje
� Kontrola podatkov AMP postaj KOLOMON
Hidrološki letopis Slovenije 2005 (mar. 2009)
Hidrološki letopis Slovenije 2006 (sept. 2009)
Hidrološki letopis Slovenije 2007 (v tisku)
Publiciranje v letu 2009
Mesečni bilten ARSO
Nenehna nadgradnja letopisa!- nove vsebine, zgoščenka s podatki
6
Prognozirano plimovanje morja za 2010
Publiciranje v letu 2009
http://www.arso.gov.si/vode/morje/
Raziskave in projekti
- injiciranje v Pivko pred Postojnsko jamo in v lovilnik olj ob avtocesti razdrto-Ljubljana
Inštitut za raziskovanje krasa ZRC SAZU
Sledilni poskusi v zaledju Malenščice
7
Raziskave in projekti
• Meritve nivojev, temp. vode in spec.el.prev. na 7 merilnih mestih v že vzpostavljeni mreži kraških podzemnih vodnih tokov.
• Opazovanje Rižane, Osapske Reke, Boljunca- injiciranje pri Černotiškem kamnolomu
Inštitut za raziskovanje krasa ZRC SAZU
0
100
200
300
400
500
4.9.07 24.10.07 13.12.07 1.2.08 22.3.08 11.5.08 30.6.08
H (
cm
);
SE
P (
mS
/cm
)
0
5
10
15
20
25
T (
oC
)
SEP H T
Raziskave in projekti
• Na KSH FGG so se nadaljevale razikave na eksperimentalnih porečjih.
• Izračun PMF za NEK• Udeležba na srečanjih delovnih teles IHP Donava
• Začele so se priprave za oblikovanje odbora za proslavo mednarodnega desetletja "Voda za življenje“
• predstavitev znanstveno raziskovalnega dela na EGU na Dunaju (več kot 10 prispevkov)
Katedra za splošno hidrotehniko FGG