39 gb einbauanleitung

Upload: gpricope

Post on 14-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 39 GB Einbauanleitung

    1/1

    BESISTA-Betschart GmbHDE - 73087 Bad Boll Offices: Heckenweg 1 Factory: Reuteweg 3

    Phone +49(0)7164/91239-0 Fax. +49(0)7164/91239-17 E-mail: [email protected] www.besista.com

    Installation instructionsBESISTA rod systems

    These installation instructions must be followed without fail. They also apply to BE-SISTA

    compression rod connections. BESISTA

    tension rod system are composed of

    safety components, which we subject to multiple tests and inspections.

    Local Court Ulm HRB 532686 Manager: Dr.-Ing. A.P. Betschart Place of performance and legal venue for both parties Gppingen 29.06.08

    Do not modify, heat, hit or distort the rod

    anchors, e.g. by smashing the pin with ahammer. In particular, do not spread thestraps orpress them together. The thick-ness of the joining plates must correspondto the wrench opening.

    Use only the pins supplied. To avoid the mis-take of using materials of different grades,always scrap any surplus pins!!

    When turning, i.e. pretensioning, the rods,restrain the rod anchors by the wrenchfaces so that they cannot twist and distort

    the straps. When using extension sleeves, take care to

    ensure that the thread ends are securely

    locked at the centre of the sleeves.

    Parts delivered cannot be returned orexchanged!

    We give no warranty on modified, re-placed or improperly treated components.Any such action will immediately invalida-te the approval and the type stress analy-sis.

    According to the approval, tension rodsmay not be modified, deformed or welded.

    Use only hot-dip galvanized tension rodsystems outdoors. Damaged areas must

    always be expertly repaired. The tension rod systems must be accessi-

    ble for maintenance and repair at anytime.

    1. Check all system parts for transit damage

    and perfect condition before installing.Damaged components must not be used.

    2. If your system is fitted with locking/coversleeve, first tighten the sleeves as far asthey will go. Do not lock securely until the

    rod is tensioned.3. Liberally grease the threads of the rods,

    then screw them into the rod anchors untilthey appear in the inspection hole!

    4. Insert one rod anchor into thejoining pla-te at one end and secure with the crosspin and locking rings.

    5. At the other end, hold the otherrod an-chor in the joining plate and turn the roduntil the pin fits into the pin-hole.

    6. Insert the pin and locking ringsand ten-sion the rod in accordance with the struc-tural engineers instructions.

    7. Check that the thread fully appears inthe inspection hole. In this way, you canbe 100% certain of the thread penetra-tion depth. This is particularly importantfrom the standpoint of your liability!

    Follow these instructions:

    0672-0091 ETA-08/0038

    Example with lock-

    ing/cover sleeve

    Example without lock-

    ing/cover sleeve

    Subject to modifications Protected by several patents