  • TIME SCHEDULE

    Program : Peningkatan Sarana Dan Prasarana Aparatur Kegiatan : Rehabilitasi Langgar / Mushola Lokasi : UPTB Bapeltan

    NOBULAN KE - I BULAN KE - II

    Progress

    Masa URAIAN PEKERJAAN BOBOT MINGGU KE MINGGU KE Pemeliharaan KETERANGAN

    % I II III IV V VI VII VIII 6 Bulan

    100 I PEKERJAAN PERSIAPAN 0.275 0.275 II PEKERJAAN TANAH & URUGAN 2.091 2.091 III PEKERJAAN STRUKTUR PONDASI 0.570 0.570 IV PEKERJAAN STRUKTUR 1.126 1.126 V PEKERJAAN DINDING DAN PLESTERAN 3.731 3.731 VI PEKERJAAN ATAP & PLAFOND 63.025 15.756 15.756 15.756 15.756 VII PEKERJAAN LANTAI DAN KERAMIK 13.548 13.548 50 VIII PEKERJAAN KUSEN, PINTU & JENDELA 2.381 2.381 IX PEKERJAAN PENGGANTUNG & KUNCI 0.615 0.615 X PEKERJAAN PENGECATAN 6.549 3.274 3.274 XI PEKERJAAN SANITASI 2.974 2.974 XII PEKERJAAN LAIN - LAIN 3.115 3.115

    0I JUMLAH 100.00 JUMLAHII KEMAJUAN 2.937 1.126 19.488 15.756 15.756 29.304 9.244 6.389 III KOMULATIF 2.937 4.063 23.550 39.307 55.063 84.367 93.611 100.000

    Di Buat OlehPerencanaCV. Anaasipa

    Agung Subagio,STDirektur

  • REKAPITULASIRENCANA ANGGARAN BIAYA (R A B )

    PROGRAM : Peningkatan Sarana Dan Prasarana A 0PEKERJAAN : Rehabilitasi Langgar / MusholaLOKASI : UPTB Bapelta 0

    NO. URAIAN PEKERJAAN PROGRES ( % )

    I PEKERJAAN PERSIAPAN 500,000.00II PEKERJAAN TANAH & URUGAN 3,802,320.59III PEKERJAAN STRUKTUR PONDASI 1,036,643.40IV PEKERJAAN STRUKTUR 2,047,494.15V PEKERJAAN DINDING DAN PLESTERAN 6,783,545.99VI PEKERJAAN ATAP & PLAFOND 114,582,944.82VII PEKERJAAN LANTAI DAN KERAMIK 24,630,504.00VIII PEKERJAAN KUSEN, PINTU & JENDELA 4,328,858.27IX PEKERJAAN PENGGANTUNG & KUNCI 1,117,280.00X PEKERJAAN PENGECATAN 11,905,585.45XI PEKERJAAN SANITASI 5,407,062.00XII PEKERJAAN LAIN - LAIN 5,662,750.00

    J U M L A H 1 181,804,988.66P P N 10 % 18,180,498.87T O T A L 199,985,487.53

    P E M B U L A T A N 199,980,000.00Terbilang :

    Seratus Sembilan Puluh Sembilan Juta Enam Ratus Enam Puluh Ribu Rupiah

    Di Buat OlehPerencana

    CV. Anaasipa

    Agung Subagio,STDirektur

  • RENCANA ANGGARAN BIAYA( R A B )

    PROGRAM : Peningkatan Sarana Dan Prasarana Aparatur KEGIATAN : Rehabilitasi Langgar / Mushola LOKASI : UPTB Bapeltan

    NO URAIAN PEKERJAAN SAT VOL

    1 2 3 4 5 6

    I PEKERJAAN PERSIAPAN1 Pembersihan Lokasi & Perataan Ls 1.00 500,000.00 500,000.00

    Jumlah I ( Pekerjaan Persiapan ) 500,000.00

    II PEKERJAAN TANAH & URUGAN1 Galian tanah pondasi M3 1.01 63,250.00 63,842.97 2 Urugan tanah kembali M3 0.40 10,520.00 4,175.13 3 Urugan tanah bawah lantai M3 3.57 159,750.00 569,508.75 4 Urugan pasir bawah lantai M3 1.51 262,500.00 395,718.75 5 Hamparan batu kerikil hias M2 7.75 357,300.00 2,769,075.00

    Jumlah II ( Pekerjaan Tanah dan Urugan ) 3,802,320.59

    III PEKERJAAN STRUKTUR PONDASI 1 Pasangan Pondasi Batu Gunung M3 1.17 886,020.00 1,036,643.40

    Jumlah III ( Pekerjaan Struktur Pondasi ) 1,036,643.40

    IV PEKERJAAN STRUKTUR1 Tipe Sloof 15/40 Cm M3 0.31 3,646,127.26 1,128,020.62 2 Tipe Kolom 11x11 Cm M3 0.07 8,566,486.62 621,926.93 3 Umpak Tiang 20 x 50 Cm M3 0.12 2,479,555.00 297,546.60

    Jumlah IV ( Pekerjaan Struktur ) 2,047,494.15

    V PEKERJAAN DINDING DAN PLESTERAN1 Pasangan Dinding Bata 1 : 5 M2 23.29 130,290.00 3,033,802.65 2 Plesteran Dinding 1 Pc : 5 Ps M2 40.21 58,554.00 2,354,456.34 3 Acian Dinding M2 40.21 34,700.00 1,395,287.00

    Jumlah V ( Pekerjaan Dinding dan Plesteran ) 6,783,545.99

    VI PEKERJAAN ATAP & PLAFOND1 Bongkaran Atap Lama Ls 1.00 1,000,000 1,000,000.00 2 Rangka Atap Galvanis 4 x 6 M2 136.00 620,000.00 84,316,900.00 3 Pas. Atap Spandex M2 236.08 94,969.41 22,420,483.57 4 Bubungan Atap M' 35.45 68,700.00 2,435,415.00 5 Pek. Plafond Dalam Gypsum T = 9 Mm M2 60.98 57,710.00 3,518,867.25 6 List Plafond Gypsum Profil M' 33.40 26,685.00 891,279.00

    Jumlah VI ( Pekerjaan Atap & Plafond ) 114,582,944.82

    HARGA SATUAN (Rp.)

    JUMLAH HARGA (Rp.)

  • NO URAIAN PEKERJAAN SAT VOL

    1 2 3 4 5 6

    VII PEKERJAAN LANTAI DAN KERAMIK1 Cor Lantai M3 1.16 1,166,900.00 1,356,521.25 2 Lantai Keramik 30 x 30 Cm M2 23.25 206,505.00 4,801,241.25 3 Lantai Keramik WC & Tempat Wudhu 20 x 20 Cm M3 9.40 264,135.00 2,482,869.00 4 Dinding Keramik Mesjid, WC & Tempat Wudhu 20 x 40 Cm M2 63.00 253,807.50 15,989,872.50

    Jumlah VII ( Pekerjaan Lantai dan Keramik ) 24,630,504.00

    VIII PEKERJAAN KUSEN, PINTU & JENDELA1 Daun Pintu dan jendela

    a) Tipe P1 (3 Unit)M2 9.52 60,105.00 572,440.02

    b) Tipe P2 (2 Unit)M2 11.30 60,105.00 678,946.08

    c) Tipe P3 (3 Unit)M2 15.37 60,105.00 923,934.06

    d) Tipe J1 (4 Unit)M2 35.83 60,105.00 2,153,538.11

    Jumlah VIII ( Pekerjaan Kusen, Pintu, Jendela dan Partisi ) 4,328,858.27

    IX PEKERJAAN PENGGANTUNG & KUNCI1 Pasang Engsel Pintu 4" Unit 8.00 76,597.50 612,780.00 2 Kunci Pintu (lengkap dg Pegangan) Set 2.00 252,250.00 504,500.00

    Jumlah IX ( Pekerjaan Penggantung & Kunci ) 1,117,280.00

    X PEKERJAAN PENGECATAN1 Cat Dinding Tembok Eksterior M2 164.09 40,811.00 6,696,676.99 2 Cat Dinding Tembok Interior M2 96.94 35,411.00 3,432,565.29 3 Cat Minyak Listplank M2 29.55 60,105.00 1,776,343.17

    Jumlah X ( Pekerjaan Pengecatan ) 11,905,585.45

    XI PEKERJAAN SANITASI1 Floor Drain Bh 3.00 48,650.00 145,950.00 2 Kloset Duduk (Sistem Back Wash) Unit 2.00 1,791,730.00 3,583,460.00 3 Pipa PVC 4" M1 12.00 53,059.00 636,708.00 4 Pipa PVC 1/2" M1 16.00 18,184.00 290,944.00 5 Kran Dinding PVC 1/2" Bh 6.00 35,000.00 210,000.00 6 Jet Washer Bh 2.00 140,000.00 280,000.00 7 Soap Holder Keramik (Tempat Sabun) Bh 2.00 70,000.00 140,000.00 8 Keran Air Jet Washer Bh 2.00 60,000.00 120,000.00

    Jumlah XI ( Sanitasi ) 5,407,062.00

    XII PEKERJAAN LAIN - LAIN1 Pembongkaran Dinding WC & Perbaikan Retak Di Dinding M Ls 1.00 750,000.00 750,000.00 2 Pemindahan & Pemasangan Tandon Ls 1.00 500,000.00 500,000.00 3 Pembuatan Bak WC 60 x 60 Ls 1.00 950,000.00 950,000.00 4 Urugan Tanah M3 9.00 159,750.00 1,437,750.00 5 Pemasangan Instalasi listrik Titik 3.00 225,000.00 675,000.00 6 Bola Lampu XL+ (Terminal) Bh 3.00 50,000.00 150,000.00 7 Pas. Besi Grill Tempat Wudhu Wanita Unit 1.00 250,000.00 250,000.00 8 Pembongkaran Plafond & Instalasi Listrik Existing Ls 1.00 950,000.00 950,000.00

    Jumlah XII ( Pekerjaan Lain - Lain ) 5,662,750.00 T O T A L 181,804,988.66

    HARGA SATUAN (Rp.)

    JUMLAH HARGA (Rp.)

    .- Cat Minyak Lapisan Luar Dan Dalam Daun Pintu & Kusen

    .- Cat Minyak Lapisan Luar Dan Dalam Daun Pintu & Kusen

    .- Cat Minyak Lapisan Luar Dan Dalam Daun Pintu & Kusen

    .- Cat Minyak Lapisan Luar Dan Dalam Daun Pintu & Kusen

  • DAFTAR ANALISA HARGA SATUAN

    HARGA H A R G A JUMLAHKODE INDEX SAT U R A I A N SATUAN BAHAN UPAH HARGA

    ( Rp ) ( Rp ) ( Rp ) ( Rp )

    A. PEKERJAAN PERSIAPANa1 1 M' Mengukur dan memasang bouplank

    0.01 M3 Kayu Papan Meranti 3,500,000.00 24,500.00 0.02 KG Paku biasa 20,000.00 400.00 0.10 OH Pekerja 80,000.00 8,000.00 0.01 OH Mandor 130,000.00 650.00

    24,900.00 8,650.00 33,550.00

    B. PEKERJAAN TANAH DAN PONDASIb1 1 M3 Galian tanah - SNI - 2835-2008

    0.75 OH Pekerja 80,000.00 60,000.00 0.03 OH Mandor 130,000.00 3,250.00

    63,250.00 63,250.00

    b2 1 M3 Urugan Tanah kembali - SNI - 2835-20080.25 OH Pekerja 80,000.00 20,000.00 0.01 OH Mandor 130,000.00 1,040.00

    21,040.00 10,520.00

    b3 1 M3 Urugan Pasir bawah Lantai - SNI - 2835-20081.20 1M3 Pasir 180,000.00 216,000.00 0.50 OH Pekerja 80,000.00 40,000.00 0.05 OH Mandor 130,000.00 6,500.00

    216,000.00 46,500.00 262,500.00

    b4 1 M3 Memadatkan tanah - SNI - 20020.50 OH Pekerja 80,000.00 40,000.00 0.05 OH Mandor 130,000.00 6,500.00

    - 46,500.00 46,500.00

    b5 1M3 Urugan tanah dipadatkan - SNI - 20021.20 M3 Tanah Urugan 75,000.00 90,000.00 0.25 OH Pekerja 80,000.00 20,000.00 0.03 OH Mandor 130,000.00 3,250.00 1.00 m3 Memadatkan tanah 46,500.00 46,500.00

    90,000.00 69,750.00 159,750.00

    b6 1M2 Hamparan krikil hias 0.200 O/Hr Pekerja 80,000.00 16,000.00 0.010 O/Hr Mandor 130,000.00 1,300.00 4.000 Bks Krikil Hias 85,000.00 340,000.00

    340,000.00 17,300.00 357,300.00

    b7 1 M3 Pas pondasi batu gunung 1 Pc : 5 Ps SNI 2838:20081.20 M3 Batu gunung 330,000.00 396,000.00

    136.00 Kg Semen Pc 1,600.00 217,600.00 0.54 M3 Pasir pasangan 180,000.00 97,920.00 0.70 OH Tukang 110,000.00 77,000.00 0.07 OH Kepala tukang 120,000.00 8,400.00 1.00 OH Pekerja 80,000.00 80,000.00 0.07 OH Mandor 130,000.00 9,100.00

    711,520.00 174,500.00 886,020.00

    C. PEKERJAAN PANCANGc4 1 Titik Memancang tiang Ulin 10x10, p = 2 m

    0.01 m3 Kayu ulin 10x10 4,800,000.00 48,000.00 0.01 m3 Kalang dan sunduk 4,800,000.00 36,000.00 0.17 Oh Pekerja 80,000.00 13,333.33 0.05 Oh Tukang 110,000.00 5,500.00 0.01 Oh Kepala tukang 120,000.00 1,200.00 0.01 Oh mandor 130,000.00 1,625.00

    84,000.00 21,658.33 105,658.33

  • HARGA H A R G A JUMLAHKODE INDEX SAT U R A I A N SATUAN BAHAN UPAH HARGA

    ( Rp ) ( Rp ) ( Rp ) ( Rp )D. PEKERJAAN PASANGAN DAN LANTAId1 1 m2 Pas. Bata 1 Pc : 5 Ps

    55.00 Buah Batu bata 1,200.00 66,000.00 11.50 Kg Semen Pc 1,600.00 18,400.00 0.04 M3 Pasir pasangan 180,000.00 7,740.00 0.10 OH Tukang 110,000.00 11,000.00 0.01 OH Kepala tukang 120,000.00 1,200.00 0.30 OH Pekerja 80,000.00 24,000.00 0.02 OH Mandor 130,000.00 1,950.00

    92,140.00 38,150.00 130,290.00

    d2 1 M2 Plesteran tebal 15 mm 1 Pc : 5 Ps SNI 2837:20086.24 Kg Semen Pc 1,600.00 9,984.00 0.02 M3 Pasir pasangan 180,000.00 4,320.00 0.15 OH Tukang 110,000.00 16,500.00 0.02 OH Kepala tukang 120,000.00 1,800.00 0.30 OH Pekerja 80,000.00 24,000.00 0.02 OH Mandor 130,000.00 1,950.00

    14,304.00 44,250.00 58,554.00

    d3 1 M2 Acian SNI-2837-20083.25 Kg Semen Pc 1,600.00 5,200.00 0.20 Oh Pekerja 80,000.00 16,000.00 0.10 Oh Tukang 110,000.00 11,000.00 0.01 Oh Kepala tukang 120,000.00 1,200.00 0.01 Oh Mandor 130,000.00 1,300.00

    5,200.00 29,500.00 34,700.00

    d7 1 M2 Pas. Lantai keramik 30 x 30 cm SNI DT - 91 - 0012 - 200711.87 bh keramik 30x30 9,000.00 106,830.00 10.00 kg PC 1,600.00 16,000.00 0.05 m3 Pasir pasang 180,000.00 8,100.00 1.50 kg Semen warna 2,250.00 3,375.00 0.32 OH Pekerja 80,000.00 25,600.00 0.35 OH Tukang batu 110,000.00 38,500.00 0.04 OH Kepala Tukang 120,000.00 4,200.00 0.03 OH Mandor 130,000.00 3,900.00

    134,305.00 72,200.00 206,505.00

    d8 1 M2 Pas. Lantai keramik 20 x 20 cm SNI 7395:200826.50 bh Keramik 20x20 5,000.00 132,500.00 10.40 Kg Semen Pc 1,600.00 16,640.00 1.62 Kg Semen warna 2,250.00 3,645.00 0.05 M3 Pasir pasangan 180,000.00 8,100.00 0.35 OH Tukang 110,000.00 38,500.00 0.04 OH Kepala tukang 120,000.00 4,200.00 0.70 OH Pekerja 80,000.00 56,000.00 0.04 OH Mandor 130,000.00 4,550.00

    160,885.00 103,250.00 264,135.00

    d9 1 m2 Memasang dinding keramik 20x40 cm SNI DT - 91 - 0012 - 200712.5 bh Keramik 40 x 20 cm 12,000.00 150,000.00 9.30 kg PC 1,600.00 14,880.00 0.02 m3 Pasir pasang 180,000.00 3,240.00 2.75 kg Semen warna 2,250.00 6,187.50 0.30 OH Pekerja 80,000.00 24,000.00 0.42 OH Tukang 110,000.00 46,200.00 0.05 OH Kepala Tukang 120,000.00 5,400.00 0.03 OH Mandor 130,000.00 3,900.00

    174,307.50 79,500.00 253,807.50

  • HARGA H A R G A JUMLAHKODE INDEX SAT U R A I A N SATUAN BAHAN UPAH HARGA

    ( Rp ) ( Rp ) ( Rp ) ( Rp )

    E. PEKERJAAN BETONe2 1 M2 Pekerjaan bekisitng untuk sloof - SNI 7394:2008 (3 kali pakai)

    0.05 m3 Kayu perancah 2,250,000.00 101,250.00 0.30 kg Paku 5 cm - 10 cm 20,000.00 6,000.00 0.10 liter Minyak bekisting 20,000.00 2,000.00 0.52 OH Pekerja 80,000.00 41,600.00 0.26 OH Tukang 110,000.00 28,600.00 0.03 OH Kepala Tukang 120,000.00 3,120.00 0.03 OH Mandor 130,000.00 3,380.00

    109,250.00 76,700.00 185,950.00

    e3 1 M2 Pekerjaan bekisitng untuk kolom - SNI 7394:2008 SNI 7394:2008 (3 kali pakai)0.04 m3 Kayu perancah 2,250,000.00 90,000.00 0.40 kg Paku 5 cm - 12 cm 20,000.00 8,000.00 0.20 liter Minyak bekisting 20,000.00 4,000.00 0.02 m3 Balok kayu Meranti 3,500,000.00 52,500.00 0.35 lbr Plywood 4 mm 65,000.00 22,750.00 2.00 btg Dolken (Galam) 5,500.00 11,000.00 0.66 OH Pekerja 80,000.00 52,800.00 0.33 OH Tukang 110,000.00 36,300.00 0.03 OH Kepala Tukang 120,000.00 3,960.00 0.03 OH Mandor 130,000.00 4,290.00

    188,250.00 97,350.00 285,600.00

    e7 1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (12 2) cm, w/c = 0,87, SNI 7394:2008230.00 kg PC 1,600.00 368,000.00

    0.89 m3 Pasir Pasang 180,000.00 160,740.00 1.03 m3 Koral beton 480,000.00 492,960.00

    200.00 liter Air 85.00 17,000.00 1.20 OH Pekerja 80,000.00 96,000.00 0.20 OH Tukang 110,000.00 22,000.00 0.02 OH Kepala Tukang 120,000.00 2,400.00 0.06 OH Mandor 130,000.00 7,800.00

    1,038,700.00 128,200.00 1,166,900.00

    e8 1 m3 Beton mutu f'c = 21,7 Mpa (K 250), slump (12 2) cm, w/c = 0,56, SNI 7394:2008384.00 kg PC 1,600.00 614,400.00

    0.69 m3 Pasir Pasang 180,000.00 124,560.00 1.04 m3 Kerikil beton 480,000.00 498,720.00

    215.00 liter Air 85.00 18,275.00 1.65 OH Pekerja 80,000.00 132,000.00 0.28 OH Tukang 110,000.00 30,250.00 0.03 OH Kepala Tukang 120,000.00 3,360.00 0.08 OH Mandor 130,000.00 10,790.00

    1,255,955.00 176,400.00 1,432,355.00

    e9 1 kg Pekerjaan Tulangan Beton SNI 7394:20081.05 kg Besi 18,000.00 18,900.00 0.02 Kg Kawat Bendrat 20,000.00 300.00 0.01 OH Tukang 110,000.00 770.00 0.01 OH Kepala tukang 120,000.00 840.00 0.01 OH Pekerja 80,000.00 560.00 0.00 OH Mandor 130,000.00 52.00

    19,200.00 2,222.00 21,422.00

  • HARGA H A R G A JUMLAHKODE INDEX SAT U R A I A N SATUAN BAHAN UPAH HARGA

    ( Rp ) ( Rp ) ( Rp ) ( Rp )e10 1 m3 Tipe Sloof 15/40 Cm

    1.00 M3 Beton f'c = 21,7 Mpa (K 2 1,432,355.00 1,432,355.00 64.68 Kg Besi 21,422.00 1,385,674.93 4.45 M2 Bekisting 185,950.00 828,097.33

    3,646,127.26 3,646,127.26

    e13 1 m3 Tipe Kolom 11x11 Cm 1.00 M3 Beton f'c = 21,7 Mpa (K 2 1,432,355.00 1,432,355.00

    171.71 Kg Besi 21,422.00 3,678,371.62 12.10 m2 Bekisting 285,600.00 3,455,760.00

    8,566,486.62 8,566,486.62

    e14 1 m3 Umpak Kolom 20 x 50 CM1.00 M3 Beton f'c = 21,7 Mpa (K 2 1,432,355.00 1,432,355.00 3.67 m2 Bekisting 285,600.00 1,047,200.00

    2,479,555.00 2,479,555.00

    G. PEKERJAAN PENGGANTUNG DAN PENGUNCIg1 Pasang Engsel Pintu SNI : 03 - 3437 - 2002

    1.00 Bh Engsel Pintu 57,000.00 57,000.00 0.02 OH Pekerja 80,000.00 1,200.00 0.15 OH Tukang Kayu 110,000.00 16,500.00 0.02 OH Kepala Tukang 120,000.00 1,800.00

    0.0008 OH Mandor 130,000.00 97.50 57,000.00 19,597.50 76,597.50

    g8 1 Bh Pasang Kunci Pintu lengkapSNI : 03 - 347 - 20021.00 Bh Kunci Pintu Lengkap (dg p 195,000.00 195,000.00 0.01 OH Pekerja 80,000.00 400.00 0.50 OH Tukang 110,000.00 55,000.00 0.01 OH Kepala Tukang 120,000.00 1,200.00

    0.005 OH Mandor 130,000.00 650.00 195,000.00 57,250.00 252,250.00

    h5 1 M2 Memasang atap Spandex0.49 Lbr Atap Spandex 130,000.00 64,039.41 0.20 Kg Paku Atap 30,000.00 6,000.00 0.13 OH Tukang 110,000.00 13,750.00 0.02 OH Kepala tukang 120,000.00 2,400.00 0.10 OH Pekerja 80,000.00 8,000.00 0.01 OH Mandor 130,000.00 780.00

    70,039.41 24,930.00 94,969.41

    h6 1 m1 Memasang nok /Bubungan0.80 bh Nok 53,000.00 42,400.00 0.05 kg Paku Atap 30,000.00 1,500.00 0.10 OH Pekerja 80,000.00 8,000.00 0.13 OH Tukang Kayu 110,000.00 13,750.00 0.02 OH Kepala Tukang 120,000.00 2,400.00 0.01 OH Mandor 130,000.00 650.00

    43,900.00 24,800.00 68,700.00

    h9 1 M2 Plafond Gypsum 9 mm- SNI 2839:20080.3700 M2 Gypsum 9 mm 73,000.00 27,010.00 0.1100 KG Paku gypsum 25,000.00 2,750.00 0.1300 OH Tukang 110,000.00 14,300.00 0.0130 OH Kepala tukang 120,000.00 1,560.00 0.1300 OH Pekerja 80,000.00 10,400.00 0.0130 OH Mandor 130,000.00 1,690.00

    29,760.00 27,950.00 57,710.00

  • HARGA H A R G A JUMLAHKODE INDEX SAT U R A I A N SATUAN BAHAN UPAH HARGA

    ( Rp ) ( Rp ) ( Rp ) ( Rp )

    h101.0500 m' List gypsum profil 13,000.00 13,650.00 0.1500 kg Tepung gypsum 3,500.00 525.00 0.060 OH Pekerja 80,000.00 4,800.00 0.060 OH Tukang 110,000.00 6,600.00 0.006 OH Kepala Tukang 120,000.00 720.00 0.003 OH Mandor 130,000.00 390.00

    14,175.00 12,510.00 26,685.00 ###

    I. PEKERJAAN PENGECATANi1 1 M2 Mengecat kayu dengan cat minyak SNI - 2002 (1 lapis plamir, 1 lapis car dasar, 3 lapis penutup)

    0.20 Kg Cat kilap merk " Aftelak" 65,000.00 13,000.00 0.15 Kg Plamir 20,000.00 3,000.00 0.17 Ltr Cat dasar 20,000.00 3,400.00 0.35 Ltr Cat penutup 65,000.00 22,750.00 0.11 OH Tukang 110,000.00 11,550.00 0.00 OH Kapala tukang 120,000.00 480.00 0.07 OH Pekerja 80,000.00 5,600.00 0.00 OH Mandor 130,000.00 325.00

    42,150.00 17,955.00 60,105.00

    i2 1 M2 Mengecat dinding Luar SNI - 20020.36 Kg Cat Dinding Luar 70,000.00 25,200.00 0.10 Kg Palmur 20,000.00 2,000.00 1.00 Lbr Kertas gosok 4,000.00 4,000.00 0.06 OH Tukang 110,000.00 6,930.00 0.01 OH Kapala tukang 120,000.00 756.00 0.02 OH Pekerja 80,000.00 1,600.00 0.00 OH Mandor 130,000.00 325.00

    31,200.00 9,611.00 40,811.00

    i3 1 M2 Mengecat Dinding & Plafon SNI - 20020.36 Kg Cat Dinding Dalam 55,000.00 19,800.00 0.10 Kg Palmur 20,000.00 2,000.00 1.00 Lbr Kertas gosok 4,000.00 4,000.00 0.06 OH Tukang 110,000.00 6,930.00 0.01 OH Kapala tukang 120,000.00 756.00 0.02 OH Pekerja 80,000.00 1,600.00 0.00 OH Mandor 130,000.00 325.00

    25,800.00 9,611.00 35,411.00

    i4 Water Profing (sika)0.25 Kg Water Profing (sika) 30,000.00 7,500.00 0.10 O/Hr Pekerja 80,000.00 8,000.00 0.10 O/Hr Tukang 110,000.00 11,000.00 0.02 O/Hr Kapala tukang 120,000.00 2,400.00 0.01 O/Hr Mandor 130,000.00 1,300.00

    7,500.00 22,700.00 30,200.00

    J. PEKERJAAN SANITAIRj1 1 bh Memasang Klosed Duduk SNI - 2002

    1.00 Bh Kloset Duduk 1,300,000.00 1,300,000.00 0.06 Ls Perlengkapan dari harga klosed 78,000.00 3.30 Oh Pekerja 80,000.00 264,000.00 0.16 Oh Mandor 110,000.00 17,600.00 1.10 Oh Tukang 120,000.00 132,000.00 0.00 Oh Kepala Tukang 130,000.00 130.00

    1,378,000.00 413,730.00 1,791,730.00

    j2 1 buah Pasang kloset jongkok SNI : 20021.00 bh kloset jongkok 250,000.00 250,000.00 6.00 kg PC 1,600.00 9,600.00 0.01 m3 Pasir pasang 180,000.00 1,800.00 3.30 OH Pekerja 80,000.00 264,000.00 1.10 OH Tukang 110,000.00 121,000.00 0.10 OH Kepala Tukang 120,000.00 12,000.00 0.16 OH Mandor 130,000.00 20,800.00

    261,400.00 417,800.00 679,200.00

    1 m1 Memasang list gypsum profil SNI : 2839:2008

  • HARGA H A R G A JUMLAHKODE INDEX SAT U R A I A N SATUAN BAHAN UPAH HARGA

    ( Rp ) ( Rp ) ( Rp ) ( Rp )

    j3 Memasang Satu Buah Wastafel6.00 Kg PC 1,600.00 9,600.00 0.01 M3 Pasir Pasang 180,000.00 1,800.00 1.00 Bh Wastafel 235,000.00 235,000.00 0.12 Bh Perlengkapan 12 % Wastaf 235,000.00 28,200.00 1.20 OH Pekerja 80,000.00 96,000.00 1.45 OH Tukang 110,000.00 159,500.00 0.15 OH Kepala Tukang 120,000.00 18,000.00 0.10 OH Mandor 130,000.00 13,000.00

    274,600.00 286,500.00 561,100.00

    j5 Memasang 1 Buah Kran Dinding1.00 Bh Kran Dinding 35,000.00 35,000.00 0.25 sealtape 2,000.00 0.01 OH Pekerja 80,000.00 800.00 0.10 OH Tukang 110,000.00 11,000.00 0.01 OH Kepala Tukang 120,000.00 1,200.00 0.01 OH Mandor 130,000.00 650.00

    35,000.00 13,650.00 48,650.00

    j7 Memasang 1 Buah Floor Drain1.00 Bh Floor Drain 35,000.00 35,000.00 0.01 OH Pekerja 80,000.00 800.00 0.10 OH Tukang 110,000.00 11,000.00 0.01 OH Kepala Tukang 120,000.00 1,200.00 0.01 OH Mandor 130,000.00 650.00

    35,000.00 13,650.00 48,650.00

    j8 1 m1 Pasang pipa PVC tipe AW dia 1/2" SNI : 20021.20 m' Pipa PVC 5,000.00 6,000.00

    35% Harga pipa Perlengkapan 1,750.00 0.04 OH Pekerja 80,000.00 2,880.00 0.06 OH Tukang 110,000.00 6,600.00 0.01 OH Kepala Tukang 120,000.00 720.00 0.00 OH Mandor 130,000.00 234.00

    7,750.00 10,434.00 18,184.00 j10 1 m1 Pasang pipa PVC tipe AW dia 4" SNI : 2002

    1.20 m' Pipa PVC 27,500.00 33,000.00 35% Harga pipa Perlengkapan 9,625.00

    0.04 OH Pekerja 80,000.00 2,880.00 0.06 OH Tukang 110,000.00 6,600.00 0.01 OH Kepala Tukang 120,000.00 720.00 0.00 OH Mandor 130,000.00 234.00

    42,625.00 10,434.00 53,059.00

  • DAFTAR HARGA SATUAN UPAH DAN BAHAN

    NO U R A I A N SAT HARGA SATUAN KETERANGAN( Rp )

    I DAFTAR HARGA SATUAN UPAH1 Pekerja OH 80,000.00 Dilokasi2 Tukang OH 110,000.00 Dilokasi3 Kepala tukang OH 120,000.00 Dilokasi4 Mandor OH 130,000.00 Dilokasi

    II DAFTAR HARGA SATUAN BAHANBAHAN BATU, TANAH & SEMEN

    1 Air Ltr 85.00 Dilokasi2 Pasir pasang M3 180,000.00 Dilokasi3 Tanah urug M3 75,000.00 Dilokasi4 Batu gunung M3 330,000.00 Dilokasi5 Batu Bata Bh 1,200.00 Dilokasi6 Keramik lantai 30 x 30 Bh 9,000.00 Dilokasi7 Keramik dinding 20 x 40 Bh 12,000.00 Dilokasi6 Keramik lantai 20 x 20 Bh 5,000.00 Dilokasi8 Keramik 10 x 20 cm Bh 3,000.00 Dilokasi9 Semen warna Kg 2,250.00 Dilokasi

    10 Koral Beton M3 480,000.00 Dilokasi11 Krikil Hias Bks 85,000.00 Dilokasi12 Semen PC Kg 1,600.00 Dilokasi

    III BAHAN LOGAM1 Paku biasa Kg 20,000.00 Dilokasi2 Paku gypsum Kg 25,000.00 Dilokasi3 Paku atap Kg 30,000.00 Dilokasi4 Besi Tulangan Kg 18,000.00 Dilokasi5 Kawat bendrat Kg 20,000.00 Dilokasi6 Rangka Atap Galvanis 4x6 M2 620,000.00 Dilokasi7 Pas Besi Grill Unit 250,000.00 Dilokasi

    IV BAHAN KAYU DAN PLYWOOD1 Balok ulin 10/10 M3 4,800,000.00 Dilokasi2 Papan meranti M3 3,500,000.00 Dilokasi3 Balok meranti M3 3,500,000.00 Dilokasi4 Kayu perancah M3 2,250,000.00 Dilokasi5 Playwood 4 mm Lbr 65,000.00 Dilokasi

  • DAFTAR HARGA SATUAN UPAH DAN BAHAN

    NO U R A I A N SAT HARGA SATUAN KETERANGAN( Rp )

    6 Gypsum 9 mm Lbr 73,000.00 Dilokasi7 List Gypsum profil 5x5 M" 13,000.00 Dilokasi8 Tepung Gypsum Kg 3,500.00 Dilokasi9 Dolken (Galam) Batang 5,500.00 Dilokasi

    V BAHAN KUNCI PENGGANTUNG1 Engsel daun pintu Bh 57,000.00 Dilokasi2 Kunci Pintu (Lengkap dg Pegangan) Bh 195,000.00 Dilokasi

    VI BAHAN ATAP1 Atap Spandex P : 3m Lbr 130,000.00 Dilokasi2 Nok Atap M1 53,000.00 Dilokasi

    VII BAHAN CAT - CATAN1 Cat Tembok Interior Kg 55,000.00 Dilokasi2 Cat Dinding Eksterior Kg 70,000.00 Dilokasi3 Plamir dinding Kg 20,000.00 Dilokasi4 Cat kilat kg 65,000.00 Dilokasi5 Cat dasar / meni kg 20,000.00 Dilokasi6 Kertas gosok Lbr 4,000.00 Dilokasi7 Minyak bekisting Ltr 20,000.00 Dilokasi

    VIII BAHAN SANITAIR 1 Klosed Duduk (Sistem Back Wash) Bh 1,300,000.00 Dilokasi2 Soap holder Keramik ( Tempat sabun ) Bh 70,000.00 Dilokasi3 Jet Washer Bh 140,000.00 Dilokasi4 Keran air Jet Washer Bh 60,000.00 Dilokasi5 Kran air Dinding 1/2" Bh 35,000.00 Dilokasi6 Floor drain Bh 35,000.00 Dilokasi7 Pipa PVC 4" M1 27,500.00 Dilokasi8 Pipa PVC 1/2" M1 5,000.00 Dilokasi9 sealtape Bh 2,000.00 Dilokasi

    IX ELEKTRIKAL1 Instalasi Listrik ttk 225,000.00 Dilokasi2 Lampu XL 20 Watt unit 50,000.00 Dilokasi

  • BACK UP DATAKEGIATAN ......................................................................................

    NO URAIAN PEKERJAAN

    I PEKERJAAN PERSIAPAN1 Pembersihan Lokasi & Perataan

    a. Total = 1.00 Ls

    II PEKERJAAN TANAH & URUGAN1 Galian tanah pondasi

    Lebar Galian x Tinggi Galian x Panjang Galian = N = 1.01 M3a. Total

    (0.4*0.2*(1+7.75))+(0.15*0.15*(3+7.75+3))b. Pas. Batu Padas

    (0.4*0.2*(1+7.75))c. Sloof

    0.15*0.15*(3+7.75+3)

    2 Urugan tanah kembali 1/2 Alas Sisa Urugan x Tinggi Sisa Urugan x Panjang Urugan Pondasi x Sisi Kanan & Kiri Sisa Urugan Pondasi = NLebar Galian x Tinggi Galian x Panjang Galian = N = 0.40 M3

    a. Total((0.1/2)*0.2*(1+7.75))+(0.15*0.15*(3+7.75+3))

    b. Pas. Batu Gunung(0.1/2)*0.2*(1+7.75)

    3 Urugan tanah bawah lantaiLuasan Pas. Batu Gunung + Luasan Sloof = 3.57 M3

    a. Total(0.1*1*7.75)+(0.12*3*7.75)

  • b. Pas. Batu Gunung0.1*1*7.75

    c. Sloof0.12*3*7.75

    4 Urugan pasir bawah lantai Tebal Urugan Pasir Lantai Dasar x Luasan Bangunan Keseluruha = 1.51 M3

    a. Total(0.05*3*7.75)+(0.05*3*2.3)

    b. Detail A0.05*3*7.75

    c Detail C0.05*3*2.3

    5 Hamparan Batu Kerikil LantaiPanjang Bidang x Luasan Bidang = N = 7.75 M2

    a. Total1*7.75

    III PEKERJAAN STRUKTUR PONDASI 1 Pasangan Pondasi

    ((Lebar Atas + Lebar Bawah)/2)*Tinggi* Panjang Horizontal & Vertikal Pas. Pondasi Batu Gunung = Na. Total = 1.17 M3

    (((0.2+0.4)/2)*0.4)*(1+7.75+1)

    IV PEKERJAAN STRUKTUR1 Tipe Sloof 15/40 Cm

    (Lebar Sloof x Tinggi Sloof x Panjang Horizontal Sloof) + (Lebar S= 0.31 M3a. Total

    0.15*0.15*(3+7.75+3)Besi Tulangan 8 mm = 32.18 KgPanjang Keseluruhan Dimensi Tulangan Besi x Jumlah Tulangan Besi x Berat Jenis Besi / M1 = N(3+7.75+3)*6*0.39

    .-

  • * Besi Tulangan 8 mm / 1 M339.08 Besi Tulangan 6 mm = 26 KgPanjang Keseluruhan Dimensi Tulangan Besi x Jumlah Tulangan Besi x Berat Jenis Besi / M1 = N(0.1+0.35+0.1+0.35+0.1)*((3+7.75+3)/0.15)*0.23

    * Besi Tulangan 6 mm / 1 M326Bekisting ( 3 x Pakai ) = 3.67 M2(0.4*2*(3+7.75+3))/3

    * Bekisting ( 3 x Pakai ) / 1 M34.45

    2 Tipe Kolom 11x11 Cm a. Panjang Kolom x Lebar Kolom x Tinggi Kolom x Jumlah Kolom = N

    Total = 0.07 M3(0.11*0.11*1)*6Besi Tulangan 8 mm = 9.36 KgPanjang Keseluruhan Dimensi Tulangan Besi x Jumlah Tulangan Besi x Berat Jenis Besi / M1 x Jumlah Konstruksi Kolom = N

    * 1*4*0.39*6Besi Tulangan 8 mm / 1 M3128.70 Besi Tulangan 6 mm = 3.13 KgPanjang Keseluruhan Dimensi Tulangan Besi x Jumlah Tulangan Besi x Berat Jenis Besi / M1 = N

    * (0.06+0.06+0.06+0.06+0.1)*(1/0.15)*0.23*6Besi Tulangan 6 mm / 1 M343.01 Bekisting = 0.88 M2Total

    * ((0.11*4)*1*5)/3Bekisting ( 3 x Pakai ) / 1 M312.1

    3 Umpak Tiang 20 x 50 Cm

    .-

    .-

    .-

    .-

    .-

  • a. Panjang Umpak x Lebar Umpak x Tinggi Umpak x Jumlah Umpak = NTotal = 0.12 M30.2*0.2*0.5*6Bekisting = 0.80 M2Total

    * ((0.2*4)*0.5*6)/3Bekisting ( 3 x Pakai ) / 1 M33.67

    V PEKERJAAN DINDING DAN PLESTERAN1 Pasangan Dinding Bata 1 : 5

    (Tinggi Pas. Batu Bata x Panjang Pas. Batu Bata)-Luasan Kusen Pada Bidang Bangunan (Faktor Pengurang) = Na. Total = 23.285 M2

    ((4+7.75+3)*1)+(0.3*(2.3+3+2.3+3))+((2.1*0.85*3))b. Dinding 1/2 Pas. Bata

    (4+7.75+3)*1c. Pas. Bata Lantai

    0.3*(2.3+3+2.3+3)d. Pas. Bata Bongkaran Dinding WC

    2.1*0.85*3

    2 Plesteran Dinding 1 : 5(Tinggi Pas. Batu Bata x Panjang Pas. Batu Bata)-Luasan Kusen Pada Bidang Bangunan (Faktor Pengurang) x 2 = N

    a. Total = 40.21 M2((4+7.75+3)*1)+((2.1*0.85*3))*2

    b. Dinding 1/2 Pas. Bata(4+7.75+3)*1

    c. Pas. Bata Bongkaran Dinding WC2.1*0.85*3

    3 Acian Dinding(Tinggi Pas. Batu Bata x Panjang Pas. Batu Bata)-Luasan Kusen Pada Bidang Bangunan (Faktor Pengurang) x 2 = N

    a. Total = 40.21 M2

    .-

  • ((4+7.75+3)*1)+((2.1*0.85*3))*2b. Dinding 1/2 Pas. Bata

    (4+7.75+3)*1c. Pas. Bata Bongkaran Dinding WC

    2.1*0.85*3

    VI PEKERJAAN ATAP & PLAFOND1 Rangka Kuda-kuda Galvanis

    (Panjang Bangunan x Lebar Bangunan = Na. Total = 136.00 M2

    (((16.2+8.5)/2)*3.7)+(((12.8+8.7)/2)*4.2*2)* Segmen 1

    (((16.2+8.5)/2)*3.7)* Segmen 2

    (((12.8+8.7)/2)*4.2*2)

    2 Atap Setara Ounduline(Panjang Rangka Atap + Lebar Rangka Atap) * 2 = N

    a. Total = 236.08 M2((3.2/1.8)*4)+((((2+8.5)/2)*3.75*4)-((3.45/2)*0.9))+(((1.5*1.95*2)+(3.45/2))*0.9)+((((16.2+8.5)/2)*3.7)+(((12.8+8.7)/2)*4.2*2)+(2.8*1.6*2))

    * Segmen 1((3.2/1.8)*4)

    * Segmen 2((((2+8.5)/2)*3.75*4)-((3.45/2)*0.9))

    * Segmen 3(((1.5*1.95*2)+(3.45/2))*0.9)

    * Segmen 4((((16.2+8.5)/2)*3.7)+(((12.8+8.7)/2)*4.2*2)+(2.8*1.6*2))

    3 Bubungan Atap Panjang Bubungan Atap 1 = N

    a. Total = 35.45 M1((1.85*4))+((3.8*4)+(1.95+1.55+1.95))+((3.7*2))

  • * Segmen 1((1.85*4))

    * Segmen 2((3.8*4)+(1.95+1.55+1.95))

    * Segmen 3((3.7*2))

    4 Pek. Plafond Dalam Gypsum T = 9 MmPanjang Bidang Bangunan x Lebar Bidang Bangunan = N

    a. Total = 60.98 M2((7.75*7.5)+(1.5*1.9))

    5 List Plafond Gypsum ProfilPanjang Bidang Bangunan x Lebar Bidang Bangunan = N

    a. Total = 33.4 M1(1.5+2.75+7.75+7.5+7.75+2.75+1.5+1.9)

    VII PEKERJAAN LANTAI DAN KERAMIK1 Cor Lantai

    Tebal Cor Lantai Dasar x Luasan Bangunan Keseluruhan = N = 1.16 M3a. Total

    (0.05*3*7.75)b. Detail A

    0.05*3*7.75

    2Panjang Area Pasangan x Lebar Area Pasangan = N = 23.25 M2

    a. Detail A3*7.75

    3Panjang Area Pasangan x Lebar Area Pasangan = N = 32.76 M2

    a. Total

    Lantai Keramik 30 x 30 Cm (PERJELAS UKURAN LUASAN & DETAIL PAS. KERAMIK)

    Dinding Keramik Mesjid 20 x 40 Cm (PERJELAS UKURAN TINGGI PAS. KERAMIK PADA GAMBAR t = 3.25 m)

  • ((1.5+2.75+2.75+1.5+1.9)*3.25)-((1.5+2.75+2.75+1.5+1.9)*0.1)

    4Panjang Area Pasangan x Lebar Area Pasangan = N = 30.24 M2

    a. Total(((2+1.25+2+1.25)+(2+1.25+2+1.25)+(2+3.5+2))*1.6)-(0.8*1.6*2)

    5Panjang Area Pasangan x Lebar Area Pasangan = N = 9.4 M2

    a. Total(2*1.25)+(3.45*2)

    VIII PEKERJAAN PENGGANTUNG & KUNCI1 Pasang Engsel Pintu 4" = 8 Bh2 Kunci Tanam = 2 Set

    IX PEKERJAAN PENGECATAN1 Cat Dinding Tembok Eksterior

    ((Tinggi Pas. Batu Bata x Panjang Pas. Batu Bata) x 2) - Luasan Kusen Pada Bidang Bangunan = Na. Total = 164.09 M2

    (((4+7.75+3)*1*2)+((2+1.5+2.75+7.75+7.5+7.75+2.75+1.5)*3.25)+(((2.1+5.85+2.1+2.7+8.7)*2.3)+((2.1+2.1+1+1)*1.3)))-31.68b. Dinding 1/2 Pas. Bata

    (4+7.75+3)*1*2c. Dinding Bangunan Mesjid

    (2+1.5+2.75+7.75+7.5+7.75+2.75+1.5)*3.25d. Dinding Bangunan WC

    ((2.1+5.85+2.1+2.7+8.7)*2.3)+((2.1+2.1+1+1)*1.3)e. Luasan Kusen Pada Bidang Bangunan (Faktor Pengurang) = 31.68 M2

    P 1 + P 2 + P 3 + J 1 = 31.68 M2 a) Tipe P1 (1 Unit) = 3.72 M2 b) Tipe P2 (2 Unit) = 4.32 M2 c) Tipe P3 (3 Unit) = 5.04 M2 d) Tipe J1 (6 Unit) = 18.60 M3

    Dinding Keramik WC & Tempat Wudhu Wanita 20 x 40 Cm (PERJELAS UKURAN TINGGI PAS. KERAMIK PADA GAMBAR t = 1.6 m)

    Lantai Keramik WC & Tempat Wudhu Wanita 20 x 20 Cm (PERJELAS UKURAN LUASAN PAS. KERAMIK PADA GAMBAR)

  • 2 Cat Dinding Tembok Interior & Plafond((Tinggi Pas. Batu Bata x Panjang Pas. Batu Bata) x 2) - Luasan Kusen Pada Bidang Bangunan = N

    a. Total = 96.94 M2(((7.75+7.5+7.75)*3.25)+((2.1+2.1+2.1+2.1+2.1+2.1+5.85+5.85)*2.3)+((7.75*7.5)+(1.5*1.9)))-95.72

    * Dinding Bangunan Mesjid(((7.75+7.5+7.75)*3.25)

    * Dinding Bangunan WC((2.1+2.1+2.1+2.1+2.1+2.1+5.85+5.85)*2.3))

    * Plafond Dalam((7.75*7.5)+(1.5*1.9))

    * Luasan Kusen Pada Bidang Bangunan (Faktor Pengurang) = 95.72 M2P 1 + P 2 + P 3 + J 1 = 94.68 M2 a) Tipe P1 (1 Unit) = 3.72 M2 b) Tipe P2 (2 Unit) = 4.32 M2 c) Tipe P3 (3 Unit) = 5.04 M2 d) Tipe J1 (6 Unit) = 18.60 M2 d) Pas. Dinding Keramik WC = 30.24 M2 d) Pas. Dinding Keramik Mesjid = 32.76 M2

    3 Cat Minyak Daun Pintu dan jendela + Asesoriesa. Total = 72.02 M2* (Panjang Kusen P1 + Lebar Kusen P1 ) x Lebar Bidang Kayu Balok x Tinggi Bidang Kayu Balok = N* Tipe P1 (1 Unit) = 9.52 M2

    (((1.55*0.12*3)+(1.55*0.06*4))+((2.4*0.12*2)+(2.4*0.06*4))+((0.5*0.12*2)+(0.5*0.06*2)))*1Daun Pintu6.51 Daun Jendela0.75

    * Tipe P2 (2 Unit) = 11.30 M2((((0.9*0.12*3)+(0.9*0.06*4))+((2.4*0.12*2)+(2.4*0.06*4)))*2)Daun Pintu7.56

  • Daun Jendela0.35

    * Tipe P3 (3 Unit) = 15.37 M2((((0.8*0.12*1)+(0.8*0.06*2))+((2.4*0.12*2)+(2.4*0.06*4)))*3)Daun Pintu11.34

    * Tipe J1 (4 Unit) = 35.83 M2((((1.55*0.12*4)+(1.55*0.06*6))+((2*0.12*4)+(2*0.06*6)))*6)Daun Jendela 28.72 Daun Jendela 24.11

    4 Cat Minyak Listplank((Panjang Sisi Atap x Lebar Sisi Atap ) = N

    a. Total = 29.55 M2((29.3*4)+(8.2*3)+(1.55*2)+(2.87*1))*0.2

    * Segmen 1(29.3*4)

    * Segmen 2(8.2*3)+(1.55*2)+(2.87*1)

    X1 Floor Drain = 3.00 Bh2 Kloset Jongkok = 2.00 Unit3 Pipa PVC 4" = 12.00 M14 Pipa PVC 1/2" = 15.00 M15 Kran Pipa PVC 1/2" = 6.00 Bh6 Jet Washer = 2.00 Bh7 Soap Holder Keramik (Tempat Sabun) = 2.00 Bh7 Keran air Jet Washer = 2.00 Bh

    XI PEKERJAAN LAIN - LAIN

    PEKERJAAN SANITAIR (TAMBAHKAN DETAIL GAMBAR SANITASI)

  • 1 Pembongkaran Dinding WC = 1.00 Ls2 Pas. Besi Grill Tempat Wudhu Wanita = 3.50 M1

    timeREKAP RABRABANALUPAHBACK UP DATA