Page 1: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV Bart De Poorter – General Manager GeoSea

5TH YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 OFFSHORE WIND - LATEST DEVELOPMENTS

Page 2: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

TABLE OF CONTENTS 1. DEME – Offshore Wind 2. Offshore Wind 2015 – Trends 3. Conclusions

Page 3: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

DEME - OFFSHORE WIND

Page 4: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

DEME - OFFSHORE WIND

A TOTAL SOLUTION FOR OFFSHORE WIND • Site Investigation • EPCI Foundations & Scour Protection • EPCI Offshore Substations • EPCI Offshore Cables • Wind Turbine Installation • Maintenance & Services

Page 5: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

5

DEME - OFFSHORE WIND ORGANISATION

• Soil Investigation • EPCI Foundations • Wind Turbines

Transport & Installation

• Cable Installation • Scour Protection • Rock Dumping

• Dredging Works • Infill of gravity-

based foundations

• Heavy Lifts • Installation of

Offshore Substations

• Maintenance & Services

Leading flag in Offshore Wind = GeoSea

• Investment & partnering: DEME Concessions, Power@Sea • New Technologies: High Wind, Flidar

Page 6: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

A leader in Offshore Wind : More than 30 reference projects A leader in Offshore Wind: More than 35 reference projects

7

Page 7: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

OFFSHORE WIND 2015 – TRENDS

Page 8: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

OFFSHORE WIND 2015 – TRENDS

• Nearshore Offshore

• Waterdepth increase

• Turbine size

• Environmental impact

• Europe Global industry

• Contract set up

• New technologies & equipment

• Safety

Page 9: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

NEARSHORE OFFSHORE

• Increasing water depth Impact on foundations

• No impact on wind farm layout!

Average water depth and distance to shore for online, under construction and consented offshore wind farms

(Bubble size represents the total capacity of the wind farm)

Page 10: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

NEARSHORE OFFSHORE

Typical fixed offshore foundations

Page 11: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

NEARSHORE OFFSHORE

• Monopiles XL monopiles (>1000 Tons)

at limit of manufacturing capacity

requires heavy lifting equipment

upgrade piling hammers

• Other foundations become economic

• Gravity Base Foundations

• Jacket

• Floating turbines?

Page 12: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

NEARSHORE OFFSHORE

= logistic concept has changed • Cargo on installation vessel Less vessels but large(r) size

• Harbour requirements

Page 13: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

JACK UP FLEET

Page 14: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

INCREASED TURBINE SIZE • Range 6 – 8 MW

• Better performance GWh/year

(higher availability + increased output)

• Expected: lower O&M cost

• Larger vessels for Transport & Installation

Page 15: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

ENVIRONMENTAL IMPACT • Particular attention for impact of offshore wind on eco system

Example: Noise Mitigation

• However; different regulations

o UK: Piling ban

o NL: No simultaneous piling operations

o GE: Noise level < 160 dB

• Requires innovative solutions

o Noise mitigation sleeve

o Bubble curtain

o …

Page 16: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

ENVIRONMENTAL IMPACT

Borkum West II Bubble Curtain

Page 17: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

ENVIRONMENTAL IMPACT

Gode Wind OWF Noise Mitigation System

Page 18: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

Godewind

Mermaid 500MW

Rentel 300MW

EVOLUTION T&I TO TURNKEY & FINANCE

2000 2004 2008 2012 2016 2020

€ EPCI

T&I

Turnkey & Finance

Samsö

Utgrunden London Array OHVS

Amrumbank OHVS

Butendiek OHVS

Northwind 216MW

Baltic 2 288MW

Ijmuiden Alpha

Ventus 30 MW WODS

Ormonde 150MW

Walney 367MW

Westermost Rough

Borkum Riffgrund

Borkum West II

200MW

Thornton Bank 325MW

Seastar 300MW

MEG1 400MW

Kentish Flats

Page 19: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

EUROPE GLOBAL INDUSTRY

• Traditional countries o Denmark, Sweden, UK, Germany, Netherlands,

Belgium • Newcomers o Netherlands (revival), France, China, US, Japan

• Maybe: o Taiwan, Korea, India, …

Page 20: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

HIGH TECH BUSINESS Evolving from ‘traditional’ marine works high tech industry

• Specialized equipment

• New technologies

Examples:

• Siemens Offshore Transmission Module (Alternative to HV Substation)

• Noise Mitigation Systems

• High Wind Boomlock

Room for improvement on cable installation, foundation design, O&M,…

Page 21: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

HIGH TECH BUSINESS

Boom Lock on Neptune

Page 22: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

HIGH TECH BUSINESS

Blade Testing

Page 23: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

SAFETY

Harsh environment

Very strict regulations

(~ Oil & Gas Industry)

- Vessel requirements

- Training of people (BOSIET, working at height, …)

Page 24: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

CONCLUSIONS

Page 25: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

CONCLUSIONS

• Offshore wind = Mature business

• Requires dedicated & specialized equipment

• High tech industry but still evolving!

Page 26: 5 YP-COM BIENNIAL TECHNICAL VISIT MAY 7TH 2015 ... BTV/Donderdag/GeoSea Pianc...at limit of manufacturing capacity requires heavy lifting equipment upgrade piling hammers •Other

All rights reserved - © D.E.M.E. NV

Disclaimer This presentation is not and does not constitute an offer or invitation to enter into a contract from GeoSea NV, or any of its affiliated or associated companies (“GeoSea”), nor does it form the basis of any contract or commitment. GeoSea makes no representation or warranty, express or implied, as to the accuracy, reliability or completeness of the material in this presentation. GeoSea, its directors, employees, agents and consultants, shall have no liability for negligence or negligent misstatements, arising out of, contained in or derived from any statements, opinions, information or matters, express or implied herein or for any omissions in this presentation. Statements contained in this presentation, particularly those regarding possible or assumed future performance, costs, production levels or rates, prices, resources, reserves or potential prospects of GeoSea are, or may be, forward looking statements or contain certain assumptions and do not constitute a warranty or commitment from GeoSea. This presentation and the information provided herewith are and remain the property of GeoSea, are presented to the recipient on a private and confidential basis and for the exclusive use of the recipients to whom it is addressed. In addition to the terms of any confidentiality undertaking that a recipient may have entered into with GeoSea, by its acceptance of the presentation, each recipient agrees that it will not, and it will procure that each of its agents, representatives, advisors, directors or employees (collectively, representatives), will not, and will not permit any third party to, copy, reproduce or distribute to others this presentation, in whole or in part, at any time without the prior written consent of GeoSea, and that it will keep confidential all information contained herein not already in the public domain and will use this presentation for the sole purpose of the development of the project addressed in the presentation for the recipient.

MORE INFO?

Bart De Poorter General Manager – GeoSea NV Tel: +32 3 250 53 12 E-mail: [email protected]