NEELUM JHELUM CONSULTANTS[JV between MWH-Int, NORPLAN, NESPAK, ACE & NDC] Tel: (+92) 58224 33653
Fax: (+92) 58224 32978e-mail: [email protected]
Malik House, Lower ChatterMuzaffarabad
Filing 120 Distribution: AddresseeCEO(NJHPC)
PM / DTLCRE C1/C3
CRE-E&MElectrical
File
Owner: Neelum Jhelum Consultants
Printed: 5 January 2016
Author: PE Electrical
Status: Final Doc ref: PO 19963 C1-C3-E1 Testing of Transformer Oil
Date: 05 January 2016
Our ref: PO-19963
Your ref: E-mail from the Office of CRE-E&M (Copy attached)
Chief Engineer & Project Director DELIVERY: BY HAND Neelum Jhelum Hydro Electric ProjectB – 4 Upper Chatter Muzaffarabad, AJK.
ATTENTION: MR. NAYYAR ALAUDDIN
NEELUM JHELUM HYDROELECTRIC PROJECTC1/C3/E1: TESTING OF TRANSFORMER OIL
Dear Sir:
With reference to the subject, enclosed herewith please find two sets of documents which have beensubmitted by Contractor. In one set, list of tests which are to be done as per Chinese Standards areindicated, while in the second set, lists of tests which are to be done as per NTDC are indicated.
You are requested to indicate as to which one you will like to carry out (i.e. the Chinese ones or NTDCones). Further, in case you want that tests indicated by NTDC should be performed, then confirm fromNTDC that the list given by Contractor regarding NTDC test is complete, and no test is missing.
You are requested to kindly send your reply at an early date and the same will be highly appreciated.
Yours faithfullyfor NEELUM JHELUM CONSULTANTS
(for)WILLIAM B. DOBBS, PEProject Manager
Encl: As stated
-
8/18/2019 51828
2/5
Muhammad lrfan Akhtar
From
Sent
To
Cc:
Subject
Attachments
Follow Up Flag
Flag Status
Assalam o alaikum
Dear Sir
Sheeraz Shakeel [[email protected]]
Wednesday, December
30
2015
9:3 AM
[email protected]; [email protected]; Murad Anwer S.E(Eiect) NJC
Fernando Urbieta ; Ch. Muhammad Ashraf; Hamad Khan
Insulation Oil Testing
img-Z29145040.pdf; img-Z29145058.pdf
Follow up
Flagged
As
attached herewith, contractor has given us
two
standards regarding INSULATING OIL TESTs.
1
According
to
them one is as per contract i-e GBSOlS0-2006
2- 2nd
is as
per
NTDC
requirement.
Both document have some tests common and some a.re different.
Your comments are required in this regard
that
which standard should
be
followed
?
Best
Regards
Sheeraz Shakil
ARE-Electrical
Neelum
Jhelum Consultants
Sr. Engineer
NESPAK
1
-
8/18/2019 51828
3/5
-
8/18/2019 51828
4/5
-
8/18/2019 51828
5/5