    NEELUM JHELUM CONSULTANTS[JV between MWH-Int, NORPLAN, NESPAK, ACE & NDC] Tel: (+92) 58224 33653

    Fax: (+92) 58224 32978e-mail: [email protected] 

    Malik House, Lower ChatterMuzaffarabad

    Filing 120 Distribution: AddresseeCEO(NJHPC)

    PM / DTLCRE C1/C3

    CRE-E&MElectrical

    File

    Owner: Neelum Jhelum Consultants

    Printed: 5 January 2016

     Author: PE Electrical

    Status: Final Doc ref: PO 19963 C1-C3-E1 Testing of Transformer Oil

    Date: 05 January 2016

    Our ref: PO-19963

    Your ref: E-mail from the Office of CRE-E&M (Copy attached)

    Chief Engineer & Project Director DELIVERY: BY HAND Neelum Jhelum Hydro Electric ProjectB  – 4 Upper Chatter Muzaffarabad, AJK.

    ATTENTION: MR. NAYYAR ALAUDDIN

    NEELUM JHELUM HYDROELECTRIC PROJECTC1/C3/E1: TESTING OF TRANSFORMER OIL

    Dear Sir:

    With reference to the subject, enclosed herewith please find two sets of documents which have beensubmitted by Contractor. In one set, list of tests which are to be done as per Chinese Standards areindicated, while in the second set, lists of tests which are to be done as per NTDC are indicated.

    You are requested to indicate as to which one you will like to carry out (i.e. the Chinese ones or NTDCones). Further, in case you want that tests indicated by NTDC should be performed, then confirm fromNTDC that the list given by Contractor regarding NTDC test is complete, and no test is missing.

    You are requested to kindly send your reply at an early date and the same will be highly appreciated.

    Yours faithfullyfor NEELUM JHELUM CONSULTANTS

    (for)WILLIAM B. DOBBS, PEProject Manager

    Encl:  As stated

  • 8/18/2019 51828

    2/5

    Muhammad lrfan Akhtar

    From

    Sent

    To

    Cc:

    Subject

    Attachments

    Follow Up Flag

    Flag Status

    Assalam o alaikum

    Dear Sir

    Sheeraz Shakeel [[email protected]]

    Wednesday, December

    30

    2015

    9:3 AM

    [email protected]; [email protected]; Murad Anwer S.E(Eiect) NJC

    Fernando Urbieta ; Ch. Muhammad Ashraf; Hamad Khan

    Insulation Oil Testing

    img-Z29145040.pdf; img-Z29145058.pdf

    Follow up

    Flagged

    As

    attached herewith, contractor has given us

    two

    standards regarding INSULATING OIL TESTs.

    1

    According

    to

    them one is as per contract i-e GBSOlS0-2006

    2- 2nd

    is as

    per

    NTDC

    requirement.

    Both document have some tests common and some a.re different.

    Your comments are required in this regard

    that

    which standard should

    be

    followed

    ?

    Best

    Regards

    Sheeraz Shakil

    ARE-Electrical

    Neelum

    Jhelum Consultants

    Sr. Engineer

    NESPAK

    1

  • 8/18/2019 51828

    3/5

  • 8/18/2019 51828

    4/5

  • 8/18/2019 51828

    5/5