    Operation and Maintenance:Power Projects

    7th February, 2012The Crowne Plaza Today, New Delhi

    Organized By

    www.powermarketsindia.com

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    2/13

    Integrated Automation of Hydro Power Plants

    Sanjay K SrivastavaHead of Department Information Technology

    Andritz Hydro Private Limited

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    3/13

    3 www.andritz.com

    Subsystems in the Power Plant

    Synchronization

    Automation and Control

    Monitoring & Diagnosis

    Turbine Controller

    Protection

    Excitation

    Power Plant Management

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    4/13

    4 www.andritz.com

    Functional Areas around the Power Plant

    Bottom Outlet

    Unit

    Auxiliaries

    Switchyard

    Control Room

    Intake

    Integrated Network Power Plant LAN(Ethernet, TCP/IP)

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    5/135 www.andritz.com

    Supra-Functional Areas

    Regional Control Room,Cascade Control

    Group Dispatch Center, National DPC

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    6/136 www.andritz.com

    Typical, Traditional Configuration

    Power Plant

    Management

    Automation &

    Control

    Tool

    Tool

    Monitoring &

    Diagnosis

    Turbine-

    controller Excitation

    Tool

    Tool

    Protection

    Tool

    Third-

    Party

    productTool

    Synchronizing

    Tool

    Third-

    Party

    product

    Different Communication - Different Hardware - Different Tools

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    7/137 www.andritz.com

    The NEPTUN Concept

    One Overall System - one Communication - one Hardware - one Tool

    Integrated Network Power Plant LAN, Ethernet TCP/IP

    Excitation ProtectionSynchronising

    Power Plant

    Management

    3rd Party

    Automation &

    Control

    Monitoring &

    Diagnosis

    Common

    Toolset

    Time3rd Party

    Turbine

    Governor

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    8/13

    8 www.andritz.com

    Typical Configuration

    Power Plant Management

    Joint Control(Level, P, Q, etc.)

    Integrated Network Power Plant LAN, Ethernet TCP/IP, Ringstructure, IEC 60870-5-104

    Synchronization

    Unit

    ExcitationGenerator

    TurbineController

    Backup

    Protection

    LocalDisplay

    Switchyard

    Protection

    Trafo

    Busbar

    Station-Controller

    BayController

    Feeder 1

    Feeder n

    Auxiliaries

    CommonControl

    Power Plant Control Room

    GPS,

    NTP

    EngineeringRedundant SCADA System

    Remote Access

    ControlBoard

    Intake / Weir

    UnitControl

    ControlBoard

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    9/13

    9 www.andritz.com

    Integration of New Services

    Integrated Network Power Plant Station Bus, Ethernet TCP/IP, Ringstructure, IEC 60870-5-104

    Common

    Control

    Remote Access

    Web-Cam

    Web-Cam

    WirelessAccesspoint

    Web-Cam

    VoIP Phone

    VoIP Phone

    VoIP PhoneMobile Web-Pad

    Mobile Web-Pad

    Web Server SMS

    Unit Switchyard AuxiliariesIntake / Weir

    Web-Cam

    Power Plant Control Room

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    10/13

    10 www.andritz.com

    Advantages of the Integrated Network Concept [1]

    Standardized, general communication

    General time synchronization

    One control hardware platform i.e. SICAM 1703 ACP

    One SCADA system i.e. 250 SCALA

    One tool i.e. Toolbox II

    Reduced maintenance (selfdiagnosis)

    Remote access for customer and/or Supplier

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    11/13

    11 www.andritz.com

    Advantages of the Integrated Network Concept [2]

    Step by step implementation of subsystems or functional areas or

    implementation of total solutions

    Reduction of I/O-hardware and cabling

    Reduction of engineering, erection works and documentation

    Reduction of spare parts by using one hardware system family

    More information about current power plant state

    Reduced training for operator and maintenance staff

    Integration of new services

  • 7/31/2019 5957_Sanjay Srivastava_Andritz Hydro Pvt Ltd

    12/13

    12 www.andritz.com

    Summary

    Increase of annual power output

    Integrated optimization

    Increased Availability (self-diagnosis)

    Application of power plant management

    Reduced total cost of ownership

    Reduced investment costs

    E.g. one communication network

    Step by step commissioning

    Minimized operation costs

    Reduced maintenance

    Reduced Downtimes by remote access

    Reduce spare parts by decreased product variety

    Reduced training