7/28/2019 6 Planilla de Metrados Agua
1/6
PROYECTO: CONSTRUCCION DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABL E DE CAYUMBA
UBICACI N: FECHA : OCTUBRE DEL 2,008DEPARTAMENTO : HUANUCOPROVINCIA : LEONCIO PRADODISTRITO : MARIANO DAMASO BERAUNLUGAR : CAYUMBA
LARGO ANCHO ALTO01.00.0001.01.00 UND 1.00 1.00 1.0001.02.00 MES 3.00 3.00 3.00
02.00.0002.01.0002.01.01 M2 1.00 0.80 0.65 0.52 8.36
1.00 1.15 1.60 1.841.00 4.00 1.50 6.00
02.01.02 M2 1.00 0.80 0.65 0.52 8.361.00 1.15 1.60 1.841.00 4.00 1.50 6.00
02.02.0002.02.01 M3 1.00 0.80 0.65 0.10 0.05 7.80
1.00 1.15 1.60 0.20 0.371.00 1.60 0.20 0.20 0.061.00 1.60 0.20 0.35 0.111.00 4.00 1.50 1.20 7.20
02.02.02 M3 1.25 0.80 0.65 0.10 0.07 9.751.25 1.15 1.60 0.20 0.461.25 1.60 0.20 0.20 0.081.25 1.60 0.20 0.35 0.141.25 4.00 1.50 1.20 9.00
02.03.0002.03.01 M3 1.00 1.60 0.20 0.35 0.11 2.91
1.00 1.60 0.20 0.20 0.061.00 1.60 1.15 0.15 0.282.00 1.10 0.15 1.00 0.332.00 1.20 0.15 1.00 0.361.00 1.50 1.10 0.05 0.082.00 1.50 0.40 0.35 0.422.00 1.50 0.15 1.20 0.541.00 1.50 1.30 0.15 0.291.00 1.30 1.00 0.15 0.201.00 0.80 0.65 0.10 0.052.00 0.55 0.10 0.80 0.09
2.00 0.50 0.10 0.80 0.081.00 0.70 0.60 0.05 0.02
02.03.02 M2 2.00 1.60 0.20 0.64 20.972.00 1.15 0.20 0.462.00 1.10 1.00 2.202.00 1.50 1.00 3.002.00 1.20 1.00 2.402.00 0.80 1.00 1.602.00 3.15 1.20 7.564.00 0.50 0.80 1.604.00 0.65 0.10 0.261.00 2.75 0.05 0.141.00 1.20 0.05 0.061.00 7.00 0.15 1.05
02.03.03 KG 76.10 76.10 76.1002.03.04 M3 1.00 1.50 1.30 0.40 0.78 1.04
1.00 0.50 1.30 0.40 0.26
02.04.0002.04.01 M2 2.00 1.20 1.00 2.40 10.00
2.00 0.80 1.00 1.601.00 1.20 0.80 0.961.00 1.20 1.20 1.442.00 1.50 1.20 3.60
02.04.02 M2 2.00 1.10 1.05 2.31 13.002.00 1.60 1.05 3.362.00 1.50 1.20 3.601.00 1.80 0.85 1.53
1.00 1.60 1.15 1.841.00 0.60 0.60 0.36
TARRAJEO EXTERIOR
REVOQUES ENLUCIDOS Y MOLDURASTARRAJEO CON IMPERMEABILIZANTES
OBRAS PROVISIONALES
OBRAS DE CONCRETO ARMADO
CARTEL DE OBRA DE 2.40X3.60 MALMACEN Y GUARDIANIA
METRADOS
PARTIDA DESCRIPCION UNIDADSUB
TOTALTOTALCANTIDAD
MEDIDAS
OBRAS PRELIMINARESLIMPIEZA DE TERRENO MANUAL
CAPTACION DE MANANTIAL
MOVIMIENTO DE TIERRASEXCAVACION MASIVA MANUAL
TRAZO Y REPLANTEO
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO Fy=4,200 KG/CM2CONCRETO CICLOPEO
-
7/28/2019 6 Planilla de Metrados Agua
2/6
PROYECTO: CONSTRUCCION DEL SISTEMA DE ABA STECIMIENTO DE AGUA POTABLE DE CAYUMBA
UBICACI N: FECHA : OCTUBRE DEL 2,008DEPARTAMENTO : HUANUCOPROVINCIA : LEONCIO PRADODISTRITO : MARIANO DAMASO BERAUNLUGAR : CAYUMBA
LARGO ANCHO ALTO
METRADOS
PARTIDA DESCRIPCION UNIDADSUB
TOTALTOTALCANTIDAD
MEDIDAS
02.05.0002.05.01 M 1.00 3.50 3.50 3.5002.05.02 M 1.00 2.50 2.50 2.50
02.06.0002.06.01 UND 2.00 2.00 2.0002.06.02 UND 1.00 1.00 1.0002.06.03 UND 1.00 1.00 1.00
02.07.0002.07.01 UND 1.00 1.00 1.0002.07.02 UND 1.00 1.00 1.00
02.08.0002.08.01 M3 1.00 1.50 1.30 0.60 1.17 2.73
1.00 2.00 1.30 0.60 1.56
02.08.02 M3 1.00 1.50 1.30 0.60 1.17 2.731.00 2.00 1.30 0.60 1.56
03.00.0003.01.0003.01.01 M 1.00 3,339.50 3,339.50 3,339.5003.01.02 M 1.00 3,339.50 3,339.50 3,339.50
03.02.0003.02.01 M 1.00 840.00 840.00 840.0003.02.02 M 1.00 2,349.50 2,349.50 2,349.5003.02.03 M 1.00 2,349.50 2,349.50 2,349.5003.02.04 M 1.00 3,339.50 3,339.50 3,339.5003.02.05 M 1.00 3,339.50 3,339.50 3,339.5003.02.06 M 1.00 3,339.50 3,339.50 3,339.50
03.03.0003.03.01 M 1.00 3,339.50 3,339.50 3,339.5003.03.02 M 1.00 3,339.50 3,339.50 3,339.50
03.04.0003.04.01 UND 52.00 52.00 52.00
03.04.02 UND 23.00 23.00 23.0003.04.03 UND 4.00 4.00 4.00
04.00.0004.01.0004.01.01 M2 1.00 4.00 4.00 16.00 17.58
1.00 1.50 1.05 1.58
04.02.0004.02.01 M3 1.00 4.00 4.00 0.80 12.80 14.06
1.00 1.50 1.05 0.80 1.2604.02.02 M3 1.25 4.00 4.00 0.80 16.00 17.58
1.25 1.50 1.05 0.80 1.58
04.03.0004.03.01 M2 1.00 4.00 4.00 16.00 17.58
1.00 1.50 1.05 1.58
04.04.0004.04.01 M3 1.00 4.00 4.00 0.20 3.20 10.01
2.00 3.60 0.15 1.95 2.112.00 3.30 0.15 1.95 1.931.00 3.60 3.60 0.15 1.941.00 1.50 1.05 0.10 0.161.00 1.30 0.15 0.90 0.182.00 1.00 0.15 0.90 0.271.00 1.30 1.15 0.10 0.152.00 0.15 0.15 1.80 0.08
04.04.02 M2 4.00 4.00 0.20 3.20 82.934.00 4.00 2.10 33.60
MOVIMIENTO DE TIERRASEXCAVACION MASIVA MANUAL
ELIMINACION DE MATERIAL EXCEDENTE
PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUA
TRAZO Y REPLANTEO
ACCESORIOS PARA TUBERIAS
CODO PVC SAP 2"X45
RELLENO CON MATERIAL PROPIOREFINE, NIVELACION Y FONDO PARA TUBERIASCAMA DE APOYA PARA TUBERIAS
LINEA DE CONDUCCION
TUBERIA PVC SAP 2" C-5
OBRAS PRELIMINARES
RESERVORIO (18.00 M3)OBRAS PRELIMINARES
TUBERAS
FILTRO DE GRAVA
FILTRO DE ARENA GRUESA
OBRAS DE CONCRETO ARMADOCONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
VALVULASVALVULA COMPUERTA DE BRONCE 2 1/2"VALVULA COMPUERTA DE BRONCE 2"
VARIOS
TUBERIA PVC SAP 2"TUBERIA PVC SAP 2 1/2" (REBOSE)
ACCESORIOS PARA TUBERIASCODO PVC SAP 2 1/2"TEE PVC SAP 2 1/2"CANASTILLA DE BRONCE DE 2"
TUBERIAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS EN TIERRA SUELTA H=1.00M
OBRAS DE CONCRETO SIMPLESOLADO E=4"
CODO PVC SAP 2"X90
DESBROCE DE MALEZAS Y ARBUSTOS
CODO PVC SAP 2"X22.5
EXCAVACIONES ROCA SUELTA H=1.00M
EXCAVACION DE ZANJA,T. ROCOSO S/EXPLOS. TUB. 6" MENOR
TRAZO, NIVELES Y REPLANTEO
-
7/28/2019 6 Planilla de Metrados Agua
3/6
PROYECTO: CONSTRUCCION DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE DE CAYUMBA
UBICACI N: FECHA : OCTUBRE DEL 2,008DEPARTAMENTO : HUANUCOPROVINCIA : LEONCIO PRADODISTRITO : MARIANO DAMASO BERAUNLUGAR : CAYUMBA
LARGO ANCHO ALTO
METRADOS
PARTIDA DESCRIPCION UNIDADSUB
TOTALTOTALCANTIDAD
MEDIDAS
4.00 3.30 1.95 25.741.00 3.30 3.30 10.891.00 5.70 0.10 0.571.00 1.30 0.90 1.172.00 1.15 0.90 2.073.00 1.00 0.90 2.702.00 1.15 1.30 2.99
04.04.03 KG 719.52 719.52 719.52
04.05.0004.05.01 M2 4.00 3.60 2.10 30.24 48.48
1.00 3.60 3.60 12.962.00 1.15 1.05 2.421.00 1.30 1.05 1.371.00 1.30 1.15 1.50
04.05.02 M2 4.00 3.30 1.95 25.74 36.631.00 3.30 3.30 10.89
04.06.0004.06.01 M 1.00 3.00 3.00 3.0004.06.02 M 1.00 3.00 3.00 3.0004.06.03 M 1.00 10.00 10.00 10.00
04.07.0004.07.01 UND 1.00 1.00 1.0004.07.02 UND 7.00 7.00 7.0004.07.03 UND 5.00 5.00 5.0004.07.04 UND 1.00 1.00 1.0004.07.05 UND 2.00 2.00 2.0004.07.06 UND 2.00 2.00 2.0004.07.07 UND 2.00 2.00 2.0004.07.08 UND 1.00 1.00 1.0004.07.09 UND 1.00 1.00 1.00
04.08.0004.08.01 UND 1.00 1.00 1.0004.08.02 UND 1.00 1.00 1.0004.08.03 UND 1.00 1.00 1.00
05.00.0005.01.0005.01.01 M 1.00 265.00 265.00 265.00
05.02.0005.02.01 M 1.00 265.00 265.00 265.0005.02.02 M 1.00 265.00 265.00 265.0005.02.03 M 1.00 265.00 265.00 265.0005.02.04 M 1.00 265.00 265.00 265.00
05.03.0005.03.01 M 1.00 265.00 265.00 265.0005.03.02 M 1.00 265.00 265.00 265.00
06.00.0006.01.0006.01.01 M2 10.00 1.00 1.00 10.00 11.60
10.00 0.40 0.40 1.60
06.02.0006.02.01 M3 10.00 0.40 0.40 0.80 1.28 11.84
10.00 0.80 0.80 1.65 10.5606.02.02 M3 10.00 0.40 0.40 0.40 0.64 0.64
10.00 0.80 0.80 1.1506.02.03 M3 12.50 0.40 0.40 0.40 0.80 4.80
12.50 0.80 0.80 0.50 4.00
06.03.00
06.03.01 M3 10.00 0.40 0.40 0.40 0.64 1.898.00 0.25 0.25 1.90 0.95
TUBERIAS
PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUA
TUBERIA FG 3"
EXCAVACION DE ZANJAS EN TIERRA SUELTA H=1.00MRELLENO CON MATERIAL PROPIO
CODO FG 3"
LINEA DE ADUCCION
CONCRETO F'C=175 KG/CM2
RELLENO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO ARMADO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRASEXCAVACION MASIVA MANUAL
TRAZO, NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
OBRAS PRELIMINARES
OBRAS PRELIMINARES
TEE C/REDUCCION FG 2 21/2"-2"
VALVULA COMPUERTA DE BRONCE 2"VALVULA COMPUERTA DE BRONCE 2 1/2"
TEE FG 2"TEE FG 3"
VARIOSESCALERA DE GATO
ACCESORIOS PARA TUBERIASCANASTILLA DE BRONCE 2 1/2"CODO FG 2"
TAPA METALICA (0.60X0.60)
VALVULA COMPUERTA DE BRONCE 3"
TUBERIA PVC SAP 2"
REFINE, NIVELACION Y FONDO PARA TUBERIASCAMA DE APOYA PARA TUBERIAS
HIPOCLORADOR
TUBERIA FG 2"TUBERIA FG 2 1/2"
REVOQUES ENLUCIDOS Y MOLDURASTARRAJEO EN EXTERIOR E=1.5 CM.
TUBERIAS
ACERO Fy=4,200 KG/CM2
TARRAJEO CON IMPERMEABILIZANTES
PASES AEREOS
-
7/28/2019 6 Planilla de Metrados Agua
4/6
PROYECTO: CONSTRUCCION DEL SISTEMA DE ABA STECIMIENTO DE AGUA POTAB LE DE CAYUMBA
UBICACI N: FECHA : OCTUBRE DEL 2,008DEPARTAMENTO : HUANUCOPROVINCIA : L EONCIO PRADODISTRITO : MARIANO DAMASO BERAUNLUGAR : CAYUMBA
LARGO ANCHO ALTO
METRADOS
PARTIDA DESCRIPCION UNIDADSUB
TOTALTOTALCANTIDAD
MEDIDAS
2.00 0.25 0.25 2.40 0.3006.03.02 M2 32.00 0.25 1.90 15.20 17.60
4.00 0.25 2.40 2.4006.03.03 KG 101.83 101.83 101.83
06.03.04 M3 2.00 1.10 1.10 0.80 1.94 5.622.00 1.10 1.00 0.80 1.766.00 0.80 0.80 0.50 1.92
06.04.0006.04.01 M2 32.00 0.25 1.90 15.20 17.60
4.00 0.25 2.40 2.40
06.05.0006.05.01 M 1.00 16.00 16.00 16.0006.05.02 M 1.00 16.00 16.00 16.00
06.06.0006.06.01 UND 2.00 2.00 2.00
06.07.0006.07.01 M 1.00 25.00 25.00 25.0006.07.02 M 2.00 1.27 2.54 5.64
2.00 0.80 1.602.00 0.53 1.061.00 0.44 0.44
06.07.03 UND 6.00 6.00 6.00
07.00.0007.01.0007.01.01 M 1.00 700.00 700.00 700.00
07.02.0007.02.01 M 1.00 700.00 700.00 700.0007.02.02 M 1.00 700.00 700.00 700.0007.02.03 M 1.00 700.00 700.00 700.0007.02.04 M 1.00 700.00 700.00 700.00
07.03.00
07.03.01 M 1.00 289.00 289.00 289.0007.03.02 M 1.00 50.00 50.00 50.0007.03.03 M 1.00 50.00 50.00 50.0007.03.04 M 1.00 1,010.00 1,010.00 1,010.0007.03.02 M 1.00 1,399.00 1,399.00 1,399.00
07.04.0007.04.01 UND 2.00 2.00 2.0007.04.02 UND 1.0007.04.03 UND 2.0007.04.04 UND 1.0007.04.05 UND 1.0007.04.06 UND 2.0007.04.07 UND 1.0007.04.08 UND 1.00
07.04.09 UND 2.0007.04.10 UND 8.0007.04.11 UND 1.0007.04.12 UND 2.0007.04.13 UND 2.00
08.00.0008.01.0008.01.01 M2 8.00 0.90 0.90 6.48 6.48
08.02.0008.02.01 M3 8.00 0.90 0.90 0.85 5.51 5.5108.02.02 M3 10.00 0.90 0.90 0.85 6.89 6.89
08.03.00
08.03.01 M3 8.00 0.90 0.90 0.15 0.97 2.9516.00 0.70 0.15 0.60 1.01
CAMA DE APOYA PARA TUBERIAS
REVOQUES ENLUCIDOS Y MOLDURASTARRAJEO EN EXTERIOR E=1.5 CM.
TUBERIAS
TUBERIAS
TUBERIA FG 2"
ACCESORIOS PARA TUBERIAS
MOVIMIENTO DE TIERRASEXCAVACION MASIVA MANUAL
CAJAS PARA VALVULASOBRAS PRELIMINARESTRAZO Y REPLANTEO
OBRAS DE CONCRETO
SUMINISTRO Y COLOCACION DE CRUZ PVC 2"
ELIMINACION DE MATERIAL EXCEDENTE
EXCAVACION DE ZANJAS EN TIERRA SUELTA H=1.00MRELLENO CON MATERIAL PROPIO
ACCESORIOS PARA TUBERIASSUMINISTRO Y COLOCACION DE TEE PVC 2" C/REDUCC. 3/4"
TUBERIA PVC SAP 1"TUBERIA PVC SAP 3/4"PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUA
TUBERIA PVC SAP 2"
REFINE, NIVELACION Y FONDO PARA TUBERIAS
RED DE DISTRIBUCIONOBRAS PRELIMINARESTRAZO, NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
PENDOLAS DE FIERRO 1/4"
ABRAZADERAS
UNION UNIVERSAL FG 2"
SISTEMA DE CABLEADOCABLE ACERADO DE 3/8"
ENCOFRADO Y DESENCOFRADO
ACERO Fy=4,200 KG/CM2
CONCRETO CICLOPEO
PRUEBA HIDRAULICA Y DESINFECCION DE REDES DE AGUA
TUBERIA PVC SAP 1 1/2"
REDUCC. PVC 2"-3/4"REDUCCION PVC 2"-1 1/2"SUMINISTRO Y COLOC. CRUZ 1 1/2"REDUCCION PVC 1 1/2"-3/4"REDUCCION PVC 1 1/2" - 1"
TEE PVC 3/4"SUMINISTRO Y COLOC. CRUZ PVC 3/4"
SUMINISTRO Y COLOC. CRUZ PVC 1"
REDUCCION PVC 1" - 3/4"TAPON PVC 3/4"TAPON PVC 1"
CONCRETO F'C=140 KG/CM2
-
7/28/2019 6 Planilla de Metrados Agua
5/6
PROYECTO: CONSTRUCCION DEL SISTEMA DE ABA STECIMIENTO DE AGUA POTABLE DE CAYUMBA
UBICACI N: FECHA : OCTUBRE DEL 2,008DEPARTAMENTO : HUANUCOPROVINCIA : LEONCIO PRADODISTRITO : MARIANO DAMASO BERAUNLUGAR : CAYUMBA
LARGO ANCHO ALTO
METRADOS
PARTIDA DESCRIPCION UNIDADSUB
TOTALTOTALCANTIDAD
MEDIDAS
16.00 0.40 0.15 0.60 0.588.00 0.70 0.70 0.10 0.39
08.03.02 M2 32.00 0.70 0.70 15.68 25.9232.00 0.60 0.40 7.6816.00 0.40 0.40 2.56
08.04.0008.04.01 UND 2.00 2.00 2.0008.04.02 UND 1.00 1.00 1.0008.04.03 UND 1.00 1.00 1.0008.04.04 UND 13.00 13.00 13.0008.04.05 UND 1.00 1.00 1.00
09.00.0009.01.0009.01.01 M2 2.00 1.10 1.70 3.74 3.7409.01.02 M2 2.00 1.10 1.70 3.74 3.74
09.02.0009.02.01 M3 2.00 1.10 1.70 0.90 3.37 3.3709.02.02 M3 2.00 1.10 1.70 1.10 4.11 4.11
09.03.0009.03.01 M2 2.00 1.25 1.80 4.50 4.50
09.04.0009.04.01 M3 6.00 1.45 1.25 0.15 1.63 1.6309.04.02 M2 6.00 1.50 1.30 11.70 11.7009.04.03 KG 2.00 54.78 109.56
09.05.0009.05.01 M2 10.00 0.90 1.50 13.50 13.5009.05.02 M2 8.00 1.10 1.70 14.96 14.96
09.06.0009.06.01 UND 2.00 2.00 2.00
09.07.0009.07.01 UND 2.00 2.00 2.00
10.00.0010.01.0010.01.01 M2 152.66 1.50 0.40 91.60 331.60
100.00 6.00 0.40 240.00
10.02.0010.02.01 M3 200.00 1.50 0.40 1.00 120.00 273.60
64.00 6.00 0.40 1.00 153.6010.02.02 M3 200.00 1.50 0.40 1.00 120.00 273.60
64.00 6.00 0.40 1.00 153.6010.03.0010.03.01 UND 152.00 152.00 152.00
10.04.00
10.04.01 UND 149.00 149.00 149.0010.04.02 UND 3.00 3.00 3.0010.04.03 UND 149.00 149.00 149.0010.04.04 UND 3.00 3.00 3.00
10.05.0010.05.01 M 191.00 1.50 286.50 670.50
64.00 6.00 384.0010.05.02 M 2.25 6.00 13.50 13.50
11.00.0011.01.00 GLB 1.00 1.00 1.00
12.00.0012.01.00 GLB 1.00 1.00 1.00
PLAN DE MANEJO AMBIENTAL
TAPON PVC 1/2"
FLETEFLETE TERRESTRE
TUBERIA PVC SAP 1/2"
PLAN DE MANEJO AMBIENTAL
TUBERIA PVC SAP 3/4"
VALVULA COMPUERTA DE BRONCE 3/4"
TAPON PVC 3/4"
TUBERIAS
RELLENO CON MATERIAL PROPIO
VALVULA COMPUERTA DE BRONCE 1/2"
CAJA DE REGISTROCAJA DE REGISTRO DE AGUA
C MARA ROMPE PRESI N
INSTALACIONES DOMICILIARIASOBRAS PRELIMINARESTRAZO Y REPLANTEO
TRABAJOS PRELIMINARES
REVOQUES Y ENLUCIDOS
ACCESORIOS
TAPAS MET LICAS
EXCAVACIN MANUAL
VALVULA COMPUERTA DE BRONCE 1"VALVULA COMPUERTA DE BRONCE 3/4"VALVULA COMPUERTA DE BRONCE 2 1/2"
MOVIMIENTO DE TIERRASEXCAVACION MASIVA MANUAL
CONCRETO SIMPLE
CONCRETO ARMADO
SOLADO PARA ZAPATAS E=4"
ACCESORIOS PARA VALVULASVALVULA COMPUERTA DE BRONCE 2"
LIMPIEZA DE TERRENO MANUALTRAZO, NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
ACCESORIOS-VLVULA
ACARREO DE MATERIAL EXCEDENTE (distancia prom. 30m)
CONCRETO F'C=210KG/CM2ENCOFRADO Y DESENCOFRADO
ACERO Fy=4200 Kg/CM2
TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1;1, E=1.5CMTARRAJEO EXT. ( MORTERO 1:5 )
ACCESORIOS ENTRA Y SALE DE 1"
TAPAS MET LICAS DE 30 X 30 CM
VALVULA COMPUERTA DE BRONCE 1 1/2"
ENCOFRADO Y DESENCOFRADO
-
7/28/2019 6 Planilla de Metrados Agua
6/6
PROYECTO: PAVIMENTACION URBANIZACION "LAS FLORES"
UBICACI N: DEPARTAMENTO : HUANUCOPROVINCIA : HUANUCODISTRITO : PILLCO MARCALUGAR : URB. "LAS FLORES"
1/0
02.00.0002.01.00
02.01.03 KG 6.00 1.558.00 1.10
16.00 1.5512.00 1.2512.00 1.4516.00 1.4008.00 0.759.00 1.106.00 0.558.00 1.5506.00 1.10
04.00.0004.04.00
04.04.03 KG 32.00 4.15064.00 1.50024.00 4.15092.00 2.60056.00 4.60026.00 3.90053.00 1.45016.00 3.9006.00 1.2004.00 3.2506.00 1.2505.00 1.100
06.00.0006.03.00
06.03.03 KG 32.00 2.10016.00 2.500130.00 1.000 3210.00 0.600
ACERO Fy=4,200 KG/CM2
RESERVORIO (18.00 M3)
PASES AEREOSCONCRETO ARMADO
CONCRETO ARMADO
Acero Fy=4,200 Kg/cm2
CONCRETO ARMADO
METRADOS
PARTIDA DESCRIPCION UNIDAD
Acero Fy=4,200 Kg/cm2 Grado 60
CAPTACION DE MANANTIAL
CANTIDAD LONGITUDLONGITUD
ACUMULADA