    Comparison Between AAC Blocks and CLC Blocks

    To answer the most common question people ask me, should I manufacture AAC* blocks or

    CLC^ blocks? here I am with the promised guide about comparison between AAC blocks and

    CLC blocks. I hope it helps my audience to decide the right product for them. I have tried to

    compare both products on various parameters. This by no means is an exhaustive list, but it

    might help to guide your decision making process in right direction. Ill include some moreparameters soon. Kindly go through it and let me know your views. I would be glad if this guide

    helps you decide on the right kind of lightweight block. So here is first episode in comparison

    between AAC blocks vs CLC blocks.

    Note: Kindly post your CLC related queries on our discussion forum. I have set up a dedicated

    topic to deal withCLC blocks and related queries.This would be like one stop solution for

    anybody looking for information related to CLC blocks.

    1. Production capacity

    Generally production capacity of CLC blocks ranges from 20 to 80 m3/day. This relatively smallcapacity is result of various factors which I have discussed below. In case you want to ramp up

    production, then there is very little you can do other than replicating the manufacturing line.

    Production capacity of AAC blocks starts from 160 m3/day and goes all the way up to 1500

    m3/day depending on client requirement. But most of the plants in India have production

    capacity in range of 500-1000 m3/day. For those who want to set up their first AAC plant, I

    would recommend 350-500 m3/day as initial capacity. Of course it can be scaled up later on

    without much hassle and little bit of extra investment. Going for capacity smaller than 350

    m3/day is not advisable as there is very small difference in terms of investment since except for

    extra autoclaves; rest of the equipment stays the same.

    So, if you are looking for a expandable project with bigger volumes, thenAAC blocks

    manufacturingis the one for you.

    2. Scalability

    As most of the CLC equipment is available in lower capacities, ramping up production would

    require setting up a parallel line. In addition to investment, it would also call for more

    manpower. Moreover like other cement products, CLC requires a total curing time of 28 days,

    more space would be required to accommodate increased production. Since CLC blocks

    require such long curing time, they cant be stacked up unlike AAC blocks to save space.

    It is possible to increase production capacity of AAC plant just by installing more autoclaves

    and some extra molds. As a matter of fact most of the equipment for plant capacity from 160

    m3/day to 800 m3/day is same except for number of autoclaves and molds. These factors work

    in favour of AAC as production capacity can be increased with much lower investment. AAC is

    the clear winner in this section.

    3. Land requirement

    CLC equipment requires very less space due to compact size and smaller production capacity.

    A CLC production facility requires around 350 m2 of covered space (depending on automation

    levels) for protecting CLC equipment from the elements. But much more space is required forcuring CLC blocks. As mentioned earlier, total curing time for CLC blocks is 28 days. Out of

    http://aac-india.com/aac-blocks-or-clc-blocks/http://aac-india.com/aac-blocks-or-clc-blocks/http://aac-india.com/aac-blocks-or-clc-blocks/http://autoclaved-aerated-concrete-aac-blocks-and-related-products.34331.n6.nabble.com/CLC-blocks-and-related-queries-td49.htmlhttp://autoclaved-aerated-concrete-aac-blocks-and-related-products.34331.n6.nabble.com/CLC-blocks-and-related-queries-td49.htmlhttp://autoclaved-aerated-concrete-aac-blocks-and-related-products.34331.n6.nabble.com/CLC-blocks-and-related-queries-td49.htmlhttp://aac-india.com/aac-blocks-project-consulting/http://aac-india.com/aac-blocks-project-consulting/http://aac-india.com/aac-blocks-project-consulting/http://aac-india.com/aac-blocks-project-consulting/http://aac-india.com/aac-blocks-project-consulting/http://aac-india.com/aac-blocks-project-consulting/http://autoclaved-aerated-concrete-aac-blocks-and-related-products.34331.n6.nabble.com/CLC-blocks-and-related-queries-td49.htmlhttp://aac-india.com/aac-blocks-or-clc-blocks/http://aac-india.com/aac-blocks-or-clc-blocks/
  • 8/11/2019 Aac Versus Clc

    2/6

    this, wet curing is required for minimum 14 days. Moreover since green CLC blocks cant be

    stacked above each other beyond a certain limit, lot of space is required. E.g. A CLC plant

    producing 50 m3/day would require minimum space of 1400 m2 to accommodate 28 days

    worth of blocks arranged in stacks of 1 m3 (1 m x 1 m x 1 m) each. Similarly if production is

    increased by 25 m3/day, space requirement would increase by 700 m2.

    On the other hand, AAC factory with production capacity of 500 m3/day requires around 5 acre(20,000 m2) of land. AAC blocks are ready to be used once they are steam cured inside

    autoclaves. Due to this AAC blocks can be stacked on top of each other without worrying about

    any damage. This way no additional space is required for finished goods storage even after

    capacity expansion. Even while expanding the capacity of an AAC plant land required does not

    increase drastically. E.g. scaling up from 160 m3/day to 240 m3/day requires less than 400 m2

    of space.

    A fresh batch of AAC blocks entering autoclave for steam curing

    4. Investment

    CLC equipment with production capacity of 20 m3/day ranges between Rs. 2-5 million

    depending on the supplier and level of automation. Project cost for a 20 m3/day plant would

    come to around Rs. 3.5-7 million excluding land. Since total production and hence sale of a

    CLC plant is lower, working capital requirement is smaller.

    Equipment cost for AAC plant of 500 m3/day would range from Rs. 50-80 million for Chinese

    equipment depending on the supplier and level of automation. Similar capacity equipment from

    European vendors would cost anywhere between Rs. 400-700 million. Most of the AAC

    machines in India are of Chinese origin, so well continue keeping that in mind. Project cost for

    a 500 m3/day plant would come to around Rs. 130-200 million excluding land. In addition to

    high project cost, working capital required for AAC plants is much higher due to bigger

    production capacity.

    In terms of investment, AAC is clearly the most capital intensive project and recommended for

    those with strong funding sources. While for those entrepreneurs who want to make smaller

    investment and test waters, CLC is the way to go.

    5. Manpower

    A medium capacity CLC plant of 40 m3/day would require 6-10 workers in a shift (8 hours),

    bringing total manpower requirement to 18-30 workers per day.

    http://aac-india.com/wp-content/uploads/2012/08/AAC_blocks_fed_in_autoclave.jpg
  • 8/11/2019 Aac Versus Clc

    3/6

    An AAC plant of 500 m3/day would require 12-15 workers in a shift (8 hours) with total

    manpower requirement to 36-45 workers daily.

    Have gone through your query about CLC vs AAC and will try to give your ans related to

    this query

    1. As far as the quality is concerned, How does CLC compare to AAC and how does it affect

    the end consumer perception when he is to make a choice?

    when we take about quality concerned in CLC you can achieve various strength and density as

    per the requirement of customer and In CLC you have various application apart from block. and

    when it comes to customers perception that which to choose among AAC or CLC i think this is

    not time for that because still AAC and CLC both are in their starting phase and as per my

    vision to market every customer has its own dilemma about any product which to choose. and

    also depend on your service and quality you offer. so both will work here in surat we have three

    plant of AAC and 20 plant of CLC every one is getting their part of market.

    2. What are the price points at which CLC and AAC blocks sell in the market?

    For the price point it mainly depends on the local market it changes every state to state and

    even city to city for example in Chennai CLC and AAC both selling price is round 3700 to 4000

    and in Bangalore it is 4500 to 4700 so selling and costing price point is depend on local raw

    material availability and their price and also make much difference on transportation too.

    3. How to go about setting up this plant? What all needs to be considered before making that

    investment?

    first of all consider your targeted market place and find near by thermal plant and check their fly

    ash quality and availability for the same and for CLC their are various plants available in market

    imported and from local manufactures too and this is all depends upon your available budget

    and always try to go with good plant offering best foam generator, mixture and foaming agent

    as this is very important for start up because in CLC manufacturing as you learn you can

    reduce the costing of blocks with your experience gain.

    4. Any ideas on why are these blocks not getting enough traction in domestic market i.e. when

    an end consumer buys bicks to construct his house.

    As i have mention above that this is just starting of CLC and AAC in India so will take time for

    consumer to adopt it. As in our city due to non availability of blocks builders do wait for blocks.

    so this is matter of time but in future every one will use this blocks due to their lots of benefit.

    5. Any ideas on selecting the location of plant to be setup.

    As per our suggestion location of plant should be not so far from available raw material and

    your targeted market because main cost adding factor for the blocks is transportation.

    Nilpesh Bhadania

  • 8/11/2019 Aac Versus Clc

    4/6

    1. Will CLC blocks always be more expensive than AAC blocks?

    Higher cost of CLC blocks can be attributed to higher cement content (25-40%) and foaming

    agent. Cost of foaming agent varies from Rs. 130-250 depending on origin and quality of

    foaming agent. Similarly, quantity of foaming agent required varies from 1.5-2.2 kg/m3. These

    two ingredients lead to higher raw material cost. When compared with AAC, raw material cost

    of CLC is much higher. This difference in cost is offset to an extent by lower overheads of CLCproduction compared to AAC production. But even after that cost of 1 m3 of CLC is higher than

    that of AAC.

    2. Weight and water absorption issues with CLC blocks.

    Density (weight) and strength of CLC blocks can be controlled by altering the recipe of CLC

    production. In fact in that regard CLC offers more flexibility by allowing blocks of various density

    and strength to be produced as per requirement.

    In addition to recipe, factors like strength and water absorption are also dependent on how well

    CLC blocks are cured. If recipe is not right and blocks are not cured properly, then weight,compressive strength and water absorption issues might crop up.

    You may also visit forum to discuss about CLC blocks in detail under topic titledCLC blocks

    and related queries

    Note: I dont have production experience with CLC blocks, but I have knowledge of it as a

    product in class of lightweight concrete just like AAC.

    Regards,

    We have been into light weight concreting since a long time but were doing only in-situ

    castings. We have a production capacity of 150 m3 per day which includes foam generator,

    mixer, dispensing pump which can pump the material directly to the moulds.

    Recently weve got an order from a reputed builder in Delhi-Ncr to produce CLC blocks for them

    at their site. Their criteria for the CLC blocks is density not more than 800-850 kg/m3 & strength

    not less than 3.5 mpa/mm2. We are using class 1 pond ash from the Dadri NTPC Plant & the

    design mix for the same is as under:

    Cement: 250 Kg.

    Flyash: 250 Kg.

    Water: 150 Liter.

    Foaming Agent: 1:40 Ltr. protein based

    Lime Water: 20 Ltr.Hardner: 1 Ltr.

    Kindly suggest if the design mix is right to attain the desired results because while doing trials

    for them we happened to achieve these results one or two times but are not getting it

    constantly. The trials were done in cubes whereas we are trying to authenticate ourselves by

    doing the same in proper mould size of 500x200x250 being stacked vertically in the height of

    500. Moreover we also intend to cure the days production in a steam curing chamber for 18

    hours so that we can despatch the days production on the third day. We have developed a

    steam curing chamber based on the principles of Autoclave chamber. Kindly suggest

    something to improve to achieve the desired results regularly.

    http://autoclaved-aerated-concrete-aac-blocks-and-related-products.34331.n6.nabble.com/CLC-blocks-and-related-queries-td49.htmlhttp://autoclaved-aerated-concrete-aac-blocks-and-related-products.34331.n6.nabble.com/CLC-blocks-and-related-queries-td49.htmlhttp://autoclaved-aerated-concrete-aac-blocks-and-related-products.34331.n6.nabble.com/CLC-blocks-and-related-queries-td49.htmlhttp://autoclaved-aerated-concrete-aac-blocks-and-related-products.34331.n6.nabble.com/CLC-blocks-and-related-queries-td49.htmlhttp://autoclaved-aerated-concrete-aac-blocks-and-related-products.34331.n6.nabble.com/CLC-blocks-and-related-queries-td49.htmlhttp://autoclaved-aerated-concrete-aac-blocks-and-related-products.34331.n6.nabble.com/CLC-blocks-and-related-queries-td49.html
  • 8/11/2019 Aac Versus Clc

    5/6

    Please reply ASAP as the client has already started setting up the production area to start the

    production immediately & we are waiting for the proper results to come up before investing in

    the moulds & steam curing chamber.

    Thanks & Regards,

    Dixit Bajaj

    09891060708

    Dear Sir,

    1 m3 material ratio-

    flyash- 520 kg price@1000 per ton=520rs

    cement-250kg price@300per bag =1500rs

    foming agent-2ltr price@160 per ltr =320

    wast oil use for mould 2ltr@40perltr = 80

    electricity use per m3 =120

    labour charges per m3 = 300

    total -

    2840other exp 260

    -

    3100

    we made clc block 900-950 density.

    can we replce cement and use lime.

    please replay soon.

    As per IS 2185, CLC density requirement is 800 kg/cbm and compressive strength should beminimum of 2.5 N/mm2. So guys, pls make sure the above important parameters are

    maintained when manufacturing CLC blocks.

    As per IS 2185, Density requirement for AAC blocks can be from 450-550 kg/cbm with

    compressive strength of 2 N/mm2.

    In hyderabad market, AAC blocks are manufactured around 600-650 kg/cbm density and

    around 3-4 N/mm2 strength. Where as CLC is around 800 kg/cbm and around 2.5 N/mm2

    strength.

    By looking at density, you can understand that about 150 200 kg less material is required formanufacturing of AAC blocks. Even though the setup costs are high for AAC plant, one can go

    upto 500-1000 cubic meter per day production capacity. This results in less overall

    manufacturing cost for AAC block. The highest capacity of CLC plant in India as per our

    knowledge is around 70 cubic meter per day (manpower requirement and land requirement is

    much higher in this case).

    Market acceptence of AAC blocks is much higher than CLC blocks even though the selling cost

    of CLC blocks is always 300-400 Rs per cubic meter less than AAC blocks. Current AAC

    market price is around 3400-3600 Rs/cubic meter, CLC market price is any where from 2800

    3100. This is because of the following points.

  • 8/11/2019 Aac Versus Clc

    6/6

    1. CLC blocks is heavier than AAC block. (4 AAC block weight is 7.5 kg, CLC block weight is

    10.5 to 11 kg).

    2. The edges/corners are easily damaged in clc blocks because they are naturally cured and to

    reach their maximum strengh it takes around 3 months. we normally deliver the blocks in 3

    weeks time.

    3. AAC block looks much better (yes, looks are important to builders it seems!!!).

    4. Yes, water absorption is very low in CLC blocks (around 10-12 %) compared to AAC blocks

    (around 20-25%).

    You can try reducing about 50 kg of flyash and 30-50 kg of cement and check the strength of

    the block. This will result in density of the block to 800 kg/cubic meter compared to your 900 kg.

    How much power is required for your CLC plant? our electricity cost per cubic meter is around

    60-70 Rs. We are using about 1.2 liter foaming agent per cubic meter.

    you can contact me for more information.