Hyundai Engineering Pakistan Private Limited {Attock Oil Refinery Up gradation Project}Working as “Sr. Mechanical Construction Engineer”, October 2015 – To dateAccomplishments:
Efficacious and fortuitous installation of Power Plant capacity 18 MW MAN Diesel/Fuel Engine Fabrication and Installation of Storage Tanks Erection of Vessels, Columns and Flare System A 12,500 BPSD DHDS unit installation for low sulpher high speed diesel and Pre-flash Unit 12,400 BSPD. Refinery shut down revamping work and Reformer Modification and 7000 BPSD Capacity isomerization unit Chemical Cleaning and pre commissioning activities along with Tie-Ins job with existing Plant
Al Husam General Contracting, Saudi Arabia Worked as “Superintendent Mechanical”, October 2014 – October 2015Accomplishments:
Efficacious and fortuitous installation and erection of 11 cooling towers/Air cooler (50 Tons/12 Meters) and Compressors (16 Tons) and 3 Storage Tanks
Auspicious erection and completion of 37 Pumps (5 Tons), Heat Exchangers, Vessels, Steel Structures both grounded and ungrounded
Supervised fabrication and field installation of all piping and Pipe supports work for A/G and U/G process and utility Piping
CPECC, (ALWASIT) IraqWorked as “Pipeline Engineer”, January 2014 – October 2014Accomplishments:
Eminent and efficient construction of 49 well heads, 300 KM Pipeline and Facility Processing Plant Successfully achieved all targets in IRAQ within stipulated timelines and budget
OMV, Pakistan, Latif Gas Field Project (Islamabad)Worked as “Pipeline Engineer”, April 2013 – December 2013Accomplishments:
Efficient laying, pigging, hydro testing and commissioning of 50km long DIA 36” pipeline along with triumphant fabrication and erection work for 12 finger and 48” Dia slug catcher
Abdul GhaffarAn Experienced Mechanical Construction Engineer
Email: [email protected] No. +92-345-5636953D.O.B: April 1, 1984LinkedIn: http://linkd.in/1G0y28H Twitter: @engrabdulghafarSkype ID: abdulghaffar702Passport # AS4184853Nationality: Pakistani
Why Abdul Ghaffar? An energetic, innovative and enthusiastic engineer with a diversified and more than 9 years of experience, strong
background of managing large teams, engineering project delivery and designing solutions in top MNCs (Gulf region) A resourceful and proactive professional looking for technical challenges and implementing complex mechanical
concepts to drive improvements in productivity and quality within allocated resources budgets and timelines Possesses sound technical knowledge of HSE related practices in Oil & Gas industry with hands on experience and
interest in fabrication, erection and planning of piping and execution services in construction industry Strong engineering and methodical aptitude of problem solving with an innate ability to analyze problems and devise
creative solutions under high pressure, dangerous and extremely difficult conditions
AREAS OF PROFESSIONAL STRENGTHS AND ENABLING SKILLS_________________________________
ASME, ASTM, API Codes & Standards Equipment/Tanks (Erection/Installation)
Steel Structure Erection Fabrication (Pipeline & Piping System CS&GRE)
MS Office Team Building
Erection (Pipeline & Piping System) Commissioning (Pipeline & Piping System)
Hydro testing (Pipeline & Piping System) Pre-commissioning (Pipeline & Piping System)
Excellent Communication Skills Resource Optimization
Efficacious erection and installation of piping work for 9 well heads along with 128 meter high Flare, knout drum and facility piping
Descon Engineering, (ABU DHABI) UAEBrouge –III ProjectIGD-5 ProjectWorked as “Piping Engineer”, September 2010 – April 2013Accomplishments:
Fortuitously supervised fabrication of spools 36000 DIA INCHES on within stipulated time and eminent supervision fabrication of 300 tons supports at workshop.
Outstanding supervision of erection/installation of piping spools at site and supervised pipe supports erection 200 tons in designated area.
Also worked on SHUTDOWN of Takreer Oil Refinery for MOC and Revamping work of Piping. GRE Piping works during turnaround of Takreer Oil Refinery Abu Dhabi.
PARCO DHDS (Diesel hydro-desulphurization), PakistanWorked as “Piping Engineer”, September 2008 – August 2010Accomplishments:
Triumphant completion and erection of 120000 DIA inches piping within stipulated time and fabricated tank 50 meter DIA
Fabricated tank 50 meter DIA with auspicious vacuum leak testing and hydro testing of tank under strict deadlines
Rikans International Pvt Ltd., PakistanWorked as “Construction & Service Engineer”, August 2007– September 2008Accomplishments:
Eminent technical evaluation of cranes, truck mounted cranes, excavators and loaders along with erection and installation of batching plant, transit mixer and truck mounted cranes.
Descon Engineering, PakistanWorked as “Trainee Engineer”, November 2006 – July 2007PPTI, ICC & PARCO Shutdown ProjectAccomplishments:
Successfully completed training on shutdown of chemical plant of ICI and Worked on turnaround of PARCO (2007)
________________________________________________PROFESSIONAL QUALIFICATION__________________________________________________________
University of Engineering and Technology, Taxila (2003- 2006)B.E (Mechanical)
______________________________________________PROFESSIONAL IN-HOUSE TRAININGS_____________________________________________________
Professional Training of piping Design and Layout system (NIDA Lahore) Engineering Project Management (PARCO, Descon and OMV Islamabad) Process Safety (PARCO, GASCO, BROUGE 3 PROJECT) Leadership & Time Management (Descon ABU DHABI and OMV Islamabad) Metal Fabrication (PARCO, Descon, OMV Islamabad, CPECC IRAQ) Service Quality Management(PARCO, Descon and OMV Islamabad) Heat exchangers(ICI Pakistan, PARCO) Registered Engineer with Pakistan Engineering Council (PEC)
Attock Oil Refinery Limited (ARL) Up Gradation Project, Rawalpindi, Pakistan