ใบรับรองผลการตรวจวิเคราะหผ์ลกระทบสิ่งแวดล้อมeia.onep.go.th/images/monitor/1584068044.pdf ·...
TRANSCRIPT
ภาคผนวก ค ใบรับรองผลการตรวจวเิคราะหผ์ลกระทบสิง่แวดล้อม
ภาคผนวก ค-1
ผลการตรวจวัดคุณภาพอากาศในบรรยากาศ
Analysis / Test Report
Rojana Industrial Park Public Co., Ltd.Report to:
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn:
Phone:
Fax:
Email:
Methavee Siangrai
Ext.
Ext.
0-2716-1759
0-2716-1750 - 5
Lot ID: 1953008
Date Received: Dec 16, 2019
Date Reported: Dec 20, 2019
Report Number: 1380598-1
Sampled by: Siriwit Ruangsom
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Page 1 of 1
Sample Description Air Quality
Location A1 : มมสยยดนนรร รลมนกอรอบบน (GPS 47P 0710503, 1442432)
Drawn into one glass filter paper (8x10 inch) placed in plastic bag and one quartz filter paper (8x10 inch) placed in plastic bag
Condition of Sample
Date of Analysis Dec 17, 2019
Lot ID Sampling Date Total Suspended Particulate (mg/m³)
Particulate Matter (PM-10) (mg/m³)
Barometric Pressure (mm Hg)
Atmospheric Temperature (°C)
1953008-1 Dec 06 0.220 0.113 755 29- Dec 07, 2019
1953008-2 Dec 07 0.144 0.080 755 30- Dec 08, 2019
1953008-3 Dec 08 0.121 0.062 755 29- Dec 09, 2019
1953008-4 Dec 09 0.136 0.078 755 29- Dec 10, 2019
1953008-5 Dec 10 0.157 0.100 755 29- Dec 11, 2019
1953008-6 Dec 11 0.152 0.077 755 30- Dec 12, 2019
1953008-7 Dec 12 0.141 0.092 755 31- Dec 13, 2019
0.33 0.12Guideline - -
Reference Method :
Total Suspended Particulate = US EPA 40 CFR Part 50 Appendix B
Particulate Matter (PM-10) = US EPA 40 CFR Part 50 Appendix J
Guideline :
Notification of the National Environmental Board. No.24, 2004 (B.E.2547) dated September 22, 2004
Technical Management :
Narumon Banchongkit
Supervisor
Approved By :
Wilawan Borirak
Assistant Manager
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 64/77, Moo. 4 Highway 331 km 91.5 T. Pluakdaeng A. Pluakdaeng Rayong 21140 Thailand I PHONE +66 0 3368 4940 I FAX +66 0 3368 4969
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21 / EMAIL S:\Reports\R_Air_Am7Days.rpt (12:55PM)
Analysis / Test Report
Rojana Industrial Park Public Co., Ltd.Report to:
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn:
Phone:
Fax:
Email:
Methavee Siangrai
Ext.
Ext.
0-2716-1759
0-2716-1750 - 5
Lot ID: 1953008
Date Received: Dec 16, 2019
Date Reported: Dec 20, 2019
Report Number: 1380598-2
Sampled by: Siriwit Ruangsom
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Page 1 of 1
Sample Description Air Quality
Location A2 : ววดอวมพววน (GPS 47P 0715869, 1444419)
Drawn into one glass filter paper (8x10 inch) placed in plastic bag and one quartz filter paper (8x10 inch) placed in plastic bag
Condition of Sample
Date of Analysis Dec 17, 2019
Lot ID Sampling Date Total Suspended Particulate (mg/m³)
Particulate Matter (PM-10) (mg/m³)
Barometric Pressure (mm Hg)
Atmospheric Temperature (°C)
1953008-8 Dec 06 0.138 0.059 755 29- Dec 07, 2019
1953008-9 Dec 07 0.143 0.061 755 30- Dec 08, 2019
1953008-10 Dec 08 0.107 0.052 755 29- Dec 09, 2019
1953008-11 Dec 09 0.129 0.063 755 29- Dec 10, 2019
1953008-12 Dec 10 0.235 0.115 755 29- Dec 11, 2019
1953008-13 Dec 11 0.099 0.089 755 30- Dec 12, 2019
1953008-14 Dec 12 0.129 0.092 755 31- Dec 13, 2019
0.33 0.12Guideline - -
Reference Method :
Total Suspended Particulate = US EPA 40 CFR Part 50 Appendix B
Particulate Matter (PM-10) = US EPA 40 CFR Part 50 Appendix J
Guideline :
Notification of the National Environmental Board. No.24, 2004 (B.E.2547) dated September 22, 2004
Technical Management :
Narumon Banchongkit
Supervisor
Approved By :
Wilawan Borirak
Assistant Manager
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 64/77, Moo. 4 Highway 331 km 91.5 T. Pluakdaeng A. Pluakdaeng Rayong 21140 Thailand I PHONE +66 0 3368 4940 I FAX +66 0 3368 4969
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21 / EMAIL S:\Reports\R_Air_Am7Days.rpt (12:56PM)
Analysis / Test Report
Rojana Industrial Park Public Co., Ltd.Report to:
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn:
Phone:
Fax:
Email:
Methavee Siangrai
Ext.
Ext.
0-2716-1759
0-2716-1750 - 5
Lot ID: 1953008
Date Received: Dec 16, 2019
Date Reported: Dec 20, 2019
Report Number: 1380598-3
Sampled by: Siriwit Ruangsom
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Page 1 of 1
Sample Description Air Quality
Location A3 : ววดปป าสามวคคคธรรมาวาส (GPS 47P 0718786, 1441014)
Drawn into one glass filter paper (8x10 inch) placed in plastic bag and one quartz filter paper (8x10 inch) placed in plastic bag
Condition of Sample
Date of Analysis Dec 17, 2019
Lot ID Sampling Date Total Suspended Particulate (mg/m³)
Particulate Matter (PM-10) (mg/m³)
Barometric Pressure (mm Hg)
Atmospheric Temperature (°C)
1953008-15 Dec 06 0.130 0.046 755 29- Dec 07, 2019
1953008-16 Dec 07 0.091 0.040 755 30- Dec 08, 2019
1953008-17 Dec 08 0.073 0.035 755 29- Dec 09, 2019
1953008-18 Dec 09 0.089 0.036 755 29- Dec 10, 2019
1953008-19 Dec 10 0.128 0.056 755 29- Dec 11, 2019
1953008-20 Dec 11 0.119 0.050 755 30- Dec 12, 2019
1953008-21 Dec 12 0.103 0.046 755 31- Dec 13, 2019
0.33 0.12Guideline - -
Reference Method :
Total Suspended Particulate = US EPA 40 CFR Part 50 Appendix B
Particulate Matter (PM-10) = US EPA 40 CFR Part 50 Appendix J
Guideline :
Notification of the National Environmental Board. No.24, 2004 (B.E.2547) dated September 22, 2004
Technical Management :
Narumon Banchongkit
Supervisor
Approved By :
Wilawan Borirak
Assistant Manager
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 64/77, Moo. 4 Highway 331 km 91.5 T. Pluakdaeng A. Pluakdaeng Rayong 21140 Thailand I PHONE +66 0 3368 4940 I FAX +66 0 3368 4969
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21 / EMAIL S:\Reports\R_Air_Am7Days.rpt (12:56PM)
Analysis / Test Report
Rojana Industrial Park Public Co., Ltd.Report to:
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn:
Phone:
Fax:
Email:
Methavee Siangrai
Ext.
Ext.
0-2716-1759
0-2716-1750 - 5
Lot ID: 1953008
Date Received: Dec 16, 2019
Date Reported: Dec 20, 2019
Report Number: 1380598-4
Sampled by: Siriwit Ruangsom
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Page 1 of 1
Sample Description Air Quality
Location A4 : ววดเวฬฬวนาราม (GPS 47P 0713740, 1439272)
Drawn into one glass filter paper (8x10 inch) placed in plastic bag and one quartz filter paper (8x10 inch) placed in plastic bag
Condition of Sample
Date of Analysis Dec 17, 2019
Lot ID Sampling Date Total Suspended Particulate (mg/m³)
Particulate Matter (PM-10) (mg/m³)
Barometric Pressure (mm Hg)
Atmospheric Temperature (°C)
1953008-22 Dec 06 0.166 0.090 755 29- Dec 07, 2019
1953008-23 Dec 07 0.094 0.059 755 30- Dec 08, 2019
1953008-24 Dec 08 0.124 0.050 755 29- Dec 09, 2019
1953008-25 Dec 09 0.090 0.050 755 29- Dec 10, 2019
1953008-26 Dec 10 0.174 0.098 755 29- Dec 11, 2019
1953008-27 Dec 11 0.183 0.081 755 30- Dec 12, 2019
1953008-28 Dec 12 0.104 0.053 755 31- Dec 13, 2019
0.33 0.12Guideline - -
Reference Method :
Total Suspended Particulate = US EPA 40 CFR Part 50 Appendix B
Particulate Matter (PM-10) = US EPA 40 CFR Part 50 Appendix J
Guideline :
Notification of the National Environmental Board. No.24, 2004 (B.E.2547) dated September 22, 2004
Technical Management :
Narumon Banchongkit
Supervisor
Approved By :
Wilawan Borirak
Assistant Manager
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 64/77, Moo. 4 Highway 331 km 91.5 T. Pluakdaeng A. Pluakdaeng Rayong 21140 Thailand I PHONE +66 0 3368 4940 I FAX +66 0 3368 4969
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21 / EMAIL S:\Reports\R_Air_Am7Days.rpt (12:56PM)
ภาคผนวก ค-2
ผลการตรวจวัดความเร็วลมและทศิทางลม
Analysis / Test Report
Page 1 of 2
For : Rojana Industrial Park Public Co., Ltd. Lot ID : 1953007 -1 to -7
Project Name : Lame Chabang Date Received : Dec 16, 2019
Address : 2034/115 26TH Fl. Italthai Towe, New Date Reported : Dec 21, 2019
Petchburi Road, Bangkapi, Huaykwang, Report Number : 1380595-1
Bangkok Thailand 10310 Parameter : Wind Speed / Wind Direction
Attn : Methavee Siangrai Location : มัสยดิพูร้ลูมกูอรอบนี
Phone : 0-2716-1750 - 5 (GPS 47P 0710503, 1442432)
Fax : 0-2716-1759 Sampling Date : Dec 06-13, 2019
Email : [email protected] Sampling by : Siriwit Ruangsom Personnel of
ALS Laboratory Group (Thailand) Co., Ltd.
Time
Date : Dec 06-07,
2019
Date : Dec 07-08,
2019
Date : Dec 08-09,
2019
Date : Dec 09-10,
2019
Date : Dec 10-11,
2019
Date : Dec 11-12,
2019
Date : Dec 12-13,
2019
WS
(m/s)
WD
(deg)
WS
(m/s)
WD
(deg)
WS
(m/s)
WD
(deg)
WS
(m/s)
WD
(deg)
WS
(m/s)
WD
(deg)
WS
(m/s)
WD
(deg)
WS
(m/s)
WD
(deg)
11:00 AM-00:00 PM 1.9 159.0 SSE 3.3 266.0 W 2.6 304.0 NW 4.0 295.0 WNW 3.3 248.0 WSW 5.3 189.0 S 3.9 292.0 WNW
00:00 PM-01:00 PM 2.2 284.0 WNW 2.3 42.0 NE 3.9 326.0 NW 3.5 286.0 WNW 4.5 290.0 WNW 8.0 251.0 WSW 0.7 336.0 NNW
01:00 PM-02:00 PM 6.3 348.0 NNW 2.1 330.0 NNW 3.3 295.0 WNW 3.2 83.0 E 4.0 253.0 WSW 6.7 269.0 W 1.6 298.0 WNW
02:00 PM-03:00 PM 3.6 276.0 W 4.5 301.0 WNW 4.7 305.0 NW 5.7 272.0 W 4.9 267.0 W 5.0 244.0 WSW 3.9 298.0 WNW
03:00 PM-04:00 PM 2.2 322.0 NW 1.2 307.0 NW 2.2 285.0 WNW 3.6 287.0 WNW 4.5 270.0 W 5.9 178.0 S 1.0 307.0 NW
04:00 PM-05:00 PM 8.6 352.0 N 1.3 359.0 N 5.6 44.0 NE 5.8 0.0 N 6.5 286.0 WNW 2.4 137.0 SE 0.9 312.0 NW
05:00 PM-06:00 PM 0.8 301.0 WNW 0.8 322.0 NW 1.9 331.0 NNW 1.5 352.0 N 1.8 295.0 WNW 0.0 - - 1.6 15.0 NNE
06:00 PM-07:00 PM 0.0 - - 0.0 - - 0.6 349.0 N 0.8 346.0 NNW 1.7 301.0 WNW 0.5 215.0 SW 0.2 - -
07:00 PM-08:00 PM 0.0 - - 1.8 305.0 NW 1.2 301.0 WNW 0.0 - - 2.0 38.0 NE 0.0 - - 0.1 - -
08:00 PM-09:00 PM 0.2 - - 2.8 345.0 NNW 0.2 - - 0.8 345.0 NNW 0.0 - - 1.1 218.0 SW 0.0 - -
09:00 PM-10:00 PM 0.4 317.0 NW 1.0 312.0 NW 0.7 309.0 NW 0.0 - - 0.0 - - 1.3 216.0 SW 0.2 - -
10:00 PM-11:00 PM 1.7 324.0 NW 6.9 310.0 NW 0.0 - - 0.0 - - 1.5 193.0 SSW 0.9 8.0 N 0.1 - -
11:00 PM-00:00 AM 4.4 305.0 NW 2.2 338.0 NNW 1.1 300.0 WNW 0.0 - - 0.6 26.0 NNE 0.0 - - 0.3 21.0 NNE
00:00 AM-01:00 AM 4.0 322.0 NW 2.4 310.0 NW 1.3 13.0 NNE 1.2 3.0 N 1.6 18.0 NNE 1.2 359.0 N 0.0 - -
01:00 AM-02:00 AM 1.8 288.0 WNW 1.9 298.0 WNW 1.6 270.0 W 0.0 - - 0.0 - - 0.0 - - 0.5 34.0 NE
02:00 AM-03:00 AM 3.9 291.0 WNW 4.9 19.0 NNE 1.4 283.0 WNW 3.6 359.0 N 1.2 14.0 NNE 0.8 24.0 NNE 0.3 35.0 NE
03:00 AM-04:00 AM 1.1 316.0 NW 3.1 323.0 NW 2.0 350.0 N 0.0 - - 1.1 11.0 N 0.6 26.0 NNE 0.2 - -
04:00 AM-05:00 AM 2.8 85.0 E 5.3 359.0 N 1.3 330.0 NNW 2.0 333.0 NNW 1.5 350.0 N 0.0 - - 0.2 - -
05:00 AM-06:00 AM 2.7 280.0 W 5.7 0.0 N 0.5 335.0 NNW 1.7 324.0 NW 1.3 20.0 NNE 0.0 - - 0.0 - -
06:00 AM-07:00 AM 6.1 301.0 WNW 2.5 9.0 N 1.5 39.0 NE 2.1 13.0 NNE 0.9 351.0 N 0.0 - - 0.8 343.0 NNW
07:00 AM-08:00 AM 5.5 242.0 WSW 6.5 331.0 NNW 8.7 2.0 N 5.0 23.0 NNE 5.5 357.0 N 1.5 0.0 N 0.9 18.0 NNE
08:00 AM-09:00 AM 7.4 278.0 W 2.5 323.0 NW 3.1 284.0 WNW 1.5 324.0 NW 2.0 307.0 NW 0.9 334.0 NNW 0.7 9.0 N
09:00 AM-10:00 AM 2.3 313.0 NW 5.1 333.0 NNW 4.7 290.0 WNW 1.1 276.0 W 3.0 285.0 WNW 2.4 344.0 NNW 0.5 15.0 NNE
10:00 AM-11:00 AM 3.5 359.0 N 5.2 268.0 W 2.2 330.0 NNW 0.9 305.0 NW 1.8 254.0 WSW 4.5 34.0 NE 0.2 - -
Reference Method : Cup Anemometer & Anodized Aluminium Vane Method
Technical Management : Approved by :
(Mr. Wichan Choonharat) (Mr. Sarayuth Jittranont)
15089-21/ EMAIL S:\Reports\GEN.RPT ( 7:31PM)
104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I +66 0 2760 3000 I +66 0 2760 3197 Part of the ALS Group
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any form without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
Analysis / Test Report
Page 2 of 2
For : Rojana Industrial Park Public Co., Ltd. Lot ID : 1953007 -1 to -7
Project Name : Lame Chabang Date Received : Dec 16, 2019
Address : 2034/115 26TH Fl. Italthai Towe, New Date Reported : Dec 21, 2019
Petchburi Road, Bangkapi, Huaykwang, Report Number : 1380595-1
Bangkok Thailand 10310 Parameter : Wind Speed / Wind Direction
Attn : Methavee Siangrai Location : มัสยดิพูร้ลูมกูอรอบนี
Phone : 0-2716-1750 - 5 (GPS 47P 0710503, 1442432)
Fax : 0-2716-1759 Sampling Date : Dec 06-13, 2019
Email : [email protected] Sampling by : Siriwit Ruangsom Personnel of
ALS Laboratory Group (Thailand) Co., Ltd.
Wind Rose
Date : Dec 06-07, 2019 Date : Dec 07-08, 2019 Date : Dec 08-09, 2019
Date : Dec 09-10, 2019 Date : Dec 10-11, 2019 Date : Dec 11-12, 2019
WS(m/s) %
> 10.0 0.00
8.0-10.0 1.78
5.5-8.0 8.33
3.3-5.5 17.86
1.7-3.3 21.43
0.3-1.7 31.55
Calms 19.05
Date : Dec 12-13, 2019 Date : Dec 06-13, 2019
Reference Method : Cup Anemometer & Anodized Aluminium Vane Method
Technical Management : Approved by :
(Mr. Wichan Choonharat) (Mr. Sarayuth Jittranont)
15089-21/ EMAIL S:\Reports\GEN.RPT ( 7:31PM)
104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I +66 0 2760 3000 I +66 0 2760 3197 Part of the ALS Group
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any form without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ภาคผนวก ค-3
ผลการตรวจวัดระดับเสียงทั่วไป
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552209-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-1
Parameter Noise (Leq 24 hrs.)
Location N1 : บ บานหนองพลลบ
Measurement Date Dec 06, 2019 Dec 07, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734220Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
47.8 66.6 43.4
46.4 61.9 42.6
48.7 64.8 44.1
49.6 67.1 45.7
48.7 63.8 44.4
45.1 62.5 42.4
45.6 57.4 44.6
42.8 51.2 42.0
43.5 62.2 41.4
43.0 71.3 41.1
45.6 66.3 42.1
46.3 61.5 43.5
45.1 59.7 42.6
43.1 56.3 41.0
48.7 64.8 44.8
46.2 61.7 43.0
44.4 51.5 41.9
47.3 63.9 44.1
50.3 65.0 46.6
55.5 69.5 51.7
53.5 69.5 50.2
52.1 69.7 47.6
48.9 71.8 43.2
46.6 68.8 40.9
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 48.7
Lmax (dB(A)) 71.8
L90 (dB(A)) 43.2
Ldn (dB(A)) 56.9
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบลบททส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดลบเสทยงโดยทลสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดลบเสทยงการรบกวน และระดลบเสทยงททสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552210-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-2
Parameter Noise (Leq 24 hrs.)
Location N1 : บ บานหนองพลลบ
Measurement Date Dec 07, 2019 Dec 08, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734220Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
44.0 62.5 40.6
46.3 62.2 42.0
46.1 65.6 42.0
46.8 60.8 43.8
46.4 63.7 42.6
44.9 59.5 41.9
45.1 62.6 43.5
48.3 74.0 41.7
42.6 57.5 41.2
41.9 65.3 40.4
42.4 62.8 40.6
42.0 69.6 38.9
44.2 65.5 40.0
44.1 55.0 41.8
47.4 63.6 43.7
50.2 72.0 39.0
44.6 69.8 40.2
48.9 73.1 41.6
44.8 64.1 41.7
45.7 60.0 43.0
49.1 72.9 44.1
47.1 70.0 41.2
44.6 65.5 39.7
44.8 68.9 41.1
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 46.1
Lmax (dB(A)) 74.0
L90 (dB(A)) 41.6
Ldn (dB(A)) 53.5
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบลบททส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดลบเสทยงโดยทลสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดลบเสทยงการรบกวน และระดลบเสทยงททสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552211-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-3
Parameter Noise (Leq 24 hrs.)
Location N1 : บ บานหนองพลลบ
Measurement Date Dec 08, 2019 Dec 09, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734220Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
49.8 84.9 39.9
45.8 62.2 41.9
49.6 78.4 44.6
51.2 82.4 45.3
48.1 66.9 44.3
44.2 66.6 42.2
51.2 75.3 43.0
43.3 67.7 41.2
41.8 69.6 39.5
40.5 62.6 37.8
41.8 59.1 39.0
40.7 67.2 38.2
41.4 67.1 36.9
37.8 56.5 36.7
43.2 63.4 39.6
42.1 63.7 40.3
40.8 59.9 38.4
47.3 61.4 42.4
46.6 66.3 43.5
49.4 71.4 44.5
48.8 69.3 43.7
49.2 71.4 43.7
45.2 67.2 40.5
42.9 62.9 37.2
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 46.7
Lmax (dB(A)) 84.9
L90 (dB(A)) 40.5
Ldn (dB(A)) 53.2
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบลบททส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดลบเสทยงโดยทลสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดลบเสทยงการรบกวน และระดลบเสทยงททสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552212-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-4
Parameter Noise (Leq 24 hrs.)
Location N1 : บ บานหนองพลลบ
Measurement Date Dec 09, 2019 Dec 10, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734220Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
40.4 59.3 36.6
48.0 75.3 37.2
44.9 69.2 41.2
49.9 85.2 40.0
46.7 66.9 42.5
49.7 78.7 44.5
51.4 82.7 45.7
48.6 67.2 44.6
44.6 66.9 42.5
51.6 75.6 43.5
41.4 59.5 39.9
49.7 71.7 38.4
45.5 67.6 36.9
45.7 68.4 36.2
48.1 65.0 44.2
47.3 61.9 43.8
44.4 51.3 42.0
47.0 56.4 44.0
49.0 65.2 45.3
55.6 69.7 51.7
53.8 67.9 50.7
52.4 69.7 48.7
47.8 69.9 41.0
38.3 74.1 32.8
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 49.3
Lmax (dB(A)) 85.2
L90 (dB(A)) 42.5
Ldn (dB(A)) 57.0
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบลบททส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดลบเสทยงโดยทลสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดลบเสทยงการรบกวน และระดลบเสทยงททสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552213-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-5
Parameter Noise (Leq 24 hrs.)
Location N1 : บ บานหนองพลลบ
Measurement Date Dec 10, 2019 Dec 11, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734220Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
41.2 68.9 32.8
41.3 65.6 36.6
39.2 58.2 35.0
43.9 69.8 36.2
41.9 62.2 35.2
45.4 70.5 35.8
45.5 77.2 42.2
42.4 58.0 40.3
43.1 66.0 38.4
40.7 58.3 38.4
39.4 59.6 37.9
50.0 71.5 38.0
45.4 68.2 36.4
44.2 65.4 35.9
50.5 73.5 36.4
41.6 69.5 35.9
38.4 54.3 36.5
45.1 58.6 41.2
46.9 68.3 41.7
48.6 80.3 42.2
47.3 77.7 36.9
43.9 66.1 39.3
44.8 72.0 37.9
44.0 74.5 36.3
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 45.1
Lmax (dB(A)) 80.3
L90 (dB(A)) 36.6
Ldn (dB(A)) 52.6
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบลบททส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดลบเสทยงโดยทลสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดลบเสทยงการรบกวน และระดลบเสทยงททสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552214-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-6
Parameter Noise (Leq 24 hrs.)
Location N1 : บ บานหนองพลลบ
Measurement Date Dec 11, 2019 Dec 12, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734220Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
40.2 65.7 35.1
40.8 61.6 36.3
42.3 65.1 37.0
45.5 71.1 38.6
46.7 76.2 40.6
45.0 62.6 40.0
45.1 61.9 44.0
43.5 77.3 42.3
41.8 61.5 40.4
42.2 61.8 40.1
40.4 52.0 39.5
40.9 63.2 39.0
39.0 55.9 37.4
41.6 61.7 37.3
39.7 56.7 37.6
40.8 60.6 38.0
42.6 67.1 39.9
44.3 62.1 40.9
46.2 67.5 42.4
46.3 70.8 42.4
46.1 68.0 40.5
45.5 71.6 40.7
44.8 74.8 38.0
41.8 64.7 35.9
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 43.7
Lmax (dB(A)) 77.3
L90 (dB(A)) 39.5
Ldn (dB(A)) 50.8
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบลบททส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดลบเสทยงโดยทลสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดลบเสทยงการรบกวน และระดลบเสทยงททสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552215-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-7
Parameter Noise (Leq 24 hrs.)
Location N1 : บ บานหนองพลลบ
Measurement Date Dec 12, 2019 Dec 13, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734220Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
46.3 62.7 42.5
46.4 65.8 42.2
46.7 61.4 43.3
46.5 61.8 43.1
45.8 63.9 42.0
45.2 56.8 43.8
48.2 74.2 42.4
44.8 70.1 41.5
42.5 65.5 40.8
42.6 63.0 41.1
43.0 69.8 39.6
43.5 65.7 39.1
44.5 56.1 42.2
47.0 63.8 43.2
49.8 72.2 40.8
47.4 70.0 40.8
48.0 73.3 40.4
46.5 64.9 42.1
45.3 61.4 42.5
48.4 73.1 44.9
48.5 70.6 41.6
44.9 65.7 40.1
45.4 69.1 41.2
44.0 71.8 40.4
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 46.3
Lmax (dB(A)) 74.2
L90 (dB(A)) 41.6
Ldn (dB(A)) 53.6
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบลบททส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดลบเสทยงโดยทลสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดลบเสทยงการรบกวน และระดลบเสทยงททสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552216-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-8
Parameter Noise (Leq 24 hrs.)
Location N2 : บ บานตะเคคยนเตคตย
Measurement Date Dec 06, 2019 Dec 07, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734221Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
64.6 81.3 59.4
64.7 83.1 59.7
61.2 78.3 56.4
64.4 81.1 60.3
64.8 83.0 59.5
62.8 86.5 57.6
62.8 89.3 55.6
54.6 86.7 44.9
45.9 71.8 37.4
48.0 71.9 38.6
50.3 73.2 40.8
48.9 77.0 35.2
50.2 80.1 37.0
50.2 75.1 37.5
42.3 62.5 34.7
34.7 54.8 31.0
40.8 63.1 35.1
36.0 59.5 30.9
37.1 57.5 32.2
54.7 81.0 38.1
49.5 71.8 41.3
51.1 76.4 44.7
49.9 71.4 43.6
49.6 71.7 42.5
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 58.8
Lmax (dB(A)) 89.3
L90 (dB(A)) 40.8
Ldn (dB(A)) 60.0
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบบบทคส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดบบเสคยงโดยทบสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดบบเสคยงการรบกวน และระดบบเสคยงทคสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552217-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-9
Parameter Noise (Leq 24 hrs.)
Location N2 : บ บานตะเคคยนเตคตย
Measurement Date Dec 07, 2019 Dec 08, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734221Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
47.3 67.6 40.3
49.5 73.1 44.3
47.5 70.4 37.9
51.2 80.4 39.2
47.4 67.6 39.6
48.3 70.0 45.0
51.7 76.6 43.2
49.8 74.7 41.8
42.8 64.2 36.5
48.6 70.6 44.0
47.0 75.7 39.1
39.2 59.8 33.3
45.7 72.8 32.0
43.6 66.8 30.5
36.5 59.2 31.6
36.0 55.3 32.3
37.2 63.1 31.5
34.2 51.6 30.1
48.5 78.0 32.1
51.5 78.3 41.9
50.3 74.3 40.2
49.1 72.8 41.0
46.9 71.0 41.2
49.2 70.5 43.5
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 47.8
Lmax (dB(A)) 80.4
L90 (dB(A)) 39.2
Ldn (dB(A)) 53.7
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบบบทคส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดบบเสคยงโดยทบสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดบบเสคยงการรบกวน และระดบบเสคยงทคสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552218-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-10
Parameter Noise (Leq 24 hrs.)
Location N2 : บ บานตะเคคยนเตคตย
Measurement Date Dec 08, 2019 Dec 09, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734221Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
47.7 72.5 38.9
46.6 69.3 38.4
46.4 71.6 38.0
45.5 66.7 38.2
48.5 69.9 39.6
46.5 66.7 38.8
50.7 74.4 44.8
48.4 68.6 42.6
49.1 71.7 39.0
52.6 81.7 40.9
49.1 71.3 43.5
49.8 72.4 46.3
53.0 77.9 43.7
50.0 76.0 41.3
45.6 63.4 40.1
49.9 71.9 45.1
46.9 77.0 38.5
51.2 80.5 33.0
44.3 63.4 39.0
49.3 72.2 39.7
53.0 82.2 41.0
49.2 69.4 41.4
50.1 71.8 46.8
55.8 78.4 49.9
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 50.0
Lmax (dB(A)) 82.2
L90 (dB(A)) 40.1
Ldn (dB(A)) 56.1
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบบบทคส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดบบเสคยงโดยทบสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดบบเสคยงการรบกวน และระดบบเสคยงทคสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552219-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-11
Parameter Noise (Leq 24 hrs.)
Location N2 : บ บานตะเคคยนเตคตย
Measurement Date Dec 09, 2019 Dec 10, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734221Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
64.3 81.6 59.2
63.2 80.6 58.7
60.8 77.7 55.5
64.5 78.8 60.1
63.0 88.8 57.9
63.4 88.5 57.4
62.4 92.1 54.9
61.2 88.5 50.3
50.5 75.1 41.0
50.2 79.9 41.6
46.0 68.0 38.0
40.4 74.2 35.0
37.8 55.0 33.8
38.0 57.4 33.3
36.5 58.8 31.9
57.9 83.5 31.7
48.9 78.0 30.8
35.6 52.0 29.6
49.5 77.6 41.7
51.6 77.1 38.3
60.2 83.8 51.4
66.1 93.3 58.4
62.7 89.7 55.5
57.5 74.8 52.4
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 60.1
Lmax (dB(A)) 93.3
L90 (dB(A)) 41.7
Ldn (dB(A)) 66.0
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบบบทคส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดบบเสคยงโดยทบสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดบบเสคยงการรบกวน และระดบบเสคยงทคสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552220-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-12
Parameter Noise (Leq 24 hrs.)
Location N2 : บ บานตะเคคยนเตคตย
Measurement Date Dec 10, 2019 Dec 11, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734221Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
63.7 82.6 57.6
64.1 83.6 57.9
61.6 83.5 54.6
61.4 83.5 55.1
62.2 81.8 55.7
61.3 83.4 56.0
61.9 80.7 54.7
61.9 85.5 51.2
53.2 77.6 44.7
45.3 62.9 40.2
42.1 61.2 37.7
41.7 61.8 36.2
39.8 63.4 34.1
44.0 66.3 34.6
37.0 63.0 33.7
39.0 63.4 33.8
52.5 79.0 32.6
38.5 71.4 32.9
49.5 79.2 34.2
54.9 80.8 39.4
62.4 81.4 55.7
66.3 83.8 60.5
63.8 84.1 59.0
60.7 79.8 55.7
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 60.1
Lmax (dB(A)) 85.5
L90 (dB(A)) 44.7
Ldn (dB(A)) 66.4
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบบบทคส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดบบเสคยงโดยทบสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดบบเสคยงการรบกวน และระดบบเสคยงทคสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552221-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-13
Parameter Noise (Leq 24 hrs.)
Location N2 : บ บานตะเคคยนเตคตย
Measurement Date Dec 11, 2019 Dec 12, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734221Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
65.5 81.5 60.7
65.6 82.7 59.9
61.4 86.3 55.2
63.3 81.5 57.4
63.6 86.8 57.9
65.9 86.8 59.2
62.3 89.2 55.8
60.5 83.3 53.9
49.1 70.9 41.0
49.4 77.3 39.8
44.4 65.2 38.4
41.4 60.8 36.3
39.7 61.0 34.3
50.1 79.1 33.7
46.8 79.1 31.7
34.9 56.2 31.9
52.9 80.3 31.3
35.9 52.0 32.2
51.0 80.3 34.1
55.7 80.7 40.8
63.4 91.3 54.7
66.2 89.9 60.1
67.4 89.5 62.0
65.5 82.0 60.3
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 61.8
Lmax (dB(A)) 91.3
L90 (dB(A)) 41.0
Ldn (dB(A)) 68.0
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบบบทคส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดบบเสคยงโดยทบสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดบบเสคยงการรบกวน และระดบบเสคยงทคสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
Analysis / Test Report
Project Name : Lame Chabang
Location :
P/O :
Receipt No :
Lot ID: 1953011Dec 16, 2019 Date Received :
Dec 24, 2019 Date Reported :
1552222-1 Report Number :
Report to : Rojana Industrial Park Public Co., Ltd.
2034/115 26TH Fl. Italthai Towe, New Petchburi Road, Bangkapi, Huaykwang, Bangkok Thailand 10310
Attn :
Phone :
Fax :
Email :
Methavee Siangrai
0-2716-1750 - 5
0-2716-1759
Page 1 of 1
Reference Number 1953011-14
Parameter Noise (Leq 24 hrs.)
Location N2 : บ บานตะเคคยนเตคตย
Measurement Date Dec 12, 2019 Dec 13, 2019 -
Measurement By Siriwit Ruangsom Personnel of ALS Laboratory Group (Thailand) Co., Ltd.
Serial No. 734221Sound Level Meter
Leq (dB(A)) Lmax (dB(A)) L90 (dB(A))
65.5 84.5 60.1
67.6 84.0 62.5
57.1 82.5 51.8
57.5 77.5 52.2
63.4 81.7 58.1
64.5 83.1 59.1
61.4 84.8 54.5
59.4 82.8 49.0
54.9 86.8 42.4
48.7 69.9 37.6
42.7 66.0 36.1
40.3 63.1 35.7
52.2 77.2 34.7
39.5 64.5 33.8
51.3 78.0 33.5
44.9 76.5 32.8
35.7 61.5 32.2
51.6 77.2 33.2
50.0 78.6 34.7
54.0 78.7 40.5
61.6 89.1 54.5
64.4 78.3 58.0
62.9 83.5 57.8
62.7 82.0 57.2
08:00 AM - 09:00 AM
09:00 AM - 10:00 AM
10:00 AM - 11:00 AM
11:00 AM - 12:00 PM
12:00 PM - 01:00 PM
01:00 PM - 02:00 PM
02:00 PM - 03:00 PM
03:00 PM - 04:00 PM
04:00 PM - 05:00 PM
05:00 PM - 06:00 PM
06:00 PM - 07:00 PM
07:00 PM - 08:00 PM
08:00 PM - 09:00 PM
09:00 PM - 10:00 PM
10:00 PM - 11:00 PM
11:00 PM - 12:00 AM
12:00 AM - 01:00 AM
01:00 AM - 02:00 AM
02:00 AM - 03:00 AM
03:00 AM - 04:00 AM
04:00 AM - 05:00 AM
05:00 AM - 06:00 AM
06:00 AM - 07:00 AM
07:00 AM - 08:00 AM
Time
Leq Average 24 hrs. (dB(A)) 60.5
Lmax (dB(A)) 89.1
L90 (dB(A)) 42.4
Ldn (dB(A)) 65.6
70 115Standard (dB(A))
Reference Method : Based on ISO (1996)/1
Standard : 1. ประกาศคณะกรรมการสสสงแวดล บอมแหหงชาตส ฉบบบทคส 15 (พ.ศ. 2540) เรรสองกกาหนดมาตรฐานระดบบเสคยงโดยทบสวไป 2. ประกาศกระทรวงออตสาหกรรม เรรสองกกาหนดคหาระดบบเสคยงการรบกวน และระดบบเสคยงทคสเก สดจากการประกอบกสจการโรงงาน พ.ศ. 2548
Technical Management
Saranya Chalermthamrong
Scientist (4)
Approved by
Supot Salamteh
Supervisor
The above results are valid only for the analyzed/tested sample(s) as indicated in this report. No part of this report or certificate may be reproduced in any from without written consent from the Laboratory. ALS Laboratory Group (Thailand) strongly recommends that this report is not reproduced except in full.
ADDRESS 104 Phatthanakan 40, Phatthanakan Rd., Khwaeng Phatthanakan, Khet Suan Luang, Bangkok 10250 Thailand I PHONE +66 0 2760 3000 I FAX +66 0 2760 3197
ALS LABORATORY GROUP (THAILAND) CO., LTD. Part of the ALS Group
15089-21/ EMAIL
ภาคผนวก ค-4
ผลการตรวจวัดระดับเสียงรบกวน