Af t a b A l a m A m ir H a ss a n Cell no: 00 966 58163 8588. Skype id: aftab.alam386 Email id: s . a f t a b 7 6@ g m a i l . co m Indian cell no: 00919971735098. P o s t A p p l i e d F o r – Sr. Mechanical Inspector. -------------------------------------------------------------- -------------------------------------- O b j e ct iv e : To w o rk with a p r ogr e s s i ve o r g a n i z at ion whi c h g i v e s oppo r t u ni t y to Uti l i z e m y skill tow a rds t he gro w th o f the o r g a n i z a t i on a nd fo r b r i g ht p e rs o n a l c a r e e r . ------------------------------------------------------------------------- -------------------------------------------- T o t a l w o r kin g e x p e ri e n c e i n A b r oad Gulf & East Africa: Fifteen (15) Years. Total Metro rail working experience : About 04 Years. P ro fe s s io n al S u m m a ry 14 Years of Experience as a Mechanical Inspector / Engineer in Gulf and East Africa. Supervision and Execution of site Plumbing,Fire Fighting ,HVAC , Pipeline & Steel Structure work. Ability to read, review, understand and implement work on site according to approved shop drawings. Performs the duties of a Mechanical Inspector in MOI Projects, Saudi Electricity Company (SEC) Sub stations projects in KSA , Medical Complex project & Dubai Metro project in Dubai and KBL and Oswal University Projects in Nairobi, Oil field projects in Muscat, Riyadh Metro. . C urre n t Em p loyme n t : Organization:

Upload: aftab-alam

Post on 11-Feb-2017

35 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Aftab Alam CV

Afta b Ala m A mir Ha ssa n

Cell no: 00 966 58163 8588. Skype id: aftab.alam386Email id: s . a f t a b 7 6@ g m a i l . co m Indian cell no: 00919971735098.

P o s t A p p l i e d F o r – Sr. Mechanical Inspector. ----------------------------------------------------------------------------------------------------

Ob jective: To wo rk with a progressi ve or ganiz ation which giv es opportunit y to

Uti l i z e m y skill tow a rds t he gro w th o f the o r g a n i z a t i on a nd fo r b r i g ht p e rs o n a l c a r e e r .---------------------------------------------------------------------------------------------------------------------

T o t a l w o r kin g e x p e ri e n c e i n A b r oad Gulf & East Africa: Fifteen (15) Years. Total Metro rail working experience : About 04 Years.

Professional Summary

14 Years of Experience as a Mechanical Inspector / Engineer in Gulf and East Africa. Supervision and Execution of site Plumbing,Fire Fighting ,HVAC , Pipeline & Steel Structure work. Ability to read, review, understand and implement work on site according to approved shop

drawings. Performs the duties of a Mechanical Inspector in MOI Projects, Saudi Electricity Company (SEC)

Sub stations projects in KSA , Medical Complex project & Dubai Metro project in Dubai and KBL and Oswal University Projects in Nairobi, Oil field projects in Muscat, Riyadh Metro..

Current Emp loyment :Organization: RAMPED Consortium. Riyadh.KSA. Clint: Ar Riyadh Development Authority. ADA. Project: Riyadh Metro Project. Package – 3. Line-5 UGD.

Currently working as a Sr.Mechanical Inspector for Riyadh Metro Project-Package-03Line-5.UGD,DEPOT And Station’s from September 2015 to till dated. 15 Months onwards.

Page 2: Aftab Alam CV

Experience Profile 01.

Organization: NKY Architects & Engineers. Grand Tower.16th Floor. King Fahd Road. Riyadh.KSA. Web : www.nky.com.tr

Clint:

Profession: Mechanical Supervisor.Period: December 2014 to August 2015.Pr oject: KAP-2. Ministry of Interior. Duty & Responsibilities: To inspect the MEP work done by contractor as per shop drawing ,approved material and standard

project technical specification ( PTS). Prepare the daily progress report. Monitor the daily base weather inclement plan. Check the shop drawing on PCM. Check the method statement for MEP on PCM. Check the ITP on PCM.Experience Profile 02.

O rg a ni z at i o n : Othman Consultant Group. Contemporary Structure Company.

Khober. Kingdom of Saudi Arabia. Web: ww w. cost .c om. s aProf ession: Mechanical Inspector.P er i o d : July 2013 to July 2014. One Year.

Projects , Duty and R esponsibilities: Saudi Electricity Company 132 KV & 33 KV Sub stations & Customer Service bldg in Al Jouf area

Work as a Mechanical Inspector. Installation and execution of all Mechanical work at site. HVAC installation work , smoke test and air balancing with Clint Engineer. Installation of fire fighting system- Sprinkler system, Fire Hose Cabinet, CO2 fire suppression system as per

NFPA Standards. Raise the RFI to Clint Engineer. Control the man power ,machine power and materials on site. Prepare the weekly work progress and report to the HO. Co-ordinate with Structural, Architectural and Electrical Engineers for site progress. Instruct site supervisors regarding further work plan as per site requirement.

Page 3: Aftab Alam CV

Experience Profile: 03.

Or ganiz ation: P P K Limited.

Nairobi.Kenya.East Africa.P r o f e ss i o n: Site Mechanical Engineer.

P e ri o d : November 2008 to June 2013.

Four and Half Year. 4 ½ Years.

P roj e c t : Clint: KBL Industrial Plant , Thika Rd , Nairobi.

Clint: Oswal University Bldg. Nairobi.

R o l e s a n d R es p o ns i b i l i t i e s:

Installation and execution of all Mechanical works at Site. Capable of reviewing shop drawings, analyzing and coordinating all materials, schedules,

program of works etc. Have hands on experience in execution of all Mechanical works - Fire Fighting system,

Chilled water system, Drainage system, Plumbing system and Builder works provisions in high rise buildings.

Witnessing of Hydro test for Fire Fighting System/Chilled Water System, Leak test forDrainage system, as required along with the Consultant Inspector.

Installed water and sanitary Piping systems. Installation of fire fighting system- Sprinkler system, Fire Hose Cabinet, CO2 fire suppression

system as per NFPA Standards. Site supervision of all Mechanical works. Ensure that all site activities are conducted under

controlled conditions as per shop drawings, method statements, specifications and work plan.

Co-ordinate with Structural, Architectural and Electrical Engineers for site progress. Ensure safe work environment, control the use of material and avoid damages and wastage. Preparing Site Material request, tools and equipment needed for the project. Preparation of Bill of quantities (BOQ) as per project specifications/drawings for Mechanical

services (Chilled Water, Drainage, Water supply and Fire Fighting systems). Instruct site supervisors regarding further work plan as per site requirement. Preparing work progress and accomplishment report.

Page 4: Aftab Alam CV

Ex p e ri e nce p r o f i l e 0 4 .

Or ga n iz at i o n : NAPCO Group. Const Division.

Dammam. Kingdom of Saudi Arabia.

w w w . na p c o gr o u p . c o m Pro f e ss i o n: Mechanical Inspector.P e ri o d : 14th Nov 2007 to 20th Oct 2008. One (01) Year.Pro j e c t & Clint: SECTI , Training Camp.SEC.

R o l e s a n d R es p o ns i b i l i t i e s: Installation and Execution of Fire Fighting & Mechanical works at Site.

Understanding all sorts of drawing with foundations / civil / wall opening and interacting with other departments.

Installation and Execution of Plumbing – Water Supply, Drainage. Reviewing the Drawings, if any discrepancy in design, make coordinate with Technical

Engineer to resolve the issue. Rising R.F.I (Request for Information) to Contractor in order to clarify any technical

issues in design drawings. Review drawings and specifications and mechanical shop drawings, follow-up their

execution, and ensure its compliance with Contract obligations and codes and standards. Follow-up the status of work progress and check the activities on site and provide the

necessary reminders & preparing weekly work progress and accomplishment report.

Ex p e ri e nce P r o f il e 0 5 . Organization: DURL ( Dubai Rapid Consortium). Mitsubishi Heavy Industries.

https://www.mhi-global.com

Dubai. United Arab Emirates.Profession: Mechanical Site Supervisor.Period: October 2005 to September 2007.( 02 Years).

Project: Dubai Metro.

Clint: Dubai RTA. Supervision: SYSPA.

Worked as a Mechanical Site Supervisor in Dubai Metro,Red line , Station’s Interchange -8, JAFJA, 02 Years.

Page 5: Aftab Alam CV

R o l e s a n d R es p o ns i b i l i t i e s:

⫸ Installation and Execution of HVAC and Duct as per shop drawing and ASHIRE & SMACNA standard.⫸ Installation of Plumbing and Sanitary and fixture as per shop drawing.⫸ Installation and Execution of firefighting as per shop drawing and NFPA standard.⫸Co-ordinate with Clint Inspector for Inspection for all Mechanical & Plumbing installation work.⫸Prepare the daily progress report and forward to superior.⫸Handling the Mechanical Sub contractor man power on site and following the daily progress on site.

Experience Profile: 06.Or ga n iz a tion: ETP L L C. Dubai. United Arab Emirates. www.emiratestechno.com

Pro f e ss i o n: Mechanical Inspector.P e ri o d : Sep 2004 to Sep 2005. One (01) Years.Pro j e c t : Arzanah Medical Complex. Clint: Medical Holding Company.R o l e s a n d R es p o ns i b i l i t i e s:

Installation and Execution of Fire Fighting works in Construction Plant. Checking Pressure test for Fire Fighting installation. Review, analyze and resolve Mechanical and Piping works in Construction field,

Discrepancies or interference’s with other disciplines. Ensuring that work is executed on site in accordance with the contract drawings,

specifications, agreed procedures and method statements. Proper Coordination with Consultant for getting approval for Site execution, drawing

changes as per site condition. Follow up the status of work progress and check the activities on site and provide the

necessary reminders. Performed tests on equipment and materials in accordance to specifications and codes

Page 6: Aftab Alam CV

.Ex p e ri e nce P r o f il e 0 7 .

Or ga n iz a tion: FIPCO (SAOG).

Muscat.Sultanate of Oman.www .fi p c o - om a n . c om

Pro f e ss i o n: QA/QC Mechanical Inspector.

P e ri o d : August 2001 to August 2004. 03 Years.

Pro j e c t : Clint : PDO, Muscat.Duti es a nd Res po nsi bi li ti es

Participate in the QA/QC and Inspection activities in plant Construction and Piping projects as per the Quality Control Inspection Plan (QCIP) of the Project’s requirements. Major responsibilities handled are as below:

Implement the project construction quality program at project site Carry out quality control activities including inspection, examination and testing to verify the quality

of the installations and ensure construction operations are in compliance with project specifications

Implement the quality control intervention points on the inspection and test plans, ITP (surveillance,witness and mandatory inspection, and record review)

Sign-off ITPs and quality control forms after all activities are complete, conformant and required records verified

Implement the project quality control procedures, inspections and test plans, and construction procedures

Implement the surveillance inspection program over contractors to ensure conformity to projectspecifications/standards

Perform receipt inspection and monitoring of interim construction site storage areas for permanent plant materials

Implement the project material control requirements Implement and verify the document control process at site Perform inspection and testing of completed installations Prepare deviation reports to document nonconforming conditions as required Implement the project requirements for control of deficient items Control calibrated measuring and test equipment used on the project Implement the project records retention requirements Daily functional reporting of responsibilities and any quality issues to assigned Project QA/QC

Manager Prepare of Documents for WPS, PQR, PWHT, Weld Map, NDE Procedure, Hydrostatic Test, and ITP.

Page 7: Aftab Alam CV

E d ucat i o n a l Q u al if i cat i o n D e tai l s .

Ti t l e : Mechanical Engineering.

Ins t it u te: H. M. S. Institute of Technology.

Tumkur. Karnataka.India.Government of Technical Education , Karnataka.

Y ea r of P a ss : July 2000.

Ti t l e : Auto CAD R—14/2000 (I). M S Office.Excel.

P e r son a l D e tai l s.

D a te of B i rt h : 13th January 1973.

S e x: Male.

Ma ri tal St a tu s : Married.

La n g u a g e s Kno w n: English & Hindi.

P e r ma n e n t A d d r e ss: N-52. N Block. Abul Fazal Enc-1. Okhla.Jamia Nagar.South Delhi.Pin:110025.India. Mobile: +91 9971735098.

D ri vi n g Li c e ns e : Saudi Arabian Valid upto 2017 & Kenyan Valid.

P a ss p o r t D e ta i ls : K 9664208. Valid upto 17.12.2022.

Thanks and Oblige.