COMPONENTES MES 1 M 2 M 3 OBRAS PROVISIONALES 5,270.16 5,270.16 5,270.16 TRABAJOS PRELIMINARES 8,171.44 8,171.44 PAV. RIGIGO - MOV. TIERRAS 623,856.80 311,928.40 PAVIMENTO RIGIDO 139,548.79 598,066.26 VARIOS ALAMEDA DE ADOQUIN-MOV. TIERRAS SARDINELES 64,470.17 VEREDAS DE ADOQUIN 35,390.48 VARIOS VEREDAS DE CONCRETO 130,853.76 AREAS VERDES SKATE PARK AREA DE JUEGOS INFANTILES SERVICIOS HIGIENICOS ALCANTARILLAS DE CONCRETO CONFECCION E INSTALACION DE STAND PORTICOS DE ENTRADA 25,000.00 CONSTRUCCION DE TOPIARIO LIMPIEZA FINAL GASTOS ADMINISTRATIVOS COMPONENTES/RESUMEN MES 1 M 2 M 3 OBRAS PROVISIONALES 5,270.16 5,270.16 5,270.16 TRABAJOS PRELIMINARES 8,171.44 8,171.44 PAVIMENTO RIGIDO 0.00 763,405.59 909,994.66 ALAMEDA DE ADOQUIN-MOV. TIERRAS 0.00 0.00 99,860.65 VEREDAS DE CONCRETO 0.00 0.00 130,853.76 SERVICIOS HIGIENICOS 0.00 0.00 0.00

Upload: adrian-cieza-arias

Post on 24-Dec-2015

214 views

Category:

Documents


0 download

DESCRIPTION

AJUSTE DE CRONOGRAMA

TRANSCRIPT

Page 1: Ajustes de Cronograma

COMPONENTES MES 1 M 2 M 3

OBRAS PROVISIONALES 5,270.16 5,270.16 5,270.16TRABAJOS PRELIMINARES 8,171.44 8,171.44PAV. RIGIGO - MOV. TIERRAS ### ###PAVIMENTO RIGIDO ### ###VARIOS

ALAMEDA DE ADOQUIN-MOV. TIERRAS

SARDINELES ###VEREDAS DE ADOQUIN ###VARIOS

VEREDAS DE CONCRETO ###AREAS VERDES

SKATE PARK

AREA DE JUEGOS INFANTILES

SERVICIOS HIGIENICOS

ALCANTARILLAS DE CONCRETO

CONFECCION E INSTALACION DE STAND

PORTICOS DE ENTRADA ###CONSTRUCCION DE TOPIARIO

LIMPIEZA FINAL

GASTOS ADMINISTRATIVOS

COMPONENTES/RESUMEN MES 1 M 2 M 3

OBRAS PROVISIONALES 5,270.16 5,270.16 5,270.16TRABAJOS PRELIMINARES 8,171.44 8,171.44

PAVIMENTO RIGIDO 0.00 ### ###

ALAMEDA DE ADOQUIN-MOV. TIERRAS 0.00 0.00 ###

VEREDAS DE CONCRETO 0.00 0.00 ###

SERVICIOS HIGIENICOS 0.00 0.00 0.00

CONSTRUCCION DE TOPIARIO 0.00 0.00 ###

Page 2: Ajustes de Cronograma

LIMPIEZA FINAL 0.00 0.00 0.00GASTOS ADMINISTRATIVOS ### ### ###

OBRAS PROVISIONALES 5270.16 5270.16 5270.16TRABAJOS PRELIMINARES 8171.44 8171.44PAVIMENTO RIGIDO 0 763405.59 909994.66ALAMEDA DE ADOQUIN-MOV. TIERRAS 0 0 99860.65VEREDAS DE CONCRETO 0 0 130853.76SERVICIOS HIGIENICOS 0 0 0CONSTRUCCION DE TOPIARIO 0 0 25000LIMPIEZA FINAL 0 0 0GASTOS ADMINISTRATIVOS 340668.09625 340668.09625 340668.09625

Page 3: Ajustes de Cronograma

M 4 M 5 M 6 M 7 M 8 TOTAL

5,270.16 5,270.16 5,270.16 5,270.16 5,270.16 ###8,171.44 8,171.44 8,171.44 8,171.44 ###

###### ### ### ### ###

### ###### ### ### ###### ### ### ###### ### ### ### ###

### ### ### ###### ### ### ###

### ### ###9,896.34 9,896.34 ###

### ### ###### ### ### ###

### ### ### ###9,750.00 9,750.00 ###

### ###### ###

### ######

PRESUPUEST ###

M 4 M 5 M 6 M 7 M 8 TOTAL

5,270.16 5,270.16 5,270.16 5,270.16 5,270.16 ###8,171.44 8,171.44 8,171.44 8,171.44 ###

### ### ### ### 0.00 ###

### ### ### ### 0.00 ###

### ### ### ### ### ###

0.00 ### ### ### ### ###

### 0.00 0.00 ### 9,750.00 ###

Page 4: Ajustes de Cronograma

0.00 0.00 0.00 0.00 ### ###### ### ### ### ### ###

PRESUPUEST ###

5270.16 5270.16 5270.16 5270.16 5270.16 42161.288171.44 8171.44 8171.44 8171.44 49028.64

598066.26 598066.26 598066.26 566513.55 0 4034112.58315180.95 385969.91 385969.91 106179.44 0 1293160.86130853.76 268444.53 204597.32 58425.3 58425.3 851599.97

0 13706.03 53733 53733 40026.97 16119925000 0 0 43750 9750 103500

0 0 0 0 16547.16 16547.16340668.09625 340668.09625 340668.09625 340668.09625 340668.09625 2725344.77

9276654.26