a.k. nigam
TRANSCRIPT
-
7/28/2019 A.K. Nigam
1/8
Arun Kumar Nigam
1-Name Arun Kumar Nigam
2-Fathers Name ` Shri M . M. Lal
3-DOB 30th Oct 1950
4-Mail ing Add ress House No- C-8057Sector-C, Pocket -8Vasant Kunj, New Delhi - 110070
Phone 011-26892661Mobile 08800873625
E mail: [email protected]
5- Educ ational & Profesional Quali f ication
S. No Course Subjects Uinversity/Int Year Ofpassing
1 MechanicalEngineering
MechanicalEngineering
Institute Of mechanicalEngineering (London)
1972
2 MechanicalEngineering
MechanicalEngineering
Indian Railway Instituteof Mechanical &Electrical Engineering
1972
3 Fellow Institute of
MechanicalEngineeringIndia
Mechanical
Engineering
Institution Of
Engineers-India
2007
4 AdvancedLeadershipProgram
Management Stern Business School,New York University,USA
2009
6- Work Exp erience
Summary
Over 38 years of experience in management/Operations of large railway systemsinvolved in managing all aspects railway working.
Infrastructure development & project management experience in setting up largeindustrial units. Currently looking after major projects viz, Coach factory atRaebareli, Wheel Plant at Chapra, Locomotive factory at Bihar etc.
Over all in charge of all 6 Production Units (DLW, CLW, ICF, RCF, DMW, & RWF)and 44 workshops on Indian Railways.
12 years of experience as head of workshops.
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected] -
7/28/2019 A.K. Nigam
2/8
7 years of International experience out of which ,
Four years as consultant for World Bank financed project, in Ministry of Transport atZimbabwe for 4 years. Responsibility included complete management of a Diesellocomotive workshop including operations, maintenance, supply chainmanagement, manpower management and training .
Over 3 years of experience as an international consultant dealing with optimizationof transport systems including Operations, materials management, formulatinginvestment strategies, and manpower planning and infrastructure development in
many developing countries. Research experience in Design & vendor development of Diesel Engines
Acquisition and management of sick enterprises..
Training experience as Director IRIMEE JAMALPUR
S. No Organization Post Held Period
1 Ministry ofRailways
Additional Member (Production Units &Workshops)
&
General Manager (Rail Coach FactoryProject)
General Manager (Workshop Projects)Chairman Bharat Wagon Ltd
Sept -08 toOct-10
Nature Of Work
Overall head of 6 Production Units of Indian Railways engaged in new manufactureof
250 Diesel Locomotives per year at Diesel Loco Works Varanasi 230 Electric Locomotives per year at Chitranjan Locomotive Works 1600 Passenger Coaches/annum at Rail coach factory Kapurthala 1400 Passenger Coaches/annum incl EMUs , Metro Cars , DEMUs at ICF
Chennai Rebuilding of 110 locomotives/Annum at Diesel Locomotive Modernization
Plant Manufacture of 200,000 wheels & axles at Rail Wheel factory
Overall head of all workshops on Railways (44 nos)
Overall In charge development of infrastructure on IR. Major current Projectsinclude, Wheel manufacturing plantProject cost 1600 crs Passenger Car Manufacturing Plant for 900 cars/year Project cost 2200 Crs Passenger Car Manufacturing Plant for 600 cars/year-Project cost 1200 Crs Diesel Locomotive Manufacture Plant 100 loco/year in PPP Diesel Component Manufacture Plant Diesel Multiples Units Manufacture Plant in PPP Freight Car Repair workshop Coach Rehabilitation workshop Setting up 2nd unit for coach manufacture at ICF
-
7/28/2019 A.K. Nigam
3/8
Axle manufacture Plant in PPP 5 Freight Car Manufacture Plants in PPP Refrigerated Container Manufacture Plant in PPP
Over all in charge for procurement. Of Machinery & Plant. Approx cost 500Crs/Year
Over all In charge of development of Maintenance Infrastructure for entire RollingStock including workshop modernization.. Approx cost Rs 1500 Crs per year.
Over all in charge of Capital & Revenue budget for Rolling Stock. Approx 36% ofthe entire Capital budget of IR is on new Rolling stock and its allied activities . Capital budget for manufacture of new Rolling stock. Approx Rs 14000 Crs . Capital Budget for setting up new plants-Rs 2500 Crs Capital Budget for procurement of Machinery & Plant- Rs 500 Crs Revenue Budget for maintenance of Rolling stock in workshops-Rs 7000 Crs
S. No Organization Post Held Period
2 South CentralRailway
Ministry of Railways
Chief Mechanical Engineer Dec-06 Sept-08
Nature of Work
Head of Mechanical engineering department on South Central Railway . As headof Mechanical department responsibility included maintenance and operation ofDiesel locomotives , Passenger Cars , freight cars , Accident management andhuman resource development .
Key Responsibilities
Management of 3 workshops undertaking complete overhaul and rehabilitation ofPassenger Cars & freight cars
Management of 5 major diesel locomotive depot undertaking heavy repairs ofapprox 500 diesel locomotives and diesel multiples unit
Management of 13 Passenger Car repair centre undertaking repair and operation ofapprox 3400 Passenger Cars
Management of 3 major Freight car repair centers undertaking repair & operation ofapprox 19000 freight cars
Over all in charge of Disaster management in 5 disaster management centers
S. No Organization Post Held Period
3 Indian Institute of Mechanical &Electrical Engineering
Ministry of Railways
DirectorDec-04 Dec-06
Nature Of Work
-
7/28/2019 A.K. Nigam
4/8
Head of one of the prestigious training institute not only on I Rly , but also amongstthe foremost Engineering Institute in the country. This is also one of the oldestInstitutes in the country for Mechanical Engineering.
I was in charge for following types of training,
SCRA A 4 year undergraduate program leading to degree in MechanicalEngineering.
18 months training for IRSME Probationary Officers
Training for officers & Supervisors of Indian Railways
International training for developing countries and PSUs
S. No Organization Post Held Period
4 Eastern Railway
Ministry Of Railways
Chief Rolling StockEngineer
Nov-99-Dec-04
Nature Of Work
Head of maintenance and operation Coaches & Wagons , on E Railway, .Key Accomplishments and Responsibilities
Overall management of 14 transportation workshops & 7 operational centers .
Supervised team of senior managers & 8000 technical staff.
Ensured maintenance, operation & availability of 5,000 passenger cars daily.
Achieved best availability of passenger cars, thus making available 500extra cars
Achieved all time best, 45% improvement in operations reliability
Provided highest ever peak accommodation. 78% additional berths provided.
Reduced cost of maintenance by reducing the manpower, and material
.
S. No Organization Post Held Period
5 Research, Design andStandards Organization(RDSO)
Ministry Of Railways
Executive DirectorApril 97-Nov99
Nature Of Work
Served as head of a Research Center, engaged in design and development ofDiesel Engines. This center has state-of-art facilities for advanced research in thefield of diesel engines.
Key Accomplishments and Responsibilities
Upgraded existing diesel engine power capacity by 15% along with GE- USA.
Provided Consultancy to, 4000 diesel locomotives on IR & new manufacture
Developed fuel-efficient diesel engines comparable to the best benchmarks
-
7/28/2019 A.K. Nigam
5/8
Developed electronic fuel injection equipment.
Developed new number of technologies for diesel locomotives on IndianRailways eg : Plate lube oil cooler , New generation turbos , streamedlinepiping etc
Quantified the benefits of multi-grade oils in collaboration with Chevron oil USA.
Published paper on New Generation Turbo Charger for IR Diesel
locomotives
S. No Organization Post Held Period
6 Eastern Railway
Ministry Of Railways
AdditionalDivisional Railway
manager
June93-April97
Nature Of Work
Managed overall operations of all departments - Mechanical, Civil, Telecomand Electrical Engineering, Finance, Transportation, Marketing Procurement,Public Relations, Human Resources.
Oversaw and managed a budget of over US $50 million.
Achieved an all time high record earnings.
Successfully completed expansion/renovation of one of the largest station
Successfully managed a large workforce of 18000 employees and 100managers
S. No Organization Post Held Period
7 National Railways OfZimbabwe
PrincipalConsultant
Oct;89-June93
Nature Of Work
Served as management consultant for over 4 years at National Railways ofZimbabwe (NRZ), under a World Bank financed project. As the management andoperational head, managed a Railway Transportation Workshop at Harare
(Zimbabwe). This workshop was engaged in the maintenance and oServed asmanagement consultant for over 4 years at National Railways of Zimbabwe (NRZ),under a World Bank financed project. As the management and operational head,managed a Railway Transportation Workshop at Harare (Zimbabwe). This workshopwas engaged in the maintenance and operation of over 100 diesel locomotives.
Key Accomplishments and Responsibilities
Managed overall operations of all departments Mechanical and Electricalengg, Operations, Disaster management, Finance and Materialsprocurement.
Achieved a 17% improvement in the performance and the availability of
-
7/28/2019 A.K. Nigam
6/8
locomotives resulting in a reduction of imports of locomotives.
Achieved 400% improvement in reliability of operation of locomotives.(MDBT).
Developed and managed a financial budget of over US $4 million.
Developed and implemented a strategic plan for training of local manpower with anobjective to meet long-term requirements of self-reliance and self-sustainabilityperation of over 100 diesel locomotives.
S. No Organization Post Held Period
8 Ministry Of Railways Director MechanicalEngineering
July88-Oct89
Nature Of Work
Serving as Director in the Ministry of Railways, oversaw formulation anddevelopment of maintenance infrastructure projects for Indian Railways.
Key Accomplishments and Responsibilities
Designed and developed strategic plans for modernizations of IndianRailways workshops in collaboration with Overseas Economic CooperationFund of Japan .
Developed and implemented strategies for financing these projects alongwith international funding agencies e.g. World Bank, OECF-Japan KFW,and ADB etc.
Managed existing World Bank Projects for modernization and up gradationof Indian Railway workshops.
Successfully planned and implemented several major infrastructure projects egestablishment of a new facility for manufacturing passenger cars, modernization oflocomotive manufacturing plant, expansion of diesel locomotives rebuilding plantManaged transfer of technology for upgrading technology in IR workshops
.
S. No Organization Post Held Period
9 Northern Railway Chief WorksManager
Sept85-july88
Nature Of Work
Served as head of one of the largest workshop. The workshop is engaged inrehabilitation of passenger and freight cars, manufacture of spare parts andoverhaul of sophisticated sub-assemblies.
Achieved highest output in productivity in the history of the workshop.
Managed overall operational responsibility of the workshop includingTechnical, Budget, Finance, Human Resources, Training, Procurementdepartments.
Supervised about 20 managers and 6000 technical staff of this workshop.
-
7/28/2019 A.K. Nigam
7/8
S. No Organization Post Held Period
10 Rail India Technical &Economic Services (RITES)
Sr Consultant Sept82-Sept85
Nature Of Work
As an International Transport Consultant, undertaken several consultancyassignments in engineering, workshops and logistics in developing countries.
Formulated a modernization contract with ADB for Bangladesh Railways
Conducted and implemented World Bank consultancy, on productivityimprovement in Zambian Railway workshop.
Undertook study on productivity of workshops on Bangladesh Railways.
Designed & detail engineering of Diesel loco Depot for Iraq RepublicRailways.
Served as a consultant for improvement in the availability of Rolling Stockand productivity in 4 workshops for Cuban National Railways.
Undertook spare parts optimization studies on Indonesian Railwaysworkshops.
Undertook productivity studies in Indonesia, Thailand, Malaysia, Bangladesh,Mexico, Chile, and Argentina Railway systems & workshops.
INITIAL 10 YEARS EXPERIENCE IN MANAGEMENT OF RAILWAY SYSTEMS.
7- Whether SC/ST/OBC/Minori t ies/Wom en NO
8- Present Posit io n Additional Member Railway Board (Retired)
9- Areaof Specialization and numbers of years experience
39 Years of experience
Area Of Specialization: Management & Policy formulation of Transportation ,Industries etc
10- Indicate how yo u f i l l the laid down cr i ter ia(A) Criteria of Experience
I retired as Additional MemberMinistry Of Railways in the grade 75500-80000 . I
have worked for more than 10 years (Since 1992) in the grade equivalent to Joint
Secretary to Government of India.
(B) Criteria of Educational Qualification
I have a degree in Mechanical Engineering
(C) Criteria of Age
I am less than 65 years (DOB- 30thOctober 1950)
-
7/28/2019 A.K. Nigam
8/8
11- Directorship held in com panies (both CPSEs and Pr ivate)
I have been Chairman Of Bharat Wagon Ltd
A K Nigam