alano water pres - udiasa - urban development … water pres.pdfttg “a class” wwtp • design...

13
W ATER AND W ASTE W ATER MANAGEMENT 2013

Upload: doantruc

Post on 02-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

WATER AND WASTE WATERMANAGEMENT

2013

Alano Water• About Alano Water

• Core business is Water & Waste Water

Expertise• Key Staff

• Total staff of approx 20

• Subcontractors

What we do• Engineering Design

• Hydraulic Design

• Maintenance & Operations

• Civil Construction

• Private Solutions

Examples of our work

Walker Flat Motor Vessel Pump Station• Construction of Jetty, WWTP, Irrigation and rising mains.

TTG “A Class” WWTP• Design and Construct by Alano Water

• Sewer Mining Project

• Risk Management planning

• 6.5 Log reduction to purple tap system

Loxton CWMS• $3.5 million Project• Alano Design Construct• WWTP• Sludge drying beds• 75 meg lined dam• 2 Storm water dams• Rising Mains• Pump stations• Irrigation Pumps• Full remote control and 

monitoring• Start Construction to PC in 

16 weeks

Stockwell CWMS• $1.5 million Project• WWTP• Bore Pumps• Full SCADA remote control and monitoring

• Retro Fit Pump Stations

• Electrical & Filtration Buildings

Under Construction

• Port Hughes Waste Water Treatment Plant

• Wallaroo Waste Water Treatment Plant

• Oakland's Park

Challenges for Alano…

• A level playing field. 

• Working under Councils and SA Water schemes.

• Councils

• Third Party Access

Benefits of an open water industry…

• More options for developers & others.

• The benefits of competition.

• Security to the industry. 

• Opportunity for long term working relationships. 

• Already has been impact to the industry.