Ali Fakhir Ibrahim
Civil Project Engineer
E-mail : [email protected] Contact : +9647510665268 LinkedIn : https://www.linkedin.com/in/ali-fakhir-841412134
Nationality: Iraqi
Profile Overview
Experience in construction field , including the projects management experience in the Gulf countries. Proven ability to take post-contract projects from planning stage through EPC execution stages till successful delivery. Highly skilled in administering and controlling project life cycle deliveries to close projects with technical and commercial success. Excellent in establishing vibrant team work culture, while managing stakeholders’ relationships and Regulatory clearances.
PROFESSIONAL SYNOPSIS
Experienced in executing projects with total administrative control, and costs running up to multi-billion USD
Expertise in Buildings, infrastructures and roads construction with smooth coordination with MEP deliverables
Efficient in coordinating design & engineering deliverables, and generation and approval process of project submittals.
Competent to review all technical submittals to ensure compliance with approved design and specifications
Conversant with engineering & construction codes & standards, contractual conditions, construction methodologies
Deft at engaging and managing team and project stakeholders in bringing out key project deliverables in time
Proactive in identifying and assessing risks, mitigating risks, and resolving issues & conflicts to minimize impacts on project schedule and milestones
Result-focused leader and team player with strong liaison, communication and problem solving skills, ability to raise performance levels, and deal with local authorities & Govt. departments for statutory sanctions and clearances
Core competencies include…..
Execution Planning Work Programming Site Logistics Set Up Resources Management
EPC Coordination Contraction Management Contracts & Claims Relationship Management
Budgeting & Cost Control QHSE Administration Quantity Survey & Billing Handover Protocol
EXPERIENCE SUMMARY
1-1- TARGET OMAN LLC
PROJECT ENGINEER SULTANATE OF OMAN 13 OCT 2014 --- - 20 OCT 2016
Project : HisnA’Shumoukh Extension –Phase 17 (DPN /15/14 Construction of RGO Complex at Hisn Al Shumookh - nizwa
Client : Royal Court Affairs / Royal Estates / The Palace- Muscat .
Value : 19,582,602 Omani Riyal.
The Works including :
1-Barracks buildings construction (seven numbers)for the Royal guards officers including all utilities( Strom water pipes
lines, sewerage pipes lines , potable water pipes lines , fire fighting pipes lines and irrigation pipes lines
2-All Externals works around the Barracks including the interior roads works length = 8.4km
Page 2 of 26
Responsibilities:
1-Manage and coordinate multidiscipline engineering activities to ensure project is executed in a safe, efficient, cost effective and timely
manner. Mainly Infrastructure and buildings experience (worked, water and buildings).
2-Act as primary technical coordination interface with client to ensure that the client’s expectations are satisfied.
3- Ensure the project conforms to the client’s approved Basis of Design and all applicable regulatory and code requirements ofspecific
accountabilities
4- Maintains HSE focus within the team to ensure OHSE requirements included in design and procurement.
5- Proactively resolves performance, scope and schedule issues with the Client as they arise.
6- Identifies , documents, communicates and meets the client’s requirements
7- Time Management
8- Contributes to the development of overall project schedule.
9- Supervises work in accordance with the approved schedule.
10- Focuses team on achievement of milestones and other key project objectives.
11- Listens to the team, discusses the issues, resolves problems and directs activities to remove roadblocks and achieve objectives.
12- Sets clear objectives to the design team, including achieving productivity and budget targets.
13- Ensures design team aware of, and complies with, applicable regulations and codes.
14- Manages inter-discipline interfaces effectively.
15- Procurement/Subcontracts Management
1-2. SULTANATE OF OMAN / SUR
Project : Construction of Water Distribution Network in Sur City and Adjoining areas
Client : Public Authority for Electricity and Water.
Consultant : Malcolm Pirnie Engineering Consultancy.
Value : 17,106,872 Omani Riyal.
Works Scope including :
Excavation, Laying, Hydro testing and Backfilling works of HDPE networks in Sur in South eastern governorate/ Sultanate
of Oman/the works including 171,247. KM length
( diameters 125 mm, 180mm, 250mm and 315 mm) Including wadi casting and gabion protection works.
Excavation, Laying , Hydro testing and Backfilling works of ductile iron Pipe total length =35 Km ( Diameter 150 mm, 300,
350mm, 400, 500 mm) including, thrust blocks, anchor blocks, Wadi casting and Gabion protection works.
Construction of Four Numbers water elevated tanks ( Capacity 1500 m3 ) with Yard piping works.
Construction of one water elevated tank (Capacity 1000 m3) with Yard piping works.
Construction of one water elevated tanks (Capacity 500 m3) with Yard piping works.
Construction of Ground Reservoir (Capacity 15000 m3) with Yard piping works.
Construction of Ground Reservoir (Capacity 5000 m3) with Yard piping works.
Construction of Pressure reducer valve chambers (N0 .16) with fitting installation and all accessories.
Construction of District flow meter chambers(No 7) with fitting installation and all accessories
Thrust boring works ( 20 Numbers) using steel sleeves DIA 700 mm by Jacking method
Construction of Gate valve chambers for Ductile Iron line No 5o with fitting installation and all accessories.
Construction of Chlorine chambers (No. 4) with all accessories.
Construction of washout chambers for DI line and HDPE line No 63 with fitting installation and all accessories.
Construction of Non return Valve (No 2) chambers with fitting installation and all accessories.
Construction of Flow control valve chambers (No.2) with fitting installation and all accessories.
Flushing and disinfection works for The Elevated tanks, Ground reservoirs and pipes networks, with shutdown works and
tapping with existing networks.
Responsibilities:
1-Planning & managing the construction project from conception to completion.
2-Ensuring the project is completed on time, within budget & with the required quality
3-Preparing all correspondence with various parties including valuations & claims.
4-Liaising with clients ,consultants and attending regular meetings.
5-Monitor and supervise Project progress to ensure specification, cost and schedule remain within defined limits.
6-Prepare, Supervise & Manage the preparation of project Scopes of work, Drawings, cost estimates, schedules, , change control and
procurement &construction contractor technical evaluation.
Page 3 of 26
2- YUKSEL INSAAT.A.S
SENIOR STRUCTURAL AND UTILITIES ENGINEER IRAQ / ERBIL/ KURDISTAN REGIONAL 7 SEP 2010----1 SEP 2014
Project : KORA-SHAQLAWA-QANDEEL High way project /Erbil / Iraq
Client : Ministry of Reconstruction and housing / General directorate of Roads and Bridges (GDRB) In Kurdistan
Consultant : Al Muhandis Engineering Consultancy
Contractor : Yuksel Insaat. A.S
Value : 178,628,200 USA Dollar
Works Scope Including:
Drainage pipes PVC Laying (Total length =90 Km, Concrete pipes =30 Km and GRP pipes laying (total length = 20.5 Km
laying with installation of manholes.
Earth works ( Cutting and Filling works ) for Road works
Box and drainage culverts construction.
Construction Five Numbers Overpass Bridges and interchanges.
Underpasses constructions.
Concrete ditches and open cannels construction 120km all types.
Tunnel length 900 m each tube works, lining works and drainage systems.
Pavement works including Road base layers ,Wet mix layer, Bitumen base course, Binder course layer ,Wearing course layer,
road guard rails installation and road marking works
Responsibilities:
1-Checking plans, drawings and quantities for accuracy of calculations.
2-Ensuring that all materials used and work performed are as per specifications.
3-Overseeing the selection and requisition of materials and plant.
4-Managing, monitoring and interpreting the contract design documents supplied by the client/architect.
5-liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
6-liaising with the local authority (where appropriate to the project) to ensure compliance with local construction regulations and by-laws.
7-liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them
informed of progress.
8-day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
9-planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines.
10-overseeing quality control, health and safety matters on site.
11-preparing reports as required.
12-resolving any unexpected technical difficulties and other problems that may arise.
3-Al UBOOR CONTRACTING COMPANY / UNITED ABAB EMIRATES
PROJECT ENGINEER UNITED ABAB EMIRATES/ DUBAI 27 Sep 2009-----01 Sep 2010 Project : Canal city development, Dubai /UAE
Client : MERAAS development / Dubai
Consultant : Al Turath engineering consultancy.
Value : 40,000,000 AED
Works Scope Including
Relocation of existing water line dia 600mm ( length 7.3 Km) with washout, flow meter and air valves chambers construction.
Page 4 of 26
Responsibilities:
1-Estimate the quantities, Follow up with supplier and cost control of the project..
2-Supervising the activities of site engineers.
3-Provide the technical advices regarding the design, Construction program, modification managerial personal
4-Attend the meetings and discuss projects activities with the client.
4-YUKSEL DUBAI CONSTRUCTION LLC . /DUBAI /UNITED ARAB EMIRATES.
PROJECT ENGINEER
UNITED ARAB EMIRATES
1 Sep 2007-----1 Sep 2009
Project : Al Nahada –Beirut Junction /Dubai /UAE
Client : Roads and Transport Authority / Dubai /UAE.
Consultant : Parson –Deleuw ,Cather Overseas/ Dubai/UAE.
Value : 227,832,920 AED
Works Scope Including:
1-Implemented in connection to Phase II of the Dubai International Airport improvement, this project includes the construction of
a 630 m tunnel (on the Al Nahda highway) and a 2x3 lane 353 m. bridge (on the Beirut highway), as well as improvement and
construction of two at-grade interchanges. Road signs, landscaping, street lighting, irrigation system, drainage systems, and tunnel
safety works were also carried out within the scope of works..
2- GRP Sewerage Pressure Line – Laying of GRP 1200mm Pressure lineswith all testingwith construction of chambers as shown:
NDRC works(7 nos.) of length 391m
Pressure line 3½ km
Construction of 5 nos. thrust blocks, chambers work including washout chamber 4 nos., air valve chambers 4 nos., access
chambers 1 no. and connection chambers 2 nos.
700mm DIA- AC Irrigation pipe line of 1½ km relocation with construction of air valves and washout chambers.
600mm DIA- AC Water Line – Dubai Electricity and Water Authority (DEWA) including:
600mm DIA - AC Pipeline laying of 2.28km with NDRC works 9 nos.
Butterfly valves chambers works and AC pipe fittings including flexible joints.
Steel sleeves works, Supports, protection ancillaries and all related works.
Precast concrete elements works .
Responsibilities:
1-Planning & managing the construction project from conception to completion .
2-Ensuring the project is completed on time, within budget & with the required quality .
3-Preparing all correspondence with various parties including valuations &claims .
4-Liaising with clients & consultants and attending regular meetings .
5-Monitor and supervise Project progress to ensure specification, cost and schedule remain within defined limits.
6-Prepare, Supervise & Manage the preparation of project Scopes of work, Drawings, cost estimates, schedules, performance
evaluation of bid analysis, change control and procurement & construction contractor technical evaluation .
7-Administer all policies and procedures for Procurement & Construction contractor Qualifications.
Page 5 of 26
5-BIN HADHER GROUP / SHARJAH /UNITED ARAB EMIRATES.
CIVIL SITE ENGINEER
UNITED ARAB EMIRATE
1 JAN 2007----1 AUG 2007 Project : G + 10 Floors / Residential and commercial Building in Sharjah / UAE
Client : Armada Properties
Consultant : Oriental innovation Consultancy /Sharjah
Value : 11,200,000 AED
Responsibilities:
1-Managing the civil sites activities and coordinating with Consultants and Clients
2-Preparing the Sites daily reports and follow up the program of works
3-Coordinating with project Engineer regarding the requirements of the site work
4-Preparing the request for inspection and submit to the Consultant for approval.
5-Attending the daily, weekly and monthly meeting and reporting the Project Engineer regarding the daily activities of works
in site.
6-PETRO LAND CONSTRUCTION COMPANY CIVIL SITE ENGINEER IRAQ /BAGHDAD FEB2005----DEC 2006
Project : Sewerage Pumps Station Construction
Client : Baghdad Municipality
Consultant : Municipality Engineering Consultancy
Contractor : Petro Land Construction Co.
Value : 119,225,256 USD
Works Scope Including:
Sewerage pumps station construction with GRP pipe laying 17km and sewerage pumps stations in Baghdad.
Responsibilities:
1-checking plans, drawings and quantities for accuracy of calculations;
2-ensuring that all materials used and work performed are as per specifications;
3-overseeing the selection and requisition of materials and plant;
4-managing, monitoring and interpreting the contract design documents supplied by the client/architect;
5-liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general staff.
MINISTRY OF RECONSTRUCTION AND HOUSING /AL MUTASIM CONTRACTING COMPANY
CIVIL SITE ENGINEER
IRAQ/BAGHDAD
23 AUG 2003----JAN 2005
Project: Rehabilitation of Ministry of water resources building ( Basement+G+11) in Baghdad Project 2: Construction of Residential complexes for Baghdad University Staff Total Value of Project : 30,654,327 USD
Page 6 of 26
Education
Bachelor degree in Civil Engineering, Al Mustansiriya University /college of Engineering/ graduated year oct 2002
Primavera Project Planner from Interman Institute in Sharjah/ United Arab Emirates/in 2008 Computer Skills
Programs: MS Office, Primavera Project Planner, AutoCAD 2D & 3D
Others: Internet Applications Languages Arabic / Native language
English /Fluent in conversation, reading and writing
Turkish / Intermediate in Conversation , reading and writing
Urdu / Intermediate in Conversation and reading
PERSONAL PARTICULARS
Date of Birth: 24 January /1980
Nationality: Iraqi
Marital Status: Single
Driving License: Light vehicle (Valid up to 2024) Issued From Sultanate of Oman
MEMBERSHIP
Aregistered member of Iraqi engineers union with registration number (102571) in 20/10/2002 and civil engineer with 13 years of
experience ,capable of working independently and committed to provide high quality services to every project with focus on progress .
REFERENCES
Name Designation Company Contact Number
1- Mohammed Fateh Telli Project Manager YUKSEL INSAAT A.S 00905422571937
E-mail : [email protected]
2- Mohammed Abbas Project Manager Al RAJEHI CONSTRUCTION 00966555071785
E-mail : [email protected]
3- Abu Al Dhahab Hussain Bakhait Project Manager OMIS CONSTRUCTION/DUBAI 00971507760016
E-mail : [email protected]
Page 14 of 26
PREVIOUS PROJECTS PHOTOGRAPHS
1-Extension of Hisn Al Shmookh Phase-17 / Sultanate of Oman / Buildings works
2-Extension of Hisn Al Shmookh Phase-17 / Sultanate of Oman / Internal Roads works
Page 15 of 26
3-Extension of Hisn Al Shmookh Phase-17 / Sultanate of Oman / Internal Roads works
4- Sultanate of Oman /Sur/Target Oman LLC /
Project : Construction of water distribution network in Sur City
Client : Public authority for electricity and water
Page 16 of 26
5-Sultanate of Oman /Sur/Target Oman LLC /
Project : Construction of water distribution network in Sur City
Client : Public authority for electricity and water /Pipes laying works for DI line at Sur City
6-Sultanate of Oman /Sur/Target Oman LLC /
Project : Construction of water distribution network in Sur City
Client : Public authority for electricity and water /Pipes laying works for DI line at Sur City
Page 17 of 26
7-Construction of Ground reservoir with Capacity 5000 m3
8-Construction of elevated tank with Capacity 1000 m3 in Sur /Oman
Page 18 of 26
9-Construction of elevated tank with Capacity 1500 m3 in Sur /Oman
10-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat
Page 19 of 26
11-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat/ Bridge construction
12-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat/ Road pavements
13-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat
Construction of Tunnel length 900 m for each Tube
Page 20 of 26
14-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / Yuksel Insaat/ Roads works and Ditches
15-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat
Asphalt plant
Page 21 of 26
16-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat
Crushers
17-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat
Construction of Box culverts
Page 22 of 26
18-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat
Construction of Box culverts
19-Kora – Shaqlawa – Qandeel High way project / Erbil / Kurdistan / Iraq / YukselInsaat
Construction of Drainage Culvert
Page 23 of 26
20-Project : Al Nahda – Beirut –Junction / Dubai/ UAE
Client : Roads and transport Authority / Dubai/ UAE
Company :YukselInsaat .A.S / Dubai/ UAE
Page 24 of 26
21-Project : Construction of Sewerage pumps station and net works in Baghdad
Client : Baghdad Municipality
GRP pipes laying
22-Project : Construction of Sewerage pumps station and net works in Baghdad
Client : Baghdad Municipality
GRP pipes laying
Page 25 of 26
23-Project : Construction of Sewerage pumps station and net works in Baghdad
Client : Baghdad Municipality
GRP pipes laying
24-Project : Reconstruction of Ministry of water resources in Baghdad
Client : Ministry of Water resources
Company : Al Mutasim company / Ministry of reconstruction and housing .
Page 26 of 26
25-Project : Reconstruction of Ministry of water resources in Baghdad
Client : Ministry of Water resources
Company : Al Mutasim company / Ministry of reconstruction and housing .
26-Project : Reconstruction of Ministry of water resources in Baghdad
Client : Ministry of Water resources
Company : Al Mutasim company / Ministry of reconstruction and housing .