中央大學。范錚強 1 scm── some details 國立中央大學、資訊管理系 范錚強...

Post on 19-Dec-2015

244 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

中央大學。范錚強 1

SCM──Some details

國立中央大學、資訊管理系范錚強

Tel: (03)426-7250

Fax:(03)427-1990

mailto: ckfarn@mgt.ncu.edu.tw

http://www.mgt.ncu.edu.tw/~ckfarn

2005

中央大學。范錚強 2

Interactions among SC partners – in the past

Internal activitiesSales forecasts, Product design, Inventory management, marketing, sales

External activitiesProcurement

Supplier Focal Buyer

中央大學。范錚強 3

Interactions among SC partners – trends

Supplier Focal Buyer

Increased external activitiesLow frequency activities

Vendor selection, Collaborative product design

High frequency activitiesCollaborative forecast, order processing, collaborative logistics

中央大學。范錚強 4

The “C” word – C-commerce

Collaboration

E.g. Pendulum swing in Taiwanese mass production business

1. OEM – Original equipment Manufacturingbrand-name buyer designed products

2. ODM – Original design and ManufacturingContract manufacturer designed products

CDM – Collaborative Design and ManufacturingCollaboration

中央大學。范錚強 5

Example: Procurement

Inter-firm Activities:Negotiation, order placing, delivery, goods received and verification, payment

Collaboration: tightly coupled activitiesShort AVL – approved vendor listProduct design – collaborative engineeringForecast – CPFR (Collaborative Planning, Forecasts and Replenishment)

中央大學。范錚強 6

Challenges from the Market

Problems facing the IT contract manufacturers in Taiwan

Customer requirements955 – 95% of all orders fulfilled within 5 days

Actions: VMI, resulting in higher inventory costs

Requirements in 2001: 983

Requirements in 2003??

Requirements in 2005??

中央大學。范錚強 7

Traditional Production Model

Traditional BTS: Build to StockSales forecast production plan procurement production FG warehousing order taking delivery

Slow movement of goods, capital tied up

Traditional BTO: Build to OrderCustomer order production scheduling procurement production delivery

Long delivery cycle, lack of competitiveness

中央大學。范錚強 8

Exploiting IT capabilities

Speed

Accessibility

Visibility

Opportunities:Early involvement and early availability of information

Postponement of decisions

中央大學。范錚強 9

Current Production Models

BTF/VMI– Build to ForecastCustomer rolling forecast procurement production scheduling production customer delivery notice delivery to VMI

BTOCustomer rolling forecast procurement customer order production scheduling production delivery

CTO/ATO: Configure to order, Assemble to orderCustomer rolling forecast procurement production scheduling production of components customer order final assembly delivery

中央大學。范錚強 10

What are the differences?

Customer ROLLING forecast

What do you do with the forecast?

中央大學。范錚強 11

Example:

A Shoe ManufacturerShortened Cycle time

12weeks

Production

10weeks

Procurement

12~13weeks

In the Past

Current

6weeks 4weeks

Order

Rolling Forecast

中央大學。范錚強 12

Evolution of Collaboration

QR: Quick Response1984, garment retailersQuick response to customer demand changesInformation sharing of Point-of-sales dataEffective in reducing lead time, inventory and obsolescence

ECR: Efficient Consumer Response1992, retailers of general merchandiseAn extension of the QR conceptCovering Suppliers and manufacturers

VMI/SMIVendor/Supplier Managed InventoryChange of ownership at buyer warehouseEliminating the buyer side warehouse

中央大學。范錚強 13

CPFR: Collaborative Planning, Forecasting and Replenishment

Early 1990’s Wal-Mart 和 Warner-Lambert tried out CPAR

Evolution into CPFR (trademark of VICS: Voluntary Interindustry Commerce Standards Association)

New generation of CPFR in 2004

中央大學。范錚強 14

CPFR

Supply Chain Visibility

Collaboration

Accurate forecast

Lower inventory

Develop front-end agreement

Create joint business plan

Create sales forecast

Identify and resolve exceptions

Create order forecast

Identify and resolve exceptions

Order generation

中央大學。范錚強 15

Resolve / Collaborate On Exception Items

Identify Exceptions for Sales Forecast

Create Joint Business Plan

Distributor Business Development Activities

Manufacturer Business Development Activities

Manufacturer Materials & Production

Planning

Create Sales Forecast

Create Order Forecast

Identify Exceptions for Order Forecast

Resolve / Collaborate On Exception Items

Order Generation Produce Product

Delivery ExecutionOrder Filling /

Shipment ExecutionDistributor Receiving

Retail Store

Consumer

LongTerm

Feedback

POS Data

Short Term

Order / PO

Distributor Exception Triggers

2

3

4

5

6

Product

Updated Data for Exception Items

Exception Items

Order filling feedback

Manufacturer Exception Triggers

Frozen Forecast

Key :Distributor

Activities

Either / J oint

Activities

Manufacturer

Activities

Business Model - Scenario B

Exception Items

7

8

Distributor Exception Triggers

Manufacturer Exception Triggers

Distributor Decision Support Data

ManufacturerDecision Support Data

Plan

nin

gF

orecastin

gR

eplen

ishm

ent

Develop Front-End Agreement1

9

Order Forecast

Constraints

Excep

tion

Criteria

Excep

tion

Criteria

Distributor Decision Support Data

ManufacturerDecision Support Data

Unresolved Supply Constraints

Business model: B

Source: www.cpfr.org

中央大學。范錚強 16

Basic Concept: Exception Handling

Mutual long term commitmentChange of business relationshipFrom ad hoc, one shot to long term

Collaborative PlanningJoint business plan

Collaborative ForecastResolve exception

Collaborative ReplenishmentInformation sharing, visibilityResolve exception

中央大學。范錚強 17

Accurate Forecast

Time

Sales

Retailer forecast too low

Retailer forecast too high

中央大學。范錚強 18

Differences at different stages

Time

Sales

using point-of-sales data to rapidly update forecasts for new products

sharing of planning information automatic

monitoring of sales, shared exception alerts

using the supplier’s forecast

中央大學。范錚強 19

The technical solutions

B2Bi

RosettaNet

ebXML

中央大學。范錚強 20

Fixed relationship B2B IOS

Inter-organization Systems AlternativesServices provided by the Focal

Integrated with in-house ERPIndependent EC server (owned or ASP)

Linking the Focal with suppliersWeb-basedInformation ExchangeProcess integration

Outsourcing?

Technology?

中央大學。范錚強 21

Focal(1)back

ERP Server

資料庫

XML格式

EC Server

ERP

中央大學。范錚強 22

Independent serviceproviders

ASPCSP

Focal(2)

XML format

ERP Server

資料庫ERP

EC Server

資料庫EC

轉出檔案

中央大學。范錚強 23

Linking with Suppliers(1)

ERP/MIS

Browser

EC Server

DBEC

DBERP

EC interface

中央大學。范錚強 24

ERPXML EC Server

(Enterprise Ver.)

EC Server(Standard Ve

r.)ERP

RosettaNet PIPs

Internet

Internet

Rosettanet/XML

XML

B2Bi Process IntegrationB2Bi Process Integration

Focal Supplier

中央大學。范錚強 25

Alternatives

ERP

SCM

B2B

Server

Portal

ASP

AP1

AP2

Browser1

Browser2

In-house Service Provider

Users

中央大學。范錚強 26

Interchange of information

DataData files, codingNeed “Data interchange” standards

MessageThe information on a traditional document reflecting a single activity (e.g. order, confirmation, delivery)Need “Message interchange” standards

ProcessThe process involved in a single activityProcess integration

中央大學。范錚強 27

Data Interchange

Paper documents, computer files, spreadsheetsPaper, fax, magnetic media, network (e.g FTP)Normally by batch

EDITransaction data for a single transactionTraditionally run on proprietary networksInternational message standards: UN/EDIFACTEOI- EDI over Internet

HTML

XML

中央大學。范錚強 28

Markup Language

“Markup” is a method of conveying metadata (that is, information about a dataset).

Markup Language use string literals, or “tags”, to delimit and describe this data.

Ease of reading, printing and exchangeprinter typesetting, proofreader, punctuation, ASCII, C, RTF

SGML: Standard Generalized ML

中央大學。范錚強 29

Example: HTML Document

<HTML><H1 ALIGN=CENTER>Hardware</H1><FONT FACE size=2>Notebook</FONT><FONT FACE size=2>IBM</FONT><FONT FACE size=2>Synnex</FONT><FONT FACE size=2>John</FONT>

中央大學。范錚強 30

Example: XML Document

<?xml version="1.0" encoding="Big5" ?>

< 產品搜尋 >

< 摘要 > 搜尋字串:“超薄手提電腦”,共找到 2 筆 </ 摘要 >

< 產品 >

< 貨號 >12478943</ 貨號 >

< 品名 >IBM 240</ 品名 >

< 定價 >$58,455</ 定價 >

< 說明頁 網址 ="http:/www.ibm.com.tw/product/nb/tp240">ThinkPad 240</ 說明頁 >

</ 產品 >

< 產品 >

< 貨號 >83424723</ 貨號 >

< 品名 >Dell A123</ 品名 >

< 定價 >$58,999</ 定價 >

< 說明頁 網址 ="http://www.dell.com.tw/product/nb/a123">NB A123</ 說明頁 >

</ 產品 >

</ 產品搜尋 >

“extended” data tags

中央大學。范錚強 31

XML advantages

Open, platform-independent

Vocabulary: Definitions of TAGS for different Application Domain

An XML vocabulary is a description of XML data that is used as the medium for information exchange, often within a specific domain of human activity(business, chemistry, law, music, for example)

Program Readable

Note: XML is not a programming language, nor an object-based system, nor an operating system. It is a powerful, elegant technique for thinking about, exchanging, and presenting data in a platform-independent manner.

中央大學。范錚強 32

XML and Browser

XML – changes in internal structure of browsersHTML Interpreter XML Parser

A normal Hypertext web-page becomes Application page

Application Software Browser Software

XML– XML data can be processed by application systems, instead of a browser

中央大學。范錚強 33

Client Side of Web-XML

ParserPresent-ation Modul

e

Browser

HTTP Server

URL

XML FileValid-

aterDocumentHandler

Application

中央大學。范錚強 34

RosettaNet

RosettaNet is a consortium of major Information Technology, Electronic Components and Semiconductor Manufacturing companies working to create and implement industry-wide, open e-business process standards.

Cluster 0: RosettaNet SupportProvides administrative functionality

Cluster 1: Partner, Product and Service ReviewAllows information collection, maintenance and distribution for the development of trading-partner profiles and product-information subscriptions

中央大學。范錚強 35

RosettaNet

Cluster 2: Product InformationEnables distribution and periodic update of product and detailed design information, including product change notices and product technical specifications

Cluster 3: Order ManagementLets partners order catalog products, create custom solutions, manage distribution and deliveries, and support product returns and financial transactions

Cluster 4: Inventory ManagementEnables inventory management, including collaboration, replenishment, price protection, reporting and allocation of constrained product

中央大學。范錚強 36

RosettaNet

Cluster 5: Marketing Information ManagementEnables communication of marketing information, including campaign plans, lead information and design registration

Cluster 6: Service and SupportProvides post-sales technical support, service warranty and asset management capabilities

Cluster 7: ManufacturingEnables the exchange of design, configuration, process, quality and other manufacturing floor information to support the "Virtual Manufacturing" environment

中央大學。范錚強 37

RosettaNet PIP

Partner Interface Process (PIP) message guidelines and XML DTD's (Document type definition).

Understand what the PIP number represents. A PIP number has 3 parts:  a number + a letter + another number.  Example: 3A4

The first number represents the Cluster.   PIP 3A4 is in Cluster 3.

The letter represents the Segment.  PIP 3A4 is in Segment A of Cluster 3.

The second number is a sequential number which completes the PIP number.  PIP 3A4 is the 4th PIP in Segment A of Cluster 3.

中央大學。范錚強 38

RosettaNet 3A4 PIP

中央大學。范錚強 39

To provide an open XML-based infrastructure enabling the global use of electronic business information in an interoperable, secure, and consistent manner by all parties.

ebXML Mission

中央大學。范錚強 40

Individual Transaction Choreography

ebXML Repository

top related