1. analisa harga satuan pekerjaan persia
Post on 17-Feb-2016
22 Views
Preview:
DESCRIPTION
TRANSCRIPT
o. URAIAN SATUAN VOLUME HARGA SATUAN HARGA
(Rp) (Rp)A-01 1 M' Pagar Sementara Dari Kayu Tinggi 2 m
- Dolken Kayu Ø 8-10 / 400 cm Btg 1.2500 28,000.00 35,000.00
- Semen Portland Kg 2.5000 1,406.00 3,515.00 - Pasir beton M3 0.0050 255,400.00 1,277.00 - Koral Beton 2/3 M3 0.0090 211,100.00 1,899.90 - Kayu balok terentang M3 0.0720 2,640,000.00 190,080.00 - Paku Biasa 2" - 5" Kg 0.0600 23,400.00 1,404.00 - Residu Kg 0.4000 8,100.00 3,240.00 - Pekerja Oh 0.4000 42,000.00 16,800.00 - Tukang Kayu Oh 0.2000 65,000.00 13,000.00 - Kepala Tukang Oh 0.0200 75,000.00 1,500.00 - Mandor Oh 0.0200 80,000.00 1,600.00 Jumlah 269,315.90 Dibulatkan 269,316.00 A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
- Dolken Kayu Ø 8-10 / 400 cm Btg 1.2500 28,000.00 35,000.00
- Semen Portland Kg 2.5000 1,406.00 3,515.00 - Seng Gelombang BJLS-30 Lbr 1.2000 62,900.00 75,480.00 - Pasir beton M3 0.0050 255,400.00 1,277.00 - Koral Beton 2/3 M3 0.0090 211,100.00 1,899.90 - Kayu balok terentang M3 0.0720 2,640,000.00 190,080.00 - Paku Biasa 2" - 5" Kg 0.0600 23,400.00 1,404.00 - Meni Besi Kg 0.4500 30,400.00 13,680.00 - Pekerja Oh 0.4000 42,000.00 16,800.00 - Tukang Kayu Oh 0.2000 65,000.00 13,000.00 - Kepala Tukang Oh 0.0200 75,000.00 1,500.00 - Mandor Oh 0.0200 80,000.00 1,600.00 Jumlah 355,235.90 Dibulatkan 355,236.00 A-03
1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
- Dolken Kayu Ø 8-10 / 400 cm Btg 1.0000 28,000.00 28,000.00
- Semen Portland Kg 2.0000 1,406.00 2,812.00 - Kawat Duri Kg 2.5000 63,500.00 158,750.00
- Pasir beton M3 0.0050 255,400.00 1,277.00 - Koral Beton 2/3 M3 0.0090 211,100.00 1,899.90 - Paku Biasa 2" - 5" Kg 0.0600 23,400.00 1,404.00 - Pekerja Oh 0.3000 42,000.00 12,600.00 - Tukang Kayu Oh 0.2000 65,000.00 13,000.00 - Kepala Tukang Oh 0.0200 75,000.00 1,500.00 - Mandor Oh 0.0200 80,000.00 1,600.00 Jumlah 222,842.90 Dibulatkan 222,843.00 A-04
1 M2 Pengukuran Dan Pasang Bouwplank
- Kayu kaso 5/7 M3 0.0120 1,870,500.00 22,446.00 - Paku Biasa 2" - 5" Kg 0.0200 23,400.00 468.00 - Kayu papan albasia M3 0.0070 2,071,700.00 14,501.90 - Pekerja Oh 0.1000 42,000.00 4,200.00 - Tukang Kayu Oh 0.1000 65,000.00 6,500.00 - Kepala Tukang Oh 0.0100 75,000.00 750.00 - Mandor Oh 0.0050 80,000.00 400.00 Jumlah 49,265.90 Dibulatkan 49,266.00 A-05
1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester
- Dolken Kayu Ø 8-10 / 400 cm Btg 1.2500 28,000.00 35,000.00
- Kayu Balok terentang M3 0.1800 2,640,000.00 475,200.00 - Paku Biasa Kg 0.8500 23,400.00 19,890.00 - Besi Strip Kg 1.1000 26,800.00 29,480.00 - Semen Portland Kg 35.0000 1,406.00 49,210.00 - Pasir Pasang M3 0.1500 233,400.00 35,010.00 - Pasir beton M3 0.1000 255,400.00 25,540.00 - Koral Beton2/3 M3 0.1500 211,100.00 31,665.00 - Bata Merah Bh 30.0000 775.00 23,250.00 - Seng Plat m' 0.2500 15,815.00 3,953.75 - Kawat harmonika M2 2.0000 35,900.00 71,800.00 - Kaca Polos 3mm M2 0.0800 87,400.00 6,992.00 - Kunci Tanam Bh 0.1500 94,500.00 14,175.00
- Plywood 120 x 240 x 0,4 cm Lbr 0.0600 140,000.00 8,400.00
- Pekerja Oh 2.0000 42,000.00 84,000.00 - Tukang Kayu Oh 2.0000 65,000.00 130,000.00 - Tukang Batu Oh 1.0000 65,000.00 65,000.00 - Kepala Tukang Oh 0.3000 75,000.00 22,500.00
- Mandor Oh 0.0500 80,000.00 4,000.00 Jumlah 1,135,065.75 Dibulatkan 1,135,066.00 A-06
1 M2 Pembuatan Gudang Semen dan Alat-alat
- Dolken Kayu Ø 8-10 / 400 cm Btg 1.7000 28,000.00 47,600.00
- Kayu balok terentang M3 0.2100 2,640,000.00 554,400.00 - Paku Biasa Kg 0.3000 23,400.00 7,020.00 - Semen Portland Kg 10.5000 1,406.00 14,763.00 - Pasir Beton M3 0.0300 255,400.00 7,662.00 - Koral Beton 2/3 M3 0.0500 211,100.00 10,555.00 - Seng Gelombang BJLS 30 Lbr 1.5000 62,900.00 94,350.00 - Pekerja Oh 1.0000 42,000.00 42,000.00 - Tukang Kayu Oh 2.0000 65,000.00 130,000.00 - Kepala Tukang Oh 0.2000 75,000.00 15,000.00 - Mandor Oh 0.0500 80,000.00 4,000.00 Jumlah 927,350.00 Dibulatkan 927,350.00 A-07 1 M2 Pembuatan Bedeng Buruh
- Dolken Kayu Ø 8-10 / 400 cm Btg 1.2500 28,000.00 35,000.00
- Kayu balok terentang M3 0.1860 2,640,000.00 491,040.00 - Paku Biasa Kg 0.3000 23,400.00 7,020.00 - Semen Portland Kg 18.0000 1,406.00 25,308.00 - Pasir Beton M3 0.0300 255,400.00 7,662.00 - Koral Beton 2/3 M3 0.0500 211,100.00 10,555.00 - Seng Gelombang BJLS 30 Lbr 1.5000 62,900.00 94,350.00 - Pekerja Oh 1.0000 42,000.00 42,000.00 - Tukang Kayu Oh 2.0000 65,000.00 130,000.00 - Kepala Tukang Oh 0.2000 75,000.00 15,000.00 - Mandor Oh 0.0500 80,000.00 4,000.00 Jumlah 861,935.00 Dibulatkan 861,935.00 A-08 1 M2 Membersihkan Lapangan dan Perataan
- Pekerja Oh 0.1000 42,000.00 4,200.00 - Mandor Oh 0.0500 80,000.00 4,000.00 Jumlah 8,200.00 Dibulatkan 8,200.00 A- 1M2 Pembuatan Jalan Sementara
09 - Batu Belah 15/20 M3 0.1500 205,500.00 30,825.00 - Batu Pecah 5/7 M3 0.0900 196,000.00 17,640.00 - Pasir Pasang M3 0.0100 233,400.00 2,334.00 - Pekerja Oh 1.0000 42,000.00 42,000.00 - Mandor Oh 0.0500 80,000.00 4,000.00 Jumlah 96,799.00 Dibulatkan 96,799.00 A-10 1 M3 Bongkaran Beton Bertulang
- Pekerja Oh 6.6670 42,000.00 280,014.00 - Mandor Oh 0.3330 80,000.00 26,640.00 Jumlah 306,654.00 Dibulatkan 306,654.00 A-11 1 M3 Bongkaran Dinding Tembok Bata Merah
- Pekerja Oh 6.6670 42,000.00 280,014.00 - Mandor Oh 0.0330 80,000.00 2,640.00 Jumlah 282,654.00 Dibulatkan 282,654.00 A-12 1 M¹ Pagar beton Pracetak ( 5 x 50 x 213 ) cm
- Panel Beton Pracetak Lbr 0.9860 199,200.00 196,411.20 - Kolom Beton Pracetak Btg 0.5250 264,000.00 138,600.00 - Pasir Beton M3 0.0740 255,400.00 18,899.60 - Koral 2/3 M3 0.1460 211,100.00 30,820.60 - Semen abu - abu Kg 45.0000 1,406.00 63,270.00 - Pekerja Oh 0.3750 42,000.00 15,750.00 - Tukang Batu Oh 0.1250 65,000.00 8,125.00 - Kepala Tukang Oh 0.0120 75,000.00 900.00 - Mandor Oh 0.0190 80,000.00 1,520.00 Jumlah 474,296.40 Dibulatkan 474,296.00 A-13 1 M¹ Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
- Kawat ram ayam Lbr 0.4340 14,900.00 6,466.60 - Besi siku L 50.50.5 Kg 6.7860 18,300.00 124,183.80 - Besi pelat (1,2 x 3) mm Kg 0.0424 18,300.00 775.92 - Baut bh 4.0000 600.00 2,400.00 - Semen Portland Kg 2.5000 1,406.00 3,515.00 - Pasir beton M3 0.0050 255,400.00 1,277.00 - Koral Beton 2/3 M3 0.0090 211,100.00 1,899.90
- Pekerja Oh 0.3750 42,000.00 15,750.00 - Tukang Batu Oh 0.1250 65,000.00 8,125.00 - Kepala Tukang Oh 0.0120 75,000.00 900.00 - Mandor Oh 0.0190 80,000.00 1,520.00 Jumlah 166,813.22 Dibulatkan 166,813.00 A-14 1 M2 Pagar BRC lengkap dengan tiang
- BRC lengkap dengan tiang Lbr 0.4340 171,300.00 74,344.20 - Semen Portland Kg 2.0000 1,406.00 2,812.00 - Kawat Duri Kg 2.5000 63,500.00 158,750.00 - Pasir beton M3 0.0050 255,400.00 1,277.00 - Koral Beton 2/3 M3 0.0090 211,100.00 1,899.90 - Pekerja Oh 0.3750 42,000.00 15,750.00 - Tukang Batu Oh 0.1250 65,000.00 8,125.00 - Kepala Tukang Oh 0.0120 75,000.00 900.00 - Mandor Oh 0.0190 80,000.00 1,520.00 Jumlah 265,378.10 Dibulatkan 265,378.00 A-15 1 M2 Steiger Werk / perancah dari Bambu
- Bambu Ø 6 - 10 (600) cm btng 1.0000 25,000.00 25,000.00 - Tali ijuk kg 0.2500 23,400.00 5,850.00 - Pekerja org 0.2500 42,000.00 10,500.00 - Tukang kayu org 0.0170 65,000.00 1,105.00 - Kepala tukang org 0.0020 75,000.00 150.00 - Mandor org 0.0130 80,000.00 1,040.00 Jumlah 43,645.00 Dibulatkan 43,645.00 A-16 1 M' Cerucuk Bambu
- Bambu Ø 7 -10 (400) cm btng 1.2500 25,000.00 31,250.00 - Pekerja org 0.5000 42,000.00 21,000.00 - Mandor org 0.0250 80,000.00 2,000.00 Jumlah 54,250.00 Dibulatkan 54,250.00