2

Audit Analysis(Q-Pulse )

Phil Flack & Gary LatheyAirworthiness Surveyor & Operations Manager

28th October 2015

3

Introduction

How we manage data from our Part-145 oversight audits.

The Recording,Analysis,Utilisation,

of Non-Conformances (Findings).

4

Recording of Non-Conformances (Findings)

Use of paper checklists.Tablets.Laptops.

5

Surveillance Report

Created from a

Non-Conformance.

6

Non-Conformance (Findings)

Data from your Submissions

Drop down menu.

7

Standard Drop Down Data

Drop down menu.

8

Analysis of Part 145 Data.

Review covers the 12 month period from; 1st October 2014 to 30th September 2015.

Analysis of the oversight of Part -145 Approvals,

UK.145. ……. Utilises Findings data arising from audit activities as listed in Q-Pulse.

9

Total Number of Part-145 Findings

10

Part-145 Findings (Standard) Breakdown

Part-145 (Paragraphs).

11

Part-145.A.65 Procedures and Quality

Part-145.A.65(c).Quality System

Part-145.A.65(b). Procedures

Part-145.A.65(a). Safety & Quality

Policy

12

Part-145.A.30 Personnel RequirementsPart-145.A.30(e). Competence of

Personnel

Part-145.A.30(d). Manhour Plan

Part-145.A.30(f). Non Destructive

Testing

13

Part-145.A.40 Tools and MaterialsPart-145.A.40(b).

Control & Calibration

Part-145.A.40(a). Availability

14

Root Cause 145

15

Utilisation of Non-Conformances

Performance Based Oversight, Risk and Complexity Picture. Highlight common trends across wider regulation Approvals spectrum (Part-21G, Part-M, Part-

147, etc). Further deeper analysis against Terms of Approval (C1, C2, etc Ratings). Information from analysis used to enhance our oversight activity. EASA Regulation change. Targeted campaign, Information Notices. Review Surveyor performance.

16

Summary

Insight into how we collect and process Findings. Provide an overview of how we may analyse this data. Use this data to promote change.

17

Conclusion (Thoughts for the day)

So what does your Quantity System analysis tell you about your organisation? Do you always have areas with nil Findings, is this a positive out come or do you need to look

deeper? Are you accurately determining the Root Cause of Findings and providing appropriate

mitigation? How do you promote the benefits of a robust Quality System?