Capstone Design - Production planning

• 20082419 박차영• 20082420 김동연• 20082432 설인수

Division of roles

In su

Cha young

Sketch

Dong yeon

PPT produced

Common

Production planning

Sketch and Data Collection

Contents- Schedule (Gantt chart)- Items problems- The proposed design item- Expected Effects- user demands- Idea sketch- Constraints- schematically approach

Schedule plan3 4 5 6

1 2 3 4 1 2 3 4 1 2 3 4 1 2

Team organization

Subject selection

Ideas plans

After research idea of re-establishing

Production planning and materials buy-ing

materials buying, Prototyping

After producing modification

Final production

Items problems

The proposed design item

Expected Effects

- When drying laundry can be dried quickly.

Can dry laundry on a rainy day.

user demands

WhyWhen/Where

HowWho Discon-

tentuse Use process

Comple-mentary Products

Incoming rain wash well to dry.

home

Clothes dryer is used by placing the heating ele-ment.

-Rain and dry wash.

userI can be some-what cumber-some.

materials

Idea sketch

Idea sketch

Idea sketch

Idea Adopted

• Prototype development costs ₩ 40,000

• Prototype development time - 10 weeks

Constraints

Thank you