PEMERINTAH ACEHDINAS BINA MARGA DAN DIPTA KARYA
SUMBER DANA : KEGIATAN DANA OTONOMI KHUSUS KAB. SIMEULUE DINAS BINA MARGA DAN CIPTA KARYA ACEHNAMA PAKET : PENINGKATAN JALAN PSR INPRES - AIR DINGINNOMOR PAKET : BANG/SMUL/2011/01NOMOR KONTRAK : 37/KTR/BANG/SMLU/OTSUS/V/2011KONTRAKTOR : PT. SELAMAT JAYA ABADIKONSULTAN : PT. NUSVEY Ass. CV. ALPHA ENGINEERING CONSULTANTLOKASI : KABUPATEN SIMUELUE
NO. URAIAN SAT.KONTRAK AWAL
Keterangan
VOLUME
DIVISI 1. UMUM
1.2 Mobilisasi Ls 50,100,000.00 1.00 50,100,000.00 0.689
DIVISI 2. DRAINASE 50,100,000.00 0.689
2.1 Galian Untuk Selokan Drainase dan Saluran Air M³ 37,888.00 2,000.00 75,776,000.00 1.042
2.3.5 Gorong-gorong Pipa Baja Bergelombang Ton 37,703,990.35 1.50 56,555,985.53 0.778
DIVISI 3. PEKERJAAN TANAH 132,331,985.53 1.820
3.1.1 Galian Biasa M³ 24,003.00 1,250.94 30,026,312.82 0.413
3.2.1 Timbunan Biasa M³ 71,022.00 2,000.00 142,044,000.00 1.953
3.2.2 Timbunan Pilihan M³ 106,227.00 1,221.83 129,791,335.41 1.785
3.3.1 Penyiapan Badan Jalan M² 2,922.00 27,900.00 81,523,800.00 1.121
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN 383,385,448.23 5.272
4.2.2 Lapis Pondasi Agregat Klas B M³ 455,605.00 1,860.00 847,425,300.00 11.652
DIVISI 5. PERKERASAN BERBUTIR 847,425,300.00 11.652
5.1.1 Lapis Pondasi Agregat Klas A M³ 526,671.00 2,790.00 1,469,412,090.00 20.204
5.1.2 Lapis Pondasi Agregat Klas B M³ 449,249.00 3,720.00 1,671,206,280.00 22.979
DIVISI 6. PERKERASAN ASPAL 3,140,618,370.00 43.184
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 11,249.00 13,950.00 156,923,550.00 2.158
6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 521,662.00 2,027.22 1,057,523,639.64 14.541
6.3.8.a Aspal Ton 10,809,425.00 126.20 1,364,149,435.00 18.757
6.3.10 Bahan Pengisi (Filler) Tambahan Kg 1,206.85 41,371.98 49,929,774.06 0.687
DIVISI 7. STRUKTUR 2,628,526,398.70 36.142
7.9 Pasangan Batu M³ 613,517.00 80.00 49,081,360.00 0.675
7.10 (3) Bronjong M³ 589,406.00 70.00 41,258,420.00 0.567
90,339,780.00 1.242 Jumlah Nilai Pekerjaan 7,272,727,282.46 100.00 PPN 10 % 727,272,728.25 TOTAL BIAYA PEKERJAAN 8,000,000,010.70 DIBULATKAN 8,000,000,000.00
PENYEDIAIr. MUDJI HALIM
JOHNNICO APRIANODIREKTUR UTAMA
HARGA SATUAN (Rp.) JUMLAH HARGA
(Rp.)BOBOT
(%)
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
SERTIFIKAT BULANANMONTHLY CERTIFICATE (MC)
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 1 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
URAIAN PEKERJAAN
NILAI KONTRAK JUMLAH PEMBAYARAN
KONTRAK AWAL (Rp.)S/D
BULAN INIS/D BOBOT (%) BOBOT (%)
BULAN LALU BULAN INI S/D BULAN INI ITEM PEKERJAAN
1 2 3 4 5 6 7 8
1 UMUM 50,100,000.00 - 35,070,000.00 35,070,000.00 0.48% 0.48%
2 DRAINASE 132,331,985.53 - 70,067,415.04 70,067,415.04 0.96% 0.96%
3 PEKERJAAN TANAH 383,385,448.23 - 205,296,253.71 205,296,253.71 2.82% 2.82%
4 PELEBARAN DAN PERKERASAN BAHU JALAN 847,425,300.00 - - - 0.00% 0.00%
5 PERKERASAN BERBUTIR 3,140,618,370.00 - 526,376,068.32 526,376,068.32 7.24% 7.24%
6 PERKERASAN ASPAL 2,628,526,398.70 - - - 0.00% 0.00%
7 STRUKTUR 90,339,780.00 - - - 0.00% 0.00%
A SUB TOTAL 7,272,727,282.46 - 836,809,737.07 836,809,737.07
11.51%S/D BULAN INI
B PPN (10%) X A 727,272,728.25 - 83,680,973.71 83,680,973.71 11.51%
C JUMLAH TOTAL A + B 8,000,000,010.70 - 920,490,710.78 920,490,710.78
D DIBULATKAN C 8,000,000,000.00 - 920,490,000.00 920,490,000.00 BULAN INI
E MATERIAL ON SITE (MOS)11.51%
F JUMLAH KOTOR SERTIFIKAT BULAN INI
G POTONGAN - POTONGAN S/D BULAN LALU
1 SERTIFIKAT S/D BULAN LALU (KOMULATIF) - 0.00%
2 5 % JAMINAN PEMELIHARAAN ( 5% X D ) 46,024,500.00
3 20 % PENGEMBALIAN UANG MUKA 184,098,000.00
H JUMLAH POTONGAN ( 1 + 2 + 3 ) 230,122,500.00
I JUMLAH BERSIH SERTIFIKAT BULAN INI TERMASUK PPN 10% (F-H) 690,367,500.00
J DIBULATKAN 690,367,500.00
Terbilang : #VALUE!
NOMOR MATA PEMBAYARAN
DIPERIKSA/DISETUJUI OLEH :KONSULTAN SUPERVISI
__________________SITE ENGINEER
MENYETUJUI OLEH :PPTK
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)
Ir. ZULKARNEN, MT.Nip. 19640516 199703 1 001
DIAJUKAN OLEH :PENYEDIA BARANG/JASA
PT. FLAMBOYANT HUMA ARTA
ALWIN ABDULLAHDIREKTUR UTAMA
MENGETAHUI OLEH :KUASA PENGGUNA ANGGARAN / KUASA PENGGUNA BARANG
KEGIATAN PEMBANGUNAN JALAN DAN JEMBATANDINAS BINA MARGA DAN CIPTA KARYA ACEH
Ir. FAJRI, MTPEMBINA
NIP. 19640831 199203 1 005
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 2 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 1. UMUM JUMLAH KONTRAK AWAL Rp 50,100,000.00
URAIAN PEKERJAAN SAT.
KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI
KUANTITAS KUANTITAS KUANTITAS
1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
1.2 Mobilisasi Ls 1.00 50,100,000.00 50,100,000.00 - - 0.70 35,070,000.00 0.70 35,070,000.00
DIVISI 1. UMUM
TOTAL HARGA 50,100,000.00 - - -
TOTAL PEMBAYARAN - - 35,070,000.00 35,070,000.00
PERSENTASE 100.00% 0.00% 70.00% 70.00%
NOMOR MATA PEMB.
HARGA SATUAN
(Rp.)
JUMLAH HARGA AWAL
(Rp.)KONTRAK
AWAL
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
DISETUJUI OLEH :PEMBANTU PPTK
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, STNip. 19830706 201001 1029
DIPERIKSA OLEH :KONSULTAN SUPERVISI
________________CHIEF INSPECTOR
DIBUAT OLEH :PENYEDIA BARANG/JASA
PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST.GENERAL SUPERINTENDENT
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 3 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 2. DRAINASE JUMLAH KONTRAK AWAL Rp 132,331,985.53
URAIAN PEKERJAAN SAT.
KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI
KUANTITAS KUANTITAS KUANTITAS
1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
2.1 Galian Untuk Selokan Drainase dan Saluran Air M³ 2,000.00 37,888.00 75,776,000.00 - - 1,849.33 70,067,415.04 1,849.33 70,067,415.04
2.3.5 Gorong-Gorong Pipa Baja Bergelombang Ton 1.50 37,703,990.35 56,555,985.53 - - - - - -
DIVISI 2. DRAINASE
TOTAL HARGA 132,331,985.53 - - -
TOTAL PEMBAYARAN - - 70,067,415.04 70,067,415.04
PERSENTASE 100.00% 0.00% 52.95% 52.95%
NOMOR MATA PEMB.
HARGA SATUAN
(Rp.)
JUMLAH HARGA AWAL
(Rp.)KONTRAK
AWAL
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
DISETUJUI OLEH :PEMBANTU PPTK
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, STNip. 19830706 201001 1029
DIPERIKSA OLEH :KONSULTAN SUPERVISI
________________CHIEF INSPECTOR
DIBUAT OLEH :PENYEDIA BARANG/JASA
PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST.GENERAL SUPERINTENDENT
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 4 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 3. PEKERJAAN TANAH JUMLAH KONTRAK AWAL Rp 383,385,448.23
URAIAN PEKERJAAN SAT.
KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI
KUANTITAS KUANTITAS KUANTITAS
1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
3.1.1 Galian Biasa M³ 1,250.94 24,003.00 30,026,312.82 - - - - - -
3.2.1 Timbunan Biasa M³ 2,000.00 71,022.00 142,044,000.00 - - - - - -
3.2.2 Timbunan Pilihan M³ 1,221.83 106,227.00 129,791,335.41 - - 1,221.83 129,791,335.41 1,221.83 129,791,335.41
3.3 Penyiapan Badan jalan M² 27,900.00 2,922.00 81,523,800.00 - - 25,840.15 75,504,918.30 25,840.15 75,504,918.30
DIVISI 3. PEKERJAAN TANAH
TOTAL HARGA 383,385,448.23 - - -
TOTAL PEMBAYARAN - - 205,296,253.71 205,296,253.71
PERSENTASE 100.00% 0.00% 53.55% 53.55%
NOMOR MATA PEMB.
HARGA SATUAN
(Rp.)
JUMLAH HARGA AWAL
(Rp.)KONTRAK
AWAL
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
DISETUJUI OLEH :PEMBANTU PPTK
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, STNip. 19830706 201001 1029
DIPERIKSA OLEH :KONSULTAN SUPERVISI
________________CHIEF INSPECTOR
DIBUAT OLEH :PENYEDIA BARANG/JASA
PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST.GENERAL SUPERINTENDENT
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 5 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN JUMLAH KONTRAK AWAL Rp 847,425,300.00
URAIAN PEKERJAAN SAT.
KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI
KUANTITAS KUANTITAS KUANTITAS
1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
4.2.2 Lapis Pondasi Aggregat Klas B M³ 1,860.00 455,605.00 847,425,300.00 - - - - - -
DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN
TOTAL HARGA 847,425,300.00 - - -
TOTAL PEMBAYARAN - - - -
PERSENTASE 100.00% 0.00% 0.00% 0.00%
NOMOR MATA PEMB.
HARGA SATUAN
(Rp.)
JUMLAH HARGA AWAL
(Rp.)KONTRAK
AWAL
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
DISETUJUI OLEH :PEMBANTU PPTK
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, STNip. 19830706 201001 1029
DIPERIKSA OLEH :KONSULTAN SUPERVISI
________________CHIEF INSPECTOR
DIBUAT OLEH :PENYEDIA BARANG/JASA
PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST.GENERAL SUPERINTENDENT
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 6 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 5. PERKERASAN BERBUTIR JUMLAH KONTRAK AWAL Rp 3,140,618,370.00
URAIAN PEKERJAAN SAT.
KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI
KUANTITAS KUANTITAS KUANTITAS
1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
5.1.1 Lapis Pondasi Agregat Klas A M³ 2,790.00 526,671.00 1,469,412,090.00 - - - - - -
5.1.2 Lapis Pondasi Agregat Klas B M³ 3,720.00 449,249.00 1,671,206,280.00 - - 1,171.68 526,376,068.32 1,171.68 526,376,068.32
DIVISI 5. PERKERASAN BERBUTIR
TOTAL HARGA 3,140,618,370.00 - - -
TOTAL PEMBAYARAN - - 526,376,068.32 526,376,068.32
PERSENTASE 100.00% 0.00% 16.76% 16.76%
NOMOR MATA PEMB.
HARGA SATUAN
(Rp.)
JUMLAH HARGA AWAL
(Rp.)KONTRAK
AWAL
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
DISETUJUI OLEH :PEMBANTU PPTK
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, STNip. 19830706 201001 1029
DIPERIKSA OLEH :KONSULTAN SUPERVISI
________________CHIEF INSPECTOR
DIBUAT OLEH :PENYEDIA BARANG/JASA
PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST.GENERAL SUPERINTENDENT
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 7 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 6. PERKERASAN ASPAL JUMLAH KONTRAK AWAL Rp 2,628,526,398.70
URAIAN PEKERJAAN SAT.
KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI
KUANTITAS KUANTITAS KUANTITAS
1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 13,950.00 11,249.00 156,923,550.00 - - - - - -
6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 2,027.22 521,662.00 1,057,523,639.64 - - - - - -
6.3.8.a Aspal Ton 126.20 10,809,425.00 1,364,149,435.00 - - - - - -
6.3.10 Bahan Pengisi (Filler) Tambahan Kg 41,371.98 1,206.85 49,929,774.06 - - - - - -
DIVISI 6. PERKERASAN ASPAL
TOTAL HARGA 2,628,526,398.70 - - -
TOTAL PEMBAYARAN - - - -
PERSENTASE 100.00% 0.00% 0.00% 0.00%
NOMOR MATA PEMB.
HARGA SATUAN
(Rp.)
JUMLAH HARGA AWAL
(Rp.)KONTRAK
AWAL
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
DISETUJUI OLEH :PEMBANTU PPTK
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, STNip. 19830706 201001 1029
DIPERIKSA OLEH :KONSULTAN SUPERVISI
________________CHIEF INSPECTOR
DIBUAT OLEH :PENYEDIA BARANG/JASA
PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST.GENERAL SUPERINTENDENT
PEMERINTAH ACEH
DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE
SERTIFIKAT BULANAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)
NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL
NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012
TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 8 dari 8
NILAI KONTRAK : Rp. 8,000,000,000.00,-
SUMBER DANA : APBA TAHUN ANGGARAN 2012
PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA
DIVISI 7. STRUKTUR JUMLAH KONTRAK AWAL Rp 90,339,780.00
URAIAN PEKERJAAN SAT.
KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI
KUANTITAS KUANTITAS KUANTITAS
1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10
7.9 Pasangan Batu M³ 80.00 613,517.00 49,081,360.00 - - - - - -
7.10 (3) Bronjong M³ 70.00 589,406.00 41,258,420.00 - - - - - -
DIVISI 7. STRUKTUR
TOTAL HARGA 90,339,780.00 - - -
TOTAL PEMBAYARAN - - - -
PERSENTASE 100.00% 0.00% 0.00% 0.00%
NOMOR MATA PEMB.
HARGA SATUAN
(Rp.)
JUMLAH HARGA AWAL
(Rp.)KONTRAK
AWAL
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)
DISETUJUI OLEH :PEMBANTU PPTK
PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)
RUSVAN VERIZAL, STNip. 19830706 201001 1029
DIPERIKSA OLEH :KONSULTAN SUPERVISI
________________CHIEF INSPECTOR
DIBUAT OLEH :PENYEDIA BARANG/JASA
PT. FLAMBOYANT HUMA ARTA
SYAHRIZAL, ST.GENERAL SUPERINTENDENT
top related