DAFTAR ANALISA HARGA SATUAN
Kegiatan : Rencana Teknik Terinci Bandar Udara Pasir Pengarayan
Pekerjaan : Pembangunan Power House
Lokasi : Rokan Hulu Propinsi Riau
SNI. 03-2835-2002
NO URAIAN HARGA SATUAN JUMLAH HARGA
1 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN.
UPAH :0.100 Oh0.050 Oh
TOTAL -
2 6.4. 1 M' PENGUKURAN DAN PEMASANGAN BOUPLANK :
BAHAN :0.0120 M³0.0200 Kg0.0070 M³
UPAH :0.1000 Oh0.1000 Oh0.0100 Oh0.0050 Oh
TOTAL -
3 6.1. 1 M³ GALIAN TANAH BIASA UPAH :
0.4000 Oh0.0400 Oh
TOTAL -
4 6.8. 1 M³ URUGAN KEMBALI UPAH :
0.1920 Oh0.0190 Oh
TOTAL -
5 6.9. 1 M³ PEMADATAN TANAH/TIMBUNAN TANAH URUG
UPAH :0.5000 Oh0.0500 Oh
TOTAL -
(Rp.) (Rp.)
PekerjaMandor
Kayu Meranti 5/7 Paku Kayu Papan 2/20
PekerjaTukangKepala TukangMandor
PekerjaMandor
PekerjaMandor
PekerjaMandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
6 6.10. 1 M³ URUGAN PASIR. BAHAN :
1.2000 M³
UPAH :0.3000 Oh0.0100 Oh
TOTAL -
7 1 M³ URUGAN TANAH BAHAN :
1.2000 M³
UPAH :0.3000 Oh0.0100 Oh
TOTAL -
8 1M² PASANGAN BATA MERAH TEBAL 1 BATA , 1 PC : 2 PS BAHAN :
204.0000 43.5000 Kg Semen Portland
0.0800 M³
UPAH :0.6500 Oh0.2000 Oh0.0200 Oh0.0300 Oh
TOTAL -
9 1M² PASANGAN BATA MERAH TEBAL 1 BATA , 1 PC : 3 PS BAHAN :
204.0000 32.9500 Kg Semen
0.0910 M³
UPAH :0.6500 Oh0.2000 Oh0.0200 Oh0.0300 Oh
TOTAL -
Pasir Urug
PekerjaMandor
Tanah Timbun
PekerjaMandor
Bh Bata Merah 4 x 7,5 x 16 Cm
Pasir Pasang
PekerjaTukang batuKepala tukang Mandor
Bh Bata Merah 4 x 7,5 x 16 Cm
Pasir Pasang
PekerjaTukang batuKepala tukang Mandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
10 1M² PASANGAN BATA MERAH TEBAL 1 BATA , 1 PC : 4 PS BAHAN :
204.0000 26.5500 Kg Semen
0.0930 M³
UPAH :0.6500 Oh0.2000 Oh0.0200 Oh0.0300 Oh
TOTAL -
11 1M² PASANGAN BATA MERAH TEBAL 1/2 BATA , 1 PC : 2 PS BAHAN :
102.0000 18.9500 Kg Semen
0.0380 M³
UPAH :0.3200 Oh0.1000 Oh0.0100 Oh0.0150 Oh
TOTAL -
12 1M² PASANGAN BATA MERAH TEBAL 1/2 BATA , 1 PC : 3 PS BAHAN :
102.0000 14.3700 Kg Semen
0.0400 M³
UPAH :0.3200 Oh0.1000 Oh0.0100 Oh0.0400 Oh
TOTAL -
13 1M² PASANGAN BATA MERAH TEBAL 1/2 BATA , 1 PC : 4 PS BAHAN :
102.0000 11.5000 Kg Semen
0.0430 M³0.0020 M³0.0010 M³
UPAH :0.3200 Oh0.1000 Oh0.0100 Oh0.0150 Oh
TOTAL -
Bh Bata Merah 4 x 7,5 x 16 Cm
Pasir Pasang
PekerjaTukang batuKepala tukang Mandor
Bh Bata Merah 4 x 7,5 x 16 Cm
Pasir Pasang
PekerjaTukang batuKepala tukang Mandor
Bh Bata Merah 4 x 7,5 x 16 Cm
Pasir Pasang
PekerjaTukang batuKepala tukang Mandor
Bh Bata Merah 4 x 7,5 x 16 Cm
Pasir PasangPerancah kayuPapan meranti
PekerjaTukang batuKepala tukang Mandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
14 1M² PASANGAN BATU KALI BAHAN :
1.2000 M2 Batu Kali163.0000 Kg Semen
0.5200 M³
UPAH : 1.5000 Oh 0.7500 Oh 0.0750 Oh 0.0750 Oh
TOTAL -
15 1 M² PLASTERAN 1 PC : 2 PS ( TEBAL. 20 MM ) BAHAN :
14.2800 Kg Semen0.0230 M³
UPAH :0.2500 Oh0.2000 Oh0.0200 Oh0.0125 Oh
TOTAL -
16 1 M² PLASTERAN 1 PC : 3 PS ( TEBAL. 20 MM ) BAHAN :
10.8000 Kg0.0260 M³
UPAH :0.2500 Oh0.2000 Oh0.0200 Oh0.0125 Oh
TOTAL -
17 1 M² PLASTERAN 1 PC : 4 PS ( TEBAL. 20 MM ) BAHAN :
8.6800 Kg0.0280 M³0.0020 M³0.0010 M³
UPAH :0.2500 Oh0.2000 Oh0.0200 Oh0.0125 Oh
TOTAL -
Pasir Pasang
PekerjaTukang batuKepala tukang Mandor
Pasir Pasang
PekerjaTukang BatuKepala TukangMandor
Sement PortlandPasir Pasang
PekerjaTukang BatuKepala TukangMandor
Sement PortlandPasir PasangPerancah kayuPapan meranti
PekerjaTukang BatuKepala TukangMandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
18 1 M² PASANG KUDA-KUDA BAJA BAHAN :
1.10000 Kg30.00000 %
UPAH :30.00000 %
TOTAL -
19 1 M2 PASANG LANGIT-LANGIT GYPSUM TEBAL 9 MM BAHAN :
0.3640 Gypsum 9 mm0.1100 Kg
UPAH :0.1000 Oh0.0500 Oh0.0050 Oh0.0050 Oh
TOTAL -
20 1 M' PASANG LIST LANGIT-LANGIT GYPSUM BAHAN :
1.1000 M' List Gypsum0.1600 Kg
UPAH :0.0500 Oh0.0500 Oh0.0050 Oh0.0030 Oh
TOTAL -
21 1 M' PASANG LIST LANGIT-LANGIT KAYU PROFIL BAHAN :
1.1000 M'0.0100 Kg
UPAH :0.0050 Oh0.0050 Oh0.0050 Oh0.0030 Oh
TOTAL -
BajaPlat Penyambung dari harga baja
dari harga bahan
LbrPaku Sekrup
PekerjaTukang KayuKepala TukangMandor
Lem
PekerjaTukang KayuKepala TukangMandor
List kayu profilPaku biasa 1" - 2"
PekerjaTukang KayuKepala TukangMandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
22 BAHAN :
218.0000 Kg Semen Portland0.5200 M³0.8700 M³
UPAH :1.6500 Oh0.2500 Oh0.0250 Oh0.0800 Oh
TOTAL -
23 BAHAN :
10.0000 Kg Semen Portland0.0260 M³0.0440 M³
UPAH :1.1500 Oh0.0200 Oh0.0020 Oh0.0060 Oh
TOTAL -
24 BAHAN :
232.0000 Kg Semen Portland0.5200 M³0.7800 M³ Kerikil
UPAH :1.6500 Oh0.2500 Oh0.0250 Oh0.0800 Oh
TOTAL -
25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR BAHAN :
1.0500 Kg0.0150 Kg
UPAH :0.0070 Oh0.0070 Oh0.0007 Oh0.0003 Oh
TOTAL -
1 M³ LANTAI KERJA BETON TUMBUK, 1 Pc : 3 Ps : 5 Krl
Pasir BetonKoral Beton
PekerjaTukang BatuKepala TukangMandor
1 M2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 Pc + : 3 Ps : 5 Krl TEBAL 5 CM
Pasir BetonKerikil
PekerjaTukang BatuKepala TukangMandor
1 M³ MEMBUAT BETON TUMBUK, 1 Pc : 2 Ps : 3 Krl
Pasir Beton
PekerjaTukang BatuKepala TukangMandor
Besi Beton Polos / UlirKawat Ikat Beton
PekerjaTukang BesiKepala TukangMandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
26 1 M³ MEMBUAT BETON DENGAN MUTU K 225. BAHAN :
388.0000 Kg Semen Portland0.6500 M³0.6500 M³ Kerikil
UPAH :6.0000 Oh1.0000 Oh0.1000 Oh0.3000 Oh
TOTAL -
27 1 M³ MEMBUAT BETON DENGAN MUTU K 275. BAHAN :
400.0000 Kg Semen Portland0.4000 M³0.8200 M³ Kerikil
UPAH :6.0000 Oh1.0000 Oh0.1000 Oh0.3000 Oh
TOTAL -
28 1 M³ MEMBUAT PONDASI BETON BERTULANG ( 115 Kg BESI + BEKISTING ) BAHAN :
0.2000 M³1.5000 Kg0.4000
115.0000 Kg2.4500 Kg
323.0000 Kg Semen Portland0.5200 M³0.7800 M³ Kerikil
UPAH :3.9000 Oh0.3500 Oh1.0400 Oh1.0500 Oh0.2450 Oh0.1650 Oh
TOTAL -
Pasir Beton
PekerjaTukang BatuKepala TukangMandor
Pasir Beton
PekerjaTukang BatuKepala TukangMandor
Kayu MerantiPaku Biasa 2 " - 5 "
Ltr Minyak BekistingBesi Beton PolosKawat Beton
Pasir Beton
PekerjaTukang BatuTukang KayuTukang BesiKepala TukangMandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
29 1 M³ MEMBUAT SLOOF BETON BERTULANG ( 120 Kg BESI + BEKISTING ) BAHAN :
0.2700 M³2.0000 Kg0.6000
120.0000 Kg1.8000 Kg
323.0000 Kg Semen Portland0.5200 M³0.7800 M³ Kerikil
UPAH :4.8500 Oh0.3500 Oh1.5600 Oh1.4000 Oh0.3310 Oh0.1700 Oh
TOTAL -
30 1 M³ MEMBUAT KOLOM BETON BERTULANG 120 Kg BESI + BEKISTING BAHAN :
0.4000 M³4.0000 Kg2.0000
120.0000 Kg4.5000 Kg
323.0000 Kg Semen Portland0.5200 M³0.7800 M³ Kerikil0.1500 M³
20.0000
UPAH :7.3000 Oh0.3500 Oh3.3000 Oh2.1000 Oh0.5700 Oh0.2500 Oh
TOTAL -
Kayu MerantiPaku Biasa 2 " - 5 "
Ltr Minyak BekistingBesi Beton Ulir/PolosKawat Beton
Pasir Beton
PekerjaTukang BatuTukang KayuTukang BesiKepala TukangMandor
Kayu MerantiPaku Biasa 2 " - 5 "
Ltr Minyak BekistingBesi Beton Ulir/PolosKawat Beton
Pasir Beton
Kayu balok merantiBtg Kayu bulat/ubar dia 8 cm/4m
PekerjaTukang BatuTukang KayuTukang BesiKepala TukangMandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
31 1 M³ MEMBUAT BALOK BETON BERTULANG 140 Kg BESI + BEKISTING BAHAN :
0.3200 M³3.2000 Kg1.6000
140.0000 Kg4.5000 Kg
323.0000 Kg Semen Portland0.5200 M³0.7800 M³ Kerikil0.1400 M³
16.0000
UPAH :5.9600 Oh0.3500 Oh2.8000 Oh1.4000 Oh0.4550 Oh0.2080 Oh
TOTAL -
32 1 M³ MEMBUAT RING BALOK BETON BERTULANG 120 Kg BESI + BEKISTING BAHAN :
0.3200 M³3.2000 Kg1.6000
120.0000 Kg3.0000 Kg
323.0000 Kg Semen Portland0.5200 M³0.7800 M³ Kerikil0.1400 M³
16.0000
UPAH :5.9600 Oh0.3500 Oh2.8000 Oh1.4000 Oh0.4550 Oh0.2080 Oh
TOTAL -
Kayu MerantiPaku Biasa 2 " - 5 "
Ltr Minyak BekistingBesi Beton Ulir/PolosKawat Beton
Pasir Beton
Kayu balok merantiBtg Kayu bulat/ubar dia 8 cm/4m
PekerjaTukang BatuTukang KayuTukang BesiKepala TukangMandor
Kayu MerantiPaku Biasa 2 " - 5 "
Ltr Minyak BekistingBesi Beton Ulir/PolosKawat Beton
Pasir Beton
Kayu balok merantiBtg Kayu bulat/ubar dia 8 cm/4m
PekerjaTukang BatuTukang KayuTukang BesiKepala TukangMandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
33 1 M³ MEMBUAT PLAT LANTAI BETON BERTULANG 120 Kg BESI + BEKISTING BAHAN :
0.3200 M³3.2000 Kg1.6000
120.0000 Kg3.0000 Kg
323.0000 Kg Semen Portland0.5200 M³0.7800 M³ Kerikil0.1400 M³
12.0000
UPAH :5.9600 Oh0.3500 Oh2.8000 Oh1.4000 Oh0.4550 Oh0.2080 Oh
TOTAL -
34 1 M³ MEMBUAT TANGGA BETON BERTULANG 150 Kg BESI + BEKISTING BAHAN :
0.2500 M³3.0000 Kg1.2000
150.0000 Kg3.0000 Kg
323.0000 Kg Semen Portland0.5200 M³0.7800 M³ Kerikil0.1050 M³
14.0000
UPAH :5.6000 Oh0.3500 Oh2.3000 Oh1.4000 Oh0.4050 Oh0.2020 Oh
TOTAL -
Kayu MerantiPaku Biasa 2 " - 5 "
Ltr Minyak BekistingBesi Beton PolosKawat Beton
Pasir Beton
Kayu balok merantiBtg Kayu bulat/ubar dia 8 cm/4m
PekerjaTukang BatuTukang KayuTukang BesiKepala TukangMandor
Kayu MerantiPaku Biasa 2 " - 5 "
Ltr Minyak BekistingBesi Beton Ulir/PolosKawat Beton
Pasir Beton
Kayu balok merantiBtg Kayu bulat/ubar dia 8 cm/4m
PekerjaTukang BatuTukang KayuTukang BesiKepala TukangMandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
35 1 M 2 PASANG ATAP SPANDEK BAHAN :
0.7000 0.0200 Kg
UPAH :0.1200 Oh0.0600 Oh0.0060 Oh0.0060 Oh
TOTAL -
36 1 M² PASANG LANTAI KERAMIK 20/ 20 Cm BAHAN :
25.0000 11.3800 Kg
0.0420 M³1.5000 M³
UPAH :0.6200 Oh0.3500 Oh0.0350 Oh0.0300 Oh
TOTAL -
37 1 M² PASANG LANTAI KERAMIK 40/ 40 Cm BAHAN :
6.2500 11.3800 Kg
0.0420 M³1.5000 M³
UPAH :0.6200 Oh0.3500 Oh0.0350 Oh0.0300 Oh -
TOTAL -
38 1 M² PASANG LANTAI KERAMIK 30/ 30 Cm BAHAN :
11.0000 11.3800 Kg
0.0420 M³1.5000 M³
UPAH :0.6200 Oh0.3500 Oh0.0350 Oh0.0300 Oh
TOTAL -
Lbr Atap SpandekBaut
PekerjaTukang KayuKepala TukangMandor
Bh Ubin Keramik 20/ 20 CmSement PortlandPasir PasangSemen Warna
PekerjaTukang BatuKepala TukangMandor
Bh Keramik 40/ 40 CmSement PortlandPasir PasangSemen Warna
PekerjaTukang BatuKepala TukangMandor
Bh Ubin Keramik 30/ 30 Cm Sement PortlandPasir PasangSemen Warna
PekerjaTukang BatuKepala TukangMandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
39 1 M' PASANG PLINT KERAMIK 10 X 40 Cm BAHAN :
2.4000 1.6500 Kg0.0032 M³0.1000 M³
UPAH :0.0900 Oh0.0900 Oh0.0090 Oh0.0045 Oh
TOTAL -
40 1 M' PASANG PLINT KERAMIK 10 X 30 Cm BAHAN :
3.0000 1.6500 Kg0.0032 M³0.1000 M³
UPAH :0.0900 Oh0.0900 Oh0.0090 Oh0.0045 Oh
TOTAL -
41 1 M² PASANG DINDING KERAMIK 20/ 25 Cm BAHAN :
20.0000 9.3000 Kg0.0180 M³1.5000 M³
UPAH :0.6000 Oh0.4500 Oh0.0450 Oh0.0300 Oh
TOTAL -
42 1 M² CAT TEMBOK WEATERSHEILD BAHAN :
0.2600 Kg0.1000 Kg0.5000 0.0500
UPAH :0.0700 Oh0.1050 Oh0.0040 Oh0.0025 Oh
TOTAL -
43 1 M² CAT TEMBOK BARU BAHAN :
Bh Plint Keramik 10/ 40 CmSement PortlandPasir PasangSemen Warna
PekerjaTukang BatuKepala TukangMandor
Bh Plint Keramik 10/ 30 CmSement PortlandPasir PasangSemen Warna
PekerjaTukang BatuKepala TukangMandor
Bh Keramik 20/ 25 CmSement PortlandPasir PasangSemen Warna
PekerjaTukang BatuKepala TukangMandor
Cat Tembok WeatersheildPlamuur
Lbr AmplasBh Kuas Gulung
PekerjaTukang CatKepala TukangMandor
NO URAIAN HARGA SATUAN JUMLAH HARGA (Rp.) (Rp.)
0.1000 Kg0.1000 0.0100 0.1000 Kg0.2600 Kg
UPAH :0.0200 Oh0.0630 Oh0.0063 Oh0.0025 Oh
TOTAL -
PlamuurLbr Kertas PasirBh Kuas golong
Cat DasarCat Penutup 2 x sapu
PekerjaTukang CatKepala TukangMandor
BILL OF QUANTITY
:: Pembangunan Power House:
ITEM PEKERJAANNO VOLUME SAT. HARGA SAT. JUMLAH
A PEKERJAAN PERSIAPAN1 48.00 m'2 140.00 m23 1.00 Ls4 1.00 Ls5 1.00 Ls
SUBTOTAL -
B PEKERJAAN TANAH & PASIR1 70.43 m32 51.51 m3
SUBTOTAL -
C PEKERJAAN PONDASI1 2.90 m32 0.61 m33 3.11 m34 6.10 m35 2.76 m3
SUBTOTAL -
D PEKERJAAN STRUKTUR LT. DASAREL-1.050 - EL+3.200
1 2.24 m32 0.86 m33 1.49 m34 0.14 m35 9.80 m36 4.80 m37 8.10 m38 3.52 m39 5.22 m3
10 0.33 m311 41.68 kg
SUBTOTAL -
E PEKERJAAN STRUKTUR LT ATAP
1 1.50 m32 1.22 m33 2.19 m35 612.00 kg
SUBTOTAL -
F PEKERJAAN LANTAI1 23.33 m22 3.45 m23 17.25 m14 41.00 m2
SUBTOTAL -
Kegiatan Rencana Teknik Terinci Bandar Udara Pasir PengarayanPekerjaanLokasi Rokan Hulu Propinsi Riau
Rp. Rp.
Pek. BouwplankPembersihan LokasiPek. Pembuatan Base CampPapan Nama ProyekDokumentasi Proyek / Foto Proyek
Pek. Galian pondasiPek. Urugan + Pemadatan tanah kembali
Pasir Padat 70mmPasir Padat 70mm untuk pondasi batu kaliLantai Kerja 50mmBeton Footing PondasiPondasi Batu kali u/ dinding bata
Sloof S1. 250X450mm Sloof S2. 250X400mm Sloof S3. 250X300mm Sloof dinding bata 130x150mm (standard)Pasir Padat 70mmLantai kerja 50mmBeton Plat Lt Dasar t = 100 mm Beton Plat Tanpa Tulangan Lt Dasar 1PC:2PS:3KR t = 80 mm Kolom K1 350x350mmKolom KP 130x130mmDolken D13-300 Construction joint
El +3.200Ring Balok RB1. 250x500Ring Balok RB2. 250x350Ring Balok RB3. 250x300Rangka Atap Baja
Lantai Keramik Homogeneous 40x40 cm PolishedLantai Keramik 20x20 (Toilet)Plint keramik 10x40 cm PolishedRabat Beton Lebar 100 cm Tebal 6cm
ITEM PEKERJAANNO VOLUME SAT. HARGA SAT. JUMLAH Rp. Rp.
G PEKERJAAN DINDING & LAPISAN1 180.49 m22 29.25 m23 360.98 m24 21.25 m25 55.90 m2
SUBTOTAL -
H PEKERJAAN KUSEN PINTU & JENDELA1 1.00 2 3.00 3 2.00 4 1.00 5 2.00 6 8.00 7 1.00 8 1.00 9 4.00
10 2.00 SUBTOTAL -
I PEKERJAAN PLAFOND1 47.42 m22 7.40 m1
SUBTOTAL -
J PEKERJAAN SANITAIR1 1.00 2 1.00 3 1.00 4 1.00
SUBTOTAL -
K PEKERJAAN PENGECATAN1 129.10 m22 47.26 m23 26.50 m2
SUBTOTAL -
L PEKERJAAN ATAP1 148.37 m22 286.74 m23 168.37 m24 List Plank GRC t=1.2cm + Cat 63.70 m1
SUBTOTAL -
M PEKERJAAN AIR CONDITIONING DAN VENTILASI
1 1.00 Unit2 1.00 Unit3 1.00 Unit4 1.00 Unit5 1.00 Unit
SUBTOTAL -
Pasangan Dinding 1/2 Bata (ad 1:4)Pasangan Dinding Bata Trasram (ad 1:2)Plesteran + Acian Dinding (ad 1:4) t=15mmPlesteran Acian Dinding Trasram (ad 1:2)Lapisan dinding Keramik 20x25 (Toilet)
Kusen, Pintu Jendela Tipe P1 (1.2m x 2.45m) bhKusen, Pintu Jendela Tipe P2 (0.9m x 2.45m) bhKusen, Pintu Jendela Tipe P3 (0.8m x 2.45m) bhKusen, Pintu Jendela Tipe P4 (0.70m x 2.05m) bhKusen, Jendela Besi Tipe J1 (0.8m x 1.85m) bhKusen, Jendela Besi Tipe J2 (0.8m x 1.85m) bhKusen, Jendela Tipe BV3 (1.75m x 0.35m) bhKusen, Jendela Tipe BV4 (0.8m x 0.35m) bhKusen, Jendela Tipe BV1 (0.8m x 0.8m) bhKusen, Jendela Tipe BV2 (1.75m x 0.35m) bh
Plafond Gypsum 9 mm + Rangka MetalList Plafond Gypsum 5 cm
Closet Duduk bhFaucet/Kran bhKitchen Zink 1 Lubang bhKran Bebek Kitchen Zink bh
Cat Tembok Dinding Luar Weather ShieldCat Tembok DalamCat Plafond
Atap Metal SpandekAlumunium FoilRockwool + Wiremesh 5x5 cm
Pemasangan Instalasi Air Conditioning (AC), lengkap denganPekerjaan pembobokan dan pengembalian kembali,support, braket, pipa refrigerant dan pipa drain.kabel power dan kelengkapan lainnya, sehimggaAC berfungsi dengan baik.Pemasangan Instalasi Exhaust Fan lengkap denganpekerjaan pembobokan dan perapihan kembali, suport,braket, kabel power dan kelengkapan lainnya sehinggaFan bisa berfungsi dengan baik.
Air Conditioning, kapasitas 5000 BtuhAir Conditioning, kapasitas 9000 BtuhExhaust Fan, kapasitas 672 CMHExhaust Fan, kapasitas 336 CMHExhaust Fan, kapasitas 192 CMH
ITEM PEKERJAANNO VOLUME SAT. HARGA SAT. JUMLAH Rp. Rp.
N PLUMBING
INSTALASI AIR BERSIH1 13.00 m
INSTALASI AIR KOTOR DAN AIR BEKAS1 Floor Drain 2.00 2 10.00 m3 2.00 m4 10.00 m5 3.00 m
SUBTOTAL -
O ALAT PEMADAM API RINGAN
1 1.00 2 1.00
SUBTOTAL -
P PEKERJAAN ELEKTRIKAL1 1.00 3 MCB 16 A 1.00 4 MCB 10 A 6.00 5 Armature 2x36 W 10.00 6 Down Light PLC 14 W 1.00 7 46.00 m8 46.00 m9 5.00
10 1.00 11 7.00 12 2.00 13 96.00 m14 96.00 m
SUBTOTAL - JUMLAH TOTAL -
Instalasi pekerjaan plumbing lengkap denganvalve, fitting, elbow, penyambungan, support sehinggainstalasi plumbing berfungsi dengan baik
Pipa PVC, kelas AW, dia 32 mm
buahPipa PVC, kelas AW, dia. 150 mmPipa PVC, kelas AW, dia. 100 mmPipa PVC, kelas AW, dia. 80 mmPipa PVC, kelas AW, dia. 50 mm
Pengadaan dan Instalasi Alat Pemadam Api Ringanlengkap dengan suport, braket dan alat bantu lainnya.
Alat Pemadam Api Ringan, Chemical Powder, 3,5 kg buahAlat Pemadam Api Ringan, CO2, 5 Kg buah
Panel Hubung Bagi bhbhbh
buahbuah
Kabel NYM 2X4 mmConduit dia. 20 mmSaklar tunggal buahSaklar ganda buahStop kontak buahStop kontak AC buahKabel NYM 2X4 mmConduit dia. 20 mm
REKAPITULASI
:::
URAIAN PEKERJAANNO JUMLAH
A PEKERJAAN PERSIAPAN - B PEKERJAAN TANAH & PASIR - C PEKERJAAN PONDASI - D PEKERJAAN STRUKTUR LT. DASAR - E PEKERJAAN STRUKTUR LT ATAP - F PEKERJAAN LANTAI - G PEKERJAAN DINDING & LAPISAN - H PEKERJAAN KUSEN PINTU & JENDELA - I PEKERJAAN PLAFOND - J PEKERJAAN SANITAIR - K PEKERJAAN PENGECATAN - L PEKERJAAN ATAP - M PEKERJAAN AIR CONDITIONING DAN VENTILASI - N PLUMBING - O ALAT PEMADAM API RINGAN - P PEKERJAAN ELEKTRIKAL -
JUMLAH Rp- PPN 10% Rp- TOTAL Rp- DIBULATKAN Rp-
PT/CV……………………..
NAMA JELAS JABATAN
Kegiatan Pembangunan, Rehabilitasi dan Pemeliharaan Prasarana Bandar UdaraPekerjaan Pembangunan Power HouseLokasi Rokan Hulu Propinsi Riau
Pasir Pengaraian, Juli 2011
DAFTAR HARGA SATUAN BAHAN DAN UPAH
: Pembangunan, Rehabilitasi dan Pemeliharaan Prasarana Bandar Udara: Pembangunan Power House: Rokan Hulu Propinsi Riau
NO TENAGA / BAHAN / PEKERJAAN SATUAN HARGA SATUAN
I. TENAGA KERJA1234
II. BAHAN A. BAHAN PASANGAN
1 M32 M33 M34 M35 M36 M3789 Batu Kali M2
10 Portland Cement / Semen Padang Type I Kg11 Kg
B. BAHAN KAYU1 M32 M33 M34 M356 M37 M'8 M29
1011 M2
C. BAHAN BESI1 Kg2 Kg3 Kg4 Kg
KegiatanPekerjaanLokasi
Mandor Hari / Org Kepala Tukang Kayu Hari / Org Tukang Hari / Org Pekerja Hari / Org
Pasir Urug Pasir Pasang Pasir Beton / Cor Tanah Urug (timbun) Batu Pecah Kerikil Batu Bata 4 x 7,5 x 16 Bh Batu Bata Pres Bh
Portland Cement Putih
Kayu Kulim Kayu Jelutung Kayu Meranti Papan Meranti Dolken Kayu dia 10 - 12/400 cm Btg Kayu Perancah ( Bekisting ) Dalam Pasang Papan Listplank Ukir + Cat Pasang Singap Ukir + Cat Selembayung Ukir Ps Papan Lebah Bergayut Bh Pasang Ventilasi Ukir Papan Tebuk + Cat
Besi Beton Baja Kawat Ikat Beton ( Bindraat ) Dolken D13-300 Construction joint
NO TENAGA / BAHAN / PEKERJAAN SATUAN HARGA SATUAN
E. BAHAN LANTAI1234567 M'
F. BAHAN ATAP123 M24 List Plank GRC t=1.2cm + Cat M'5 M26 M2
G. BAHAN LANGIT-LANGIT 12 M'3 Plywood 9 mm4 Plywood 3,6 mm5 Plywood 3 mm6 List Gypsum M'
H. BAHAN PIPA1 M'2 Floor Drain3 M'4 M'5 M'6 M'
I. BAHAN SANITAIR12 Shower Spray345678
J. BAHAN PAKU1 Kg2 Kg3 Kg4 Kg5 Kg6 Kg7 Kg
Keramik ukuran 40 x 40 cm Bh Keramik ukuran 20 x 20 cm Bh Plint keramik 10 x 40 cm Bh Keramik Anti Slip ukuran 40 x 40 cm Bh Keramik Anti Slip ukuran 30 x 30 cm Bh Keramik ukuran 20 x 25 cm Bh Bon-bon Keramik
Atap Genteng Metal 0,3 mm Lbr Atap Spandek Lbr Rockwool + Wiremesh 5x5 cm
Waterproofing atap dak beton (Teras) Alumunium Foil
Gypsum tebal 9 mm Lbr List Profil
LbrLbrLbr
Pipa PVC, kelas AW, dia 32 mmBh
Pipa PVC, kelas AW, dia. 150 mmPipa PVC, kelas AW, dia. 100 mmPipa PVC, kelas AW, dia. 80 mmPipa PVC, kelas AW, dia. 50 mm
Closet Duduk BhBh
Faucet/Kran BhWastafel BhUrinoir BhCermin 60x100 t=6 mm di bevel BhKitchen Zink 1 Lubang BhKran Bebek Kitchen Zink Bh
Baut Paku Sekrup Paku Seng Paku 2" - 5" Besi Strip 2" Besi Gypsum Paku Triplek / Teakwood
NO TENAGA / BAHAN / PEKERJAAN SATUAN HARGA SATUAN
K. BAHAN KUSEN123456789
10
M. BAHAN LISTRIK12 MCCB 32 A, 3 pole3 MCB 16 A4 MCB 10 A5 Armature 2x36 W6 Down Light PLC 14 W7 m8 m9
10111213 m14 m
O. BAHAN FINISHING1 Kg2 Kg3 Kg45 Kg6 Kg7 Kg89
101112 Kg13 Seal Tape14 Teak Oil Kg
O. BAHAN PERLENGKAPAN1 Unit2 Unit3 Unit4 Unit5 Unit7 Unit8 Unit
Kusen, Pintu Jendela Tipe P1 (1.2m x 2.45m) BhKusen, Pintu Jendela Tipe P2 (0.9m x 2.45m) BhKusen, Pintu Jendela Tipe P3 (0.8m x 2.45m) BhKusen, Pintu Jendela Tipe P4 (0.70m x 2.05m) BhKusen, Jendela Besi Tipe J1 (0.8m x 1.85m) BhKusen, Jendela Besi Tipe J2 (0.8m x 1.85m) BhKusen, Jendela Tipe BV3 (1.75m x 0.35m) BhKusen, Jendela Tipe BV4 (0.8m x 0.35m) BhKusen, Jendela Tipe BV1 (0.8m x 0.8m) BhKusen, Jendela Tipe BV2 (1.75m x 0.35m) Bh
Panel Hubung Bagi bhbhbhbh
buahbuah
Kabel NYM 2X4 mmConduit dia. 20 mmSaklar tunggal buahSaklar ganda buahStop kontak buahStop kontak AC buahKabel NYM 2X4 mmConduit dia. 20 mm
Cat Tembok Weatersheild Cat Tembok setara Platon Cat Kayu Dasar / Menie Minyak Cat Ltr Residu Setara Cap Roket Dempul Plamur Kertas Pasir Lbr Kuas 3" Bh Kuas Golong ( Rol ) Bh Minyak Cat Bekesting Ltr Lem
Bh
Air Conditioning, kapasitas 5000 BtuhAir Conditioning, kapasitas 9000 BtuhExhaust Fan, kapasitas 672 CMHExhaust Fan, kapasitas 336 CMHExhaust Fan, kapasitas 192 CMHAlat Pemadam Api Ringan, CO2, 5 KgAlat Pemadam Api Ringan, Chemical Powder, 3,5 kg
top related