1 Name of Work :
2 :
3 Classification of Road : Other District Roads
4
a. G.O.Ms.No :
b. Nomenclature : Darga Road
c. Length : 1.000 Km
d. Amount of Sanction : Rs. 170.00Lakhs.
5
6 Change in Scope of Sanction if any : No
7 Amount of Estimate now prepared : Rs. 170.00 Lakhs
8
9 Revised Administrative Sanction if any : N.A
10
11
Whether the Estimate amount is with in
allowable limit of power of sanction of
competent authority
: Yes
CHECK LIST FOR ROAD WORKS FOR SCRUTINY AND SANCTION OF ESTIMATES
Widening and Improving from Two Lane
to Available Full width at Km 0 / 4 -- 1 / 4
of Dharga Road including Drain (ODR)
Name of Scheme Under which work is
taken up
Comprehensive Road Infrastructure
Development Programe 2013 -- 2014
Whether Administrative Sanction of
Government / Director of Highways
Department / Collector is Obtained
: Yes
G.O.Ms No. Highways (HN1)
Department Dated
Whether Nomenclature length amount
is as per G.O / A.S: Yes
Whether the following details are
enclosed site plan, index map &
alignment of road
: -
Whether L.S & C.S working drawing
data with quarry chat (quarry map
counter signed by concerned Executive
Engineer) detailed Estimate, Abstract
Estimate, Specification report etc., is
enclosed.
: Yes
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
2/67
II) ALIGNMENT
1
2
3
4
5
6 What are the gradients adopted. : --
III) HYDRAULIC PARTICULARS FOR C.D. WORKS
1
2
3
4
5
6 Whether remedial is the seepage flow : --
7
Whether alternative alignment are
studied: Existing alignment followed
If so whether details of each alignment
their merits and demerits are given in
the estimate and only the best is
selected.
: --
Whether geological conditions have
been studied?: --
Is the alignment approved by
competent Authority: --
Whether the reference of the
benchmark, which has been used for
carrying out survey, is mentioned
whether permanent benchmark is also
indicated
: --
Are there any breaching sections in the
tanks, channesl etc., close to the
alignment proposals
: --
If it is realignment locate branches in
the existing road in the past?: --
Whether the following are correctly
fixed HFL / MFL / MWL along the road: --
Whether there are branches in the part
in the channels tanks / rivers due to
rains floods in the pest and it so any
special protection to be provided for
: --
Whether remedial measures are
proposed for 3 and 4 above: --
Note the level of water table
throughout out.: --
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
3/67
IV) PAVEMENT
1
a.
b.
2
3
4
5
6
7
8
9
10
11
12
To what standards the road is formed
or improved MDR / ODR / SH / UR: SH
What is the traffic intensity that is
considered S or C Curve:
soil Test and B.B.D. Test are carried out as
per IRC 37 -- 2001 and IRC 81 -- 1997
respectively in widening and
strengthening area.
Are the standards adopted in all aspects
like width, side slope and right of way: Yes
Is the road earth suitable for
foundation? Whether the provision is
made for conveying good earth for
forming the approach if necessary
: Yes
Whether pavement is scientifically
designed base on soaked CBR value of
Sub Grade are Sub Base materials
: Yes
Whether L.S or C.S are taken at
specified intervals and quantity worked
out?
: Yes
Whether suitable camper and gradient
is provided?: Yes
Whether the road level has been fixed
corresponding to the bridge estimate if
any to the project and the reference
bench mark
: N.A
Whether the earth quality is approved
with reference to availability and
suitability? Whether provision made
for extra lead and lift for earth work?
: N.A
Whether approach alignment is
designed with suitable horizontal and
vertical curves
: Yes
Whether the WBM is for compacted
thickness? If so is 331 / 3% extra
collection provided for?
:
Whether soaked CBR value of the sub
grade in found out and pavement is
suitably designed?
: Yes
Whether suitable sub base of minimum
CBR of 20% is provided: Yes
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
4/67
13
14
V) RATES
1
2
3
4
5
6
VI) OTHER ITEMS
1
a
b
c
IS adequate provision for LA made
whether land acquisition plan and
schedule are available?
: Yes
Whether the foundation earth work
reates included for bailing charges and
shuttering all labour materials etc.,
completed?
: N.A
Whether any provision made for a rate
removal of sand upto sill level withoutbailing?
: -
Whether suitable wearing course is
proposed: Yes
Whether current year rates adopted
:
Yes 2013 -- 14, with An extra 10% on
labour for the works in respect of chennai
city limit
Whether the rates for other items are
checked with reference to standard
data or approved date as the case may
be and the provisions are just and
adequate?
: Yes
Whether the estimate it provided with
adequate provision for the following
items
: --
Whether concrete rate is inclusive of
form work bailing out water etc., and
vibration charges
: -
Whether formation rate is inclusive of
compaction allowance and watering
and compaction etc., if so not based of
field tests
: -
Provision for Name Board and Sign
Board and Caution Board etc.,: Yes
Provision for land acquisition for the
following item?: Nil
Provision for cross drainage works if
any?: Nil
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
5/67
I
1 1.000 Km
2 1.800 Km3 5.200 Km
4 2.500 Km
5 1.200 Km
6 1.000 Km
7 0.700 Km
13.400 Km
Or 13.000 Km
II
1 6.000 Km
2 8.000 Km
3 20.800 Km
4 3.400 Km
5 1.000 Km
6 0.700 Km
39.900 Km
Or 40.000 Km
III
1 6.000 Km
2 8.000 Km
3 20.000 Km
4 0.400 Km
5 0.500 Km
34.900 Km
Or 35.000 Km
DARGA ROAD AT KM 0 / 4 -- 1 / 4
METAL QUARRY : CHIKAKARAYAPURAM QUARRY TO CMP SITE
Cart Track
Kundrathur -- Kumaran Chavadi 3 / 8 -- 5 / 6
Pallavaram -- Kundrathur Road km 7 / 8 -- 2 / 6
BITUMEN LEAD : CPCL @ MANALI TO SITE
Manali to Tollgate km 0 / 0 -- 6 / 0
W.K.M. ( 1.000 / 2)
Pammal -- Thiruneermalai Road Km 0 / 0 -- 2 / 5
Darga Road Km 0 / 0 -- 0 / 4
Tollgate -- Parrys Km 8 / 0 -- 0 / 0
NH -- 45 Km 0 / 0 -- 20 / 0
Tollgate -- Parrys Km 8 / 0 -- 0 / 0
NH -- 45 Km 0 / 0 -- 20 / 8
Thiruneermalai Road Km 20 / 8 -- 24 / 2
Tambaram -- Thiruneermalai Road Km 0 / 0 -- 1 / 0
To CMP Site
Panchayat Road
Tambaram -- Thiruneermalai Road to CMP Site
To Site
BITUMEN LEAD : CPCL @ MANALI
Manali to Tollgate km 0 / 0 -- 6 / 0
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
6/67
IV
1 2.000 Km
2 15.400 Km
3 10.800 Km
4 7.600 Km
5 0.400 Km
6 0.500 Km
36.700 Km
Or 37.000 Km
V
1 1.000 Km
2 1.800 Km
3 7.800 Km
4 0.200 Km
5 0.400 Km
6 0.500 Km
11.700 Km
Or 12.000 Km
VI
1 3.000 Km
2 39.000 Km
3 0.400 Km
4 0.500 Km
42.900 Km
Or 43.000 Km
METAL QUARRY : CHIKAKARAYAPURAM QUARRY
Cart Track
BITUMEN LEAD : EMULSION @ IRUNKATTUKOTTAI
Kundrathur -- Kumaran Chavadi 3 / 8 -- 5 / 6
Pallavaram -- Kundrathur Road 7 / 8 -- 0 / 0
NH -- 45 Km 19 / 8 -- 20 / 0
W.K.M 1.000 / 2
Cart Track 0 / 0 -- 2 / 0
Darga Road Km 0 / 0 -- 0 / 4
Darga Road Km 0 / 0 -- 0 / 4
Darga Road Km 0 / 0 -- 0 / 4
NH -- 45 Km 59 / 0 -- 20 / 0
W.K.M 1.000 / 2
SAND QUARRY : PALAR RIVER @ MANAPAKKAM
Manapakkam Road km 0 / 0 -- 3 / 0
NH -- 4 Km 34 / 8 -- 19 / 4
Mount -- Poonammallee Road km 10 / 8 -- 0 / 0
NH -- 45 Km 12 / 4 -- 20 / 0
W.K.M ( 1.000 / 2 )
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
7/67
1
Left Side
1 x 1 16.01
( + 1.30 ) / 2
1 x 1 17.54
( + 1.00 ) / 2
1 x 1 17.54
( + 1.30 ) / 2
1 x 1 22.88
( + 1.70 ) / 2
1 x 1 25.16
( + 1.60 ) / 2
1 x 1 22.11
( + 1.30 ) / 2
1 x 1 40.41
( + 4.00 ) / 2
1 x 1 54.90
( + 3.20 ) / 2
1 x 1 34.31
( + 1.30 ) / 2
1 x 1 15.25
( + 0.70 ) / 2
1 x 1 11.44
( + 0.80 ) / 2
1 x 1 12.20
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing
on bank with all leads and lifts as per SS20B including cost of all labour materials, tools,
equipments and all incidental charges and sheeting, shoring and bracing and their subsequentremoval, removal of all logs, stumps and other deleterious matter and obstructions, trimming
of bottom of excavation back filling, clearing up the site and disposal of all surplus materials
etc., complete as per standard specification for Boxing
Km 0 / 400 -- 0 / 425 1.0525.00 0.610
Km 0 / 425 -- 0 / 450 25.00 1.15
DETAILED ESTIMATE
NAME OF WORK : WIDENING AND IMPROVING FROM TWO LANE TO AVAILABLE FULL WIDTH
AT KM 0 / 4 -- 1 / 4 OF DHARGA ROAD INCLUDING DRAIN (ODR)
1.00
Km 0 / 475 -- 0 / 500 25.00 1.50 0.610
0.610
1.30
Km 0 / 450 -- 0 / 475 25.00 1.15 0.610
25.00 2.65 0.610
1.70
Km 0 / 525 -- 0 / 550 25.00 1.45 0.610
1.30
Km 0 / 500 -- 0 / 525 25.00 1.65 0.610
0.70
Km 0 / 675 -- 0 / 700 25.00 0.80 0.610
1.30
Km 0 / 650 -- 0 / 675 25.00 0.75 0.610
3.20
Km 0 / 625 -- 0 / 650 25.00 1.00 0.610
4.00
Km 0 / 600 -- 0 / 625 25.00 2.25 0.610
1.30
Km 0 / 575 -- 0 / 600 25.00 3.60 0.610
1.60
Km 0 / 550 -- 0 / 575
0.80
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
8/67
( + 0.80 ) / 2
1 x 1 12.96
( + 0.90 ) / 2
1 x 1 14.87
( + 1.05 ) / 2
1 x 1 19.06
( + 1.45 ) / 2
1 x 1 48.80
( + 4.95 ) / 2
1 x 1 75.49
( + 4.95 ) / 2
1 x 1 73.20
( + 4.65 ) / 2
1 x 1 70.91
( + 4.65 ) / 2
1 x 1 73.20
( + 4.95 ) / 2
1 x 1 71.68
( + 4.45 ) / 2
1 x 1 62.53
( + 3.75 ) / 2
1 x 1 54.90
( + 3.45 ) / 2
1 x 1 54.14
( + 3.65 ) / 2
1 x 1 57.95
( + 3.95 ) / 2
1 x 1 48.80
( + 2.45 ) / 2
1 x 1 35.84
( + 2.25 ) / 2
1 x 1 17.16
( + 0.00 ) / 2
Km 0 / 775 -- 0 / 800 25.00 3.20 0.610
0.90
Km 0 / 750 -- 0 / 775 25.00 1.25 0.610
0.80
Km 0 / 725 -- 0 / 750 25.00 0.98 0.610
1.05
0.80
Km 0 / 700 -- 0 / 725 25.00 0.85 0.610
4.65
Km 0 / 875 -- 0 / 900 25.00 4.80 0.610
4.95
Km 0 / 850 -- 0 / 875 25.00 4.65 0.610
4.95
Km 0 / 825 -- 0 / 850 25.00 4.80 0.610
1.45
Km 0 / 800 -- 0 / 825 25.00 4.95 0.610
4.65
Km 0 / 900 -- 0 / 925 25.00 4.70 0.610
4.95
Km 0 / 925 -- 0 / 950 25.00 4.10 0.610
4.45
Km 0 / 950 -- 0 / 975 25.00 3.60 0.610
3.75
Km 0 / 975 -- 1 / 000 25.00 3.55 0.610
3.45
Km 1 / 000 -- 1 / 025 25.00 3.80 0.610
3.65
Km 1 / 025 -- 1 / 050 25.00 3.20 0.610
3.95
Km 1 / 050 -- 1 / 075 25.00 2.35 0.610
2.45
Km 1 / 075 -- 1 / 100 25.00 1.13 0.610
2.25
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
9/67
1 x 1 22.49
( + 2.95 ) / 2
1 x 1 44.99
( + 2.95 ) / 2
1 x 1 42.70
( + 2.65 ) / 2
1 x 1 42.70
( + 2.95 ) / 2
1 x 1 57.95
( + 4.65 ) / 2
1 x 1 56.43
( + 2.75 ) / 2
1 x 1 20.97
( + 0.00 ) / 2
1 x 1 0.00
( + 0.00 ) / 2
1 x 1 0.00
( + 0.00 ) / 2
1 x 1 15.25
( + 2.00 ) / 2
1 x 1 30.50
( + 2.00 ) / 2
1 x 1 34.31
( + 2.50 ) / 2
Right Side
1 x 1 7.63
( + 1.00 ) / 2
1 x 1 26.69
( + 2.50 ) / 2
1 x 1 32.79
( + 1.80 ) / 2
1 x 1 32.03
( + 2.40 ) / 2
Km 1 / 100 -- 1 / 125 25.00 1.48 0.610
0.00
Km 1 / 125 -- 1 / 150 25.00 2.95 0.610
2.95
Km 1 / 150 -- 1 / 175 25.00 2.80 0.610
2.95
Km 1 / 175 -- 1 / 200 25.00 2.80 0.610
2.65
Km 1 / 200 -- 1 / 225 25.00 3.80 0.610
2.95
Km 1 / 225 -- 1 / 250 25.00 3.70 0.610
4.65
Km 1 / 250 -- 1 / 275 25.00 1.38 0.610
2.75
Km 1 / 275 -- 1 / 300 25.00 0.00 0.610
0.00
Km 1 / 300 -- 1 / 325 25.00 0.00 0.610
0.00
Km 1 / 325 -- 1 / 350 25.00 1.00 0.610
0.00
Km 1 / 350 -- 1 / 375 25.00 2.00 0.610
2.00
Km 1 / 375 -- 1 / 400 25.00 2.25 0.610
2.00
Km 0 / 400 -- 0 / 425 25.00 0.50 0.610
0.00
Km 0 / 425 -- 0 / 450 25.00 1.75 0.610
1.00
Km 0 / 450 -- 0 / 475 25.00 2.15 0.610
2.50
Km 0 / 475 -- 0 / 500 25.00 2.10 0.610
1.80
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
10/67
1 x 1 38.89
( + 2.70 ) / 2
1 x 1 40.41
( + 2.60 ) / 2
1 x 1 38.89
( + 2.50 ) / 2
1 x 1 41.94
( + 3.00 ) / 2
1 x 1 49.56
( + 3.50 ) / 2
1 x 1 52.61
( + 3.40 ) / 2
1 x 1 44.99
( + 2.50 ) / 2
1 x 1 29.74
( + 1.40 ) / 2
1 x 1 37.36
( + 3.50 ) / 2
1 x 1 42.70
( + 2.10 ) / 2
1 x 1 26.69
( + 1.40 ) / 2
1 x 1 22.11
( + 1.50 ) / 2
1 x 1 22.11
( + 1.40 ) / 2
1 x 1 23.64
( + 1.70 ) / 2
1 x 1 25.93
( + 1.70 ) / 2
1 x 1 28.21
( + 2.00 ) / 2
1 x 1 30.50
Km 0 / 500 -- 0 / 525 25.00 2.55 0.610
2.40
Km 0 / 525 -- 0 / 550 25.00 2.65 0.610
2.70
Km 0 / 550 -- 0 / 575 25.00 2.55 0.610
2.60
Km 0 / 575 -- 0 / 600 25.00 2.75 0.610
2.50
Km 0 / 600 -- 0 / 625 25.00 3.25 0.610
3.00
Km 0 / 625 -- 0 / 650 25.00 3.45 0.610
3.50
Km 0 / 650 -- 0 / 675 25.00 2.95 0.610
3.40
Km 0 / 675 -- 0 / 700 25.00 1.95 0.610
2.50
Km 0 / 700 -- 0 / 725 25.00 2.45 0.610
1.40
Km 0 / 725 -- 0 / 750 25.00 2.80 0.610
3.50
Km 0 / 750 -- 0 / 775 25.00 1.75 0.610
2.10
Km 0 / 775 -- 0 / 800 25.00 1.45 0.610
1.40
Km 0 / 800 -- 0 / 825 25.00 1.45 0.610
1.50
Km 0 / 825 -- 0 / 850 25.00 1.55 0.610
1.40
Km 0 / 850 -- 0 / 875 25.00 1.70 0.610
1.70
Km 0 / 875 -- 0 / 900 25.00 1.85 0.610
1.70
Km 0 / 900 -- 0 / 925 25.00 2.00 0.610
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
11/67
( + 2.00 ) / 2
1 x 1 28.21
( + 1.70 ) / 2
1 x 1 23.64
( + 1.40 ) / 2
1 x 1 23.64
( + 1.70 ) / 2
1 x 1 28.21
( + 2.00 ) / 2
1 x 1 26.69
( + 1.50 ) / 2
1 x 1 30.50
( + 2.50 ) / 2
1 x 1 38.13
( + 2.50 ) / 2
1 x 1 35.08
( + 2.10 ) / 2
1 x 1 31.26
( + 2.00 ) / 2
1 x 1 34.31
( + 2.50 ) / 2
1 x 1 38.13
( + 2.50 ) / 2
1 x 1 43.46
( + 3.20 ) / 2
1 x 1 48.80
( + 3.20 ) / 2
1 x 1 51.09
( + 3.50 ) / 2
1 x 1 34.31
( + 1.00 ) / 2
1 x 1 16.78
( + 1.20 ) / 2
2.00
Km 0 / 925 -- 0 / 950 25.00 1.85 0.610
2.00
Km 0 / 950 -- 0 / 975 25.00 1.55 0.610
1.70
Km 0 / 975 -- 1 / 000 25.00 1.55 0.610
1.40
Km 1 / 000 -- 1 / 025 25.00 1.85 0.610
1.70
Km 1 / 025 -- 1 / 050 25.00 1.75 0.610
2.00
Km 1 / 050 -- 1 / 075 25.00 2.00 0.610
1.50
Km 1 / 075 -- 1 / 100 25.00 2.50 0.610
2.50
Km 1 / 100 -- 1 / 125 25.00 2.30 0.610
2.50
Km 1 / 125 -- 1 / 150 25.00 2.05 0.610
2.10
Km 1 / 150 -- 1 / 175 25.00 2.25 0.610
2.00
Km 1 / 175 -- 1 / 200 25.00 2.50 0.610
2.50
Km 1 / 200 -- 1 / 225 25.00 2.85 0.610
2.50
Km 1 / 225 -- 1 / 250 25.00 3.20 0.610
3.20
Km 1 / 250 -- 1 / 275 25.00 3.35 0.610
3.20
Km 1 / 275 -- 1 / 300 25.00 2.25 0.610
3.50
Km 1 / 300 -- 1 / 325 25.00 1.10 0.610
1.00
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
12/67
1 x 1 16.78
( + 1.00 ) / 2
1 x 1 20.59
( + 1.70 ) / 2
1 x 1 21.35
( + 1.10 ) / 2
2735.91
2736
Cum
2
Left Side
1 x 1 8.66
( + 1.30 ) / 2
1 x 1 9.49
( + 1.00 ) / 2
1 x 1 9.49
( + 1.30 ) / 2
1 x 1 12.38
( + 1.70 ) / 2
1 x 1 13.61
( + 1.60 ) / 2
1 x 1 11.96
( + 1.30 ) / 2
1 x 1 21.86
( + 4.00 ) / 2
1 x 1 29.70
( + 3.20 ) / 2
1 x 1 18.56
( + 1.30 ) / 2
1 x 1 8.25
( + 0.70 ) / 2
1.30
Km 0 / 500 -- 0 / 525 25.00 1.65 0.330
Providing and Laying Granular Sub Base as per table Nos. 400 -- 1 / 400 -- 2 and grading I of
MORTH -- Revision IV with coarse graded material or any other granular material or
combination these of for 230mm thick to give a CBR of 30 on prepared sub -- grade in
accordance with the requirements of the specifications.
1.70
Km 0 / 525 -- 0 / 550 25.00 1.45 0.330
1.60
Km 0 / 550 -- 0 / 575 25.00 2.65
Or
0.330
1.30
Km 0 / 575 -- 0 / 600 25.00 3.60 0.330
4.00
Km 0 / 600 -- 0 / 625 25.00 2.25 0.330
3.20
Km 0 / 625 -- 0 / 650 25.00
Km 1 / 325 -- 1 / 350 25.00 1.10 0.610
1.20
Km 1 / 350 -- 1 / 375 25.00 1.35 0.610
1.00
Km 1 / 375 -- 1 / 400 25.00 1.40 0.610
1.70
Km 0 / 400 -- 0 / 425 25.00 1.05 0.330
0.80
Km 0 / 425 -- 0 / 450 25.00 1.15 0.330
1.30
Km 0 / 450 -- 0 / 475 25.00 1.15 0.330
1.00
Km 0 / 475 -- 0 / 500 25.00 1.50 0.330
Total
1.00 0.330
1.30
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
13/67
1 x 1 6.19
( + 0.80 ) / 2
1 x 1 6.60
( + 0.80 ) / 2
1 x 1 7.01
( + 0.90 ) / 2
1 x 1 8.04
( + 1.05 ) / 2
1 x 1 10.31
( + 1.45 ) / 2
1 x 1 26.40
( + 4.95 ) / 2
1 x 1 40.84
( + 4.95 ) / 2
1 x 1 39.60
( + 4.65 ) / 2
1 x 1 38.36
( + 4.65 ) / 2
1 x 1 39.60
( + 4.95 ) / 2
1 x 1 38.78
( + 4.45 ) / 2
1 x 1 33.83
( + 3.75 ) / 2
1 x 1 29.70
( + 3.45 ) / 2
1 x 1 29.29
( + 3.65 ) / 2
1 x 1 31.35
( + 3.95 ) / 2
1 x 1 26.40
( + 2.45 ) / 2
1 x 1 19.39
Km 0 / 800 -- 0 / 825 25.00 4.95 0.330
4.95
Km 0 / 825 -- 0 / 850 25.00 4.80 0.330
4.95
Km 0 / 650 -- 0 / 675 25.00 0.75 0.330
0.70
Km 0 / 675 -- 0 / 700 25.00 0.80 0.330
0.80
Km 0 / 700 -- 0 / 725 25.00
1.45
0.85 0.330
0.80
Km 0 / 725 -- 0 / 750 25.00 0.98 0.330
0.90
Km 0 / 750 -- 0 / 775 25.00 1.25 0.330
1.05
Km 0 / 775 -- 0 / 800 25.00 3.20 0.330
Km 0 / 850 -- 0 / 875 25.00 4.65 0.330
4.65
Km 0 / 875 -- 0 / 900 25.00 4.80 0.330
4.65
Km 0 / 900 -- 0 / 925 25.00 4.70 0.330
4.95
Km 0 / 925 -- 0 / 950 25.00 4.10 0.330
4.45
Km 0 / 950 -- 0 / 975 25.00 3.60 0.330
3.75
Km 0 / 975 -- 1 / 000 25.00 3.55 0.330
3.45
Km 1 / 000 -- 1 / 025 25.00 3.80 0.330
3.65
Km 1 / 025 -- 1 / 050 25.00 3.20 0.330
3.95
Km 1 / 050 -- 1 / 075 25.00 2.35 0.330
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
14/67
( + 2.25 ) / 2
1 x 1 9.28
( + 0.00 ) / 2
1 x 1 12.17
( + 2.95 ) / 2
1 x 1 24.34
( + 2.95 ) / 2
1 x 1 23.10
( + 2.65 ) / 2
1 x 1 23.10
( + 2.95 ) / 2
1 x 1 31.35
( + 4.65 ) / 2
1 x 1 30.53
( + 2.75 ) / 2
1 x 1 11.34
( + 0.00 ) / 2
1 x 1 0.00
( + 0.00 ) / 2
1 x 1 0.00
( + 0.00 ) / 2
1 x 1 8.25
( + 2.00 ) / 2
1 x 1 16.50
( + 2.00 ) / 2
1 x 1 18.56
( + 2.50 ) / 2
Right Side
1 x 1 4.13
( + 1.00 ) / 2
1 x 1 14.44
( + 2.50 ) / 2
1 x 1 17.74
2.45
Km 1 / 075 -- 1 / 100 25.00 1.13 0.330
2.25
Km 1 / 100 -- 1 / 125 25.00 1.48 0.330
0.00
Km 1 / 125 -- 1 / 150 25.00 2.95 0.330
2.95
Km 1 / 150 -- 1 / 175 25.00 2.80 0.330
2.95
Km 1 / 175 -- 1 / 200 25.00 2.80 0.330
2.65
Km 1 / 200 -- 1 / 225 25.00 3.80 0.330
2.95
Km 1 / 225 -- 1 / 250 25.00 3.70 0.330
4.65
Km 1 / 250 -- 1 / 275 25.00 1.38 0.330
2.75
Km 1 / 275 -- 1 / 300 25.00 0.00 0.330
0.00
Km 1 / 300 -- 1 / 325 25.00 0.00 0.330
0.00
Km 1 / 325 -- 1 / 350 25.00 1.00 0.330
0.00
Km 1 / 350 -- 1 / 375 25.00 2.00 0.330
2.00
Km 1 / 375 -- 1 / 400 25.00 2.25 0.330
2.00
Km 0 / 400 -- 0 / 425 25.00 0.50 0.330
0.00
Km 0 / 425 -- 0 / 450 25.00 1.75 0.330
1.00
Km 0 / 450 -- 0 / 475 25.00 2.15 0.330
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
15/67
( + 1.80 ) / 2
1 x 1 17.33
( + 2.40 ) / 2
1 x 1 21.04
( + 2.70 ) / 2
1 x 1 21.86
( + 2.60 ) / 2
1 x 1 21.04
( + 2.50 ) / 2
1 x 1 22.69
( + 3.00 ) / 2
1 x 1 26.81
( + 3.50 ) / 2
1 x 1 28.46
( + 3.40 ) / 2
1 x 1 24.34
( + 2.50 ) / 2
1 x 1 16.09
( + 1.40 ) / 2
1 x 1 20.21
( + 3.50 ) / 2
1 x 1 23.10
( + 2.10 ) / 2
1 x 1 14.44
( + 1.40 ) / 2
1 x 1 11.96
( + 1.50 ) / 2
1 x 1 11.96
( + 1.40 ) / 2
1 x 1 12.79
( + 1.70 ) / 2
1 x 1 14.03
( + 1.70 ) / 2
2.50
Km 0 / 475 -- 0 / 500 25.00 2.10 0.330
1.80
Km 0 / 500 -- 0 / 525 25.00 2.55 0.330
2.40
Km 0 / 525 -- 0 / 550 25.00 2.65 0.330
2.70
Km 0 / 550 -- 0 / 575 25.00 2.55 0.330
2.60
Km 0 / 575 -- 0 / 600 25.00 2.75 0.330
2.50
Km 0 / 600 -- 0 / 625 25.00 3.25 0.330
3.00
Km 0 / 625 -- 0 / 650 25.00 3.45 0.330
3.50
Km 0 / 650 -- 0 / 675 25.00 2.95 0.330
3.40
Km 0 / 675 -- 0 / 700 25.00 1.95 0.330
2.50
Km 0 / 700 -- 0 / 725 25.00 2.45 0.330
1.40
Km 0 / 725 -- 0 / 750 25.00 2.80 0.330
3.50
Km 0 / 750 -- 0 / 775 25.00 1.75 0.330
2.10
Km 0 / 775 -- 0 / 800 25.00 1.45 0.330
1.40
Km 0 / 800 -- 0 / 825 25.00 1.45 0.330
1.50
Km 0 / 825 -- 0 / 850 25.00 1.55 0.330
1.40
Km 0 / 850 -- 0 / 875 25.00 1.70 0.330
1.70
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
16/67
1 x 1 15.26
( + 2.00 ) / 2
1 x 1 16.50
( + 2.00 ) / 2
1 x 1 15.26
( + 1.70 ) / 2
1 x 1 12.79
( + 1.40 ) / 2
1 x 1 12.79
( + 1.70 ) / 2
1 x 1 15.26
( + 2.00 ) / 2
1 x 1 14.44
( + 1.50 ) / 2
1 x 1 16.50
( + 2.50 ) / 2
1 x 1 20.63
( + 2.50 ) / 2
1 x 1 18.98
( + 2.10 ) / 2
1 x 1 16.91
( + 2.00 ) / 2
1 x 1 18.56
( + 2.50 ) / 2
1 x 1 20.63
( + 2.50 ) / 2
1 x 1 23.51
( + 3.20 ) / 2
1 x 1 26.40
( + 3.20 ) / 2
1 x 1 27.64
( + 3.50 ) / 2
1 x 1 18.56
Km 0 / 875 -- 0 / 900 25.00 1.85 0.330
1.70
Km 0 / 900 -- 0 / 925 25.00 2.00 0.330
2.00
Km 0 / 925 -- 0 / 950 25.00 1.85 0.330
2.00
Km 0 / 950 -- 0 / 975 25.00 1.55 0.330
1.70
Km 0 / 975 -- 1 / 000 25.00 1.55 0.330
1.40
Km 1 / 000 -- 1 / 025 25.00 1.85 0.330
1.70
Km 1 / 025 -- 1 / 050 25.00 1.75 0.330
2.00
Km 1 / 050 -- 1 / 075 25.00 2.00 0.330
1.50
Km 1 / 075 -- 1 / 100 25.00 2.50 0.330
2.50
Km 1 / 100 -- 1 / 125 25.00 2.30 0.330
2.50
Km 1 / 125 -- 1 / 150 25.00 2.05 0.330
2.10
Km 1 / 150 -- 1 / 175 25.00 2.25 0.330
2.00
Km 1 / 175 -- 1 / 200 25.00 2.50 0.330
2.50
Km 1 / 200 -- 1 / 225 25.00 2.85 0.330
2.50
Km 1 / 225 -- 1 / 250 25.00 3.20 0.330
3.20
Km 1 / 250 -- 1 / 275 25.00 3.35 0.330
3.20
Km 1 / 275 -- 1 / 300 25.00 2.25 0.330
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
17/67
( + 1.00 ) / 2
1 x 1 9.08
( + 1.20 ) / 2
1 x 1 9.08
( + 1.00 ) / 2
1 x 1 11.14
( + 1.70 ) / 2
1 x 1 11.55
( + 1.10 ) / 2
1480.10
1481
Cum
3
Left Side
1 x 1 6.56
( + 1.30 ) / 2
1 x 1 7.19
( + 1.00 ) / 2
1 x 1 7.19
( + 1.30 ) / 2
1 x 1 9.38
( + 1.70 ) / 2
1 x 1 10.31
( + 1.60 ) / 2
1 x 1 9.06
( + 1.30 ) / 2
1 x 1 16.56
( + 4.00 ) / 2
Providing and laying Wet Mix Macadam base course of 250 mm compacted thickness in two
layers of 125mm thick or else as specified on the proposed sub base with graded stone
aggregate and granular materials of quantity size and grading in layers as specified including
mixing in base mix plant, spreading in un uniform layer with motor grader and compaction
with vibrating rollers of 80 to 100 KN static weight and fine dressing to required frade and
cross slope as shown on the drawing equipement a per Technical Specification Clause 406
25.00 1.45 0.250
1.60
Km 0 / 550 -- 0 / 575 25.00 2.65 0.250
1.30
1.70
Km 0 / 525 -- 0 / 550
1.65 0.250
1.30
Km 0 / 450 -- 0 / 475 25.00 1.15 0.250
1.00
Km 0 / 475 -- 0 / 500 25.00 1.50 0.250
1.30
Km 0 / 500 -- 0 / 525 25.00
3.50
Km 1 / 300 -- 1 / 325 25.00 1.10 0.330
1.00
Km 1 / 325 -- 1 / 350 25.00 1.10 0.330
1.20
Km 1 / 350 -- 1 / 375 25.00 1.35 0.330
1.00
Km 1 / 375 -- 1 / 400 25.00 1.40 0.330
1.70
Km 0 / 400 -- 0 / 425 25.00 1.05 0.250
0.80
Km 0 / 425 -- 0 / 450 25.00 1.15 0.250
Total
Or
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
18/67
1 x 1 22.50
( + 3.20 ) / 2
1 x 1 14.06
( + 1.30 ) / 2
1 x 1 6.25
( + 0.70 ) / 2
1 x 1 4.69
( + 0.80 ) / 2
1 x 1 5.00
( + 0.80 ) / 2
1 x 1 5.31
( + 0.90 ) / 2
1 x 1 6.09
( + 1.05 ) / 2
1 x 1 7.81
( + 1.45 ) / 2
1 x 1 20.00
( + 4.95 ) / 2
1 x 1 30.94
( + 4.95 ) / 2
1 x 1 30.00
( + 4.65 ) / 2
1 x 1 29.06
( + 4.65 ) / 2
1 x 1 30.00
( + 4.95 ) / 2
1 x 1 29.38
( + 4.45 ) / 2
1 x 1 25.63
( + 3.75 ) / 2
1 x 1 22.50
( + 3.45 ) / 2
1 x 1 22.19
3.60 0.250
4.00
0.75 0.250
0.70
Km 0 / 675 -- 0 / 700 25.00 0.80 0.250
0.80
0.250
1.05
Km 0 / 775 -- 0 / 800
4.65
Km 0 / 875 -- 0 / 900 25.00 4.80 0.250
Km 0 / 700 -- 0 / 725 25.00 0.85 0.250
0.80
Km 0 / 575 -- 0 / 600 25.00
Km 0 / 650 -- 0 / 675 25.00
25.00 3.20 0.250
1.45
Km 0 / 600 -- 0 / 625 25.00 2.25 0.250
3.20
Km 0 / 625 -- 0 / 650 25.00 1.00 0.250
1.30
Km 0 / 725 -- 0 / 750 25.00 0.98 0.250
0.90
Km 0 / 750 -- 0 / 775 25.00 1.25
Km 0 / 900 -- 0 / 925 25.00 4.70 0.250
4.95
Km 0 / 925 -- 0 / 950 25.00 4.10 0.250
4.45
Km 0 / 950 -- 0 / 975 25.00
Km 0 / 800 -- 0 / 825 25.00 4.95 0.250
4.95
Km 0 / 825 -- 0 / 850 25.00 4.80 0.250
4.95
Km 0 / 850 -- 0 / 875 25.00 4.65 0.250
3.60 0.250
3.75
4.65
Km 0 / 975 -- 1 / 000 25.00 3.55 0.250
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
19/67
( + 3.65 ) / 2
1 x 1 23.75
( + 3.95 ) / 2
1 x 1 20.00
( + 2.45 ) / 2
1 x 1 14.69
( + 2.25 ) / 2
1 x 1 7.03
( + 0.00 ) / 2
1 x 1 9.22
( + 2.95 ) / 2
1 x 1 18.44
( + 2.95 ) / 2
1 x 1 17.50
( + 2.65 ) / 2
1 x 1 17.50
( + 2.95 ) / 2
1 x 1 23.75
( + 4.65 ) / 2
1 x 1 23.13
( + 2.75 ) / 2
1 x 1 8.59
( + 0.00 ) / 2
1 x 1 0.00
( + 0.00 ) / 2
1 x 1 0.00
( + 0.00 ) / 2
1 x 1 6.25
( + 2.00 ) / 2
1 x 1 12.50
( + 2.00 ) / 2
1 x 1 14.06
( + 2.50 ) / 2
25.00 0.00 0.250
0.00
2.35 0.250
2.45
Km 1 / 075 -- 1 / 100 25.00 1.13 0.250
2.25
Km 1 / 300 -- 1 / 325 25.00 0.00 0.250
Km 1 / 100 -- 1 / 125 25.00 1.48 0.250
3.45
Km 1 / 000 -- 1 / 025 25.00 3.80 0.250
3.65
Km 1 / 025 -- 1 / 050 25.00 3.20 0.250
2.80 0.250
2.95
0.00
Km 1 / 125 -- 1 / 150 25.00 2.95 0.250
2.95
Km 1 / 150 -- 1 / 175 25.00
3.95
Km 1 / 050 -- 1 / 075 25.00
Km 1 / 175 -- 1 / 200 25.00 2.80 0.250
2.65
Km 1 / 200 -- 1 / 225 25.00 3.80 0.250
2.95
Km 1 / 225 -- 1 / 250 25.00 3.70 0.250
2.00 0.250
2.00
0.00
Km 1 / 325 -- 1 / 350 25.00 1.00 0.250
0.00
Km 1 / 350 -- 1 / 375 25.00
4.65
Km 1 / 250 -- 1 / 275 25.00 1.38 0.250
2.75
Km 1 / 275 -- 1 / 300
Km 1 / 375 -- 1 / 400 25.00 2.25 0.250
2.00
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
20/67
Right Side
1 x 1 3.13
( + 1.00 ) / 2
1 x 1 10.94
( + 2.50 ) / 2
1 x 1 13.44
( + 1.80 ) / 2
1 x 1 13.13
( + 2.40 ) / 2
1 x 1 15.94
( + 2.70 ) / 2
1 x 1 16.56
( + 2.60 ) / 2
1 x 1 15.94
( + 2.50 ) / 2
1 x 1 17.19
( + 3.00 ) / 2
1 x 1 20.31
( + 3.50 ) / 2
1 x 1 21.56
( + 3.40 ) / 2
1 x 1 18.44
( + 2.50 ) / 2
1 x 1 12.19
( + 1.40 ) / 2
1 x 1 15.31
( + 3.50 ) / 2
1 x 1 17.50
( + 2.10 ) / 2
1 x 1 10.94
( + 1.40 ) / 2
1 x 1 9.06
( + 1.50 ) / 2
2.15 0.250
2.70
Km 0 / 550 -- 0 / 575 25.00 2.55 0.250
2.60
Km 0 / 575 -- 0 / 600 25.00 2.75
2.50
Km 0 / 475 -- 0 / 500 25.00 2.10 0.250
1.80
Km 0 / 500 -- 0 / 525 25.00 2.55 0.250
2.40
Km 0 / 525 -- 0 / 550 25.00 2.65 0.250
Km 0 / 400 -- 0 / 425 25.00 0.50 0.250
0.00
Km 0 / 425 -- 0 / 450 25.00 1.75 0.250
1.00
Km 0 / 450 -- 0 / 475 25.00
0.250
2.50
Km 0 / 600 -- 0 / 625 25.00 3.25 0.250
3.00
Km 0 / 625 -- 0 / 650 25.00 3.45 0.250
3.50
Km 0 / 650 -- 0 / 675 25.00 2.95 0.250
3.40
Km 0 / 675 -- 0 / 700 25.00 1.95 0.250
2.50
Km 0 / 700 -- 0 / 725 25.00 2.45 0.250
1.40
Km 0 / 725 -- 0 / 750 25.00 2.80 0.250
3.50
Km 0 / 750 -- 0 / 775 25.00 1.75 0.250
2.10
Km 0 / 775 -- 0 / 800 25.00 1.45 0.250
1.40
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
21/67
1 x 1 9.06
( + 1.40 ) / 2
1 x 1 9.69
( + 1.70 ) / 2
1 x 1 10.63
( + 1.70 ) / 2
1 x 1 11.56
( + 2.00 ) / 2
1 x 1 12.50
( + 2.00 ) / 2
1 x 1 11.56
( + 1.70 ) / 2
1 x 1 9.69
( + 1.40 ) / 2
1 x 1 9.69
( + 1.70 ) / 2
1 x 1 11.56
( + 2.00 ) / 2
1 x 1 10.94
( + 1.50 ) / 2
1 x 1 12.50
( + 2.50 ) / 2
1 x 1 15.63
( + 2.50 ) / 2
1 x 1 14.38
( + 2.10 ) / 2
1 x 1 12.81
( + 2.00 ) / 2
1 x 1 14.06
( + 2.50 ) / 2
1 x 1 15.63
( + 2.50 ) / 2
1 x 1 17.81
Km 0 / 800 -- 0 / 825 25.00 1.45 0.250
1.50
Km 0 / 825 -- 0 / 850 25.00 1.55 0.250
1.40
Km 0 / 850 -- 0 / 875 25.00 1.70 0.250
1.70
Km 0 / 875 -- 0 / 900 25.00 1.85 0.250
1.70
Km 0 / 900 -- 0 / 925 25.00 2.00 0.250
2.00
Km 0 / 925 -- 0 / 950 25.00 1.85 0.250
2.00
Km 0 / 950 -- 0 / 975 25.00 1.55 0.250
1.70
Km 0 / 975 -- 1 / 000 25.00 1.55 0.250
1.40
Km 1 / 000 -- 1 / 025 25.00 1.85 0.250
1.70
Km 1 / 025 -- 1 / 050 25.00 1.75 0.250
2.00
Km 1 / 050 -- 1 / 075 25.00 2.00 0.250
1.50
Km 1 / 075 -- 1 / 100 25.00 2.50 0.250
2.50
Km 1 / 100 -- 1 / 125 25.00 2.30 0.250
2.50
Km 1 / 125 -- 1 / 150 25.00 2.05 0.250
2.10
Km 1 / 150 -- 1 / 175 25.00 2.25 0.250
2.00
Km 1 / 175 -- 1 / 200 25.00 2.50 0.250
2.50
Km 1 / 200 -- 1 / 225 25.00 2.85 0.250
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
22/67
( + 3.20 ) / 2
1 x 1 20.00
( + 3.20 ) / 2
1 x 1 20.94
( + 3.50 ) / 2
1 x 1 14.06
( + 1.00 ) / 2
1 x 1 6.88
( + 1.20 ) / 2
1 x 1 6.88
( + 1.00 ) / 2
1 x 1 8.44
( + 1.70 ) / 2
1 x 1 8.75
( + 1.10 ) / 2
1121.30
1122
Cum
4
Left Side
1 x 1 26.25
( + 1.30 ) / 2
1 x 1 28.75
( + 1.00 ) / 2
1 x 1 28.75
( + 1.30 ) / 2
1 x 1 37.50
( + 1.70 ) / 2
1 x 1 41.25
( + 1.60 ) / 2
Providing and laying of Prime Coat using Bituminous Emulsion at the rate of 7.00 kg per ten
square meter over the WMM surface preparatory to another bituminous construction over it.
2.50
Km 1 / 225 -- 1 / 250 25.00 3.20 0.250
3.20
Km 1 / 250 -- 1 / 275 25.00 3.35 0.250
3.20
Km 1 / 275 -- 1 / 300 25.00 2.25 0.250
3.50
Km 1 / 300 -- 1 / 325 25.00 1.10 0.250
1.00
Km 1 / 325 -- 1 / 350 25.00 1.10 0.250
1.20
Km 1 / 350 -- 1 / 375 25.00 1.35 0.250
1.00
Km 1 / 375 -- 1 / 400 25.00 1.40 0.250
1.70
Km 0 / 400 -- 0 / 425 25.00 1.05 -
Total
Or
-
1.00
Km 0 / 475 -- 0 / 500 25.00 1.50 -
0.80
Km 0 / 425 -- 0 / 450 25.00 1.15 -
1.30
Km 0 / 450 -- 0 / 475 25.00 1.15
1.30
Km 0 / 500 -- 0 / 525 25.00 1.65 -
1.70
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
23/67
1 x 1 36.25
( + 1.30 ) / 2
1 x 1 66.25
( + 4.00 ) / 2
1 x 1 90.00
( + 3.20 ) / 2
1 x 1 56.25
( + 1.30 ) / 2
1 x 1 25.00
( + 0.70 ) / 2
1 x 1 18.75
( + 0.80 ) / 2
1 x 1 20.00
( + 0.80 ) / 2
1 x 1 21.25
( + 0.90 ) / 2
1 x 1 24.38
( + 1.05 ) / 2
1 x 1 31.25
( + 1.45 ) / 2
1 x 1 80.00
( + 4.95 ) / 2
1 x 1 123.75
( + 4.95 ) / 2
1 x 1 120.00
( + 4.65 ) / 2
1 x 1 116.25
( + 4.65 ) / 2
1 x 1 120.00
( + 4.95 ) / 2
1 x 1 117.50
( + 4.45 ) / 2
1 x 1 102.50
Km 0 / 525 -- 0 / 550 25.00 1.45 -
1.60
Km 0 / 550 -- 0 / 575 25.00 2.65 -
1.30
Km 0 / 575 -- 0 / 600 25.00 3.60 -
4.00
Km 0 / 600 -- 0 / 625 25.00 2.25 -
3.20
Km 0 / 625 -- 0 / 650 25.00 1.00 -
1.30
Km 0 / 650 -- 0 / 675 25.00 0.75 -
0.70
Km 0 / 675 -- 0 / 700 25.00 0.80 -
0.80
Km 0 / 700 -- 0 / 725 25.00 0.85 -
0.80
Km 0 / 725 -- 0 / 750 25.00 0.98 -
0.90
Km 0 / 750 -- 0 / 775 25.00 1.25 -
1.05
Km 0 / 775 -- 0 / 800 25.00 3.20 -
1.45
Km 0 / 800 -- 0 / 825 25.00 4.95 -
4.95
Km 0 / 825 -- 0 / 850 25.00 4.80 -
4.95
Km 0 / 850 -- 0 / 875 25.00 4.65 -
4.65
Km 0 / 875 -- 0 / 900 25.00 4.80 -
4.65
Km 0 / 900 -- 0 / 925 25.00 4.70 -
4.95
Km 0 / 925 -- 0 / 950 25.00 4.10 -
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
24/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
25/67
1 x 1 50.00
( + 2.00 ) / 2
1 x 1 56.25
( + 2.50 ) / 2
Right Side
1 x 1 12.50
( + 1.00 ) / 2
1 x 1 43.75
( + 2.50 ) / 2
1 x 1 53.75
( + 1.80 ) / 2
1 x 1 52.50
( + 2.40 ) / 2
1 x 1 63.75
( + 2.70 ) / 2
1 x 1 66.25
( + 2.60 ) / 2
1 x 1 63.75
( + 2.50 ) / 2
1 x 1 68.75
( + 3.00 ) / 2
1 x 1 81.25
( + 3.50 ) / 2
1 x 1 86.25
( + 3.40 ) / 2
1 x 1 73.75
( + 2.50 ) / 2
1 x 1 48.75
( + 1.40 ) / 2
1 x 1 61.25
( + 3.50 ) / 2
1 x 1 70.00
( + 2.10 ) / 2
Km 1 / 350 -- 1 / 375 25.00 2.00 -
2.00
Km 1 / 375 -- 1 / 400 25.00 2.25 -
2.00
Km 0 / 400 -- 0 / 425 25.00 0.50 -
0.00
Km 0 / 425 -- 0 / 450 25.00 1.75 -
1.00
Km 0 / 450 -- 0 / 475 25.00 2.15 -
2.50
Km 0 / 475 -- 0 / 500 25.00 2.10 -
1.80
Km 0 / 500 -- 0 / 525 25.00 2.55 -
2.40
Km 0 / 525 -- 0 / 550 25.00 2.65 -
2.70
Km 0 / 550 -- 0 / 575 25.00 2.55 -
2.60
Km 0 / 575 -- 0 / 600 25.00 2.75 -
2.50
Km 0 / 600 -- 0 / 625 25.00 3.25 -
3.00
Km 0 / 625 -- 0 / 650 25.00 3.45 -
3.50
Km 0 / 650 -- 0 / 675 25.00 2.95 -
3.40
Km 0 / 675 -- 0 / 700 25.00 1.95 -
2.50
Km 0 / 700 -- 0 / 725 25.00 2.45 -
1.40
Km 0 / 725 -- 0 / 750 25.00 2.80 -
3.50
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
26/67
1 x 1 43.75
( + 1.40 ) / 2
1 x 1 36.25
( + 1.50 ) / 2
1 x 1 36.25
( + 1.40 ) / 2
1 x 1 38.75
( + 1.70 ) / 2
1 x 1 42.50
( + 1.70 ) / 2
1 x 1 46.25
( + 2.00 ) / 2
1 x 1 50.00
( + 2.00 ) / 2
1 x 1 46.25
( + 1.70 ) / 2
1 x 1 38.75
( + 1.40 ) / 2
1 x 1 38.75
( + 1.70 ) / 2
1 x 1 46.25
( + 2.00 ) / 2
1 x 1 43.75
( + 1.50 ) / 2
1 x 1 50.00
( + 2.50 ) / 2
1 x 1 62.50
( + 2.50 ) / 2
1 x 1 57.50
( + 2.10 ) / 2
1 x 1 51.25
( + 2.00 ) / 2
1 x 1 56.25
Km 0 / 750 -- 0 / 775 25.00 1.75 -
2.10
Km 0 / 775 -- 0 / 800 25.00 1.45 -
1.40
Km 0 / 800 -- 0 / 825 25.00 1.45 -
1.50
Km 0 / 825 -- 0 / 850 25.00 1.55 -
1.40
Km 0 / 850 -- 0 / 875 25.00 1.70 -
1.70
Km 0 / 875 -- 0 / 900 25.00 1.85 -
1.70
Km 0 / 900 -- 0 / 925 25.00 2.00 -
2.00
Km 0 / 925 -- 0 / 950 25.00 1.85 -
2.00
Km 0 / 950 -- 0 / 975 25.00 1.55 -
1.70
Km 0 / 975 -- 1 / 000 25.00 1.55 -
1.40
Km 1 / 000 -- 1 / 025 25.00 1.85 -
1.70
Km 1 / 025 -- 1 / 050 25.00 1.75 -
2.00
Km 1 / 050 -- 1 / 075 25.00 2.00 -
1.50
Km 1 / 075 -- 1 / 100 25.00 2.50 -
2.50
Km 1 / 100 -- 1 / 125 25.00 2.30 -
2.50
Km 1 / 125 -- 1 / 150 25.00 2.05 -
2.10
Km 1 / 150 -- 1 / 175 25.00 2.25 -
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
27/67
( + 2.50 ) / 2
1 x 1 62.50
( + 2.50 ) / 2
1 x 1 71.25
( + 3.20 ) / 2
1 x 1 80.00
( + 3.20 ) / 2
1 x 1 83.75
( + 3.50 ) / 2
1 x 1 56.25
( + 1.00 ) / 2
1 x 1 27.50
( + 1.20 ) / 2
1 x 1 27.50
( + 1.00 ) / 2
1 x 1 33.75
( + 1.70 ) / 2
1 x 1 35.00
( + 1.10 ) / 2
4485.02
4486
Cum
5
Left Side
1 x 1 26.25
( + 1.30 ) / 2
1 x 1 28.75
( + 1.00 ) / 2
1 x 1 28.75
( + 1.30 ) / 2
1 x 1 37.50
Providing and laying of Tack Coat using Bulk Bitumen VG 10 at the rate of 3.50 kg per ten
square meter over the WMM surface treated with primer preparatory to another bituminous
construction over it.
2.00
Km 1 / 175 -- 1 / 200 25.00 2.50 -
2.50
Km 1 / 200 -- 1 / 225 25.00 2.85 -
2.50
Km 1 / 225 -- 1 / 250 25.00 3.20 -
3.20
Km 1 / 250 -- 1 / 275 25.00 3.35 -
3.20
Km 1 / 275 -- 1 / 300 25.00 2.25 -
3.50
Km 1 / 300 -- 1 / 325 25.00 1.10 -
1.00
Km 1 / 325 -- 1 / 350 25.00 1.10 -
1.20
Km 1 / 350 -- 1 / 375 25.00 1.35 -
1.00
Km 1 / 375 -- 1 / 400 25.00 1.40 -
1.70
Km 0 / 400 -- 0 / 425 25.00 1.05 -
0.80
Km 0 / 425 -- 0 / 450 25.00 1.15 -
Total
Or
-
1.30
Km 0 / 450 -- 0 / 475 25.00 1.15 -
1.00
Km 0 / 475 -- 0 / 500 25.00 1.50
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
28/67
( + 1.70 ) / 2
1 x 1 41.25
( + 1.60 ) / 2
1 x 1 36.25
( + 1.30 ) / 2
1 x 1 66.25
( + 4.00 ) / 2
1 x 1 90.00
( + 3.20 ) / 2
1 x 1 56.25
( + 1.30 ) / 2
1 x 1 25.00
( + 0.70 ) / 2
1 x 1 18.75
( + 0.80 ) / 2
1 x 1 20.00
( + 0.80 ) / 2
1 x 1 21.25
( + 0.90 ) / 2
1 x 1 24.38
( + 1.05 ) / 2
1 x 1 31.25
( + 1.45 ) / 2
1 x 1 80.00
( + 4.95 ) / 2
1 x 1 123.75
( + 4.95 ) / 2
1 x 1 120.00
( + 4.65 ) / 2
1 x 1 116.25
( + 4.65 ) / 2
1 x 1 120.00
( + 4.95 ) / 2
1.70
Km 0 / 525 -- 0 / 550 25.00 1.45 -
1.60
Km 0 / 550 -- 0 / 575 25.00 2.65
1.30
Km 0 / 500 -- 0 / 525 25.00 1.65 -
-
1.30
Km 0 / 575 -- 0 / 600 25.00 3.60 -
4.00
Km 0 / 600 -- 0 / 625 25.00 2.25 -
3.20
Km 0 / 625 -- 0 / 650 25.00 1.00 -
1.30
Km 0 / 650 -- 0 / 675 25.00 0.75 -
0.70
Km 0 / 675 -- 0 / 700 25.00 0.80 -
0.80
Km 0 / 700 -- 0 / 725 25.00 0.85 -
0.80
Km 0 / 725 -- 0 / 750 25.00 0.98 -
0.90
Km 0 / 750 -- 0 / 775 25.00 1.25 -
1.05
Km 0 / 775 -- 0 / 800 25.00 3.20 -
1.45
Km 0 / 800 -- 0 / 825 25.00 4.95 -
4.95
Km 0 / 825 -- 0 / 850 25.00 4.80 -
4.95
Km 0 / 850 -- 0 / 875 25.00 4.65 -
4.65
Km 0 / 875 -- 0 / 900 25.00 4.80 -
4.65
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
29/67
1 x 1 117.50
( + 4.45 ) / 2
1 x 1 102.50
( + 3.75 ) / 2
1 x 1 90.00
( + 3.45 ) / 2
1 x 1 88.75
( + 3.65 ) / 2
1 x 1 95.00
( + 3.95 ) / 2
1 x 1 80.00
( + 2.45 ) / 2
1 x 1 58.75
( + 2.25 ) / 2
1 x 1 28.13
( + 0.00 ) / 2
1 x 1 36.88
( + 2.95 ) / 2
1 x 1 73.75
( + 2.95 ) / 2
1 x 1 70.00
( + 2.65 ) / 2
1 x 1 70.00
( + 2.95 ) / 2
1 x 1 95.00
( + 4.65 ) / 2
1 x 1 92.50
( + 2.75 ) / 2
1 x 1 34.38
( + 0.00 ) / 2
1 x 1 0.00
( + 0.00 ) / 2
1 x 1 0.00
Km 0 / 900 -- 0 / 925 25.00 4.70 -
4.95
Km 0 / 925 -- 0 / 950 25.00 4.10 -
4.45
Km 0 / 950 -- 0 / 975 25.00 3.60 -
3.75
Km 0 / 975 -- 1 / 000 25.00 3.55 -
3.45
Km 1 / 000 -- 1 / 025 25.00 3.80 -
3.65
Km 1 / 025 -- 1 / 050 25.00 3.20 -
3.95
Km 1 / 050 -- 1 / 075 25.00 2.35 -
2.45
Km 1 / 075 -- 1 / 100 25.00 1.13 -
2.25
Km 1 / 100 -- 1 / 125 25.00 1.48 -
0.00
Km 1 / 125 -- 1 / 150 25.00 2.95 -
2.95
Km 1 / 150 -- 1 / 175 25.00 2.80 -
2.95
Km 1 / 175 -- 1 / 200 25.00 2.80 -
2.65
Km 1 / 200 -- 1 / 225 25.00 3.80 -
2.95
Km 1 / 225 -- 1 / 250 25.00 3.70 -
4.65
Km 1 / 250 -- 1 / 275 25.00 1.38 -
2.75
Km 1 / 275 -- 1 / 300 25.00 0.00 -
0.00
Km 1 / 300 -- 1 / 325 25.00 0.00 -
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
30/67
( + 0.00 ) / 2
1 x 1 25.00
( + 2.00 ) / 2
1 x 1 50.00
( + 2.00 ) / 2
1 x 1 56.25
( + 2.50 ) / 2
Right Side
1 x 1 12.50
( + 1.00 ) / 2
1 x 1 43.75
( + 2.50 ) / 2
1 x 1 53.75
( + 1.80 ) / 2
1 x 1 52.50
( + 2.40 ) / 2
1 x 1 63.75
( + 2.70 ) / 2
1 x 1 66.25
( + 2.60 ) / 2
1 x 1 63.75
( + 2.50 ) / 2
1 x 1 68.75
( + 3.00 ) / 2
1 x 1 81.25
( + 3.50 ) / 2
1 x 1 86.25
( + 3.40 ) / 2
1 x 1 73.75
( + 2.50 ) / 2
1 x 1 48.75
( + 1.40 ) / 2
1 x 1 61.25
0.00
Km 1 / 325 -- 1 / 350 25.00 1.00 -
0.00
Km 1 / 350 -- 1 / 375 25.00 2.00 -
2.00
Km 1 / 375 -- 1 / 400 25.00 2.25 -
2.00
Km 0 / 400 -- 0 / 425 25.00 0.50 -
0.00
Km 0 / 425 -- 0 / 450 25.00 1.75 -
1.00
Km 0 / 450 -- 0 / 475 25.00 2.15 -
2.50
Km 0 / 475 -- 0 / 500 25.00 2.10 -
1.80
Km 0 / 500 -- 0 / 525 25.00 2.55 -
2.40
Km 0 / 525 -- 0 / 550 25.00 2.65 -
2.70
Km 0 / 550 -- 0 / 575 25.00 2.55 -
2.60
Km 0 / 575 -- 0 / 600 25.00 2.75 -
2.50
Km 0 / 600 -- 0 / 625 25.00 3.25 -
3.00
Km 0 / 625 -- 0 / 650 25.00 3.45 -
3.50
Km 0 / 650 -- 0 / 675 25.00 2.95 -
3.40
Km 0 / 675 -- 0 / 700 25.00 1.95 -
2.50
Km 0 / 700 -- 0 / 725 25.00 2.45 -
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
31/67
( + 3.50 ) / 2
1 x 1 70.00
( + 2.10 ) / 2
1 x 1 43.75
( + 1.40 ) / 2
1 x 1 36.25
( + 1.50 ) / 2
1 x 1 36.25
( + 1.40 ) / 2
1 x 1 38.75
( + 1.70 ) / 2
1 x 1 42.50
( + 1.70 ) / 2
1 x 1 46.25
( + 2.00 ) / 2
1 x 1 50.00
( + 2.00 ) / 2
1 x 1 46.25
( + 1.70 ) / 2
1 x 1 38.75
( + 1.40 ) / 2
1 x 1 38.75
( + 1.70 ) / 2
1 x 1 46.25
( + 2.00 ) / 2
1 x 1 43.75
( + 1.50 ) / 2
1 x 1 50.00
( + 2.50 ) / 2
1 x 1 62.50
( + 2.50 ) / 2
1 x 1 57.50
( + 2.10 ) / 2
1.40
Km 0 / 725 -- 0 / 750 25.00 2.80 -
3.50
Km 0 / 750 -- 0 / 775 25.00 1.75 -
2.10
Km 0 / 775 -- 0 / 800 25.00 1.45 -
1.40
Km 0 / 800 -- 0 / 825 25.00 1.45 -
1.50
Km 0 / 825 -- 0 / 850 25.00 1.55 -
1.40
Km 0 / 850 -- 0 / 875 25.00 1.70 -
1.70
Km 0 / 875 -- 0 / 900 25.00 1.85 -
1.70
Km 0 / 900 -- 0 / 925 25.00 2.00 -
2.00
Km 0 / 925 -- 0 / 950 25.00 1.85 -
2.00
Km 0 / 950 -- 0 / 975 25.00 1.55 -
1.70
Km 0 / 975 -- 1 / 000 25.00 1.55 -
1.40
Km 1 / 000 -- 1 / 025 25.00 1.85 -
1.70
Km 1 / 025 -- 1 / 050 25.00 1.75 -
2.00
Km 1 / 050 -- 1 / 075 25.00 2.00 -
1.50
Km 1 / 075 -- 1 / 100 25.00 2.50 -
2.50
Km 1 / 100 -- 1 / 125 25.00 2.30 -
2.50
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
32/67
1 x 1 51.25
( + 2.00 ) / 2
1 x 1 56.25
( + 2.50 ) / 2
1 x 1 62.50
( + 2.50 ) / 2
1 x 1 71.25
( + 3.20 ) / 2
1 x 1 80.00
( + 3.20 ) / 2
1 x 1 83.75
( + 3.50 ) / 2
1 x 1 56.25
( + 1.00 ) / 2
1 x 1 27.50
( + 1.20 ) / 2
1 x 1 27.50
( + 1.00 ) / 2
1 x 1 33.75
( + 1.70 ) / 2
1 x 1 35.00
( + 1.10 ) / 2
4485.02
4486
Cum
6
1 x 1 261.25
( + 8.40 ) / 2
1 x 1 225.00
( + 9.60 ) / 2
Providing and laying of Tack Coat using Bulk Bitumen VG 10 at the rate of 3.00 kg per ten
square meter over the BT surface treated with primer preparatory to another bituminousconstruction over it.
Km 0 / 400 -- 0 / 425 25.00 10.45 -
12.50
Km 0 / 425 -- 0 / 450 25.00 9.00 -
8.40
Km 1 / 125 -- 1 / 150 25.00 2.05 -
2.10
Km 1 / 150 -- 1 / 175 25.00 2.25 -
2.00
Km 1 / 175 -- 1 / 200 25.00 2.50 -
2.50
Km 1 / 200 -- 1 / 225 25.00 2.85 -
2.50
Km 1 / 225 -- 1 / 250 25.00 3.20 -
3.20
Km 1 / 250 -- 1 / 275 25.00 3.35 -
3.20
Km 1 / 275 -- 1 / 300 25.00 2.25 -
3.50
Km 1 / 300 -- 1 / 325 25.00 1.10 -
1.00
Km 1 / 325 -- 1 / 350 25.00 1.10 -
1.20
Km 1 / 350 -- 1 / 375 25.00 1.35 -
1.00
Km 1 / 375 -- 1 / 400 25.00 1.40 -
1.70
Total
Or
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
33/67
1 x 1 226.25
( + 8.50 ) / 2
1 x 1 221.25
( + 9.20 ) / 2
1 x 1 245.00
( + 10.40 ) / 2
1 x 1 270.00
( + 11.20 ) / 2
1 x 1 275.00
( + 10.80 ) / 2
1 x 1 310.00
( + 14.00 ) / 2
1 x 1 346.25
( + 13.70 ) / 2
1 x 1 311.25
( + 11.20 ) / 2
1 x 1 267.50
( + 10.20 ) / 2
1 x 1 236.25
( + 8.70 ) / 2
1 x 1 237.50
( + 10.30 ) / 2
1 x 1 232.50
( + 8.30 ) / 2
1 x 1 215.63
( + 8.95 ) / 2
1 x 1 230.00
( + 9.45 ) / 2
1 x 1 272.50
( + 12.35 ) / 2
1 x 1 312.50
( + 12.65 ) / 2
1 x 1 312.50
10.40
Km 0 / 550 -- 0 / 575 25.00 11.00 -
Km 0 / 450 -- 0 / 475 25.00 9.05 -
14.00
Km 0 / 625 -- 0 / 650 25.00 12.45 -
13.70
9.60
Km 0 / 475 -- 0 / 500 25.00 8.85 -
8.50
Km 0 / 500 -- 0 / 525 25.00 9.80 -
Km 0 / 650 -- 0 / 675 25.00 10.70 -
11.20
11.20
Km 0 / 575 -- 0 / 600 25.00 12.40 -
10.80
Km 0 / 600 -- 0 / 625 25.00 13.85 -
9.20
Km 0 / 525 -- 0 / 550 25.00 10.80 -
Km 0 / 675 -- 0 / 700 25.00 9.45 -
10.20
Km 0 / 700 -- 0 / 725 25.00 9.50 -
8.70
Km 0 / 725 -- 0 / 750 25.00 9.30 -
10.30
Km 0 / 750 -- 0 / 775 25.00 8.63 -
8.30
Km 0 / 775 -- 0 / 800 25.00 9.20 -
8.95
Km 0 / 800 -- 0 / 825 25.00 10.90 -
9.45
Km 0 / 825 -- 0 / 850 25.00 12.50 -
12.35
Km 0 / 850 -- 0 / 875 25.00 12.50 -
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
34/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
35/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
36/67
( + 4.00 ) / 2
1 x 1 2.70
( + 3.20 ) / 2
1 x 1 1.69
( + 1.30 ) / 2
1 x 1 0.75
( + 0.70 ) / 2
1 x 1 0.56
( + 0.80 ) / 2
1 x 1 0.60
( + 0.80 ) / 2
1 x 1 0.64
( + 0.90 ) / 2
1 x 1 0.73
( + 1.05 ) / 2
1 x 1 0.94
( + 1.45 ) / 2
1 x 1 2.40
( + 4.95 ) / 2
1 x 1 3.71
( + 4.95 ) / 2
1 x 1 3.60
( + 4.65 ) / 2
1 x 1 3.49
( + 4.65 ) / 2
1 x 1 3.60
( + 4.95 ) / 2
1 x 1 3.53
( + 4.45 ) / 2
1 x 1 3.08
( + 3.75 ) / 2
1 x 1 2.70
( + 3.45 ) / 2
Km 0 / 950 -- 0 / 975
Km 0 / 925 -- 0 / 950
0.80
25.00 0.98 0.030
4.00
25.00 2.25 0.030
1.30
25.00 3.60 0.030
25.00 4.95 0.030
1.05
0.80
4.80 0.030
25.00 0.85
25.00 3.20 0.030
0.90
25.00 1.25 0.030
0.030
0.70
25.00 0.80 0.030
1.30
25.00 0.75 0.030
3.20
25.00 1.00 0.030
1.45
0.030
4.65
25.00 4.70 0.030
4.65
25.00 4.80 0.030
4.95
25.00 4.65 0.030
4.95
25.00
4.45
25.00 3.60 0.030
4.95
25.00 4.10
Km 0 / 800 -- 0 / 825
Km 0 / 825 -- 0 / 850
Km 0 / 850 -- 0 / 875
Km 0 / 875 -- 0 / 900
Km 0 / 900 -- 0 / 925
3.75
Km 0 / 575 -- 0 / 600
Km 0 / 600 -- 0 / 625
Km 0 / 625 -- 0 / 650
Km 0 / 650 -- 0 / 675
Km 0 / 675 -- 0 / 700
Km 0 / 700 -- 0 / 725
Km 0 / 725 -- 0 / 750
Km 0 / 750 -- 0 / 775
Km 0 / 775 -- 0 / 800
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
37/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
38/67
( + 2.50 ) / 2
Right Side
1 x 1 0.38
( + 1.00 ) / 2
1 x 1 1.31
( + 2.50 ) / 2
1 x 1 1.61
( + 1.80 ) / 2
1 x 1 1.58
( + 2.40 ) / 2
1 x 1 1.91
( + 2.70 ) / 2
1 x 1 1.99
( + 2.60 ) / 2
1 x 1 1.91
( + 2.50 ) / 2
1 x 1 2.06
( + 3.00 ) / 2
1 x 1 2.44
( + 3.50 ) / 2
1 x 1 2.59
( + 3.40 ) / 2
1 x 1 2.21
( + 2.50 ) / 2
1 x 1 1.46
( + 1.40 ) / 2
1 x 1 1.84
( + 3.50 ) / 2
1 x 1 2.10
( + 2.10 ) / 2
1 x 1 1.31
( + 1.40 ) / 2
1 x 1 1.09
2.00
Km 0 / 400 -- 0 / 425 25.00 0.50 0.030
0.00
Km 0 / 425 -- 0 / 450 25.00 1.75 0.030
1.00
Km 0 / 450 -- 0 / 475 25.00 2.15 0.030
2.50
Km 0 / 475 -- 0 / 500 25.00 2.10 0.030
1.80
Km 0 / 500 -- 0 / 525 25.00 2.55 0.030
2.40
Km 0 / 525 -- 0 / 550 25.00 2.65 0.030
2.70
Km 0 / 550 -- 0 / 575 25.00 2.55 0.030
2.60
Km 0 / 575 -- 0 / 600 25.00 2.75 0.030
2.50
Km 0 / 600 -- 0 / 625 25.00 3.25 0.030
3.00
Km 0 / 625 -- 0 / 650 25.00 3.45 0.030
3.50
Km 0 / 650 -- 0 / 675 25.00 2.95 0.030
3.40
Km 0 / 675 -- 0 / 700 25.00 1.95 0.030
2.50
Km 0 / 700 -- 0 / 725 25.00 2.45 0.030
1.40
Km 0 / 725 -- 0 / 750 25.00 2.80 0.030
3.50
Km 0 / 750 -- 0 / 775 25.00 1.75 0.030
2.10
Km 0 / 775 -- 0 / 800 25.00 1.45 0.030
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
39/67
( + 1.50 ) / 2
1 x 1 1.09
( + 1.40 ) / 2
1 x 1 1.16
( + 1.70 ) / 2
1 x 1 1.28
( + 1.70 ) / 2
1 x 1 1.39
( + 2.00 ) / 2
1 x 1 1.50
( + 2.00 ) / 2
1 x 1 1.39
( + 1.70 ) / 2
1 x 1 1.16
( + 1.40 ) / 2
1 x 1 1.16
( + 1.70 ) / 2
1 x 1 1.39
( + 2.00 ) / 2
1 x 1 1.31
( + 1.50 ) / 2
1 x 1 1.50
( + 2.50 ) / 2
1 x 1 1.88
( + 2.50 ) / 2
1 x 1 1.73
( + 2.10 ) / 2
1 x 1 1.54
( + 2.00 ) / 2
1 x 1 1.69
( + 2.50 ) / 2
1 x 1 1.88
( + 2.50 ) / 2
1.40
Km 0 / 800 -- 0 / 825 25.00 1.45 0.030
1.50
Km 0 / 825 -- 0 / 850 25.00 1.55 0.030
1.40
Km 0 / 850 -- 0 / 875 25.00 1.70 0.030
1.70
Km 0 / 875 -- 0 / 900 25.00 1.85 0.030
1.70
Km 0 / 900 -- 0 / 925 25.00 2.00 0.030
2.00
Km 0 / 925 -- 0 / 950 25.00 1.85 0.030
2.00
Km 0 / 950 -- 0 / 975 25.00 1.55 0.030
1.70
Km 0 / 975 -- 1 / 000 25.00 1.55 0.030
1.40
Km 1 / 000 -- 1 / 025 25.00 1.85 0.030
1.70
Km 1 / 025 -- 1 / 050 25.00 1.75 0.030
2.00
Km 1 / 050 -- 1 / 075 25.00 2.00 0.030
1.50
Km 1 / 075 -- 1 / 100 25.00 2.50 0.030
2.50
Km 1 / 100 -- 1 / 125 25.00 2.30 0.030
2.50
Km 1 / 125 -- 1 / 150 25.00 2.05 0.030
2.10
Km 1 / 150 -- 1 / 175 25.00 2.25 0.030
2.00
Km 1 / 175 -- 1 / 200 25.00 2.50 0.030
2.50
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
40/67
1 x 1 2.14
( + 3.20 ) / 2
1 x 1 2.40
( + 3.20 ) / 2
1 x 1 2.51
( + 3.50 ) / 2
1 x 1 1.69
( + 1.00 ) / 2
1 x 1 0.83
( + 1.20 ) / 2
1 x 1 0.83
( + 1.00 ) / 2
1 x 1 1.01
( + 1.70 ) / 2
1 x 1 1.05
( + 1.10 ) / 2
OVER ALL
1 x 1 13.06
( + 8.40 ) / 2
1 x 1 11.25
( + 9.60 ) / 2
1 x 1 11.31
( + 8.50 ) / 2
1 x 1 11.06
( + 9.20 ) / 2
1 x 1 12.25
( + 10.40 ) / 2
1 x 1 13.50
( + 11.20 ) / 2
1 x 1 13.75
( + 10.80 ) / 2
1 x 1 15.50
( + 14.00 ) / 2
Km 0 / 425 -- 0 / 450 25.00 9.00 0.050
8.40
Km 0 / 450 -- 0 / 475 25.00 9.05 0.050
9.60
Km 0 / 475 -- 0 / 500 25.00 8.85 0.050
8.50
Km 0 / 500 -- 0 / 525 25.00 9.80 0.050
9.20
Km 0 / 525 -- 0 / 550 25.00 10.80 0.050
10.40
Km 0 / 550 -- 0 / 575 25.00 11.00 0.050
11.20
Km 0 / 575 -- 0 / 600 25.00 12.40 0.050
10.80
Km 0 / 400 -- 0 / 425 25.00 10.45 0.050
12.50
Km 1 / 300 -- 1 / 325 25.00 1.10 0.030
Km 1 / 200 -- 1 / 225 25.00 2.85 0.030
1.00
Km 1 / 325 -- 1 / 350 25.00 1.10 0.030
1.20
Km 1 / 350 -- 1 / 375 25.00 1.35 0.030
1.00
Km 1 / 375 -- 1 / 400 25.00 1.40 0.030
1.70
2.50
Km 1 / 225 -- 1 / 250 25.00 3.20 0.030
3.20
Km 1 / 250 -- 1 / 275 25.00 3.35 0.030
3.20
Km 1 / 275 -- 1 / 300 25.00 2.25 0.030
3.50
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
41/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
42/67
( + 12.15 ) / 2
1 x 1 15.06
( + 11.95 ) / 2
1 x 1 14.63
( + 11.45 ) / 2
1 x 1 14.19
( + 11.25 ) / 2
1 x 1 12.59
( + 8.90 ) / 2
1 x 1 12.72
( + 11.45 ) / 2
1 x 1 14.63
( + 11.95 ) / 2
1 x 1 14.69
( + 11.55 ) / 2
1 x 1 15.13
( + 12.65 ) / 2
1 x 1 16.88
( + 14.35 ) / 2
1 x 1 17.25
( + 13.25 ) / 2
1 x 1 12.66
( + 7.00 ) / 2
1 x 1 8.88
( + 7.20 ) / 2
1 x 1 8.56
( + 6.50 ) / 2
1 x 1 10.13
( + 9.70 ) / 2
1 x 1 11.44
( + 8.60 ) / 2
679.49
680Or
Total
11.65
Km 1 / 025 -- 1 / 050 25.00 12.05 0.050
11.55
Km 1 / 225 -- 1 / 250 25.00 13.50 0.050
12.15
Km 1 / 050 -- 1 / 075 25.00 11.70 0.050
11.95
Km 1 / 075 -- 1 / 100 25.00 11.35 0.050
11.45
Km 1 / 100 -- 1 / 125 25.00 10.08 0.050
11.25
Km 1 / 125 -- 1 / 150 25.00 10.18 0.050
Km 1 / 375 -- 1 / 400 25.00 9.15 0.050
9.70
12.65
Km 1 / 250 -- 1 / 275 25.00 13.80 0.050
14.35
Km 1 / 275 -- 1 / 300 25.00 10.13 0.050
13.25
Km 1 / 300 -- 1 / 325 25.00 7.10 0.050
7.00
Km 1 / 325 -- 1 / 350 25.00 6.85 0.050
7.20
Km 1 / 350 -- 1 / 375 25.00 8.10 0.050
6.50
8.90
Km 1 / 150 -- 1 / 175 25.00 11.70 0.050
11.45
Km 1 / 175 -- 1 / 200 25.00 11.75 0.050
11.95
Km 1 / 200 -- 1 / 225 25.00 12.10 0.050
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
43/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
44/67
( + 8.30 ) / 2
1 x 1 8.63
( + 8.95 ) / 2
1 x 1 9.20
( + 9.45 ) / 2
1 x 1 10.90
( + 12.35 ) / 2
1 x 1 12.50
( + 12.65 ) / 2
1 x 1 12.50
( + 12.35 ) / 2
1 x 1 12.75
( + 13.15 ) / 2
1 x 1 13.55
( + 13.95 ) / 2
1 x 1 13.55
( + 13.15 ) / 2
1 x 1 12.50
( + 11.85 ) / 2
1 x 1 11.75
( + 11.65 ) / 2
1 x 1 11.90
( + 12.15 ) / 2
1 x 1 12.05
( + 11.95 ) / 2
1 x 1 11.70
( + 11.45 ) / 2
1 x 1 11.35
( + 11.25 ) / 2
1 x 1 10.08
( + 8.90 ) / 2
1 x 1 10.18
( + 11.45 ) / 2
10.30
Km 0 / 750 -- 0 / 775 25.00 8.63 0.040
8.30
Km 0 / 775 -- 0 / 800 25.00 9.20 0.040
8.95
Km 0 / 800 -- 0 / 825 25.00 10.90 0.040
9.45
Km 0 / 825 -- 0 / 850 25.00 12.50 0.040
12.35
Km 0 / 850 -- 0 / 875 25.00 12.50 0.040
12.65
Km 0 / 875 -- 0 / 900 25.00 12.75 0.040
12.35
Km 0 / 900 -- 0 / 925 25.00 13.55 0.040
13.15
Km 0 / 925 -- 0 / 950 25.00 13.55 0.040
13.95
Km 0 / 950 -- 0 / 975 25.00 12.50 0.040
13.15
Km 0 / 975 -- 1 / 000 25.00 11.75 0.040
11.85
Km 1 / 000 -- 1 / 025 25.00 11.90 0.040
11.65
Km 1 / 025 -- 1 / 050 25.00 12.05 0.040
12.15
Km 1 / 050 -- 1 / 075 25.00 11.70 0.040
11.95
Km 1 / 075 -- 1 / 100 25.00 11.35 0.040
11.45
Km 1 / 100 -- 1 / 125 25.00 10.08 0.040
11.25
Km 1 / 125 -- 1 / 150 25.00 10.18 0.040
8.90
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
45/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
46/67
C&M, Tambaram Sub Division
Chennai -- 100
Chennai City Roads Division
Saidapet, Chennai -- 15
Assistant Engineer (H)
C&M, Tambaram Section
Chennai -- 15
Divisional Engineer (H) C&M Assistant Divisional Engineer (H)
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
47/67
Sl
NoQuantity Unit Description Rate Unit Amount
1
2736 Cum 65.25 Cum 178524
2
1481 Cum 1090.18 Cum 1614557
3
1122 Cum 1386.86 Cum 1556057
ABSTRACT ESTIMATE
NAME OF WORK :
Estimate Amount : Rs. 200.00 Lakhs
WIDENING AND IMPROVING FROM TWO LANE TO AVAILABLE FULL WIDTH
AT KM 0 / 4 -- 1 / 4 OF DHARGA ROAD INCLUDING DRAIN (ODR)
Earthwork excavation in all classes of soils
except hard rock requiring blasting and
depositing on bank with all leads and lifts as
per SS20B including cost of all labour
materials, tools, equipments and all and
bracing and their subsequent removal of
excavation back filling, clearing up the site
and disposal of all surplus materials etc.,
complete as per standard specification for
Providing and Laying Granular Sub Base as
per table Nos. 400 -- 1 / 400 -- 2 and grading I
of MORTH -- Revision IV with coarse graded
material or any other granular material or
combination these of for 230mm thick to give
a CBR of 30 on prepared sub -- grade in
accordance with the requirements of the
specifications.
Providing and laying Wet Mix Macadam base
course of 250 mm compacted thickness in two
layers of 125mm thick or else as specified on
the proposed sub base with graded stone
aggregate and granular materials of quantity
size and grading in layers as specifiedincluding mixing in base mix plant, spreading
in un uniform layer with motor grader and
compaction with vibrating rollers of 80 to 100
KN static weight and fine dressing to required
frade and cross slope as shown on the
drawing equipement a per Technical
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
48/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
49/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
50/67
1 12 742.00 91.40 833.40
2 12 1034.00 91.40 1125.40
3 12 958.00 91.40 1049.40
3 43 110.00 277.85 387.85
4 12 92.40 63.30 155.70
5 5500.00 208.95 5708.95
6 48000.00 2029.32 50029.32
7 48000.00 48000.00
10%
228.00 22.80 each 250.80
355.00 35.50 each 390.50
206.00 20.60 each 226.60
363.00 36.30 each 399.30
326.00 32.60 each 358.60
322.00 32.20 each 354.20
300.00 30.00 each 330.00
293.00 29.30 each 322.30
Vibration charges for CC 26.20 cum 26.20
Vibration charges for RCC 35.25 cum 35.25
351.00 cum 351.00
Cement mortar 1:2
1.00 Cum 387.85 Cum 387.85
0.72 Mt 5708.95 Mt 4110.44
Total 4498.29
Cement mortar 1:3
1.00 Cum Sand 387.85 Cum 387.85
0.48 Mt Cement 5708.95 Mt 2740.30
Total 3128.15
Fitter II class
Painter I Class
PVC Pipe
DATA
Sand
Cement
Mazdoor I class
Carpenter I Class
Mazdoor II class
Mason I class
Mason II class
Fitter I class
Steel upto 16 mm At site
Binding Wire Black 18 G
RATES OF LABOUR
Sand for mortar Palar (manapakkam)
Quarry Fines Chikkarayapuram
Cement At site
40 mm ISS metal Chikkarayapuram
20 mm ISS metal Chikkarayapuram
12 mm ISS metal Chikkarayapuram
DATA
COST OF MATERIALS
Sl
NoKind of Materials Name of Quarry
Lead
in Km
Cost of
Materials
Conveyance
ChargesTotal
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
51/67
1.00 Cum Sand 387.85 Cum 387.85
0.96 Mt Cement 5708.95 Mt 5480.59
Total 5868.44
9.00 Cum 833.40 Cum 7500.60
4.50 Cum 3128.15 Cum 14076.66
1.80 Nos. 358.60 each 645.48
17.70 Nos. 250.80 each 4439.16
14.10 Nos. 226.60 each 3195.06
10.00 Cum 26.20 Cum 262.00
Total 30118.96
3011.90
9.00 Cum 1125.40 Cum 10128.60
4.50 Cum 4498.29 Cum 20242.32
1.80 Nos. 358.60 each 645.48
17.70 Nos. 250.80 each 4439.16
14.10 Nos. 226.60 each 3195.06
10.00 Cum 26.20 Cum 262.00
Total 38912.62
3891.26
6.30 cum 1125.40 cum 7090.02
2.70 cum 1049.40 cum 2833.38
4.50 cum 5868.44 cum 26407.99
3.50 Nos. 358.60 each 1255.10
21.20 Nos. 250.80 each 5316.96
35.30 Nos. 226.60 each 7998.98
10.00 cum 26.20 cum 262.00
Total 51164.43
5116.44
Vibration charges
Rate pet 1 Cum
Cost of 20 mm ISS metal
Cost of 12 mm ISS metal
Cement mortar 1:1.5
Mason II class
Mazdoor I class
Mazdoor II class
Mason II class
Mazdoor I class
Mazdoor II class
Vibration charges
Rate per cum
Reinforced Cement concrete 1:1.5:3 mix using 20 mm ISS metal ( M 20 )
Mazdoor II class
Vibration charges
Rate per cum
Cement concrete 1:2:4 mix using 20 mm ISS metal ( M 15 )
Cost of 20 mm ISS metal
Cement mortar 1:2
Cement mortar 1:1.5
Cement concrete 1:3:6 mix using 40 mm ISS metal ( M 10 )
Cost of 40 mm ISS metal
Cement mortar 1:3
Mason II class
Mazdoor I class
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
52/67
Cost of MS Sheets and angles for each set weight of MS sheet 90cmx60cmx10 gauge
24.92 Kg/Sqm
13.46 Kg/no
4 Kg/no
13.46 Kg 48.00 Kg 646.08
4.00 Kg 48.00 each 192.00
0.92
Total 839.00
19.00 Nos 839.00 Each 15941.00
398.53
0.12 Cum 14880.00 Cum 1785.60
98.50 RM 21.10 RM 2078.35
Total 3863.95
772.79
1.00 Use 398.53 40 uses 398.53
1.00 Use 772.79 5 uses 772.79
3.80 Nos 390.50 each 1483.90
5.40 Nos 250.80 each 1354.32
1.00 No 330.00 each 330.00
LS 4.46
LS 6.00
Total 4350.00
435.00
DATA
Sub Data -- 1
3.175 x 7850 / 1000
0.90 x 0.60 x 24.92
Weight of MS angle of size 25x
25 x 3mm 3.60m x 1.11 Kg / m
Cost of MS sheets
Cost of MS Angle
Sundries
Sub Data -- 2
Cost of MS sheets & Angle
Assuming for 40 uses
For Single Uses
ver oa coun ry woo o s ,
asur na props cm o cm
Assuming 5 Times
Add for Welding grills nails
Add for oiling for ms sheets
Rate per 1 Sqm
For Single Uses
MAIN DATA
Cost of MS Sheets and Anglesos o s ver oa o s s
Carpenter I Class
Mazdoor I Class
Fitter II Class
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
53/67
2.00 Nos 250.80 each 501.60
For 1 Cum 5.02
1
1.00 Cum 41.85 Cum 41.85
1.00 Cum 5.02 Cum 5.02
3.00 Cum 7.80 Cum 23.40
Total 70.27
2
1.00 Cum 155.70 Cum 155.70
1.00 Cum 5.02 Cum 5.02
Total 160.72
3
1.00 Cum 3011.90 Cum 3011.90
1.00 Cum L.S 6.00
1.00 Cum Curing concrete L.S 6.00
Total 3023.90
4
1.00 Cum 3891.26 Cum 3891.26
6.65 Sqm 435.00 Sqm 2892.75
1.00 Cum L.S 6.00
1.00 Cum Curing concrete L.S 6.00
Total 6796.01
5
0.14 Cum 3128.15 Cum 437.941.10 Nos 399.30 each 439.23
0.50 Nos 250.80 each 125.40
1.10 Nos 226.60 each 249.26
Total 1251.83
125.18
Mazdoor I class
Mazdoor II class
Rate per sqm
Centering charges
Imported Soft water
Rate per cum
Plastering CC 1:3 12mm
Cement mortar 1:3Mason I class
CC 1:3:6 40mm
Rate for CC 1:3:6
Imported Soft water
Rate per cum
RCC 1:2:4 20mm for Side Walls
Rate for CC 1:2:4
Quarry Fine
Cost of Quarry Fines
Filling charges
Earthwork
As per S.I No. 62
Conveyance
Filling Charges for 1 Cum
Mazdoor I Class
Refilling the sides
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
54/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
55/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
56/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
57/67
1 x 1 225.00 1.250 0.100 28.13
1 x 1 250.00 1.250 0.100 31.25
TOTAL 59.38
Or 60.00
Cum
8
L/R
1 x 1 3168.00 1.30 0.89 3665
1 x 1 10.00 475.00 0.39 1853
Total 5518
Or 5.60MT
Chennai -- 100
Divisional Engineer (H) C&M
Chennai City Roads Division
Saidapet, Chennai -- 15
Assistant Divisional Engineer (H)
C&M, Tambaram Sub Division
Chennai -- 100
Assistant Engineer (H)
C&M, Tambaram Section
Distri rod 8mm
Km 0 / 4 -- 1 / 0 LS
Km 1 / 0 -- 1 / 4 LS
Supply and fabrication of Tor steel grade S-415 steel required for all RCC items of works
involved in the schedule including cost of steel , cost of fabrication , labour charges for cleaning
the bars straightening , cutting , bending , tying grills , hoisting and palcing the reinforcement in
position as specified in the drawings including cost of binding wire , provision for spacing bars ,
cover blocks and all other incidental charges etc., complete as per standard specifications.
Main Rod 12mm
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
58/67
Sl
NoQuantity Unit Description Rate Unit Amount
1
737 Cum 70.27 Cum 51789
2
111 Cum 160.72 Cum 17840
3
111 Cum 3023.90 Cum 335653
Vibrated Cement Concrete M10 grade mix
1:3:6 using 40mm ISS size hard broken
granite metal including cost and conveyance
of all materials from approved quarry to
worksite including cost of mixing the
concrete, transporting, laying, vibrating,
compacting, curing with all leads for soft
potable water, working in all depths including
hire, running and fuel charges for all tools and
plants employed including as per standard
specification for FOUNDATION
Filling with Quarry Fine including cost and
conveyance of quarry dust to work site
including labour charges for filling, laying,
compacting by manual labour under optimum
moisture content to get the maximum density
flooding with water as layers or built-up to
the bottom level inclusive all other incidental
charges etc., complete for foundation.
ABSTRACT ESTIMATE
NAME OF WORK : SUB ESTIMATE FOR CONSTRUCTION OF DRAIN AT KM 0 / 0 -- 1 / 0 OF
THIRUNEERMALAI ROAD.
Earthwork excavation in all classes of soils
except hard rock requiring blasting and
depositing on bank with all leads and lifts as
per SS20B including cost of all labour
materials, tools, equipments and all incidental
charges and sheeting, shoring and bracing and
their subsequent removal, removal of all logs,
stumps and other deleterious matter and
obstructions, trimming of bottom of
excavation back filling, clearing up the site
and disposal of all surplus materials etc.,
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
59/67
Sl
NoQuantity Unit Description Rate Unit Amount
4
257 Cum 6796.01 Cum 1746575
5
48 Nos 351.00 Nos 16848
6
48 Nos 1800.00 Nos 86400
Vibrated Cement Concrete M 15 grade mix
1:2:4 using 40mm ISS size hard broken
granite metal including cost and conveyance
of all materials from approved quarry to
worksite including cost of cement which has
to be procured by the contractor including
cost and labour charges for formwork and
centering mixing the concrete, transporting,
laying, vibrating, compacting, curing with all
leads for soft potable water, working in all
depths including hire, running and fuel
charges for all tools and plants employed
including as per standard specification for
SIDE WALL
Providing and fixing 150mm dia PVC PIPES of
required length for retaining wall including
grating arrangements including cost and
conveyance of all materials to worksite, cost
and labour for semi-spherical backfill
arrangements with 100mm size broken
granite stones at the periphery and labour
charges for fixing etc., complete to drain the
backfill as per standard specification.
Supplying and fixing of Reinforced Cement
Concrete Man hole cover 750 mm dia with
frames as per IRC 50- 1979 as directed by the
Departmental officers including labour
charges for fixing at every intervals of 10 m
along the drain including all other incidental
charges etc., complete
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
60/67
Sl
NoQuantity Unit Description Rate Unit Amount
7
60 Cum 8917.29 Cum 535037
8
5.60 MT 62906.32 MT 352275
3142417
Saidpaet Chennai -- 15 Chennai -- 100 Chennai -- 100
Vibrated Reinforced Cement Concrete M 20
grade mix using 12mm ISS size hard broken
granite metal including cost and conveyance
of all materials from approved quarry to
worksite including cost of cement which has
to be procured by the contractor but
excluding cost and fabrication of steel
including cost and labour charges for
formwork and centering mixing the concrete,
transporting, laying, vibrating, compacting,
curing with all leads for soft potable water, as
per standard specification for Cover slab.
Supply and fabrication of Tor steel grade S-
415 steel required for all RCC items of works
involved in the schedule including cost of
steel , cost of fabrication , labour charges for
cleaning the bars straightening , cutting ,
bending , tying grills , hoisting and palcing the
reinforcement in position as specified in the
drawings including cost of binding wire ,
provision for spacing bars , cover blocks andall other incidental charges etc., complete as
per standard specifications.
TOTAL
Divisional Engineer (H) C&M Assistant Divisional Engineer (H) Assistant Engineer (H)
Chennai City Roads Division C&M, Tambaram Sub Division C&M, Tambaram Section
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
61/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
62/67
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
63/67
BC 40mm BC 40mmCC 1:4:8
0.610
18.500
Chennai City Roads Division
Saidapet, Chennai -- 15.
8.945 8.945
Assistant Engineer (H)
C&M, Tambaram Section
Chennai -- 100
Assistant Divisional Engineer (H)
C&M, Tambaram Sub Division
Chennai -- 100
Not for Scale
DBM 6 mmDBM 6 mm
Divisional Engineer (H) C&M
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
64/67
Saidapet, Chennai -- 15 Chennai -- 100. Chennai -- 100.
CERTIFICATE
Certified that the provisions made in the Estimate are based on the Road Condition
and other parameters like soil, Traffic intensities and relfection etc., I have personally
inspected site and certify that the provisions made in the estimate are correct.
Countersigned
Divisional Engineer (H) C&M Assistant Divisional Engineer (H) Assistant Engineer (H)
Chennai City Roads Division C&M, Tambaram Sub Division C&M, Tambaram Section
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
65/67
1
2
3
4
5
6
7
8
Chennai City Roads Division C&M, Tambaram Sub Division C&M, Tambaram Section
Saidapet, Chennai -- 15 Chennai -- 100. Chennai -- 100.
CERTIFICATE
Countersigned
Divisional Engineer (H) C&M Assistant Divisional Engineer (H) Assistant Engineer (H)
This is to Certify that the list of works proposed under CRIDP 2012 -- 13 have not been
taken up in the last Five Years in any Plan Schemes.
It is further Certified that the above Road works have not been improved under Special
Repairs / Periodical Renewal in the last 5 Years.
It is also Certified that the Proposed works do not find place in the approved list of
works by NABARD under improvement of MDR and ODR (2012 -- 13) Quarry Roads).
It is Certified that the proposed works do not fine place in the approved list of bridge
works sanctioned by NABARD Bank for the year 2012 -- 13.
It is Certified that the proposed works are not included in second list of Bridge Works
(priority 2) which areunder consideration of the NABARD Bank for approval.
It is also Certified that the above works are not proposed to be taken up under anyother Scheme.
The Proposals have been prepared adhering the appropriate circulars, Government
Orders and guidelines issued then and there.
The Proposals have been prepared considering the badly damaged stretches, VIP
representations, priority basis etc.,
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx
66/67
Category : State Highways -- 48
Name of Road : Marmalong Bridge Irumbuliyur Road
Metal Quarry : Chikkarayapuram
Sand Quarry : Manapakkam (Palar River)
Census Point : Km 13 / 5
PROPOSAL
16 / 4
6
8
17 / 0
2
4
6
8
18 / 0
2
4
6
8
19 / 0
19 / 2
Divisional Engineer (H) C&M
Chennai City Roads Division
Saidapet, Chennai -- 15
Proposed Stretch
Assistant Engineer (H)
C&M, Tambaram Section
Assistant Divisional Engineer (H)
C&M, Tambaram Sub Division
Chennai -- 100.Chennai -- 100.
ROAD CHART
Traffic Intensity : 8010 Cv
KM & HM 2007 -- 08 2008 -- 09 2009 -- 10 2010 -- 11 2011 -- 12
-
7/27/2019 DARGA 0.4 -- 1.4.xlsx