dat nen quan 12

Post on 23-Aug-2014

110 Views

Category:

Real Estate

5 Downloads

Preview:

Click to see full reader

DESCRIPTION

Dat nen so do quan 12. So rieng, giao nen xay dung ngay Dat nen so do quan 12, Cach cau vuot Nga tu Ga 2km, Cach nga 5 Go Vap 6 Km Gia uu dai cho dot dau, chi 10 nen, Co so ha tang hoan chinh, Dien tich tu 54m2 den 58m2 (5x10, 5x11, 5x12...) Phap ly: So do, Huong: Tay Bac va Dong Nam Thanh toan linh hoat: Coc 50 Trieu - Thanh toan 30% (Bao gom coc) Ky HD Mua Ban - Thanh toan 68% Ky HD Cong Chung - Nhan so Do thanh toan 2% Nhan dat xay dung ngay De biet them chi tiet vui long goi ve so hotline: 0933001808 http://www.newssaigon.net/2014/05/Dat-nen-quan-12-so-do-rieng-xay-dung-tu-do-gia-hap-dan.html

TRANSCRIPT

DAT NEN QUAN 12

Dat nen so do quan 12. So rieng, giao nen xay dung ngay

• Dat nen so do quan 12, Cach cau vuot Nga tu Ga 2km, Cach nga 5 Go Vap 6 Km

• Gia uu dai cho dot dau, chi 10 nen, • Co so ha tang hoan chinh, • Dien tich tu 54m2 den 58m2 (5x10, 5x11, 5x12...)• Phap ly: So do, • Huong: Tay Bac va Dong Nam• Thanh toan linh hoat:• Coc 50 Trieu• - Thanh toan 30% (Bao gom coc) Ky HD Mua Ban• - Thanh toan 68% Ky HD Cong Chung• - Nhan so Do thanh toan 2%• Nhan dat xay dung ngay• De biet them chi tiet vui long goi ve so hotline: 0933001808http://www.newssaigon.net/2014/05/Dat-nen-quan-12-so-do-rieng-xay-dung-tu-do-gia-hap-dan.html

District 12 ground red book, own book, getting built right background

• Land District 12, Station Way overpass intersection 2km, 5 way intersection Vap 6 Km

• Special Rate for the first phase, only 10 background, • Complete infrastructure, • The area from 54m2 to 58m2 (5x10, 5x11, 5x12 ...) • Legal: Red Book, • Direction: North West and South East • Flexible Payment: • Pile 50 Million • - Payment of 30% (including deposit) Signed Purchase

Contract • - 68% Payment Notary Signing Contract • - Get paid Diagram 2% • Get immediate construction land • For more details please call the hotline number:

0933001808

top related