edvard grieg anders henriksson, lundin petroleum prosjektleder

Post on 01-Jan-2017

221 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

www.lundin-norway.no

Edvard Grieg Anders Henriksson, Lundin Petroleum Prosjektleder

www.lundin-norway.no

Lundin Petroleum – Asset overview

www.lundin-norway.no

Lundin Norway AS • Established on the NCS in 2004 by the

purchase of the DNO portfolio in Norway

• ”Core staff” from previous Saga Petroleum and DNO

• 40 licences in total, 22 as operator

• Daily NCS production of approximately 30 000 boe from the Alvheim and Volund fields

• Several development projects in the planning phase as operator

– Brynhild – startup 2014 – Luno– startup 2015

www.lundin-norway.no

Utsirahøyden

Utsirahøyden is an area where Lundin has focus Exploration has been on and off

in almost 40 years in this area Several ongoing development

projects in this area Edvard Grieg Ivar Aasen Johan Sverdrup Infrastructure: oil, gas, power

www.lundin-norway.no

Edvard Grieg

PL338 is located in block 16/1, about 180 km west of Stavanger Water depth at platform location is 109 m

By January 2011 the license consisted of: Lundin Norway AS (operat0r): 50% Wintershall Norge AS: 30% RWE Dea Norge AS: 20%

Todays owners: Lundin Norway AS (operatør): 50% OMV Norge AS: 20% Wintershall Norge AS: 15% Statoil Petroleum AS: 15%

www.lundin-norway.no

Edvard Grieg

www.lundin-norway.no

Edvard Grieg - Capacities

Kapasitet PL338 Kapasitet PL338 + tie-ins

Olje (Sm3/d) 14 300 20 000

Gassprosessering (MSm3/d) 2.5 5

Prod. vann (Sm3/d) 13 000 13 000

Vanninjeksjon (Sm3/d) 24 000 24 000

www.lundin-norway.no

Edvard Grieg - Mainlifts

P00 5338 T

C00 10645 T

F00 268 T

N FORBORINGSDEKK

H00 + L00 + U00 6665 T

TOTAL TOPSIDE TØRRVEKT 22668 T

Weightreport rev. 14

www.lundin-norway.no

Jacket EPC – Some key data

Jacket Contract value 1.2 BN Jacket weight: 13.400 ton Pile weight: 6.500 ton Bouyancy tanks: 1.500 tonnes Temporary drill deck for 20 slots Appurtenances

7 Risers for pipeline connection 10 caissons (7 pump caissons and 3 dump caissons) 16 J –tubes 8 for future cables 8 for future risers

Delivery date: 01.04.14

www.lundin-norway.no

Edvard Grieg – Pre-drilling

www.lundin-norway.no

Edvard Grieg – UHGP Installeres 2014

www.lundin-norway.no

Edvard Grieg – EGOP «Grane Y» Installation on going

www.lundin-norway.no

EG platform: High complexity

EG platform designed as a Field Centre from day #1 in-license tie-ins: discoveries & prospects final processing + export of oil & gas from Ivar Aasen Specific design challenges Significant differences between reservoirs to be produced

Incompatible formation waters

Area solutions for oil & gas export + future power from shore

www.lundin-norway.no

EG main process 3 separators to limit recycle of intermediate components 1x coalescer to reduce water-in-oil to ~0.3% due to salt content

2-stage recompression w/VSD & 2-casing design w/space for extra impellers

HP gas compression train 1x 100% train ... with «spare» compressors «high» and «low» design flow for gas processing

www.lundin-norway.no

EG inlet separators Parallel inlet separators primary / secondary / test segregated water treatment Inlet routing flexibility valves: primary/test valves: secondary/test spools: primary/secondary Significant impact on layout

Space for future manifolds

www.lundin-norway.no

Jacket EPC – Construction at Verdal Yard

Load-Out 1-2 of April

www.lundin-norway.no

Jacket EPC – Construction at Verdal Yard

Status 9th. of April

www.lundin-norway.no

Verdal, April 15th, 1430 hours

www.lundin-norway.no

The Launch moment! Well testing and by the way, Launch, May 3rd.

www.lundin-norway.no

Saturday evening, May 3rd.

www.lundin-norway.no

Sunday morning, May 4th.

www.lundin-norway.no

Pile stabbing

www.lundin-norway.no

Pile hammer

www.lundin-norway.no

Bouyancy tanks Removal, May 10th.

www.lundin-norway.no

PDD installation

www.lundin-norway.no

Finished, May 13th. 0500 hours

www.lundin-norway.no

Edvard Grieg Topside EPC Contract

www.lundin-norway.no

Topside EPC Contract – May Bi-weekly cut-off

www.lundin-norway.no

Engineering April 2014

Karl-Petter Løken

www.lundin-norway.no

Detail Engineering finished

Construction and Follow-on Engineering on-going

Engineering manning reduced every month

Engineering

www.lundin-norway.no

Edvard Grieg Topside EPC Contract

Equipment

www.lundin-norway.no

Duisburg 29.07.2013

www.lundin-norway.no

Hengelo 2.08.2013

www.lundin-norway.no

Hengelo 13.02.2014 Final Inspection Re-compressor and Injection Compressor

www.lundin-norway.no

www.lundin-norway.no

ATV

www.lundin-norway.no

Edvard Grieg Topside EPC Contract

Construction

www.lundin-norway.no

Process Module - Assembly status Three of total four deck floors are installed.

The first section for the fourth deck (P40) has arrived from Poland (in the hook)

www.lundin-norway.no

Process Module – Current status of erection program in Egersund.

Installation of equipments on P30 deck has commenced.

Gas Injection Compressor 1 and 2 Stg. Recompressor

www.lundin-norway.no

Process Module

1 & 2 stage recompressor and Gas Inj. Compressor skids are installed incl. Noise hoods.

El. Cabinets in LER and the framework for Raised Access Floor are installed.

www.lundin-norway.no

C00 Installation dates

www.lundin-norway.no

www.lundin-norway.no

www.lundin-norway.no

www.lundin-norway.no

www.lundin-norway.no

Installation of C32 Mod Section

www.lundin-norway.no

Installation of C32 Mod Section

www.lundin-norway.no

Currency connection

The light is on!

www.lundin-norway.no

Lifting of Helideck, May 27th.

www.lundin-norway.no