eu declaration of conformity - 솔루엠 · eu declaration of conformity according to ... as laid...
Post on 08-Aug-2018
227 Views
Preview:
TRANSCRIPT
EU
Declara
tion
of
Co
nfo
rmity
EU Declaration of ConformityAccording to
EMC Directive 2004/108/ECFor the following
Product : LED CONVERTERModel Name : PSDV160351BVariant Model Name : PSDV160351A
Applicant : SAMSUNG ELECTRO-MECHANICS Co., Ltd.150, Maeyeong-ro, Yeongtong-gu, Suwon-si,Gyeonggi-do, 443-743 KOREA
Manufacturer#1 : DONGGUAN SAMSUNG ELECTRO-MECHANICS CO., LTD.HENGKENG VILLAGE LIAOBU TOWNDONGGUAN CITY GUANGDONGPROVINCE P.R.CHINA P.C:523413
Manufacturer#2 : SAMSUNG ELECTRO-MECHANICSTHAILAND CO., LTD.WELLGROW INDUSTRIAL ESTATE,93 MOO 5 T.BANGSAMAK,A.BANGPAKONG, CHACHOENGSAO 24180THAILAND
We hereby declare, Electromagnetic Compatibility Directives (2004/108/EC) are fulfilled,as laid out in the guideline set down by the member states of the EEC Commission.This declaration is valid for all samples that are part of this declaration, which aremanufactured according to the production charts appendix.
The standards relevant for the evaluation of EMC requirements are as follows:
Test Standards : EN 55015:2013EN 61547:2009EN 61000-3-2:2014EN 61000-3-3:2013
Date of issue: January 07, 2015
----------------------------------------------------------(Name and signature of authorized person)
DONGGUAN SAMSUNGELECTRO-MECHANICS CO., LTD.HENGKENG VILLAGE LIAOBU TOWNDONGGUAN CITY GUANGDONGPROVINCE P.R.CHINA P.C:523413
SAMSUNG ELECTRO-MECHANICSTHAILAND CO., LTD.WELLGROW INDUSTRIAL ESTATE,93MOO 5 T.BANGSAMAK, A.BANGPAKONG,CHACHOENGSAO 24180 THAILAND
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 2 of 62
Contents
1. Applicant information ...........................................................................................................................................3
2. Laboratory information ........................................................................................................................................4
3. Test system configuration......................................................................................................................................5
3.1 Operation environment ............................................................................................................................5
3.2 Measurement Uncertainty .......................................................................................................................6
4. Description of E.U.T...............................................................................................................................................7
4.1 General information.................................................................................................................................7
4.2 Product description..................................................................................................................................7
4.3 Auxiliary equipments...............................................................................................................................7
4.4 Test configuration ....................................................................................................................................8
4.5 Operating conditions ...............................................................................................................................8
5. Summary of test results .........................................................................................................................................9
5.1 Summary of EMI emission test results...................................................................................................9
5.2 Summary of immunity test results..........................................................................................................9
5.3 Performance criteria ............................................................................................................................. 10
6. Test results .............................................................................................................................................................11
6.1 Disturbance Voltages .............................................................................................................................11
6.2 Radiated Electromagnetic disturbance ................................................................................................ 15
6.3 Radiated Emission ................................................................................................................................ 18
6.4 Harmonics ............................................................................................................................................. 22
6.5 Flicker.................................................................................................................................................... 29
6.6 Electrostatic Discharge......................................................................................................................... 32
6.7 Radio Frequency Electromagnetic Fields ........................................................................................... 36
6.8 Electric Fast Transient/BURST ........................................................................................................... 39
6.9 Surge...................................................................................................................................................... 43
6.10 Conducted Immunity.......................................................................................................................... 45
6.11 Magnetic field immunity.................................................................................................................... 49
6.12 Dips and Interruptions........................................................................................................................ 51
7. E.U.T. photographs ............................................................................................................................................. 53
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 3 of 62
1. Applicant information
Applicant: SAMSUNG ELECTRO-MECHANICS Co., Ltd.
Address: 150, Maeyeong-ro, Yeongtong-gu, Suwon-si,
Gyeonggi-do, 443-743 KOREA
Telephone : +82-31-210-6318
E-mail: bblim@samsung.com
Contact name: Im Jun Hwan
Manufacturer#1: DONGGUAN SAMSUNG ELECTRO-MECHANICS CO., LTD.
Address: HENGKENG VILLAGE LIAOBU TOWN DONGGUAN
CITY GUANGDONG PROVINCE P.R.CHINA P.C:523413
Manufacturer#2: SAMSUNG ELECTRO-MECHANICS THAILAND CO., LTD.
Address: WELLGROW INDUSTRIAL ESTATE, 93 MOO 5 T.BANGSAMAK,
A.BANGPAKONG, CHACHOENGSAO 24180 THAILAND
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 4 of 62
2. Laboratory information
Address
EMC compliance Ltd.
65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, Korea
Telephone Number: 82 70 5008 1021
Facsimile Number: 82 505 299 8311
FCC Site Designation No: KR0040, FCC Site Registration No: 687132
VCCI Registration No.: R-3327, G-198, C-3706, T-1849
Industry Canada Registration No.: 8035A
KOLAS NO.: 231
SITE MAP
EMC compliance
Suwon city
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 5 of 62
3. Test system configuration
3.1 Operation environment
Temperature Humidity Pressure
Chamber(10 m) : 21.7 °C 21.1 % R.H. -
Shielded room(CE) : 22.2 °C 23.6 % R.H. -
Shielded room(ESD) : 24.0 °C 37.4 % R.H. 101.1
Test site
These testing items were performed following locations;
Test item Test site
Disturbance Voltages Shielded Room
Radiated Electromagnetic disturbance Shielded Room
Radiated Emission 10 m Chamber
Harmonics current Immunity area
Voltage fluctuations and flickers Immunity area
Electrostatic discharge Shielded Room
Radiated RF immunity Fully anechoic chamber (3 m)
Electric Fast Transient/BURST Shielded Room
Surge Shielded Room
Conducted RF immunity Shielded Room
Magnetic field immunity Shielded Room
Voltage dip/interruption Shielded Room
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 6 of 62
3.2 Measurement Uncertainty
All measurements involve certain levels of uncertainties, especially in field of EMC.
The factors contributing to uncertainties are test receiver, cable loss, antenna factor calibration,
Antenna directivity, antenna factor variation with height, antenna phase center variation, antenna
frequency interpolation, measurement distance variation, site imperfection, mismatch, and system
repeatability. Based on CISPR 16-4-2, the measurement uncertainty level with a 95 % confidence
level was applied.
Conducted emission measurement (C.L: Approx 95 %, k = 2)
Shielded Room (CE#1)9 ~ 150 : ± 3.75
150 ~ 30 : ± 3.36
Shielded Room (CE#2)9 ~ 150 : ± 3.79
150 ~ 30 : ± 3.42
Radiated Emission measurement (C.L: Approx 95 %, k = 2)
10 m Chamber (#F4)
30 ~ 300 3 m: + 4.87 , - 4.99
10 m: + 4.86 , - 4.98
300 ~ 1 000 3 m: + 5.04 , - 5.14
10 m: + 4.91 , - 5.02
1 ~ 6 3 m: + 6.03 , - 6.06
10 m Chamber (#F2)
30 ~ 300 3 m: + 4.94 , - 5.06
10 m: + 4.93 , - 5.05
300 ~ 1 000 3 m: + 4.97 , - 5.08
10 m: + 4.84 , - 4.96
1 ~ 6 3 m: + 6.03 , - 6.05
Radio Frequency Electromagnetic Fields (C.L: Approx 95 %, k = 2)
± 1.82
Disturbance power Electromagnetic Fields (C.L: Approx 95 %, k = 2)
± 3.30
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 7 of 62
4. Description of E.U.T.
4.1 General information
- PSDV160351B is a LED CONVERTER.
4.2 Product description
Type of product LED CONVERTER
Model name (Basic) PSDV160351B
Model name (Variant) PSDV160351A
Difference Converter shape
Serial no -
Testing voltage 230 V, 50
Product ratingInput: AC 100 - 240 V, 50/60 , 0.35 A, 17 W
Output: DC 40 V, 0.35 A, 14 W
Internal clock frequency Below108
Note -
4.3 Auxiliary equipments
Type Model / Part # Serial number Manufacturer
LED - - -
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 8 of 62
4.4 Test configuration
Note
*
Start End Cable
Name I/O port Name I/O portLength
(m)Spec.
1 EUT(LED
CONVERTER)
Power AC Main Power 2.0 Non-Shield
2 (+,-) LED (+,-) 0.7 Non-Shield
4.5 Operating conditions
The EUT was configured as normal intended use.
Test mode Normal operation
1 Check the LED lighting test mode.
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 9 of 62
5. Summary of test results
5.1 Summary of EMI emission test results
Applied Test items Test method Result
Disturbance Voltages EN 55015:2013 Complied
Radiated Electromagnetic disturbance EN 55015:2013 Complied
Radiated Emission EN 55015:2013 Complied
Harmonics current EN 61000-3-2:2014 Complied
Voltage fluctuations and flickers EN 61000-3-3:2013 Complied
5.2 Summary of immunity test results
Applied Test items Test method Result
* EN 61547:2009
Electrostatic discharge EN 61000-4-2:2009 Complied
Radiated RF immunity EN 61000-4-3:2006+A2:2010 Complied
Electric Fast Transient/BURST EN 61000-4-4:2012 Complied
Surge EN 61000-4-5:2014 Complied
Conducted RF immunity EN 61000-4-6:2014 Complied
Magnetic field immunity EN 61000-4-8:2010 Complied
Voltage dip/interruption EN 61000-4-11:2004 Complied
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 10 of 62
5.3 Performance criteria
Performance criterion A:
During the test no change of the luminous intensity shall be
observed and the regulating control, if any, shall operate during the test as intended.
(The luminous intensity shall be deemed to be unchanged if the measured intensities do not deviate by
more than 15 %.)
Performance criterion B:
During the test the luminous may change the any value.
After the test the luminous intensity shall be restored to its initial value within 1 min. Regulating
controls needs not function during the test, but after the test the mode of the control shall be the same
as before the test provided that during the test no mode changing commands were given.
Performance criterion C:
During and after the test change of the luminous intensity is allowed and the lamp(s) may be
extinguished. After the test, within 30min, all functions shall return to normal if necessary by
temporary interruption of the mains supply and/or operating the regulating control. Additional
requirement for lighting equipment incorporating a starting device: After the test the lighting
equipment is switch off. After half an hour it is switched on again. The lighting equipment shall start
and operate as intended.
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 11 of 62
6. Test results
6.1 Disturbance Voltages
Test specification EN 55015:2013
Testing voltage 230 V, 50
Test facility Shielded room (CE#2)
Date 2014. 12. 29
Temperature (°C) 22.2 °C Humidity (% R.H.) 23.6 % R.H.
Remarks Complied
6.1.1 Limits of disturbance voltages measurement
Mains terminals
FrequencyLimits ()a
Quasi-peak Average
9 ~ 50 110 -
50 ~ 150 90 ~ 80 b -
150 ~ 0.5 66 ~ 56 b 56 ~ 46 b
150 ~ 5 0 56 c 46 c
5 ~ 30 60 50a At the transition frequency, the lower limit applies.
b The limit decreases linearly with the logarithm of the frequency in the ranges
50 – 150 and 150 – 0.5 c For electrode less lamps and luminaries, the limit in the frequency range of
2.51 – 3.0 is 73 () quasi-peak and 63 () average
Load terminals
Frequency []Limits ()a
Quasi-peak Average
0.15 ~ 0.50 80 70
0.50 ~ 30 74 64a At the transition frequency, the lower limit applies.
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 12 of 62
Control terminals
Frequency []Limits ()*
Quasi-peak Average
0.15 ~ 0.50 84 ~ 74 74 ~ 64
0.50 ~ 30 74 64
Note #1 The limits decrease linearly with the logarithm of the frequency in the range 0.15 to 0.5
Note #2 The voltage disturbance limits are derived for use with an impedance stabilization network (ISN) which
Presents a common mode(asymmetric mode) impedance of 15Ω to the control terminal
6.1.2 Measurement procedure
The measurements were performed in a shielded room. EUT was setup as shown in photograph and
placed on a non-metallic table height of 0.8 m above the reference ground plane. The rear of table
was located 0.4 m to the vertical conducted plane. EUT was power through the LISN, which was
bonded to the ground plane. The LISN power was filtered. Each EUT power lead, except ground
(safety) lead was individually connected through a LISN to input power source. EUT signal cables
that hung closer than 0.4 m to the Horizontal metal ground 0.3 m ~ 0.4 m long. The power cord
was bundles in the center. All peripheral equipment was powered from a sub LISN. The LISN and ISN
were positioned 0.8 m from the EUT. Peak and Average detection were used in preliminary testing
and Quasi-peak and Average detections were used at final measurement.
6.1.3 Used equipments
Equipment Model Serial No. Makers Next Cal. Date Used
Test Receiver ESCI7 100732 R&S 2015.01.27
Test Receiver ESCI 100001 R&S 2015.07.14
Test Receiver ESCI 100710 R&S 2015.10.13
TWO-LINEV-NETWORK
ENV216 101352 R&S 2015.10.13
TWO-LINEV-NETWORK
NNLK8121 8121-472 SCHWARZBECK 2015.06.24
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 13 of 62
6.1.4 Photographs of test setup
* Mains terminals
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 14 of 62
6.1.5 Disturbance Voltages measurement result
* Main terminals (PSDV160351B)
EMC Comliance.LtdShieldroom
29 December,2014 16:48<<Conducted Emission>>
Standard : EN55015 CLASS BModel :Serial :Operator :AC Power : 230V 50HzTemp,Humidity:
Remark1 :Remark2 :Remark3 :Remark4 :
0.01 30.000.10 1.00 10.000
120
10
20
30
40
50
60
70
80
90
100
110
Frequency
Level
[MHz]
[dB(uV)]
<CISPR15>Limit (QP)Limit (AV)
<CE>Spectrum (N,AV)Spectrum (N,PK)Spectrum (L1,AV)Spectrum (L1,PK)Suspected Item(N)Suspected Item(L1)Final Item-QP(N)Final Item-AV(N)Final Item-QP(L1)Final Item-AV(L1)
Final Result
--- N Phase ---No. Frequency Reading Reading c.f Result Result Limit Limit Margin Margin
QP CAV QP CAV QP AV QP CAV[MHz] [dB(uV)] [dB(uV)] [dB] [dB(uV)] [dB(uV)] [dB(uV)] [dB(uV)] [dB] [dB]
1 0.42923 23.9 20.3 9.6 33.5 29.9 57.3 47.3 23.8 17.42 1.03033 22.3 17.7 9.6 31.9 27.3 56.0 46.0 24.1 18.73 3.21819 23.0 18.0 9.6 32.6 27.6 56.0 46.0 23.4 18.44 8.91932 18.8 13.7 9.8 28.6 23.5 60.0 50.0 31.4 26.5
--- L1 Phase ---No. Frequency Reading Reading c.f Result Result Limit Limit Margin Margin
QP CAV QP CAV QP AV QP CAV[MHz] [dB(uV)] [dB(uV)] [dB] [dB(uV)] [dB(uV)] [dB(uV)] [dB(uV)] [dB] [dB]
1 0.16837 46.4 38.6 9.6 56.0 48.2 65.0 55.0 9.0 6.82 0.20378 32.2 18.4 9.6 41.8 28.0 63.5 53.5 21.7 25.53 0.25811 32.4 26.6 9.6 42.0 36.2 61.5 51.5 19.5 15.34 0.3425 27.0 23.4 9.6 36.6 33.0 59.1 49.1 22.5 16.15 0.72874 24.8 12.7 9.6 34.4 22.3 56.0 46.0 21.6 23.76 2.14546 22.2 16.9 9.6 31.8 26.5 56.0 46.0 24.2 19.57 7.33433 22.1 17.0 9.7 31.8 26.7 60.0 50.0 28.2 23.38 12.35234 12.3 6.9 9.7 22.0 16.6 60.0 50.0 38.0 33.49 29.41177 13.2 7.1 9.7 22.9 16.8 60.0 50.0 37.1 33.2
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 15 of 62
6.2 Radiated Electromagnetic disturbance
Test specification EN 55015:2013
Testing voltage 230 V, 50
Test facility Shielded room
Date 2015. 01. 02
Temperature (°C) 20.0 °C Humidity (% R.H.) 13.9 % R.H.
Remarks Complied
6.2.1 Limits of radiated electromagnetic disturbance measurement
Frequency
Limits for loop diameter
() a
2 m 3 m 4 m
9 ~ 70 88 81 75
70 ~ 150 88 ~ 58 b 81 ~ 51 b 75 ~ 45 b
150 ~ 3.0 58 ~ 22 b 51 ~ 15 b 49 ~ 9 b
3.0 ~ 30 22 15 ~ 16 c 9 ~ 12 c
a At the transition frequency, the lower limit applies.b Decreasing linearly with the logarithm of the frequency. For electrode less lamps and
luminaries, the limit in the frequency range of 2.2 ~ 3.0 is 58 () for 2 m,
51 () for 3 m, and 45 () for 4 m loop diameter.c Increasing linearly with the logarithm of the frequency.
* Margin() = Limit(()) - QuasiPeak(())
6.2.2 Used equipments
Equipment Model Serial No. Makers Next Cal. Date Used
Test Receiver ESCI 101408 R&S 2015.03.04
Triple Loop Antenna HXYZ9170 HFCD 9171-218 SCHWARZBECK -
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 16 of 62
6.2.3 Photographs of test setup
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 17 of 62
6.2.4 Radiated Electromagnetic disturbance result
* X.Y.Z ( 2m )
-10
0
10
20
30
40
50
60
70
80
90
100
9k 20 30 50 100k 200 300 500 1M 2M 3M 5M 10M 20 30M
Leve
lin
dB킕
Frequency in Hz
LOOP 2m_RE
Frequency(MHz)
Corr.(dB)
QuasiPeak(dB(µA))
Limit(dB(µA))
Margin(dB)
0.0109 0.04 10.76 88.00 77.24
0.1567 0.05 11.13 57.47 46.34
0.1792 0.06 12.94 55.88 42.94
0.2869 0.07 8.66 50.27 41.61
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 18 of 62
6.3 Radiated Emission
Test specification EN 55015:2013
Testing voltage 230 V, 50
Test facility 10 m Chamber (#F2)
Test distance 10 m
Date 2014. 12. 24
Temperature (°C) 21.7 °C Humidity (% R.H.) 21.1 % R.H.
Remarks Complied
6.3.1 Limits of radiated emission measurement
Frequency
[]
Quasi-peak limits
((/m))*
30 ~ 230 30
230 ~ 300 37
*: At the transition frequency, the lower limit applies.
6.3.2 Measurement procedure
The test was done at a 10 m chamber with a quasi-peak detector. EUT was placed on a non-metallic
table height of 0.8 m above the reference ground plane. Cables were folded back and forth forming a
bundle 0.3 m to 0.4 m long and were hanged at a 0.4 m height to the ground plane.
Cables connected to EUT were fixed to cause maximum emission.
Test was made with the antenna positioned in both the horizontal and vertical planes of polarization.
The measurement antenna was varied in height above the conducting ground plane to obtain the
maximum signal strength.
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 19 of 62
6.3.3 Used equipments
Equipment Model no. Serial no. Makers Next Cal. Date Used
Test Receiver ESCI7 100732 R&S 2015.01.27
Test Receiver ESCI 100001 R&S 2015.07.14
Test Receiver ESCI 100710 R&S 2015.10.13
Test Receiver ESR 101078 R&S 2015.02.24
Bi-Log Antenna VULB 9168 440 SCHWARZBECK 2016.08.28
Amplifier 310N 284608SONOMA
INSTRUMENT2015.04.16
3 Attenuator 8491B 22981 HP 2015.03.04
Antenna Mast MA4000-EP 303 Innco Systems -
Turn Table DT2000S-1t 079 Innco Systems -
Preamplifier 8449B 3008A02343 AGILENT 2015.10.13
Horn ANT 3115 00155772 ETS 2015.02.26
Spectrum Analyzer E4407B US39010142 AGILENT 2015.10.13
6.3.4 Sample calculation
The field strength is calculated adding the antenna Factor, cable loss and, Antenna pad adding,
subtracting the amplifier gain from the measured reading.
The sample calculation is as follow:
Result = M.R + C.F(A.F + C.L +3 Att – A.G)
M.R = Meter Reading
C.F = Correction Factor
A.F = Antenna Factor
C.L = Cable Loss
A.G= Amplifier Gain
3 Att = 3 Attenuator
If M.R is 30 , A.F 12 , C.L 5 , 3 , A.G 35
The result is
30 + 12 + 5 + 3 – 35 = 15 (/m)
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 20 of 62
6.3.5 Photographs of test setup
* 30 ~ 300
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 21 of 62
6.3.6 Radiated emission measurement result
* Graph and Data
* 30 ~ 300 (PSDV160351B)
EMC Compliance Ltd.10m Chamber
24 December,2014 21:54<<Radiated Emission>>
Standard : EN55015 CLASS B 10mModel :Serial :Operator :AC Power : AC 230V / 50HzTemp,Humidity:
Remark1 :Remark2 :Remark3 :Remark4 :
30 30050 100 2000
60
10
20
30
40
50
Frequency
Level
[MHz]
[dB(uV/m)]
<15 >Limit(QP)
<RE>Spectrum(H,PK)Spectrum(V,PK)Suspected Item(H)Suspected Item(V)Final Item(H,QP)Final Item(V,QP)
Final Result
No. Frequency (P) Reading c.f Result Limit Margin Height Angle RemarkQP QP QP QP
[MHz] [dB(uV)] [dB(1/m)] [dB(uV/m)] [dB(uV/m)] [dB] [cm] [deg]1 53.038 V 35.1 -12.9 22.2 30.0 7.8 100.0 178.72 58.858 H 26.8 -13.3 13.5 30.0 16.5 100.0 171.73 60.676 V 39.1 -13.4 25.7 30.0 4.3 192.0 299.44 63.950 V 35.2 -13.6 21.6 30.0 8.4 100.0 237.05 166.285 V 34.0 -11.8 22.2 30.0 7.8 100.0 138.36 196.355 H 34.0 -14.3 19.7 30.0 10.3 400.0 328.3
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 22 of 62
6.4 Harmonics
Test specification EN 61000-3-2:2013
Testing voltage 230 V, 50
Test facility Immunity area
Date 2015. 01. 02
Temperature(°C) 21.4 °C Humidity (% R.H.) 23.2 % R.H. Pressure () 101.2
Remarks Complied
6.4.1 Measurement procedure
Theequipment is supplied in serieswith shunt(s) Rmor current transformer(s)from asourcehavingthesamenominal
voltageand frequencyas the rated supplyvoltageand frequencyof theequipment. Measurements shallbemadeunder
normal load, or conditionsfor adequateheatdischarge, andunder normaloperatingconditions. User’soperation controls
or automaticprogrammers shallbeset toproduce themaximumharmoniccomponent, for each successiveharmonic
component in turn.For thepurposeof harmoniccurrent limitation, equipment is classified asfollows :
ClassA: Equipmentnotspecified in oneof the threeother Classesshallbeconsidered as ClassAequipment.
- Balanced three-phaseequipment;
- Household appliances excludingequipment identified as Class D;
- Tools excludingportable tools;
- Dimmers for incandescent lamps;
- Audio equipment.
Class B:Portable tools;Arcweldingequipmentwhich isnotprofessionalequipment.
Class C :Lightingequipment.
Class D:Equipmenthavingaspecified power accordingto 6.2.2 less thanor equal to
600w,of thefollowingtypes:
- Personalcomputers and personalcomputermonitors;
- Televisionreceivers.
6.4.2 Used equipments
Equipment Model no. Serial no. Makers Next Cal. date Used
DIGITAL POWERANALYZER
DPA500N P1303109855 EM TEST 2015.08.27
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 23 of 62
6.4.3 Photographs of test setup
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 24 of 62
6.4.4 Measurement result
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 25 of 62
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 26 of 62
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 27 of 62
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 28 of 62
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 29 of 62
6.5 Flicker
Test specification EN 61000-3-3:2013
Testing voltage 230 V, 50
Test facility Immunity area
Date 2015. 01. 02
Temperature(°C) 21.4 °C Humidity (% R.H.) 23.2 % R.H. Pressure () 101.2
Remarks Complied
6.5.1 Measurement procedure
EUT was connected to the power analyzer system.
Measurement was performed to obtain the desired flicker parameters.
The measuring time depends on which parameters are to be measured.
Plt = 2 h
Pst = 10 min
Controls and automatic programs shall be set to produce the most unfavorable sequence of voltage
changes, using only those combinations of controls and programs are mentioned by the manufacturer
in the instruction manual.
6.5.2 Used equipments
Equipment Model no. Serial no. Makers Next Cal. date Used
DIGITAL POWERANALYZER
DPA500N P1303109855 EM TEST 2015.08.27
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 30 of 62
6.5.3 Photographs of test setup
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 31 of 62
6.5.4 Measurement result
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 32 of 62
6.6 Electrostatic Discharge
Test specification EN 61000-4-2:2009, Criteria : B
Test level
Contact: ± 4
Air: ± 2 , ± 4 , ± 8
HCP: ± 2 , ± 4
VCP: ± 2 , ± 4
Discharge impedance 330 Ω / 150
Number of discharge(Each polarity)
Contact: 10 Air: 10 HCP / VCP: 10
Interval betweendischarges
1 s
Testing voltage 230 V, 50
Test facility Shielded room
Date 2014. 12. 29
Temperature(°C) 24.0 °C Humidity (% R.H.) 37.4 % R.H. Pressure () 101.1
RemarksComplied- A: There was no change of operation status during above testing.*Lux Meter: Before (31.26 klux) / After(31.26 klux)
6.6.1 Measurement procedure
A ground reference plane was located on the floor, and connected to earth via a low Impedance
connection. The return cable of the ESD generator was connected to the reference plane. In case of
floor standing equipment, EUT was placed on the reference plane on 0.1 m of insulating Support. In
case of table top equipment, EUT was placed on a wooden table 0.8 m above the reference grounded
floor. A horizontal coupling plane (HCP) was placed on the table, and Connected to the reference
plane via a 470 resistor located in each end (0.5 insulating support between EUT and HCP).
In both cases a vertical coupling plane(VCP) OF 0.5 X 0.5 m was located 0.1 m from the EUT’s
sides. The VCP was connected to the reference plane in the same matter as the HCP.
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 33 of 62
6.6.2 Used equipments
Equipment Model No. Serial No. Makers Next Cal. Date Used
ESD Tester PESD-1600 H011 309 HAEFELY 2015.06.30
ESD Tester NSG 437 182 TESEQ 2015.04.09
HCP - - - -
VCP - - - -
Light Meter 1335 90501870 TES 2015.09.23
6.6.3 Photographs of test setup
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 34 of 62
6.6.4 Measurement result
Electrostatic Discharge (Test Point) Air discharge
Contact discharge
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 35 of 62
HCP/VCP discharge
Location(EUT) Applied level (±) Result
HCP (All 4 sides) ± 2 , ± 4 A
VCP (All 4 sides) ± 2 , ± 4 A
Contact discharge
Location(EUT) Applied level (±) Result- - - -
Air discharge
Location(EUT) Applied level (±) Result
A1 Enclosure(Case) ± 2 , ± 4 , ± 8 A
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 36 of 62
6.7 Radio Frequency Electromagnetic Fields
Test specification EN 61000-4-3:2006+A2:2010, Criteria : A
Tested frequency 80 ~ 1
Test level &Modulation
3 V/m, 80 % Amplitude Modulation (1 )
Frequency Step log 1 % step
Dwell time 3 s
Distance 3 m from EUT to tip of antenna
Testing Voltage 230 V, 50
Test facility Fully anechoic chamber (3 m)
Date 2015. 01. 02
Temperature(°C) 19.6 °C Humidity (% R.H.) 15.0 % R.H. Pressure () 101.1
RemarksComplied- A: There was no change of operation status during above testing.*Lux Meter: Before (30.59 klux) / After(30.59 klux)
6.7.1 Measurement procedure
The test was performed at 3 m full anechoic chamber.
For floor standing equipment, the EUT was standing on the floor.
For tabletop equipment, the EUT was located on a wooden table 0.8 m above the floor.
The EUT was tested all sides, horizontal and vertical polarization.
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 37 of 62
6.7.2 Used equipments
Equipment Model no. Serial no. Makers Next Cal. date Used
Power meter PM2002 302852 AR 2015.09.23
Power sensor PH2000 303224 AR 2015.09.23
Power sensor PH2000 311217 AR 2015.09.23
Directional coupler DC6180 303976 AR 2015.09.23
Signal generator E4421B GB40052295 AGILENT 2015.09.23
Broadband Amplifier BBA100 100996-1 R&S 2015.02.06
Log Periodic DipoleAntenna
LPDA-0803 - ETS -
Isotropic Probe HI-6105 156301ETS-LINDGR
EN2015.07.14
Antenna master - - ETS -
6.7.3 Photographs of test setup
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 38 of 62
6.7.4 Measurement result
Location(EUT) Antenna polarization Result
Front sideHorizontal A
Vertical A
Rear sideHorizontal A
Vertical A
Left sideHorizontal A
Vertical A
Right sideHorizontal A
Vertical A
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 39 of 62
6.8 Electric Fast Transient/BURST
Test specification EN 61000-4-4:2012, Criteria : B
Coupling
AC main
DC Line
Control: Clamp
Telecommunication: Clamp
Test level
AC main: ± 1 Peak
DC Line: ± 0.5 Peak
Control: ± 0.5 Peak
Telecommunication: ± 0.5 Peak
Repetition frequency 5 , Tr/Th = 5 / 50
Coupling time(Minimum)
120 s
Testing Voltage 230 V, 50
Test facility Shielded room
Date 2014. 12. 30
Temperature(°C) 22.9 °C Humidity (% R.H.) 41.0 % R.H. Pressure () 101.3
Remarks
Complied- A: There was no change of operation status during above testing.* AC main_Lux Meter : Before (31.33 klux) / After(31.34 klux)* DC Line_Lux Meter: Before (30.95 klux) / After(30.96 klux)
6.8.1 Measurement procedure
A ground reference plane was located on the floor.
EFT generator was connected to reference ground plane via low impedance connection.
For floor standing equipment, EUT was placed on a 0.1 m wooden table.
For tabletop equipment, EUT was placed on a 0.1 m above the ground reference plane.
Test generator and coupling/decoupling network was placed on, and bounded to, the
ground reference plane. When using the coupling clamp, the minimum distance between
the coupling plates and all other conductive surfaces, except the ground reference plane
beneath the coupling clamp, Shall be 0.5 m.
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 40 of 62
6.8.2 Used equipments
Equipment Model no. Serial no. Makers Next Cal. date Used
Ultra compact simulator UCS 500N5T P1317117973 EM TEST 2015.11.10
Capacitive coupling clamp HFK P1411132494 EM TEST 2015.04.21
Light Meter 1335 90501870 TES 2015.09.23
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 41 of 62
6.8.3 Photographs of test setup
* AC main
* DC Line
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 42 of 62
6.8.4 Measurement result
* AC main
Coupling point (+) (-) Result
L+N + 1 - 1 A
* DC Line
Coupling point (+) (-) Result
DC + 0.5 - 0.5 A
* Control
Coupling point (+) (-) Result
- - - -
* Telecommunication
Coupling point (+) (-) Result
- - - -
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 43 of 62
6.9 Surge
Test specification EN 61000-4-5:2014, Criteria : B
CouplingAC main: Direct
Control: Direct / CDN
Test level
AC main: Differential mode: ± 0.5 , ± 1
Common mode: ± 0.5 , ± 1 , ± 2
Control: ± 0.5 , ± 1
Coupling ImpedanceDifferential mode: 18
40 Ω + 0.5 Common mode: 10 Ω + 9 Direct
Surge pulse shape Tr/Th = 1.2 / 50
Angles (+) 90 °, (-) 270 °
Number of surge 5
Coupling time 1 min
Testing Voltage 230 V, 50
Test facility Shielded room
Date 2014. 12. 30
Temperature(°C) 22.9 °C Humidity (% R.H.) 41.0 % R.H. Pressure () 101.3
RemarksComplied- A: There was no change of operation status during above testing.*Lux Meter: Before (31.36 klux) / After(31.35 klux)
6.9.1 Measurement procedure
A ground reference plane was located on the floor. SURGE generator was connected to
reference ground plane via low impedance connection. For floor standing equipment & table top
equipment, EUT was placed on a wooden table.
6.9.2 Used equipments
Equipment Model no. Serial no. Makers Next Cal. date Used
Ultra compact simulator UCS 500N5T P1317117973 EM TEST 2015.11.10
CDN CNV 508 N1 V1108108861 EM TEST 2015.09.30
Light Meter 1335 90501870 TES 2015.09.23
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 44 of 62
6.9.3 Photographs of test setup
6.9.4 Measurement result
* AC main
Coupling point (+) (-) Result
L-N + 0.5 , + 1 - 0.5 , - 1 A
* Control
Coupling point (+) (-) Result
- - - -
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 45 of 62
6.10 Conducted Immunity
Test specification EN 61000-4-6:2014, Criteria : A
Tested frequency 0.15 ~ 80
Test level & Modulation 3 V, 80 % Amplitude Modulation (1 )
Frequency Step log 1 % step
Dwell time 3 s
Coupling method
AC main: CDN(M2)
DC Line: CDN(M2)
Control: Clamp
Telecommunication: Clamp
Testing Voltage 230 V, 50
Test facility Shielded room
Date 2014. 12. 30
Temperature(°C) 22.8 °C Humidity (% R.H.) 39.8 % R.H. Pressure () 101.3
Remarks
Complied- A: There was no change of operation status during above testing.* AC main_Lux Meter: Before (31.28 klux) / After(31.27 klux)* DC Line_Lux Meter: Before (30.88 klux) / After(30.88 klux)
6.10.1 Measurement procedure
A ground reference plane was located on the floor.
The test was performed on a ground reference plane on a 0.1 m wooden table.
This test were performed using CDN for mains, clamp for signal and injection probe.
The frequency range was swept from 0.15 to 80 . This frequency range was
Modulated with 1 sine wave at 80 %.
The signal generators provided the modulated frequency at a 1 % step size.
The power and all network cable, I/O cables longer than 3 m length were tested.
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 46 of 62
6.10.2 Used equipments
Equipment Model no. Serial no. Makers Next Cal. date Used
ContinuousWave Simulator
CWS500N1.4 P1409132195 EM TEST 2015.05.13
CDN CDN M2/M3 P1402128648 EM TEST 2015.05.10
CDN CDN M2/M3 P1402128649 EM TEST 2015.05.10
Attenuator ATT6/80 P1402129094 EM TEST 2015.05.10
ElectromagneticInjection Clamp
EM101 36197 Liithi 2015.05.13
CDN CDN S1-75 P1404129801 EM TEST 2015.05.10
CDN CDN-T8-RJ45 P1404129872 EM TEST 2015.05.10
Light Meter 1335 90501870 TES 2015.09.23
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 47 of 62
6.10.3 Photographs of test setup
* AC main
* DC Line
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 48 of 62
6.10.4 Measurement result
* AC main
Coupling point Coupling method Result
Power CDN(M2) A
* DC Line
Coupling point Coupling method Result
DC CDN(M2) A
* Control
Coupling point Coupling method Result
- - -
* Telecommunication
Coupling point Coupling method Result
- - -
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 49 of 62
6.11 Magnetic field immunity
Test specification EN 61000-4-8:2010, Criteria : A
Magnetic field strength 3 A/m (rms)
Coupling time 60 s
Frequency 50 / 60
Testing Voltage 230 V, 50
Polarization X, Y, Z
Date 2014. 12. 30
Temperature (°C) 22.9 °C Humidity (% R.H.) 41.0 % R.H. Pressure () 101.3
RemarksComplied- A: There was no change of operation status during above testing.*Lux Meter: Before (31.26 klux) / After(31.26 klux)
6.11.1 Measurement procedure
The test was performed on a ground reference plane (GRP) on a 0.8 m wooden table.The EUT was isolated 10 cm isolating support. The ground plane was connected to floor
reference ground plane via low impedance connection. The test generator was placed 3 m distancefrom the induction coil. The generator was connected reference ground plane. Preliminary verificationof equipment performances was carried out prior to applying the test magnetic field. The field wasapplied to the EUT horizontal, vertical polarization.
6.11.2 Used equipments
Equipment Model no. Serial no. Makers Next Cal. date Used
Ultra compact simulator UCS 500N5T P1317117973 EM TEST 2015.11.10
Magnetic coil MS 100 0701-03 EM TEST -
Current transformer MC 2630 113-97 EM TEST -
ELF Field Monitor ELF-66D K316093 WALKER 2015.05.08
Light Meter 1335 90501870 TES 2015.09.23
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 50 of 62
6.11.3 Photographs of test setup
6.11.4 Measurement result
Positions Polarity Test level Frequency Result
Enclosure
X
3 A/m 50/60
A
Y A
Z A
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 51 of 62
6.12 Dips and Interruptions
Test specification EN 61000-4-11:2004 , Criteria: B or C
Number of dips 3 T
Duration 60 s
Phase Zero crossing (0 °, 180 ° )
Testing Voltage 100 V, 50/60 , 240 V, 50/60
Date 2014. 12. 30
Temperature (°C) 22.9 °C Humidity (% R.H) 41.0 % R.H Pressure () 101.3
RemarksComplied*Lux Meter: Before (31.25 klux) / After(31.26 klux)
6.12.1 Measurement procedure
The dips/interruption test is only applicable to AC mains.
The dips/interruptions were applied at zero crossing.
6.12.2 Used equipments
Equipment Model no. Serial no. Makers Next Cal. date Used
Ultra compact simulator UCS 500N5T P1317117973 EM TEST 2015.11.10
Light Meter 1335 90501870 TES 2015.09.23
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 52 of 62
6.12.3 Photographs of test setup
6.12.4 Measurement result
* 100 V, 50/60 , 240 V, 50/60
Test Level(%UT)
Dip/Int.(%UT)
Duration/Period
Angle(°)
Countnumber
Result
70 % 30 % 10/25 Period 0 3T A
0 % 100 % 0.5 Period 0 / 180 3T A
Comment:
- A: There was no change of operation status during above testing. (0.5 Period, 10/25 Period)
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 53 of 62
7. E.U.T. photographs
* PSDV160351B
Front View
Rear View
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 54 of 62
Left View
Right View
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 55 of 62
Top View
Bottom View
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 56 of 62
Inside
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 57 of 62
Main Board
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 58 of 62
* PSDV160351A
Front View
Rear View
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 59 of 62
Left View
Right View
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 60 of 62
Top View
Bottom View
http://www.emc2000.co.kr
EMC Compliance Ltd. 65, Sinwon-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do, 443-390, KoreaTEL: 82 70 5008 1021 FAX: 82 505 299 8311
This test report shall not be reproduced, except in full, without the written approval.
Report No.: EMC-CE-E5336Page: 61 of 62
Inside
top related