ifm-002/pnd/ix/2014 - · pdf filepertamina’s overseas operations through pertamina ......
Post on 31-Jan-2018
219 Views
Preview:
TRANSCRIPT
Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: pnd@patranusa.com
IFM-002/PND/IX/2014
IFM-002/PND/IX/2014
Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: pnd@patranusa.com
IFM-002/PND/IX/2014
industry news update
INAMETA Platinum is GIS (Geographic information System) web portal
application, to examine oil & gas and other energy data availability in
Indonesia. INAMETA Platinum is also equipped with well log and Seismic Data
viewer.
INAMETA Platinum data consist of Working areas (oil, gas, and CBM) and the
most recent contracts, including 60 new Pertamina split areas, 60 basins, over
800 fields and 25.000 wells, more than 40.000 seismic lines, 45.000 technical
reports (geology, geophysics, geochemistry, bio-stratigraphy, reserves, and
prospects) and Oil and gas pipelines.
Government and Commission VII House of
Representatives Agreed on Macro Assumptions of
Draft State Budget 2015, which relates to Energy and
Mineral Resources, namely:
ICP US$ 105 per barrel
Total production/ oil and gas lifting 2,148,000 barrel of oil
equivalent per day, consists of oil lifting 900,000 barrel per day
and gas lifting 1,248,000 barrel per day.
Source:
Directorate General of Oil and Gas. (2014, September 15). Pemerintah dan Komisi VII Sepakati Asumsi Makro RAPBN 2015. Retrieved 2014, from http://migas.esdm.go.id/berita-kemigasan/detail/3731/Pemerintah-dan-Komisi-VII-Sepakati-Asumsi-Makro-RAPBN-2015
PT. Pertamina has successfully increased the total
production up to 11.9 percent compared to the realization in
the same period last year. Based on PT. Pertamina press release in
September 2014, in the first semester of 2014, PT. Pertamina
recorded a total production of 520,260 barrels of oil equivalent per
day (boepd). Pertamina’s overseas operations through Pertamina
International Exploration and Production and the consolidated
production of PT Pertamina Hulu Energi played the main role in this
increment of production.
Source:
PT. Pertamina. (2014, September 7). Pertamina Bukukan Produksi 520 ribu boepd. Retrieved 2014, from http://www.pertamina.com/news-room/siaran-
pers/pertamina-bukukan-produksi-520-ribu-boepd/
Draft State Budget 2015: Cost Recovery US$ 16
Billion, and Oil and Gas Revenue Target IDR
326.96 Trillion. These amounts are set by Budget Agency of
House of Representatives, wherein this cost recovery is smaller US$
16.5 billion than the Financial Memorandum Draft State Budget
2015, meanwhile oil and gas revenue target is higher IDR 23.25
trillion than the original plan which adjusted with the increment of
oil production target.
Source:
Directorate General of Oil and Gas. (2014, September 23). RAPBN 2015: Cost Recovery US$ 16 Miliar, Penerimaan Migas Rp 326,96 Triliun, Subsidi BBM Rp 276 Triliun. Retrieved 2014, from http://migas.esdm.go.id/berita-kemigasan/detail/3738/RAPBN-
2015:-Cost-Recovery-US$-16-Miliar,-Penerimaan-Migas-Rp-326,96-Triliun,-Subsidi-BBM-Rp-276-Triliun
President of Republic of Indonesia inaugurated
2 Oil and Gas Projects with the total investment
of Rp 13.6 trillion, namely Ruby Gas Field development
project (Sebuku Block) which managed by Mubadala Petroleum
and Sisi Nubi 2B (Mahakam Block) with the operator Total E&P
Indonesie.
Source:
Directorate General of Oil and Gas. (2014, September 15). Presiden Resmikan Proyek Migas Senilai Rp 13,6 Triliun. Retrieved 2014, from http://migas.esdm.go.id/berita-kemigasan/detail/3730/Presiden-Resmikan-Proyek-Migas-Senilai-Rp-13,6-Triliun
Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: pnd@patranusa.com
IFM-002/PND/IX/2014
new data available
Kampar block is located in the Central of Sumatra (onshore)
and stretches from north to south. Geologically, the northern
part of the block is included in Merbau Trend, southern part is
included in Lirik Trend, and the northern and eastern parts
bordered with Bengkalis Trough. This block has been explored
since 1959 and it covers area some of 4,545 sq km.
Data available:
351 2D seismic lines (2,657.04 km), 381 wells data, production
history and G&G data.
South and Central Sumatra Block (Kampar Block)
Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: pnd@patranusa.com
IFM-002/PND/IX/2014
Evaluation of
Data
Information
Revised
Data Relinquishment
Data
Evaluation Revised
Report Signing Data Storage
3 months (60 working days)
Notification of
obligation on PSC
Contractors to
relinquish Data
and/or PCS
Contractors took
the initiatives to
prepare
relinquishment of
Data
SKK Migas/PSC
Contractors (5
months before the
deadline)
Relinquish of Data
Information (Working
areas coordinates and
data list)
SKK Migas/PSC
Contractors
no
yes 2 weeks (10 working days)
Directorate General of Oil and Gas (DJM),
Center for Data and Information Technology on
EMR (Pusdatin ESDM)
Directorate General of Oil and Gas (DJM),
Center for Data and Information Technology on
EMR (Pusdatin ESDM)
no
yes
Center for Data and Information Technology on
EMR (Pusdatin ESDM)
PSC Contractors/SKK Migas, Directorate General of Oil and Gas (DJM),
Center for Data and Information Technology on EMR (Pusdatin ESDM)
Based on the rules and regulations, PSC
contractors are required to relinquish some
or total of their Working Areas along with
the data that obtained from the results of
the Exploration and Exploitation to the
Center of Data and Information Technology
on EMR through the Executing Agency. Data
that received from the elimination process of
some or all working areas (relinquishment/
termination) must be ensured its
completeness, so checking on data
completeness is performed.
The scope of examination of the quantity
and type of data that relinquished by the
PSC contractors are as follows:
Seismic Data
Well Data
G&G Reports and G&G Map
Study and other data
Data that received from the PSC contractors
are verified for the completeness and quality
of data, so the data verification reports can
be submitted to the Directorate of Oil and
Gas and data storage can be done.
Mechanism on Data Relinquishment of Exploration and Exploitation
Source: Pedoman Penyerahan Data Fisik Survey Umum, Eksplorasi, dan Eksploitasi Minyak dan Gas Bumi ESDM-2007
Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: pnd@patranusa.com
IFM-002/PND/IX/2014
Relinquishment and Termination activities of Indonesia oil and gas Working Areas in 2014 can be seen in the following:
SIAK 3,136.784 km 2D seismic
lines and 122 wells
Partial and Total Relinquishment
Partial and total relinquishment activities of Indonesia oil and gas
Working Areas in 2014 Status: May-August 2014
Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: pnd@patranusa.com
IFM-002/PND/IX/2014
SW BUKIT BARISAN 114.150 km 2D seismic lines
WEST TIMOR 124.251 km 2D
seismic lines
Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: pnd@patranusa.com
IFM-002/PND/IX/2014
EAST KANGEAN 476.708 km 2D seismic lines
NORTH MADURA 4,889.202 km 2D seismic lines
Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: pnd@patranusa.com
IFM-002/PND/IX/2014
WEST KAMPAR 2,142.142 km 2D
seismic lines and 6
wells
BONE 921.679 km 2D seismic lines
top related