Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.
1. Contratos, IPD
2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Integration
Agency Owner Architect
Engineers GC Subs
Predesign Schematic
Design Design
Development
Construction
Documents
Agency
Permit /
Bidding
Construction Closeout
WHO
REALIZE HOW
WHAT
Traditional
WHAT
WHO
HOW
Agency Owner Architect
Engineers GC
Subs
Conceptual-
ization
Criteria
Design Detailed
Design
Implementation
Documents
Agency Coord /
Final Buyout
Construction Closeout
REALIZE
Integrated
•Define the processes, structure and metrics up front!
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Tradicional
Multi-Party Agreement
Cons.
B101
Sub.
Dueño
Contratista Arquitecto
A201
C401 A401
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Tradicional: Limita la cooperación y la innovación
Multi-Party Agreement
Cons.
B101
Sub.
Dueño
Contratista Arquitecto
A201
C401 A401
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
No se distribuyen ni los riesgos ni las recompensas
Shared Risk/Reward
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Separate Contracts + Joining Agreement
Multi-Party Agreement
Cons.
B195
Sub.
Owner
Contractor Architect
A195
A295
C401 A401
B101 A201
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Value Proposition of Collaboration From the Construction Industry Institute – UT Austin
• Acuerdos:
Prohibido demandarse
Utilidades compartidas
• Problema?
La única alternativa es solucionarlo
• Cambios?
Reaccionar lo mas rápido posible
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Everyone Signs the Same Agreement
Full IPD
Multi-Party Agreement
Owner
Sub. Contractor Cons. Architect
Sub. Cons.
AIA C195
ConsensusDocs 300
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Multi-Party Agreement
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Value Proposition of Collaboration From the Construction Industry Institute – UT Austin
• Acuerdos:
Prohibido demandarse
Utilidades compartidas
• Problema?
La única alternativa es solucionarlo
• Cambios?
Reaccionar lo mas rápido posible
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Integration
Agency Owner Architect
Engineers GC Subs
Predesign Schematic
Design Design
Development
Construction
Documents
Agency
Permit /
Bidding
Construction Closeout
WHO
REALIZE HOW
WHAT
Traditional
WHAT
WHO
HOW
Agency Owner Architect
Engineers GC
Subs
Conceptual-
ization
Criteria
Design Detailed
Design
Implementation
Documents
Agency Coord /
Final Buyout
Construction Closeout
REALIZE
Integrated
•Define the processes, structure and metrics up front!
La Presión de la
Bomba es 2 bar
Si, pero
necesitamos
la presión
de diseño
¿De que bomba
estas hablando?
¿Te refieres a la
presión normal
de succión?
¿Entonces
cual es la
presión
minima de
succión?
Ya les dije:
2 bar
¿Te refieres a la presión minima de succión que
puede soportar la bomba o el proceso?
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Principios IPD
• Respeto y confianza mutua
• Beneficio y recompensa mutua
• Innovacion y toma de decisiones colaborativamente
• Involucramiento temprano de los participantes
• Definición temprana de metas
• Planificación intensiva
• Comunicación abierta
• Tecnología apropiada
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.
1. Contratos, IPD
2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.
1. Contratos, IPD
2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones
BIM+
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.
1. Contratos, IPD
2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones
BIM+
BIM+
BIM+ Product
Modeling
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Principios IPD
• Respeto y confianza mutua
• Beneficio y recompensa mutua
• Innovacion y toma de decisiones colaborativamente
• Involucramiento temprano de los participantes
• Definición temprana de metas
• Planificación intensiva
• Comunicación abierta
• Tecnología apropiada
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.
1. Contratos, IPD
2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones
ICE Integrated Concurrent Engineering
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Integration
Agency Owner Architect
Engineers GC Subs
Predesign Schematic
Design Design
Development
Construction
Documents
Agency
Permit /
Bidding
Construction Closeout
WHO
REALIZE HOW
WHAT
Traditional
WHAT
WHO
HOW
Agency Owner Architect
Engineers GC
Subs
Conceptual-
ization
Criteria
Design Detailed
Design
Implementation
Documents
Agency Coord /
Final Buyout
Construction Closeout
REALIZE
Integrated
•Define the processes, structure and metrics up front!
45
Integrated Concurrent Engineering (ICE) en JPL y CIFE
Propiedades: • Organización en el mismo lugar físico (Red
de conocimiento cercana) • Excelente infraestructura técnica • Métrica formales • Cultura y procesos informales
Photo thanks to JPL
Alaskan Way Viaduct Replacement
Project –Single Bore Tunnel, Seattle Wa.
Parsons
Brinckerhoff
Alaskan Way Viaduct and Seawall Replacement Program
Visualization uses:
- Communication to a non professional audience and stakeholders
Approximately 3.2 km. long; 17 mt. in diameter
Up to 65.5 mt. feet deep to the crown
Construction started in fall 2011 and will run to 2015/2016
BIM Model - Under Seattle
• Seattle Underground 3D Model:
• Used in design validation and clearance check
• Used as a design tool, contributed to design decision process
Alaskan Way Viaduct and Seawall Replacement Program
Collaborative Design Sessions
Parsons
Brinckerhoff
Computer Analysis and Visualization Environment (CAVE) Collaborative Work Environment
Tunnel Cross Section Systems Coordination: 3 sessions in 3 weeks Attendees: WSDOT, Seattle Fire Dept, PB Engineers (MEP/Structural/Civil) VDC Model used for: -Communication - all designers presented Using 3d Model not 2D drawings -Addressed all questions related to: Egress and MEP Systems, Lighting and staging Results: Traditional Process: 12 weeks VDC Process: 3 weeks
Alaskan Way Viaduct and Seawall Replacement Program
Bored Tunnel – Systems Coordination
Tunnel Cross Section Systems coordination Model Uses: -MEP Coordination -Construction Sequencing – Typical 500’ section
Alaskan Way Viaduct and Seawall Replacement Program
Bored Tunnel – Systems Coordination
Tunnel Cross Section Systems coordination Model Uses: -MEP Coordination -Construction Sequencing – Typical 500’ section
Alaskan Way Viaduct and Seawall Replacement Program
UCSF Mission Bay Hospital ICE Session
• UCSF Mission Bay Hospital
– 60,000 m2 Hospital; 23,000 m2
Edificio para pacientes; 9,000 m2
Centro de energía
– Presupuesto ~ US$ 1,600
– Plazo Dic. 2014
• Workshop VDC de planificación
integrada . 4 días. En el CIFE con 32
participantes clave del proyecto
• “Big Room” con 100 profesionales
trabajando en el proyecto (dueño,
arquitecto, ingenieros, contratistas,
subcontratistas)
Image Courtesy DPR Inc.
Image Courtesy DPR Inc.
(c) 2012 56
Mejoramiento dramático de las métricas cuando el equipo del proyecto trabaja en el mismo ambiente de trabajo utilizando VDC
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.
1. Contratos, IPD
2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones
BIM+ Product
Modeling
BIM+ Product
Modeling
ICE Integrated Concurrent Engineering
Project Objectives
BIM+ Product
Modeling
Process Modeling
ICE Integrated Concurrent Engineering
VIRTUAL DESIGN AND CONSTRUCTION
(VDC)
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.
1. Contratos, IPD
2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones
DIGITAL PROTOTYPE
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller Ing. Civil, M.Sc., Ph.D.
1. Contratos, IPD
2. BIM (Building Information Modeling) 3. BIM+ 4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction) 6. DDC (Digital Design and Construction) 7. Conclusiones
Click to edit Master title style
May 01, 2009 Slide ‹#›
Lessons learned from applied Integrated Project Delivery AIA National Convention: F32
Integration
Agency Owner Architect
Engineers GC Subs
Predesign Schematic
Design Design
Development
Construction
Documents
Agency
Permit /
Bidding
Construction Closeout
WHO
REALIZE HOW
WHAT
Traditional
WHAT
WHO
HOW
Agency Owner Architect
Engineers GC
Subs
Conceptual-
ization
Criteria
Design Detailed
Design
Implementation
Documents
Agency Coord /
Final Buyout
Construction Closeout
REALIZE
Integrated
•Define the processes, structure and metrics up front!
Tool
Set
Skill
Set
Mind
Set
Tool
Set
Skill
Set
Mind
Set
CAMBIAR EL CHIP