Jigs and procedure for ladder assembly BelleIInote #8. 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo. Updates. Design of ladder assembly jigs for layer 6 Forward DSSD(trapezoidal) assembly Backward DSSD(rectangle) assembly Booting new lab for the assembly in IPMU. Equipment - PowerPoint PPT Presentation

TRANSCRIPT

Jigs and procedure for ladder assemblyBelleIInote #8

6th Feb 2012Yoshiyuki Onuki

University of Tokyo

1

Updates

• Design of ladder assembly jigs for layer 6- Forward DSSD(trapezoidal) assembly- Backward DSSD(rectangle) assembly• Booting new lab for the assembly in IPMU. - Equipment- Handling jigs

2

Assembly flow

3

Forward part assembly

Backward part assembly

Origami part Backward part Forward part

Gluing ddge DSSD on the ribs

Placing all DSSDs on the assembly bench

Origami assembly

Gluing Origami part on the ribs

Origami PA assembly

t

Placing all DSSDs on the assembly bench

4

Forward part assembly

Backward part assembly

Origami part Backward part Forward part

Gluing ddge DSSD on the ribs

Placing all DSSDs on the assembly bench

Origami assembly

Gluing Origami part on the ribs

Origami PA assembly

t

=>Please refer B2note and past B2GM slides

Assembly-bench and Rib-jig

55

Linear bush

Assembly-bench

Linear bush pin

Rib-jig

6

Combining Assemby-bench and Rib-jig

7

Placing aligned backward DSSD

8

Placing aligned backward DSSD(rec.)

9

Placing aligned Origami DSSD(left)

10

Placing aligned Origami DSSD(left)

11

Placing aligned Origami DSSD(mid)

12

Placing aligned Origami DSSD(mid)

13

Placing aligned Origami DSSD(right)

14

Placing aligned Origami DSSD(right)

15

Placing aligned forward DSSD(tra.)

16

Placing aligned forward DSSD(tra.)

17

Picking up forward DSSD(tra.)

18

Picking up forward DSSD(tra.)

19

Picking up backward DSSD(rec.)

20

Picking up backward DSSD(rec.)

21

Picking up backward DSSD(rec.)

Forward part assembly

22

Forward part assembly

Backward part assembly

Origami part Backward part Forward part

Gluing ddge DSSD on the ribs

Placing all DSSDs on the assembly bench

Origami assembly

Gluing Origami part on the ribs

Origami PA assembly

t

23

Picked up backward DSSD(rec.)

Placing hybrid board

24

Gluing PE1 and wire bonding

25

26

Flipping DSSD with another jig

Flipping DSSD with another jig

27

Remove 1st jig

28

Gluing PE2 and wire bonding

29Then, readout of slant part is completed

Gluing edge DSSD on the ribs

30

Forward part assembly

Backward part assembly

Origami part Backward part Forward part

Gluing edge DSSD on the ribs

Placing all DSSDs on the assembly bench

Origami assembly

Gluing Origami part on the ribs

Origami PA assembly

t

Jig for gluing slant DSSD.

31

goniometer

Rotation axisRotation axis

Slant DSSD is chucked here

Edge of slant DSSD will sit on here.Þ The edge doesn’t move after the rotation.Þ Precise alignment of slant DSSD can be done in the horizontal plane on the assembly-benchÞ This jig can be applied for not only L6 but also L4,L5 ladder assembly.

Picking up forward(slant) part

32

Picking up with gluing jig

33

Picking up with gluing jig

34

Picking up with gluing jig

35

Replacing sensor supports with rib support on the rib-jig

36

Replacing sensor supports with rib support on the rib-jig

37

Replacing sensor supports with rib support on the rib-jig

38

Replacing sensor supports with rib support on the rib-jig

39

Placing ribs on the rib-jig

40

Gluing forward(slant) sensor on the ribs

41

Rotating goniometers to fit the slant angle and gluing

42

With the same way,we can applied for the backward DSSDmuch more easier(since w/o gonio rotation) 

Gluing edge DSSD on the ribs is finished

43

Origami assembly

44

Forward part assembly

Backward part assembly

Origami part Backward part Forward part

Gluing edge DSSD on the ribs

Placing all DSSDs on the assembly bench

Origami assembly

Gluing Origami part on the ribs

Origami PA assembly

t

Airex jig

45Stopper for rohacell can be used for alignment

Holes for stopper position

Gluing Rohacell

46

Origami PCB jig(Long)

47

Origami PCB jig(Short)

48

Gluing (Long)Origami PCB

49

Gluing (Short)Origami PCB

50

Gluing (Short)Origami PCB

51

52

Gluing Origami part on the ribs

53

Forward part assembly

Backward part assembly

Origami part Backward part Forward part

Gluing edge DSSD on the ribs

Placing all DSSDs on the assembly bench

Origami assembly

Gluing Origami part on the ribs

Origami PA assembly

t

Placing Origami part on the ribs

54

Gluing Origami part on the ribs

55

Picking up the ladder.

56Pulled out rib-mount through the jig. Assembly completed.

Pins

Rib-mount has the linear bush holes at back-side.

IPMU(Institute for the Physics and Mathematics of the Universe)

57

KEK

IPMU

Akihabara

Booting Lab for the assembly in IPMU.

• Automatic wire bonding machine(REBO-7S, Ultrasonic engneering Co., Ltd. ) will be delivered.

• Wire bond pull tester(Dage4000+)• Clean room(4×8m2) in class 1000.• 3D vision measuring machine which can cover

L6(Mitsutoyo, QV Apex 606, 600×650×250mm).• Glue dispenser• Some rigid tables and microscopes…• Mechanical and electorical QA system.

58

Handling assembly jigs

950mm800mm 820mm

Wire-bonder Table 3D measuring machine

• Weight of the most heaviest jig(L6Assembly bench) is about 11kg(Al).• The size is 900mm×200mm×30mm• Difficult to lift up and move on by man power

Floor

Handling assembly jigs

950mm800mm 820mm

Wire-bonder Table 3D measuring machine

• Weight of the most heaviest jig(L6Assembly bench) is about 11kg(Al).• The size is 900mm×200mm×30mm• Difficult to lift up and move on by man power • Use the Z-stages and forklift.

Z-stages

Forklift

Floor

Summary• Somehow method to assemble forward(slant) part

become much more concrete method.- Forward and backward part (DSSDs w/ hybrid board) will

be assembled and glued on the ribs at first.- The after, straight(Origami) part will be glued on the ribs.- The jigs can be used for the other layer assembly.- The design of jigs will be finish soon.• Lab for ladder assembly in IPMU- Most of the quipment will be delivered in end of March.

61

Plan

• L6 assembly-bench and rib-jig will be delivered by end of March. The other jigs will be delivered in April.

• The other equipment for full ladder assembly also will be delivered by end of March.

• Mockup production can be started soon after delivering of jigs since no wire-bonding.

• Some tuning and training is needed before the first ladder assembly for L6. The most concern is wire bonding(optimizing bonding parameters, automating, bonding QA…).