MavenThought Inc.Amir Barylko > Kanban > What’s Kanban?

AMIR BARYLKO

WHAT ISKANBAN?

MavenThought Inc.Amir Barylko > Kanban > What’s Kanban?

INTROKanban System

Pull vs PushGoals

Software ProcessExample

MavenThought Inc.Amir Barylko > Kanban > What’s Kanban?

KANBAN SYSTEM

•Kanban = Signal Card

•Kanban cards represent the capacity of the system

•Each card is a “signal”

•No work can be started unless has a card available

•The card gets attached to a work item

MavenThought Inc.Amir Barylko > Kanban > What’s Kanban?

PULL VS PUSH

New work is New work is

pulled pushed

into the system based on

into the system based on

capacity demand

MavenThought Inc.Amir Barylko > Kanban > What’s Kanban?

GOALS

•Improve your current process

•Not change roles

•Not change flow

•Easy adoption

MavenThought Inc.Amir Barylko > Kanban > What’s Kanban?

SOFTWARE PROCESS

•Cards are “virtual”

•Cards represent a work item

•The system is represented by a card “wall”

•Pull is signaled when the work-in-progress is less than the actual limit

•Often implemented with sticky notes and a board

MavenThought Inc.Amir Barylko > Kanban > What’s Kanban?

KANBAN BOARD

MavenThought Inc.Amir Barylko > Kanban > What’s Kanban?

MODEL YOUR PROCESSIdentify WorkflowDrawing the boardTime Calculation

BuffersWork Items

MavenThought Inc.Amir Barylko > Kanban > Implementation

IDENTIFY WORKFLOW

•Which states/phases can be possible?

•What are the transitions?

•Which roles are involved?

•Which are the boundaries?

MavenThought Inc.Amir Barylko > Kanban > Implementation

EXAMPLE

Analysis

Design

Coding

Testing

UAT

Deploy

MavenThought Inc.Amir Barylko > Kanban > Implementation

WORK ITEMS

•Use Cases

•User stories

•Bugs

•Change request

•Etc....

MavenThought Inc.Amir Barylko > Kanban > Implementation

BOARD / CARD WALL

•Each phase/state becomes a column

•Has a first input column (usually called backlog)

•May have a last archive form done items

•The flow goes from left to right

•By convention highest priority goes on top

MavenThought Inc.Amir Barylko > Kanban > Implementation

EXAMPLE BOARD

Input Analysis Design Coding Testing UAT Deploy

Flow

MavenThought Inc.Amir Barylko > Kanban > Implementation

LEAD TIME

•Starts when the card is added to the input queue and finishes when is delivered/deployed

Input Analysis Design Coding Testing UAT Deploy

Lead Time

MavenThought Inc.Amir Barylko > Kanban > Implementation

CYCLE TIME

•Starts when work begins on the card and finishes when the card is ready to be deployed

Input Analysis Design Coding Testing UAT Deploy

Cycle Time

MavenThought Inc.Amir Barylko > Kanban > Implementation

BUFFERS

•Identify cards that are ready

•But can’t be moved to the next phase

•Usually shown as “done”

•or marked with different color

MavenThought Inc.Amir Barylko > Kanban > Implementation

BOARD WITH BUFFERSBacklog AnalysisAnalysis CodingCoding UAT Deploy Archive

In Prog. Done In Prog. Done

MavenThought Inc.Amir Barylko > Kanban > Implementation

WORK ITEMS

•Do all the work items have the same workflow?

•How can we identify them?

•Use different colors

•Or different rows (swim lanes)

•Or both

MavenThought Inc.Amir Barylko > Kanban > Implementation

USING SWIM LANESBacklog AnalysisAnalysis CodingCoding UAT Archive

In Prog. Done In Prog. Done

Features

Bugs

Small Change

MavenThought Inc.Amir Barylko > Kanban > Implementation

WHAT GOES IN THE CARD?

•Information about the feature/request

•Number for traceability (tracking system, etc)

•Who’s assigned

•Deadline

•Other?

MavenThought Inc.Amir Barylko > Kanban > Implementation

Post-It&

Sharpie!DRAW YOUR BOARD

•Split up in teams (2 or 3)

•Identify current workflow

•Identify work items

•Draw a board

•Discuss