KESIAPAN PLN MELISTRIKI INDUSTRI SMELTER
TUMBUH BERSAMA MENUJU INDONESIA MAJU
Jakarta, 20 Desember 2019
SYAMSUL HUDADIREKTUR BISNIS REGIONAL SULAWESI & KALIMANTAN
PLN at Glance
22
Generation
Generation
Step Up
Transformer 500 KV
Step Up Transformer
150 KV
500 KV Extra High
Voltage Transmission Lines
150 KV Extra High
Voltage Transmission
500 KV/ 150 KV
Substation
150 KV/ 20 KV
Substation
Industry Customer (150 KV)
150 KV High Voltage
Transmission Lines
Industry / Business
Customer (20 KV)
20 KV
Medium
Voltage
Distribution
Lines
20 KV/ 380 V – 220 V
Substation
380 V – 220 V Low Voltage
Distribution Lines
Business / Residential
Customer (380 V- 220 V)
G E N E R AT I O N
6 1 . 3 2 7 M W
T R A N S M I S S I O N
5 6 . 8 9 9 K M S
D I S T R I B U T I O N
5 8 . 0 8 1 M VA
E L E C T R I C I T Y
R AT I O 9 8 , 8 6 %
E M P L O Y E E S
5 4 . 0 0 0
C U S T O M E R S
7 4 , 5 J U TA
Perbandingan Konsumsi Listrik Per kapitadan Konsumsi Listrik Nasional
Konsumsi Listrik Nasional
Meningkat (kWh)
Indikator kemajuan ekonomi suatu negara
diukur dari konsumsi energi per kapita. Nilai
Indonesia masih 1,06 kWh per kapita, jauh dari
angka negara tetangga sekalipun. Dengan
mengoptimalkan listrik yang tersedia,
ekonomi Indonesia akan semakin
meningkat
878918
956
1.012
1.064
Des 20182017201620152014
Konsumsi Listrik Per Kapita (MWh)
Perbandingan Negara
Sou
th K
ore
a
Sin
gap
ore
Jap
an
Ho
ngk
on
g
Mal
aysi
a
Ch
ina
Thai
lan
d
Vie
tnam
Ind
on
esia
Ind
ia
Ph
ilip
pin
es
Pak
ista
n
10,5
8,1
7,2
5,8
4,43,7
2,31,3 1,0 0,8 0,40,7
Sumber : worldbank.org
33
Kondisi Kelistrikan Sistem Besar Saat Beban Puncak TertinggiTidak Ada Pemadaman
44
Normal Sistem dikatakan normal jika cadangan daya lebih dari 30%
Cukup Sistem dikatakan cukup jika cadangan daya kurang dari 30%
Defisit Sistem dikatakan defisit jika pada saat beban puncak tertinggi, daya mampu kurang dari beban puncak
LEGEND:
DMN : Daya Mampu/PasokanBP : Beban PuncakCAD : Balance/Cadangan
Satuan MW (Megawatt)% CAD : CAD/BP
Sumatera
Batam
Bangka
Belitung
Khatulistiwa
Jawa Bali
Barito - Mahakam
Sulbagsel
Sulutenggo
Lombok
Timor
Ambon
Ternate
Sorong
Jayapura
2518
5855
8374
CAD
BP
DMN
53 258
312
CAD
BP
DMN
34
43
77
CAD
BP
DMN
61
159
219
CAD
BP
DMN
60
414
474
CAD
BP
DMN
114
438
552
CAD
BP
DMN
26 106
132
CAD
BP
DMN
11
57
68
CAD
BP
DMN
337
1.300
1.5…
CAD
BP
DMN
CAD
BP
DMN
7.969
27.973
35.942
CAD
BP
DMN
27
85 112
CAD
BP
DMN
401
478
CAD
BP
DMN
12 48
60
CAD
BP
DMN
17
36
53
CAD
BP
DMN
23
37
60
CAD
BP
DMN
NIAS62%
26%
43%
38%
Bintan
85
81 166
CAD
BP
DMN
105%
79%
28%
15%
26%
19%47%
21%25%
30%
19%
25%
32%
Bangka
1.705
1.310
395
76
BAURAN ENERGI TAHUN 2025
KAPASITAS PEMBANGKIT
56.397MW28.866MW 16.246MW 11.285MW
JARINGAN TRANSMISI
57.293KMS20.227KMS 16.246KMS 20.227KMS
KAPASITAS GARDU INDUK
124.341MVA81.758 MVA 29.140 MVA 13.563 MVA
JARINGAN DISTRIBUSI
472.795KMS213.757 kms 174.922 kms 84.116 kms
EBT 23,0%
Gas 22,0%
17,3% 45,0% 25,9%
Batubara 54,6%
BBM 0,4%
23,0% 21,5% 16,4%
59,4% 33,3% 56,3%
0,3% 0,2% 1,4%
Holding Regional Jawa-Bali-Nusa Tenggara (JBN)
Regional Kalimantan-Sulawesi-Maluku-Papua (KSMP)Regional Sumatera (SUM)
55
Rencana Penambahan Infrastruktur PLN 2019 s.d. 2028
35,3
GW20.126,1
57%
734
2%
8,7
GW4.389,0
51%
26,6
GW15.737,1
59%
Progres Pembangkit :TOTAL KAPASITAS
35.320 MW
Total yang sudah terkontrak dan PPA sebesar 33,132.7 MW
PLN IPPTOTAL
: Perencanaan
: Kontrak/Ppa Belum Konstruksi
: Pengadaan
: Konstruksi
: Slo/cod/komisioning
Kebutuhan Tambahan
Pembangkit :
7.475
6.351
2.174
6.226
2.423
7.237
3.152
10.060
7.439
12.000
10.000
8.000
6.000
4.000
2.000
12
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
KEBUTUHAN
TAMBAHAN
TRANSMISI:
790
2.5981.7651.6992.109
3.977
7.056
10.644
13.14513.509
500 kV275 kV150 kV
70 Kv
TRANSMIS
I
TOTAL
10,1354,159
41,3821,617
TOTAL 57,293
500 / 275 kV500 / 150 KV275 / 150 KV
150 / 70 KV150 / 20 KV70 / 20 KV
TRAFO TOTAL
5,25044,41810,000
1,37361,9301,370
TOTAL 124,341
Program Pembangunan Pembangkit
35.000 MW Terus Berjalan
Kebutuhan Tambahan
Gardu Induk :
3.858
PLT EBT Lain
PS
PLTA
PLTM
PLTG/MG
PLTGU
PLTP
PLTU
Jumlah
18.000
16.000
14.000
12.000
10.000
8.000
6.000
4.000
2.000
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
70 Kv
150 kV
250 Kv DC
275 kV
500 kV DC
500 kV
40.000
35.000
30.000
25.000
25.000
20.000
15.000
10.000
5.000
45.000
2019 2021 2022 2023 2024 2025 2026 2027 20282020
70/20 Kv
150/20 kV
150/70 Kv
275/150 kV
500/150 kV
500 /275 kv
66
KelistrikanRegional
Kondisi Kelistrikan Sistem Sulawesi
88
8 Oktober 2019 Sistem Sulbagsel
sudah tersambung sampai Kendari
dengan selesainya transmisi 150 KV
dari Wotu –Kendari.
oo
Kondisi Kelistrikan Sistem Sulawesi setelah interkoneksiSulsel -Sultra
99
DMN
477.7 MW
SULUTGO(Sulut, Gorontalo)
StatusAman
BP (MW)
401.2
81%
Cad (MW)
76.5
19%
Cad (MW)
395
30%
SULBAGSEL
(Sulsel, Sulbar, Sulteng, Kendari)
StatusAman
DMN
1705,8 MW
BP (MW)
1310,8
70%
KAPASITAS PEMBANGKIT
RENCANA PENAMBAHAN INFRASTRUKTUR
TAHUN 2019 S/D 2028
BAURAN ENERGI
JARINGAN TRANSMISI
GARDU INDUK
JARINGAN DISTRIBUSI
•
•
•
•
2020 2022 2024 2026 2028
501 1.160 1.931 900 930
Rencana Kapasitas Pembangkit
PELANGGAN POTENSIAL DI SULAWESI
1010
1. PT Meares Soputan Mining 40 MVA (Energize 30 MVA)
2. PT J Resource Bolaang Mongondow Energize 2 MVA
3. PT Arafura Surya Alam (J-res) MoU 15 MVA
4. KEK Bitung MoU 85 MVA5. Kawasan Wisata Likupang
24 MVA6. Boulevard 2 : 76 MVA7. The Monaco Bay : 19 MVA
1. PT Ceria Nugraha IndotamaSPJBTL 412 MVA
2. Bintang Smelter Indonesia SPJBTL 100 MVA
3. PT Macika Mineral Industri(SPJBTL 5 MVA) MOU 40 MVA
4. PT Cahaya Modern Mineral IndustriMoU 30 MVA
5. PT MBG Nikel Indonesia MoU 118 MVA
6. PT Kovalen Mining 918 MVA7. PT PBI (Mineral Bumi Nusantara)
150 MVA8. KI Pertambangan Torobulu 128 MVA9. KI Pengelola Perikanan 50 MVA10. KI Pertambangan Kapolimo 128 MVA11. PT Kinlin Nikel Industri 40 MVA12. KI Pertam Pomala 128 MVA13. PT Antam UBPN Sultra 118 MVA14. Stargate Mineral Asia 118 MVA15. PT Mandiodo 118 MVA16. PT Bishi Industri Bombana 600 MVA17. PT AMI Bombana 50 MVA
ASultra 3,251 MVASPJBTL : 517 MVAMoU: 1.106 MVA; Potensi: 1.628 MVA
Sulteng 520 MVAMoU: 170 MVA ; Potensi: 350 MVA1. PT ANG & FANG Brothers
MoU 100 MVA2. PT Sarana Mineralindo
Perkasa MoU 70 MVA3. KEK Palu : 200 MVA4. KI Morowali : 150 MVA
1. PT Tanjung Sarana Lestari: 3 MVA
2. PT Letawa: 0,8 MVA3. PT Celebes Litha Jaya: 1,1
MVA4. PT Isco Polewali: 1,1 MVA5. Maleo Town Square: 2
MVA
Gorontalo 112 MVAMoU : 112 MVA
1. PT Banyan Tumbuh Lestari / Inti Global Laksana MoU 30 MVA
2. PT Pani Bersama Tambang MoU 7 MVA
3. PT GorontaLo Minerals MoU 75 MVA
Sulut 261 MVAEnergize: 32 MVAMoU: 134 MVA ; Potensi: 95 MVA
1
3
5
9
4
1
32
4 1
4
1 23
2
67
1
3
2
7
2
8INDEKS
- : Status Pelanggan Energize
- : Status Pelanggan SPJBTL
- : Status Pelanggan MoU
- : Status Potensi Pelanggan
3
4
123
4
5
Sulbar 8 MVAPotensi: 8 MVA
6
10
11 5
67
8
9
11
12
13
11
10
Sulsel 1.037 MVAEnergize: 40 MVA, SPJBTL : 160 MVAMoU: 807 MVA ; Potensi: 30 MVA
1. PT Huadi Nickel Alloy Indonesia Energize 40MVA
2. PT Huadi Nickel Alloy Indonesia Exp160 MVA
3. PT Sinergi Mutiara Cemerlang MoU37 MVA
4. KIMA Maros MoU 37,5 MVA5. FKS Land MoU 113,5 MVA6. Center Point Of Indonesia MoU 45
MVA7. PT Vale Indonesia MoU 60 MVA8. Kawasan Industri Bantaeng MoU 400
MVA9. PT Pelindo Indonesia MoU 44 MVA10. South Sulawesi LNG MoU 40 MVA 11. PT Marsmindo Dwi Area MoU 30
MVA12. Smelter Palopo 30 MVA
5
1514
Calon pelanggan besar di Sulawesi saat ini 4.440 MVA dan
telah tersambung 72 MVA
72 677
2.329 2.161
-
2.000
4.000
ENERGIZE SPJBTL MOU POTENSI
Prosentase Potensi Pelanggan
Berdasar Provinsi SULTRA60% SULSEL
23%
SULTENG10%
SULUT5%
GORONTALO2%
SULBAR0%
Status Potensi Pelanggan sultra
ENERGIZE0%
SPJBTL14%
MOU34% POTENSI
52%
Total 49 PLG
1418
16 17
Kondisi Sistem Kalimantan
Kaltimra(Kalimantan Timur danKalimantan Utara)
Status AMAN
Kalbar(Kalimantan Barat)
Status AMAN
KalseltengKalimantan Selatan danKalimantan Tengah)
Status AMAN
Tanjung Redep
Samarinda
Balikpapan
Palangkaraya
Banjarmasin
PontianakCad (MW)59,114%
DMN474 MW
BP (MW) 414,986%
Cad (MW) 337,2 26%
BP (MW) 1300,2
74%
Keterangan : 1. BP dan DMN Sistem Khatulistiwa
terjadi tanggal 11 November 2019 2. BP dan DMN Sistem Kalimantan
(Kalseltengtim) terjadi tanggal 21 Oktober 2019
3. Sumber data : mercusuar .pln.co.id(data s.d 10 Oktober 2019)
DMN1537,4 MW
9 1111
JARINGAN TRANSMISI
KAPASITAS PEMBANGKIT
RENCANA PENAMBAHAN INFRASTRUKTUR
TAHUN 2019 S/D 2028
BAURAN ENERGI (2025)
JARINGAN TRANSMISI
GARDU INDUK
JARINGAN DISTRIBUSI
•
•
•
•
29.020
165.538
BP = Beban PuncakCad = Cadangan DayaDMP = Daya Mampu Pasok** pada subsistem termasuk transfer
2020 2022 2024 2026 2028
2.525 5.086 4.135 2.497 2.001
RENCANA TAMBAHAN PEMBANGKIT (MW)
18
MALUKU
61,74; 17%
119,2; 33%
180,95; 50%
Cadangan Operasi (MW)Beban Puncak (MW)Daya Mampu (MW)
1313
22
MALUKU UTARA
30,29; 13%
82,8; 37%
113,09; 50%
Cadangan Operasi (MW)Beban Puncak (MW)Daya Mampu (MW)
1414
SIAGA
SIAGA
BALI
JAWA TIMUR
Sistem Sumbawa – Bima
Daya Mampu 161,75 MW
Beban Siang 83 MW
Beban Malam 106 MW
Cadangan Daya 55,75 MW
NORMAL
Sistem Lombok
Daya Mampu 316,80 MW
Beban Siang 190 MW
Beban Malam 256 MW
Cadangan Daya 60,80 MW
NORMAL
Sistem Kupang/Timor
Daya Mampu 137,55 MW
Beban Siang 51,37 MW
Beban Malam 83,33 MW
Cadangan Daya 54,22 MW
NORMAL
Sistem Manggarai
Daya Mampu 36,15 MW
Beban Siang 14,72 MW
Beban Malam 27,35 MW
Cadangan Daya 8,80 MW
NORMAL
Sistem Maumere
Daya Mampu 33,07 MW
Beban Siang 10,64 MW
Beban Malam 16 MW
Cadangan Daya 17,07 MW
NORMAL
Bali
Daya Mampu 1.170 MW
Beban Siang 698 MW
Beban Malam 789 MW
Cadangan Daya 381 MW
NORMAL
Daya Mampu 8.192 MW
Beban Siang 3.950 MW
Beban Malam 4.654 MW
Cadangan Daya 3.538 MW
NORMAL
Jawa Timur
1515
KEBIJAKAN TARIFTENAGA LISTRIK
Jan-16 Jul-16 Jan-17 Nov-19Jul-15
Tarif Tegangan
Rata-Rata Turun
5%
Rendah
Menengah
Tinggi
9%
8%
1.548
1.219
1.087
1.467
1.115
997
1.467
1.115
997
Tarif Listrik Tidak Ada Kenaikan Sejak Tahun 2015
1717
INDONESIA(Rp/kWh)
THAILAND(Rp/kWh)
VIETNAM(Rp/kWh)
MALAYSIA(Rp/kWh)
PHILIPPINES(Rp/kWh)
SINGAPORE(Rp/kWh)
1,467 1,268 1,723 2,572 2,254 1,495
1,467 1,722 1,262 1,862 1,421 1,897
1,115 1,217 1,215 1,824 1,387 1,744
1,115 1,052 1,077 1,703 1,355 1,090
997 984 1,077 1,657 1,347 1,034
Okt 19 Okt 19 Okt 19 Okt 19 Okt 19 Okt 19
Rumah Tangga
Bisnis
Menengah-TR
Bisnis Besar-TM
Industri
Menengah-TM
Industri Besar-TT
JENIS PENGGUNA
PERIODE TARIF
1818
Perbandingan Tarif Listrik Negara Asean
Catatan :
- Per Oktober 2019, posisi Indonesia dalam tarif untuk industri TT merupakan yangterendah kedua setelah Malaysia, dan Singapura berada pada posisi tertinggi.
- Sedangkan untuk Industri TM, tarif di Indonesia berada urutan ketiga tertinggi. Posisivietnam berada tepat dibawah Indonesia.
2016
Indikator Kemudahan Berusaha
2017
106
1. Starting a Business
2. Dealing with Construction Permits
3. Registering Property
4. Getting Electricity
5. Paying Taxes
91
6. Getting Credit
7. Protecting Minority Investors
8. Trading Across Borders
9. Enforcing Contracts
10. Resolving Insolvency
167 151
113
123
2018
61
115
70
69
113
171
72
74
116
118
49
104
62
70
108
166
76
144
108
106
38
114
55
43
112
145
38
2019
51
73
134
112
100
33
112
44
116
146
36
4. Getting Electricity 61 49 38 33
1919
Indikator Ease of Doing Business
KEHANDALAN UNTUK PELANGGAN
2020
IBT B
T/L A
KEHANDALAN
A
Untuk memberikankehandalan, PLN dapat
menyesuaikankebutuhan akankehandalan dari
Pelanggan Smelter
KEHANDALAN
B
T/L A
KEHANDALAN A
Dipasok dari 1 TransmitionLine Sistem PLN (T/L A)
KEHANDALAN B
Dipasok dari 2 TransmitionLine Sistem PLN (T/L A danbackup T/L B)
KEHANDALAN C
Dipasok dari 2 TransmitionLine Sistem PLN (T/L A danbackup T/L B) dan terdapatPembangkit didekat lokasipelanggan
T/L B
KEHANDALAN
C
T/L BT/L A
ACO ACO
TERIMA KASIH