KOTUKU PARK, PARAPARAUMU BEACH NORTH August 2007
Reference: W07061
Kotuku Drive
Taka
he D
rive
Pateke Way
Petrel Close
Matuku Place
Manly Street
The Drive
Hana Udy Place
Kotu
ku D
rive
Kotuku Green
Dune Lookout
Lake Kotuku
ArapawhitiHistoric Reserve
Detention Pond
Lake Ngarara
Saltwater Ponds & Wetland AreaFuture low density development
Playground
Waikanae Estuary Scientific Reserve
Lake Ngarara
Boardwalk at detention pond
Kotuku Park entry signage
Asphalt walkway
Kotuku Lake
MASTERPLAN
Stage 4
Figure 1
Scale 1:2000 @ A3
KOTUKU PARK, PARAPARAUMU BEACH NORTH August 2007
Reference: W07061
View east from Dune lookout
View over Kotuku Lake to Dune Lookout
Historic interpretation at the entrance to the Historic Arapawhiti Cemetery Reserve
Boardwalk through Arapawhiti Cemetery Reserve
Boardwalk around detention pondBridge detail over Kotuku Lake
SITE PHOTOS
Lake Ngarara
Figure 2
KOTUKU PARK, PARAPARAUMU BEACH NORTH August 2007
Reference: W07061
Planting TypesA : Dry Areas Coprosma propinquaCoprosma repens Cordyline australisCortaderia toe toeGriselinea littoralisKunzea ericoides
Olearia solandri
Area C Area A
Area B
10
1
2
9
8
7
3 4
6
5
Taka
he Driv
e
Lake Ngarara
New Reserve Access
Waikanae Scientific Reserve
Limit o
f Stage 4 Contra
ct Works Area
Scale 1:1000 @ A3
Botanic Name Common Name Grade Total
Coprosma propinqua Mingimingi PB5 490
Coprosma repens Taupata PB5 305
Cordyline australis To kouka, Cabbage tree PB5 100
Cortaderia toe toe Toe Toe PB5 505
Griselinia littoralis Broadleaf PB5 115
Kunzea ericoides* Kanuka PB5 150
Leptospermum scoparium* Manuka PB5 230
Phormium tenax Harakeke PB5 1160
Olearia solandri PB5 290
Total 3345
*single 25x 25 stake
Planting Schedule
B : Damp Transition
Areas Coprosma propinquaCordyline australisCortaderia toe toeLeptospermum scopariumPhormium tenax
C: Damp Areas Coprosma propinquaCordyline australisCortaderia toe toeLeptospermum scopariumPhormium tenax
STAGE 4
Initial planting in Stage 4, September 2006.View north across proposed Stage 4 Lots Fence around perimeter of Stage 4 planting
The plants listed in the planting schedule were planted in September 2006 and are under contract with a one year maintenance period finishing 28 September 2007. Replacement planting is currently being undertaken for any losses that have occurred.
Fencing has been constructed with a gate for the new reserve access which will be constructed with the lot development and access roading for Stage 4.
Area C
Area B
Area B
Area A
Area A
Area C