lifting equation

Post on 06-Feb-2016

157 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

Lifting Equation. Tujuan. Menilai risiko LBP pada pekerjaan lifting loading Memberikan rekomendasi pencegahan LBP. Ruang Ligkup. Untuk pekerjaan lifting-loading berulang Dengan 2 tangan Tidak termasuk carrying (hanya untuk ≤ 7 feet). Jenis Risk Assessment untuk Lifting-loading. - PowerPoint PPT Presentation

TRANSCRIPT

Lifting Equation

Tujuan

• Menilai risiko LBP pada pekerjaan lifting loading

• Memberikan rekomendasi pencegahan LBP

Ruang Ligkup

• Untuk pekerjaan lifting-loading berulang• Dengan 2 tangan• Tidak termasuk carrying (hanya untuk ≤ 7 feet)

Jenis Risk Assessment untuk Lifting-loading

1. Lifting equation dari Alberta Institute (sudah dipelajari)

2. AL dan MPL (NIOSH WPG for manual lifting)3. RWL (single task & Multi Task)

NIOSH WPG for manual lifting 1981

• Pada NIOSH WPG for manual lifting 1981 dikenal :– Action Limit (AL) – Maximum Permissible Limit (MPL)

• AL & MPLo Bila beban < AL maka yang mampu mengangkat

beban adalah : > 99% pekerja Laki-laki (mayoritas)> 75% pekerja wanita (mayoritas)

o Bila beban > AL maka perlu kontrol administratif & teknik

o Bila Beban > MPL maka perlu redesign karena hanya 25% pekerja pria & < 1% pekerja wanita yg mampu menjalankan tugas ini (minoritas)

• AL (lb)= 90(6/H)(1-0.01IV-30I)(0.7+3/D)(1-F/Fmax)• MPL= 3(AL)

– H: Lokasi horizontal tangan asal mengangkat diukur dari titik tengah tubuh antara kedua tumit (Inch). Nilai minimum 6”

– V: Lokasi vertikal tangan mulai mengangkat diukur dari lantai

– D: Jarak mengangkat dari awal mengangkat sampai akhir/tujuan mengangkat (Inch). Nilai minimum 10”

– F= Frekuensi mengangkat per menit– Fmax: Frekuensi maksimum

Penerapan dalam Kasus

• Seorang pekerja melakukan pekerjaan mengangkat dan memindahkan kotak dengan frekuensi 0,2 kali/menit. Jarak horizontal (H) 18 inchi, jarak vertikal 24 inchi dan jarak destinasi 61 inchi. Berat kotak 12 lbs (lihat ilustrasi). Pekerjaan ini dilakukan > 1 jam tapi < 2 jam/ hari

• Apakah pekerjaan ini aman secara ergonomi?

Horisontal

Vertical

H

V

Horisontal

Vertical

D

Diketahui:H = 45 cm = 17,71 inch = 18 inchV = 60 cm = 23,62 inch = 24 inchD = 154 cm = 60,6 inch = 61 inch

F = 0,2 x/menitDurasi = 1,5 jamBerat = 12 lbs

• Rerata frekuensi mengangkat 0,2 kali/menit dengan lama waktu angkat > 1 jam namun kurang dari 2 jam. Note: menurut tabel Fmax =12 (hal 127 dari Guide 1981).

• AL (lb) = 90(6/H)(1-.01|V-30|)(.7+3/D)(1-F/Fmax) • H Factor = (6/18) = 0 .33 • V Factor = (1-.01|V-30|) = (1-.01|24-30|) = 0.94 • D Factor = (.7+3/D) = (.7+3/61) = .75 • F Factor = (1-F/Fmax) = (1-.2/12) = .983 • AL = 90(.33)(.94)(.75)(.983) = 20,58 lbs • MPL = 3(AL) = 3(20,58) = 61,75 lbs

• Kesimpulan: • AW = 12 lbs• AL = 20,58 lbs• AW < AL task ini bisa diterima oleh sebagian

besar pekerja tanpa menimbulkan LBP

Application Manual for the

REVISED NIOSH LIFTING EQUATION

U.S. Department of Health and Human ServicesPublic Health ServiceCenters for Disease Control and PreventionNational Institute for Occupational Safety and Health

January 1994

Thomas R. Waters, Ph.D.Vern Putz-Anderson, Ph.D.Arun Garg, Ph.D

NIOSH Work Practices Guide (WPG) for Manual Lifting berlaku Maret

1981-Juli 1993 (NIOSH Equation 1981)

Revisi dilakukan tahun 1991 dan dipublikasi Juli 1993 (Revised NIOSH

Lifting Equation)

Pada revisi disediakan evaluasi terhadap gerakan asimetris, hand

container coupling, work duration-lifting frequency

REVISED NIOSH LIFTING EQUATION

Definition of Terms

RWL (Recommended Weight Limit)Kondisi task dalam berat yang diperbolehkan untuk diangkat sebagian besar pekerja sehat dalam suatu periode waktu tertentu tanpa ada peningkatan resiko LBP yang berhubungan dengan lifting/lowering.

LI (Lifting Index)Perkiraan relatif tentang tingkat stres fisik yang berhubungan dengan manual lifting task

Kriteria :LI ≤ 1,0 (Low Risk Of LBP); LI > 1 (Moderately Stressful Task); LI > 3 (Highly Stressful Task)

RECOMMENDED WEIGHT LIMIT (RWL)

• Recomendasi NIOSH• RWL= berat beban yang masih aman untuk

dikerjakan pada waktu tertentu tanpa menimbulkan risiko gangguan sakit pinggang (LBP) (Water & Anderson 1996b)

• 6 variabel : Horizonta Load (H); Vertical Load (V), Destination (D), Angle of Asymetric (A), Frequency of Lifting (F), Coupling Classification ( C )

Rumus RWL untuk Berat (Kg), Jarak (cm)

RWL = LC X HM X VM X DM X AM X FM X CM

LC = LOAD CONSTANT =23 KgHM=HORIZONTAL MULTIPLIER = 25/HVM= Vertical Multiplier = (1 – 0,003 I(V-75)I )DM = Distance Multiplier = (0,82 + 4.5/ D )AM = Asymetric Multiplier = (1 – 0.0032A)FM = Frequency Multiplier (tabel 1)CM – Coupling Multiplier (tabel 2)

LC untuk org indonesia L= 21 kg (42 lbs) ; P = 20 kg (40 lbs)

Untuk Berat (lbs), dan jarak dalam inchi

HM = 10/H

VM = 1-(0,0075 |V-30|)

DM = 0,82+(1,8/D)

Tabel 1 Frequency MuliplierFreq. lift/min (F)

Lama Kerja Mengangkat

≤ 1 jam > 1 jam dan ≤ > 2 jam ≤ 8 jam

V < 75cm V ≥ 75cm V < 75cm V ≥ 75 V < 75 V ≥ 75

≥ 0,2 1,00 1,00 0,95 0,95 0,85 0,85

0,5 0,97 0,97 0,92 0,92 0,81 0,81

1 0,94 0,94 0,88 0,88 0,75 0,75

2 0,91 0,91 0,84 0,84 0,65 0,65

3 0,88 0,88 0,79 0,79 0,55 0,55

4 0,84 0,84 0,72 0,72 0,45 0,45

5 0,80 0,80 0,60 0,60 0,35 0,35

6 0,75 0,75 0,50 0,50 0,27 0,27

7 0,70 0,70 0,42 0,42 0,22 0,22`

8 0,60 0,60 0,35 0,35 0,18 0,18

lanjutanFreq. lift/minute (F)*

Lama Kerja Mengangkat

≤ 1 jam > 1 jam dan ≤ 2 jam > 2 jam ≤ 8 jam

**V < 75 V ≥ 75 V < 75 V ≥ 75 V < 75 V ≥ 75

9 0,52 0,52 0,26 0,26 0,00 0,15

10 0,45 0,45 0,00 0,23 0,00 0,13

11 0,41 0,41 0,00 0,21 0,00 0,00

12 0,37 0,37 0,00 0,00 0,00 0,00

13 0,00 0,34 0,00 0,00 0,00 0,00

14 0,00 0,31 0,00 0,00 0,00 0,00

15 0,00 0,28 0,00 0,00 0,00 0,00

>15 0,00 0,00 0,00 0,00 0,00 0,00*untuk frekuensi angkatan < 1 kali/5 menit , F= 0,2 lift/min

** dalam cm , diukur dari permukaan lantai

Table 5: Frequency Multiplier Table (FM) =============================================================== Work Duration ------------------------------------------------- Frequency <= 1 Hour >1 but <=2 Hours >2 but <=8 Hours Lifts/min ------------- ---------------- ---------------- (F): V<30+ V>=30 V<30 V>=30 V<30 V>=30 --------- ----- ----- ---- ----- ---- ----- <=0.2 1.00 1.00 .95 .95 .85 .85 0.5 .97 .97 .92 .92 .81 .81 1 .94 .94 .88 .88 .75 .75 2 .91 .91 .84 .84 .65 .65 3 .88 .88 .79 .79 .55 .55 4 .84 .84 .72 .72 .45 .45 5 .80 .80 .60 .60 .35 .35 6 .75 .75 .50 .50 .27 .27 7 .70 .70 .42 .42 .22 .22 8 .60 .60 .35 .35 .18 .18 9 .52 .52 .30 .30 .00 .15 10 .45 .45 .26 .26 .00 .13 11 .41 .41 .00 .23 .00 .00 12 .37 .37 .00 .21 .00 .00 13 .00 .34 .00 .00 .00 .00 14 .00 .31 .00 .00 .00 .00 15 .00 .28 .00 .00 .00 .00 >15 .00 .00 .00 .00 .00 .00 + Values of V are in inches : For lifting less frequently than once per 5 minutes, set F = 0.2 lifts/minute. ===============================================================

Tabel 2. Couplig Multiplier

Tipe coupling Cm

V < 75 cm (30 inch) V ≥ 75 cm(30 inch)

Baik (Good) 1,00 1,00

Sedang (Fair) 0,95 1,00

Jelek (Poor) 0,90 0,90

LIFTING INDEX (LI)

• ESTIMASI SEDERHANA THD RISIKO CEDERA YANG DIAKIBATKAN OLEH OVER EXERTION.

• BERDASARKAN BERAT BEBAN DAN NILAI RWL LI DPT DITENTUKAN SBB

• LI = BB / RWL ≤ 3,0• KRITERIA : LI ≤ 1,0 (LOW RISK OF LBP); LI > 1 (MODERATELY STRESSFUL TASK); LI > 3 (HIGHLY STRESSFUL TASK)

Penerapan dalam Kasus

Step 1. Measure and Record of Variables

Vertical

V

Object Weight

Hand Location VerticalDistance

(D)

Asimetric Angle Frequency Rate

Duration

Object Coupling ©

Origin Destination

Original

Destination

L (lbs)

L (max)

H V H V37

A A Lift/min (HRS) Fair

12 12 18 24 24 61 1 1 12 <1

H

By. Reny Indrayani (101042010)

Horisontal

Vertical

V

H

By. Reny Indrayani (101042010)

Coupling Type V < 30 inch V ≥ 30 inch

Good 1,00 1,00

Fair 0,95 1,00

Poor 0,90 0,90

Object Weight

Hand Location VerticalDistance

(D)

Asimetric Angle Frequency Rate

Duration

Object Coupling ©

Origin Destination

Original

Destination

L (lbs)

L (max)

H V H V

37

A A Lift/min (HRS) Fair

12 12 18 24 24 61 1 1 12 <1 0,95 1,00

Coupling Type

Table 5: Frequency Multiplier Table (FM) =============================================================== Work Duration ------------------------------------------------- Frequency <= 1 Hour >1 but <=2 Hours >2 but <=8 Hours Lifts/min ------------- ---------------- ---------------- (F): V<30+ V>=30 V<30 V>=30 V<30 V>=30 --------- ----- ----- ---- ----- ---- ----- <=0.2 1.00 1.00 .95 .95 .85 .85 0.5 .97 .97 .92 .92 .81 .81 1 .94 .94 .88 .88 .75 .75 2 .91 .91 .84 .84 .65 .65 3 .88 .88 .79 .79 .55 .55 4 .84 .84 .72 .72 .45 .45 5 .80 .80 .60 .60 .35 .35 6 .75 .75 .50 .50 .27 .27 7 .70 .70 .42 .42 .22 .22 8 .60 .60 .35 .35 .18 .18 9 .52 .52 .30 .30 .00 .15 10 .45 .45 .26 .26 .00 .13 11 .41 .41 .00 .23 .00 .00 12 .37 .37 .00 .21 .00 .00 13 .00 .34 .00 .00 .00 .00 14 .00 .31 .00 .00 .00 .00 15 .00 .28 .00 .00 .00 .00 >15 .00 .00 .00 .00 .00 .00 + Values of V are in inches : For lifting less frequently than once per 5 minutes, set F = 0.2 lifts/minute. ===============================================================

STEP 2. DETERMINE THE MULTIPLIERS

LC = 42 lbs (pekerja laki-laki, indonesia)

HM = 10/18 = 0,56

VM = 1-(0,0075 |V-30|) = 1-(0,0075 |24-30|) = 0,96

DM = 0,82+(1,8/D) = 0,82+(1,8/37) = 0,87

AM = 1

FM = 0,37

CM = 0,95

LC = 42 lbs

HM = 10/24 = 0,42

VM = 1-(0,0075 |V-30|) = 1-(0,0075 |61-30|) = 0,77

DM = 0,82+(1,8/D) = 0,82+(1,8/37) = 0,87

AM = 1

FM = 0,37

CM = 1,00

Origin Destination

Origin Destination

Step 3. Determine the RWL’s

RWL = LC . HM . VM . DM . AM . FM . CM= 42 . 0,56 . 0,96 . 0,87 . 1 . 0,37 . 0,95= 6,90 lbs

RWL = LC . HM . VM . DM . AM . FM . CM= 42 . 0,42 . 0,77 . 0,87 . 1 . 0,37 . 1,00= 4,37 lbs

RWL origin = 6,90 lbs RWL destin = 4,37 lbs

Origin Destination

Step 4. Determine the Lifting Index

LI = Object Weight / RWL= 12/6,90= 1,74

LI origin = 1,74 LI destin = 2,74

LI = Object Weight / RWL= 12/4,37= 2,74

STEP 5. COMPARE WITH THE CRITERIA

Kriteria :

LI ≤ 1,0 (Low Risk Of LBP);

LI > 1 (Moderately Stressful Task);

LI > 3 (Highly Stressful Task)

LI Origin = 1,74

LI Destination = 2,64 LI > 1 (Moderately Stressful Task)

Kesimpulan :

Pekerjaan tersebut tergolong berisiko sedang untuk

menimbulkan MSDs (LBP)

Step 6. Recommendation

Variabel Rekomendasi

H, A, Duration -

VMemperendah V destination : dengan tidak menumpuk box terlalu tinggi sehingga ketinggian V des berada di bawah bahu rata-rata pekerja (cukup hingga 5 tumpuk box saja = 50 inch)

Distance Memperkecil selisih antara V ori dengan V des

FMengurangi jumlah angkatan per menit. F=12/menit dikurangi maksimal F=8/menit

C 1 box dalam 1 kali angkat, sehingga pegangan lebih mantap

Kompensasi : waktu penyelesaian pemindahan box menjadi lebih lama (yakni dari 16,67 menit 33,34 menit)

Penerapan Rekomendasi

STEP 2. DETERMINE THE MULTIPLIERS

LC = 42 lbs

HM = 10/18 = 0,56

VM = 1-(0,0075 |V-30|) = 1-(0,0075 |24-30|) = 0,96

DM = 0,82+(1,8/D) = 0,82+(1,8/26) = 0,89

AM = 1

FM = 0,60

CM = 1,00

LC = 42 lbs

HM = 10/24 = 0,42

VM = 1-(0,0075 |V-30|) = 1-(0,0075 |50-30|) =

0,85

DM = 0,82+(1,8/D) = 0,82+(1,8/26) = 0,89

AM = 1

FM = 0,60

CM = 1,00

Origin Destination

Origin Destination

Step 3. Determine the RWL’s

RWL = LC . HM . VM . DM . AM . FM . CM= 42 . 0,56 . 0,96 . 0,89 . 1 . 0,60 . 1,00= 12,06 lbs

RWL = LC . HM . VM . DM . AM . FM . CM= 42 . 0,42 . 0,85 . 0,89 . 1 . 0,60 . 1,00= 8,01 lbs

RWL origin = 12,06 lbs RWL destin = 8,01 lbs

RWL origin = 6,90 lbs RWL destin = 4,37 lbs

Origin Destination

Step 4. Determine the Lifting Index

LI = Object Weight / RWL= 6/12,06= 0,5

LI origin = 0,5(Low Risk Of LBP)

LI destin = 0,75(Low Risk Of LBP)

LI = Object Weight / RWL= 6/8,01= 0,75

LI origin = 1,74 LI destin = 2,74

Terimakasih

top related