mp 389 mp 00 390 1690puc.sd.gov/commission/dockets/hydrocarbonpipeline/2007/hp07-001/… · 560 +...
Post on 27-Oct-2020
0 Views
Preview:
TRANSCRIPT
S_UTM14_SD_093
W_SDFWS_1365
W_SDFWS_1364
W_UTM14_AERIAL_17636
MAT
CH
LIN
E
15
60+0
0
MAT
CH
LIN
E
16
90+0
0
12
30" O.D. X 0.438" W.T., API-5LX-70 W/FBE COATING30" O.D. X 0.386" W.T., API-5LX-70 W/FBE COATING
192'12,194'
PIPELINE WARNING SIGNS 10 EACATHODIC TEST STATION 3 EAAERIAL MARKER 1 EA
PIPELINE MARKERS 0 EA
AS-BUILT ALIGNMENT
1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG.2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG.
KEYSTONE MAINLINE (NPS 30 2009) ROSWELL SECTION
SPREAD 3B DISCIPLINE 03
SHEET 13 OF 20 SHEETS
STA. 1561+04 TO STA. 1691+13
UEI
LOYS ALVIN GRAY, III SD CE9004
1835
1835-03-ML-02-013 2
266T
H S
TREE
T
MAINLINE VALVE NO. ROSWL+31_4-A0-MLV-001SEE DWG. 1835-01-ML-03-130
NATURAL GROUND
TOP OF PIPE
ML-SD-MC-0867.0000 ML-SD-MC-0868.0000
ML-SD-MC-0869.0000
ML-SD-MC-0870.0000
ML-SD-MC-0871.0000 ML-SD-MC-0872.0000
ML-SD-MC-0873.0000
ML-
SD
-MC
-087
4.00
00STA
TE H
IGH
WAY
42
432ND AVENUE
ML-SD-MC-0867.0000 ML-SD-MC-0868.0000 ML-SD-MC-0869.0000 ML-SD-MC-0870.0000 ML-SD-MC-0871.0000 ML-SD-MC-0872.0000 ML-SD-MC-0873.0000
RD
-SD
-MC
-086
8.00
00S
TATE
HIG
HW
AY
42
266T
H S
TRE
ET
RD
-SD
-MC
-087
2.00
00
432N
D A
VE
NU
ER
D-S
D-M
C-0
869.
0000
201'FBEBR.
7
1607
+60
1609
+61
236'FBE BR.
7
1620
+53
1622
+89
160'FBEBR.
7
1662
+31
1663
+91
4,656'FBE
2
1,092'FBE
2
3,724'FBE
2
1660
+13
64'FBE
1
2,722'FBE
2
1561
+04
1691
+13
MA
TCH
LIN
E
156
1+04
MA
TCH
LIN
E
169
1+13
MP389
1607
+60
9.5
' CV
R.
1629
+07
5.9
' CV
R.
1662
+61
UN
DE
RG
RO
UN
D
8
.2' C
VR
.
1690
+83
7.5
' CV
R.
1573
+48
FE
NC
E
1581
+63
FE
NC
E
1620
+82
FE
NC
E
1620
+98
UN
DE
RG
RO
UN
D
1621
+43
ED
GE
OF
RO
AD
1621
+72
CL
432N
D A
VE
NU
E16
22+1
0 E
DG
E O
F R
OA
D
1623
+61
TE
LEP
HO
NE
LIN
E
1636
+25
FE
NC
E
1649
+71
FE
NC
E
1657
+36
FE
NC
E
1663
+20
ED
GE
OF
RO
AD
1663
+44
FE
NC
E (E
LEC
TRIC
)
1690
+21
FE
NC
E
1658
+73
CL
SLO
UG
H
PO
WE
RLI
NE
1663
+11
CL
266T
H S
TRE
ET,
1663
+03
ED
GE
OF
RO
AD
1662
+81
FE
NC
E
1608
+62
CL
STA
TE
H
IGH
WA
Y 4
2
1608
+79
ED
GE
OF
RO
AD
1608
+46
ED
GE
OF
RO
AD
1608
+03
WA
TER
SU
PP
LY L
INE
1607
+64
FE
NC
E
1609
+30
UN
DE
RG
RO
UN
D
(BA
RB
ED
WIR
E)
1560
+00
1580
+55
1635
+14
1648
+60
1689
+06
1690
+00
1572
+41
FE
NC
E
1580
+55
FE
NC
E
1619
+72
FE
NC
E
1619
+88
UN
DE
RG
RO
UN
D
1620
+33
ED
GE
OF
RO
AD
1620
+62
CL
432N
D A
VE
NU
E16
21+0
0 E
DG
E O
F R
OA
D
1622
+51
TE
LEP
HO
NE
LIN
E
1635
+14
FE
NC
E
1648
+60
FE
NC
E
1656
+24
FE
NC
E
1662
+07
ED
GE
OF
RO
AD
1662
+30
FE
NC
E (E
LEC
TRIC
)
1689
+06
FE
NC
E
1661+98
1657
+60
CL
SLO
UG
H
(B
AR
BE
D W
IRE
)
PO
WE
RLI
NE
1620+62
1608
+30
1607
+52
1661
+98
CL
266T
H S
TRE
ET
1661
+89
ED
GE
OF
RO
AD
1661
+68
FE
NC
E
1607
+53
CL
STA
TE
1607
+70
ED
GE
OF
RO
AD
1607
+37
ED
GE
OF
RO
AD
1606
+94
WA
TER
SU
PP
LY L
INE
1606
+55
FE
NC
E
1608
+30
FE
NC
E
(BA
RB
ED
WIR
E)
1617
+72
P.I.
10°
24'3
1" L
T.
1623
+65
P.I.
13°
37'2
2" R
T.
1662
+88
P.I.
00°
01'0
6" R
T.
FOR VALVEASSEMBLYMATERIALSEE DWG.1835-01-ML-03-130
1660
+90
RO
SW
L+16
59+7
7 R
OS
WL+
1609
+40
FE
NC
E
PO
WE
RLI
NE
1660
+81
4.5
' CV
R.
P
OW
ER
LIN
E
1573
+46
1581
+64
1573
+74
1579
+13
1657
+37
1659
+47
1690
+21
ML-SD-MC-0874.0000
1661
+48
UN
DE
RG
RO
UN
D
MA
TCH
LIN
E
156
0+00
MA
TCH
LIN
E
169
0+00
(37)
1608
+21
UN
DE
RG
RO
UN
DP
OW
ER
LIN
E
1660
+77
26'
425
1661
+03
128'FBE
1
7 30" O.D. X 0.516" W.T., API-5LX-70 W/FBE COATING 597'425 MAINLINE VALVE ASSEMBLY
LAT. 43.529464LONG. -97.564170
1660
+51
M.P
. 390
MP390
LAT. 43.543481LONG. -97.568943
1607
+71
M.P
. 389
TEST SECTION 3B-4ILTO-027-2010
1618
+76
P.I.
02°
51'4
9" L
T.
1623
+65
P.I.
13°
37'2
2" R
T.16
24+7
5 P
.I. 1
3°37
'22"
RT.
1618
+76
P.I.
02°
51'4
9" L
T.16
19+8
5 P
.I. 0
2°51
'49"
LT.
1617
+72
P.I.
10°
24'3
1" L
T.16
18+8
1 P
.I. 1
0°24
'31"
LT.
1662
+88
P.I.
00°
01'0
6" R
T.16
64+0
1 P
.I. 0
0°01
'06"
RT.
(B
AR
BE
D W
IRE
)
(B
AR
BE
D W
IRE
)
(BA
RB
ED
WIR
E)
(B
AR
BE
D W
IRE
)
(B
AR
BE
D W
IRE
)
(B
AR
BE
D W
IRE
)
(B
AR
BE
D W
IRE
)
(B
AR
BE
D W
IRE
)
(BA
RB
ED
WIR
E)
(B
AR
BE
D W
IRE
)
(B
AR
BE
D W
IRE
)
(B
AR
BE
D W
IRE
)
(BA
RB
ED
WIR
E)
(B
AR
BE
D W
IRE
)
(BA
RB
ED
WIR
E)
(B
AR
BE
D W
IRE
)
(B
AR
BE
D W
IRE
)
1657
+07
BE
GIN
SLO
UG
H
1658
+21
EN
D S
LOU
GH
1658
+19
BE
GIN
SLO
UG
H
1659
+34
EN
D S
LOU
GH
1663
+35
TE
LEP
HO
NE
LIN
E16
62+2
2 T
ELE
PH
ON
E L
INE
P
OW
ER
LIN
E
1636
+25
1 EA
425 1835-01-ML-03-130 MAINLINE VALVE
(265
TH S
TRE
ET)
(2
65TH
STR
EE
T)
HIG
HW
AY
42
(2
65TH
STR
EE
T)(2
65TH
STR
EE
T)
1605
+07
BE
GIN
RO
CK
SH
IELD
1606
+44
EN
D R
OC
K S
HIE
LD16
06+1
6 B
EG
IN R
OC
K S
HIE
LD16
07+5
3 E
ND
RO
CK
SH
IELD
ROSWL+31_4-A0-MLV-001 (+26')
ROSWL+31_4-A0-MLV-001
FOR
CO
NTI
NU
ATIO
N S
EE
DW
G.
1835
-03-
ML-
02-0
14
FOR
CO
NTI
NU
ATIO
N S
EE
DW
G.
1835
-03-
ML-
02-0
12
31_4
-AO
-MLV
-001
31_4
-AO
-MLV
-001
M.P. 388.12 TO M.P. 390.58
LAT. 43.52935198LONG. -97.56413674
1835-01-ML-03-131 MAINLINE VALVEROSWL+31_4-A0-MLV-001
3
0
1) ALL CHAINAGES ARE IN FEET UNLESS OTHERWISE SPECIFIED.
2) DATUM ELEVATION AND PROJECTION ARE BASED ON MEAN SEA LEVEL AND NAD 83.
3) FIELD PIPE LOCATING REQUIRED TO DETERMINE PLACEMENT OF PIPELINE WITHIN PERMANENT EASEMENT.
4) UNLESS OTHERWISE NOTED, 48 INCHES MINIMUM COVER EXCEPT 36 INCHES IN AREAS OF CONSOLIDATED ROCK.
5) NO ACTUAL AS-BUILT GROUND SHOTS WERE TAKEN AT THIS LOCATION. THE PROFILE REPRESENTS A PROJECTION FROM SHOTS TAKEN AT 150' TO 250' INTERVALS.
7) THE SUBSTANTIAL CONSTRUCTION COMPLETION DATE, BASED ON CALIPER PIG RUN, WAS OCTOBER 31, 2009 FOR M.P. 343.98 TO 377.31, NOVEMBER 01, 2009 FOR M.P. 377.29 TO 403.97 AND AUGUST 17, 2009
8) ORIGINAL IN-SERVICE DATE OF THE KEYSTONE PIPELINE (PHASE 1): JUNE 30, 2010.
9) CPS CALCULATION DATE: MAY 2010.
10) ORION STATION SERIES NUMBER: 1182700.
6) THE TYPE OF COATING APPLIED TO THE FIELD WELDS DURING THE ORIGINAL CONSTRUCTION WAS TWO COMPONENT LIQUID EPOXY. THE COATING PRODUCTS USED WERE DENSO 7200 OR SPC SP-2888.
FOR M.P. 403.90 TO 422.96.
11) TO DETERMINE THE MILE POST AT A GIVEN LOCATION, ADD THE 3D STATION NUMBER FROM THIS SEGMENT TO STATION NUMBER 18931+49 AND DIVIDE BY 5280.
10/02/22
6.1'
CV
R.
2.1'
CLR
. (A
BO
VE
)
6.5'
CV
R.
1.5'
CLR
. (A
BO
VE
)
5.5'
CV
R.
CLR
. UN
K.
7.9'
CV
R.
4.0'
CLR
. (A
BO
VE
)
5.0'
CV
R.
3.0'
CLR
. (A
BO
VE
)
8.2'
CV
R.
CLR
. UN
K.
390
top related