NIE 14.2 Sources Sought Review and Timeline Kim Bowen Division Chief Integration Planning System of Systems Integration Directorate
The Army's Integration Team
Agile Process Overview
• Army
identifies and
defines gaps
and needs
based on
multiple data
sources
• Army
releases an
NIE Sources
Sought and
Gov Call for
Mature
Solutions
• Potential
Candidates go
through Lab
Testing to assess
capability and
performance
expectations
• Funding applied
at this Phase as
applicable
Decision Point 1 determines
Potential Solutions based on five
assessment criteria. Industry is
contacted on next step.
Decision Point 2 Recommended
Approved Selection List of who will
participate at NIE. Industry contacted.
• Selected
Candidates are
assigned a
sponsor who
guides them
through the prep
and rehearsal for
the NIE event
approximately 180
days.
• Selected
Candidates
participate in NIE
• Industry is
contacted within
60 days in
conjunction with
final NIE report.
• Army performs
analysis of the NIE Final
Reports
• Recommendations to
where solutions could fit
in Formations/ Echelons
• How capability will be
used
• Determine
procurement and fielding
way forward
Decision Point 3 Approved HQDA
Position on Solution Way Forward
and Procurement.
Phase 0
Define Gaps and Near
Term Requirements
Lead: TRADOC
Phase I
Solicit Potential Solutions
Lead: ASA/ALT
Phase II
Candidate Assessment
Lead: ASA/ALT
Phase III
Evaluation Preparation
Lead: BMC
Phase IV
Integrated Rehearsal
Lead: ASA/ALT
Phase V
Integrated Evaluation
Lead: BMC
Phase VI
Network Implementatio
n Plan
Lead: ARSTAF
1 2 3
30 Days 180 Days 30 Days 30 Days 75 Days
0
Decision Point 0 Approved HQDA
Position on GAP and objectives to
the next NIE .
Phase 0
Define Gaps and Near
Term Requirements
Lead: TRADOC
Phase I
Solicit Potential Solutions
Lead: ASA(ALT)
Phase II
Candidate Assessment
Lead: ASA(ALT)
Phase III
Evaluation Preparation
Lead: BMC /ATEC
Phase 0
Define Gaps and Near
Term Requirements
Lead: TRADOC
Phase I
Solicit Potential Solutions
Lead: ASA(ALT)
Phase II
Candidate Assessment
Lead: ASA(ALT)
Phase III
Evaluation Preparation
Lead: BMC /ATEC
Phase IV
Integrated Rehearsal
Lead: ASA(ALT)/ATEC
Phase V
Integrated Evaluation
Lead: BMC/ATEC
Phase VI
Network Implementati
on Plan
Lead: ARSTAF
Where we are now
Phase 0
Define Gaps and Near
Term Requirements
Lead: TRADOC
Phase I
Solicit Potential Solutions
Lead: ASA(ALT)
Phase II
Candidate Assessment
Lead: ASA(ALT)
Phase III
Evaluation Preparation
Lead: BMC /ATEC
Phase IV
Integrated Rehearsal
Lead: ASA(ALT)/ATEC
Phase V
Integrated Evaluation
Lead: BMC/ATEC
Phase VI
Network Implementati
on Plan
Lead: ARSTAF
DEC JAN 13
FEB MAR APR MAY JUN JUL AUG SEP OCT 13
NOV DEC JAN 14
FEB
1 2 3
NOV OCT 12
NIE 14.1
JUL AUG SEP OCT 13
NOV DEC JAN 14
FEB MAR APR MAY JUN JUL AUG
1 2
JUN
MAY 13 NIE 14.2
# Decision Point
DEC JAN 14
FEB MAR APR MAY JUN JUL AUG
1 2
NOV OCT 13
0
NIE 15.1
NIE 13.2 - Entering Final Assessments and DP3
Planning & Gap Development
0
Planning & Gap Development
0
SEP 13
25
3
Phase IV
Integrated Rehearsal
Lead: ASA(ALT)/ATEC
Agile Process Phases I thru V
PURPOSE: Reduce NIE Risk Assess - Integrate - Rehearse
Phase I Solicit Potential Solutions against
validated Gaps and Opportunities
• Sources Sought
• White Paper Review
• SUE TIM
Phase II Candidate Assessment of approved
solutions for readiness to Participate in the NIE
• Laboratory Evaluation
• Troops to Task
• Initial Horse Blanket Development
Phase III: Evaluation Preparation continues to
assess viability and to assist proposed solutions in
preparing for NIE
• Bull Pen
• Platform delivery
• Platform/system integration
• Spectrum management / Information
Assurance
• Validate Training Support Packages
Phase III-IV: APG Lab Based Risk Reduction
System installation, end to end thread check out,
technical validation of entire echelon performance
with realistic communications effects, and checkout
prior to executing NIE
• Laboratory Evaluation & Integration
• Assess Threads
• Rehearse entire event in the lab
• Integrate instrumentation
• System configuration and installation
Phase III- IV: Ft Bliss Integration and Rehearsal
System installation on the Vehicles , end to end system
check out, network validation and checkout prior to
executing NIE
• Vehicle Integration (Golden Vehicle )
• System configuration and installation
• Integrate instrumentation
• Build the Network in the motor pool
NIE Candidate Selection Process
Phase I Initial Proposal Review
Candidate not invited to
SUE TIM Candidate invited to
the SUE TIM
No
Yes
Was Selected
as a candidate
at DP1
Formal Notification
and final Assessment
No
Phase II Black Box Assessment /
Horseblanket/Arch & T2T
Selected as a SUE at
DP 2
Formal Final Assessment
Based on LBRR, TRADOC
Report, and ATEC Evaluation (NIE Finish + 60
Days)
No
Yes
Attend LBRR & NIE (Phase III-V)
Formal Notification
and Final Assessment
Solicitation
Does it meet Initial
Proposal Review Criteria
5
Yes
Oversight and Advisory approval
of Evaluations
Notification to come to
Bull Pen
Formal Notification
and DP1 Assessment
Final Assessments
After the NIE - Data is analyzed and recorded into reports - A summary letter and the reports are sent to participants
6
ATEC
TRADOC/ARCIC
LBRR & NIE Reports
Final Assessments
Systems Integration Report
Trouble Ticket Report
NIE Participation
FBO for Industry Day (4/18/13)
• Registration
• RSVP for Lab Tours
• Visit Requests (FV)
• Industry Day
• Lab Tours
• TIM (MITRE)
FBO for Sources Sought (6/21/13
• Test Service Agreement (FV)
• Visit Requests (FV)
• TIM (reminder)
• Labs
• Bull Pen
• Ft. Bliss
• WSMR
• Picture Badges (FV-C4ISR Campus)
• Response Requirements/Sched.
Industry Day (6/25/13)
• Gov’t. Briefings
• Q&A Sessions
• Lab Tours
• FV Sidebar (FV)
Responses Due (7/10/13)
• White Papers
• Training Packages
SUE TIM (7/22/13 - 8/1/13)
• Oral Presentation
• RFI
DP1
LWN
DP2
(8/14/13)
(9/13)
Start Ph II Lab Assess.
(Black Box) (8/26/13)
• Broker Arrangements (FV)
• Equipment Delivery
(NLT 8/26/13)
• FSAs/SMEs Available
Start LBRR Testing (1/14)
• Broker Arrangements (FV)
• Equipment Delivery
(NLT 11/13)
• FSAs/SMEs Available
Start Support of Architecture
Development (9/13)
• Horse Blanket Design
• Transport Design
Start Support of NIE
Preps (3/14)
• FSAs/SMEs Available
• VALEX
• COMMEX
• FIELDEX Start Support of
NIE Execution (4/14)
• FSAs/SMEs Available
Receive Assessment
Report – 60 Days Post NIE
• Lab Assessments
• NIE Execution Results
NIE Execution Comp. (5/14)
• Storage Media Confiscation
• Storage Media Cleansing
• Equipment Return
VF= Foreign Vendor
NIE 14.2 Industry Sources Sought Gaps
The following gaps are being sought after for evaluation in the 14.2 NIE: Gap 1: Intelligence Collection Gap 2: Interoperation with Unified Action and Coalition Partners Gap 4: Develop Home Station Capabilities Gap 5: Forcible Entry Mission Command (Ground) Gap 11: Operational Energy - Onboard Exportable Power Gap 13: Aerial Layer Network Extension Gap 14: Adaptive Exchange of Data among NetOps Management Systems Gap 17: Extend the WIN-T Infrastructure to Support Disadvantaged Users Gap 18: BDE/BN Command Post Mobility and Scalability Gap 19: Integrated Network Access Control
Blue: Govt only Gaps
14.2 Sources Sought Structure
1. Intro and Gaps Listing
3. Assessment Process
3.4 Event Schedule and
Tier 1 Schedule
4. White Paper, Presentation
5. Phase II Lab 6. LBRR
7. NIE Events 7.1 Vehicle Integration Req.
APPENDIX A White Paper Format and
Content
Attachment 2 TRL-6
Requirements
Attachment 3 NIE 14.2 Top
Level Transport Architecture
Attachment 4 Safety
Assessment Report Guidance
APPENDIX C Presentation
Format
APPENDIX D Operator
Training Plan
Attachment 5 NIE Tier 1 Schedule
Attachment 6 Foreign Vendor
Information
APPENDIX E Cooperative Technology Assessment Agreement
APPENDIX F CERDEC Test
Service Agreement
(FVO*)
Attachment 1 CSIL
Consolidated Test Plan
APPENDIX B Questionnaire Spreadsheet
2. Gap Requirements
Top Row: Key Paragraphs
Middle Row: Supporting Appendixes
Bottom Row: Key Attachments
NIE 14.2 Critical Events for Industry
Whitepaper Submission 7/10/13
Draft Training Package 7/10/13
SUE TIM Presentation @APG 7/22/13 -8/1/13
DP1 Candidate Selection 8/14/13
Selected Equipment to LAB @APG 8/19/13
(identified by oversight committee, confirmed by DP1)
DP2 Final Selection 1 to N list 9/25/13
Face to Face Meeting (Bullpen) Oct 2013
@FBTX) (RFIs and response deadline are sent with invite)
All Networked Equipment to LAB@APG Nov 2013
(delivery and lab procedures are sent with invite)
All Equipment to FBTX Dec 2013
FSR Support to FBTX Jan 2014
New Equipment Training (NET) Jan 2014
For Your System to Succeed in the NIE… …Responding to Critical Dates is a Must
Feedback is not a “Criticism” of your system. It is meant to help you understand what the Army observed of your technology to include strengths and weaknesses
Take Aways for Industry
Awareness of The Agile Process
A tool for rapid decisions by informed Senior Leadership
Designed as a step by step process through phases
Helps the Army fill significant Gaps and Objectives
Provides fairness in the selection of systems entering NIE
How to submit a White Paper
The information you provide is how we assess your readiness to come to the NIE
Clearly identify the gap your system will address
Insure you can meet key dates and equipment quantities
Submit a complete package on time
Check FedBizOps for updates and clarifications
Two way Communication is Critical
Face to Face Meetings
-Systems Under Evaluation Technical Information Meeting(SUE TIM) is the SME review of the White Paper that contributes to a mutual agreement of what comes to the NIE
-The Bull Pen is a comprehensive information exchange covering critical topics from architecture
design to spectrum management
Virtual Meetings
-Use for rapid dissemination of information (Schedule, Equipment, FSR Support, Updates)
11
Information updates are posted to: http://www.bctmod.army.mil/development_focus/index.html
Point of Contacts
Erin Tromley Deputy Division Chief, Integrated Planning System of Systems Integration Directorate BB: 586-214-5052 erin.m.tromley.civ@mail.mil
Agile Process Phase 0 – Solicitation Process Point of Contacts
Agile Process Phase I-III Selection Process Point of Contacts
Joint & International Coordination Point of Contacts
Richard VanBuskirk Lead: Solicitation Process 586-282-9898 (office) richard.j.vanbuskirk.civ@mail.mil
William E. O'Brien Lead: Selection Process 703-545-4988 (office phone) william.e.obrien10.civ@mail.mil
John Eccles Lead: Joint & International (JMNI) 443-910-1724 (cell) John.t.eccles.civ@mail.mil
Tim Dean (443) 395-1051 timothy.j.dean.civ@mail.mil
Trish Martinez Cox 703- 545-4986 (Office) patricia.r.martinezcox.civ@mail.mil
George McPherson 703-983-7412 (office) gmcphers@mitre.org george.mcpherson@us.army.mil
Steven L. Holt 443-910-3949 (cell) steven.l.holt12.ctr@mail.mil
Jacob Kay 703-545-4995 (office) jacob.m.kay.ctr@mail.mil
Barry Van Buskirk 443-395-1600 (office) barry.l.vanbuskirk.civ@mail.mil
http://www.bctmod.army.mil/development_focus/index.html
Kim Bowen Division Chief, Integrated Planning System of Systems Integration Directorate 586-282-9599 (office) Kimberly.s.bowen2.civ@mail.mil
Capability Set Acquisition
• REQUEST FOR PROPOSALS
– Army is dedicated to competitive environment and has taken action to build a Request for Proposal process for soliciting industry participation in NIE and establishing competitive production line items for future ordering opportunity post a Decision Point 3 to field a capability.
– Proposals initially go through a two-stage evaluation • Stage I is a paper review of proposal for technical acceptability (offerors found to be technically
acceptable in Stage I move to Stage II)
• Stage II is a black box assessment for product technical acceptability and evaluated prices (Offeror(s) providing best-value or offeror(s) technically acceptable low price are given a contract for participation NIE.
– RFPs will result in competitive contract awards of either a single contract or Multiple Indefinite Delivery-Indefinite Quantity contracts for a gap. Pricing will be fixed at Not-To-Exceed prices at initial award. Post NIE orders can be competed among MATO contract holders by the responsible PM on either a best value or low price technically acceptable basis.
• Post NIE proposals will be solicited from NIE contract holders. Source Selection criteria will be established by the assigned PM and product performance in NIE will serve as an evaluation factor.
– The Army is also soliciting PMs to incorporate NIE participation in to their planned acquisitions.
• Other potential methods include Engineering Change Proposal (ECP)/Modification Work Order (MWO) to an existing Program of Record or to utilize an existing Indefinite Delivery/Indefinite Quantity (IDIQ) contract, such as the Common Hardware Systems contract, to procure systems within their scope.
• The Army will maintain flexibility with methods of procurement.
• The assigned PM will be responsible for determining the most appropriate procurement vehicle for supporting a CS
RFP Status To Date
• A RFP for Vehicle Tactical Router participation in NIE 14.1 was issued in
Dec 2012 resulting in the award of six Multiple Award Task Order (MATO)
contracts on 14 Jun 2013.
• With each contract awarded an order was issued for participating in NIE 14.1.
Contractors will loan their equipment and support integration, training, and
product maintenance for NIE
• Additional orders for production units may be solicited among MATO holders
for post NIE 14.1 requirements = future NIE architecture or CS fielding
• CS fielding procurement would be the responsibility of the assigned PM not
SOSE&I.
• A RFP for an Interoperable Voice Client Software solution was released
on 22 May 2013 and closed on 21 Jun 2013. Award of a single contract
for participation in NIE 14.2 with options for production licenses is
anticipated.
• SOSE&I is collaborating with PEOs and PMs to identify and develop a
viable gap RFP candidate for 15.1.
Continued NIE Growth
NIE - Future NIE - Past
The NIE process continues to
evolve including the incorporation
of Foreign Vendor Opportunities
Foreign Participation will reinforce
competition within the Agile
Process and NIE Acquisition effort
Army
Programs
of Record
Industry
Systems
Participation
DoD Joint
Participation
Foreign
Systems
Participation
SoS Events
Milestones
-40 -37 -34 -31 -28 -25 -22 -19 -16 -13 -10 -7 -4 -1
07/22/13 08/12/13 09/02/13 09/23/13 10/14/13 11/04/13 11/25/13 12/16/13 01/06/14 01/27/14 02/17/14 03/10/14 03/31/14 04/21/14 05/12/14 06/02/14 06/23/14
4w
4/28/14
1w 1w 3w
12w
LDIF / Data Product Development
2w
4w
10/25 5/27
10/25/13
6/20 4/28
1w
Recovery
4w
Field
EX
HB/TD Design (Final) NIE
DP3 Baseline Insertion
6/14/13
Status As Of: 14-Jun-13
1w
5/23
1/6/14
3/10 1/13
1/17
5/5
12/16 1/1
2.5w
10/28
7/5/13
Candidate Responses
Due
10w
SUT/SUE NET
1/20 3/28
3/10
3/7 4/4
NIE Start
NIE Finish
6/25/13
10/28
SUE TIM
1w
COM
MEX
1w
12/2 5/23
9/13 8/26
Tech Assm’t - Lab
5/23 4/21
HB/TD
Design (Draft)
9/30
3w
RFIs to SoSI
9/27/13
Final OTP Due
12/13/13
11/15
3w 1w 1w
3/14
9w
5w
HB/CM Lock
NIE 14.1 & 15.1
10/11/13
Fund Rqst Forms
Due Form 1494 Due
9/27/13
FSRs @ FBTX /
WSMR
11/18 8/30 9/3 10/18 10/21
Instrumentation V&V
Baseline/SUE Instrument Installation
8w 4w 2w
12/13
1/13 3/7
4w
2/7 2/10
4w Vehicle Integration Design
1/10
11w
Approve Instr.
Plan
11/4/13
1w
1/20 1/31
2w
1w
12/20 2/10 5/5
3w 2w 2w 3w 11w Lab Architecture Updates
1w
6/20/14 5/23/14
C 8/14
8/21/13
DP1 - LWN Viable Cand.
List
9/25/13
C 9/18
DP2 - LWN SUT/SUE
Lock
2w
C 9/30
RFP Identify Gaps
RFP
Contract Awd VISC
11/21/12
RFP
Release
VISC
5/22/13 1/9/14
LBRR
3/17 4/4
3w
1w
2d
1/17/14
LDIF
3/10/14
ATC Artifacts Req’d
ATC
2/28/14 DIACAP
Pkg for SoSI Sponsored
SUEs
1/6/14
6/24
ID C/O and
B-Line Sys (Procure)
6/21/13
25w
NIE Final
Report
Aug-Sep
2014
Recovery/DeMod
1/13
3/7
4w
1d
SE
CD
1/17/14
End-to-End Thread
Regression Testing
Load Data Products
/ Create and Load
Radio Config Files
NIE 14.2 Tier 1 Schedule
HB Input Cutoff
10/11/13
NSWG
Aug
2014
Dev Instr.
Plan
9/30 10/11
4w
6/20 5/23
4/19/13
6/5/13
C 5/31
5/10/13
6/10/13
6/27/13
10/10/13
DP2 ACP GOSC
FICO Unit Property
Xfer Baseline/Carryover Long Lead Procurement Sole Source Procurement (25w) GSA (13w) Existing Contract (11w)
SW Lock
9/9 9/27
Golden Vehicle
Build
Fleet Vehicle
Build VALEX
Prep
Week
Pilot
NIE Final Report
4/4
SA
TE
M
12/13 12/2 Deliv SUT
SUE Sys to
FBTX
Deliv
SUE
Sys to
APG
Phase 2 Lab
Assessments
Bull Pen
Sched
Synch
Fnd
Rvw
UN
SC
2/1 AD Training Block
Leave
Deliv Int
SUT/SUE
Sys to APG
Core Network Integration
SUE & App Integration
Functional Testing
1/20 2/7
Lab Testing in Support of NIE Field Testing
LBRR Final Reports
3/10
NIE 14.1 Vehicle Integration NIE 14.1 Check Out NIE 14.1 NIE 15.1 Candidate Selection NIE 14.1 Recovery NIE 15.1 HB
Design
4/18 4/21 3/21 3/24
NIE 15.1 Vehicle Integration Design
TRIAD
Gap
Analysis
DP0 – ANC Gaps
Tech Call/Sources
Sought
Release
ARCIC Gaps
Opportunities
S.S.
HQDA Objectives
S.S. Industry
Day
Gap
Anal
Schedule
Integration
Meeting
TSARC
SUT
ID
DP0 - LWN Approved
Gaps
4/19 4/8
top related