portfolio & cv l r de bruin
Post on 02-Apr-2016
223 Views
Preview:
DESCRIPTION
TRANSCRIPT
1
Portfolio & CVRobertus de Bruin
Augustus 2014
2
3
ContentCurriculum Vitae
Portfolio
New Media Platform2014TU DelftAfstudeer studio
Geselecteerde projecten
Informeer Brussel2012TU DelftMaster 1 studio
FMR HU Utrecht2011HU UtrechtHU afstudeer project
Groei en transformatie2011TU DelftPre-Master
5
9
10
18
24
28
5
Curriculum Vitae
6
PERSOONSGEGEVENS
OPLEIDINGEN
WERKERVARING
Curriculum Vitae Robertus de Bruin, ir
Adres: Goedestraat 120 3572RX Utrecht
E-mail: debruin.robertus@gmail.comTelefoon nr.: 0630415372
Nationaliteit: NederlandsGeboortedatum: 02-02-1986
Architectenregister registratie nr.: 1.140715.017
2014 Master Architecture, Urbanism and Building sciences TU Delft
2012 Bachelor Bouwkunde Hogeschool Utrecht
2011 Pre-Master Architecture, urbanism and Building sciences TU Delft
2007 MBO Werktuigbouwkunde Scutos, Utrecht
2003 VMBO Elektrotechniek ‘tGilde,Gorinchem
2012- Robertus de Bruin Bouwwerkzaamheden [o.a. bouwaanvraag, wonningsplitsing, woningsamenvoeg ing,aanbouw, interieur ontwerp, interieurbouw en verbouw]
2012 Blauw Architecten Bachelor afstudeer stage [o.a.duurzaamheid,energie-neutraal,flexwerken]
2009 Blauw Architecten Stage [o.a.etaillering,rendering,maquettebouw,definitiefont werp, verkoop tekeningen]
7
SOFTWARE
NOMINATIES
OVERIGE INFORMATIE
Tekensoftware: Graphisoft Archicad BIM Vaardig Autodesk Revit Basis kennis Autodesk Autocad Vaardig Arkey systems Basis kennis Google Sketch-up Vaaridg
Grafisch: Indesign Vaardig Illustrator Vaardig Photoshop Vaardig Artlantis render studio Vaardig Coreldraw Basis kennis
Overig: MSOffice Vaardig
Talen: Nederlands Engels
Overige interesses: Gitaar spelen, wielrennen, surfen, muziek, meubelen bouwen.
Referenties: R.M. Lichtenberg, Architect Blauw Architecten C.A. Ter Beek, Architect Blauw Architecten
2007-2009 A&A Techniek Hoofd engineer, tekenaar, werkvoorbereider [o.a. leiding geven, machine ontwerp en ontwikkeling]
2004-2006 Diverse opleidingsgerelateerde stages [uitvoerende werkzaamheden]
2014 Archiprix NewMediaPlatform,Chicago
2012 Holland-ontwerp Award FMR Hogeschool Utrecht, Utrecht
8
9
Portfolio
10
NEW MEDIA PLATFORMPROJECT INFORMATIE
Locatie: Chicago
Datum: september 2013- juli 2014
Programma: Stedenbouwkundige visie ll New media platform
oppervlakte: 2km2 ll 10.000m2
Software: Archicad Artlantis Photoshop Illustator IndesignNominatie: Archiprix
Eindcijfer: 9
OMSCHRIJVING
De stad Chicago is een van de meest gesegregeerde steden van de Verenigde Staten, waarbij South Chicago dagelijks kampt met gangs, criminaliteit en geweld. Dit wordt o.a. in stand gehouden door de monofunctionele wijken die geen uitweg bieden aan dit bestaan. Een leeg gebied van 2 km2 tussen South Chicago en de kust van Michigan Lake biedt de mogelijkheid om hier verandering in te brengen.Om de kans van slagen van deze ontwikkeling zo groot mogelijk te maken, wordt South Chicago hier vanaf het begin bij betrok-ken. De wijk wordt versterkt met faciliteiten zoals sportcentra e.d. Tegelijkertijd zorgen incubatoren voor toestroom van nieuwe ge-bruikers. Omhieraanbijtedragenhuisvesthet‘newmediaplatform’zowelwijk gebonden culturele programma’s als ruimte voor startendeondernemers.Door het overlappende thema ‘newmedia’wordtinteractie gestimuleerd. De leegte en tevens hoofdrouting in het midden van het gebouw faciliteert deze (verticale) interactie. Daar-naast wordt de interactie op iedere verdieping verder gefaciliteerd door middel van een informeel werkplein. De gevel bestaat groten-deels uit 3d geprinte luiken die een grote rol spelen in het regelen van het binnenklimaat. Naast het regelen van de zontoetreding, vormen de luiken, wanneer ze over elkaar heen worden gesloten, eenextraisolerendelaagomhetgebouw.Opdezemanierkun-nendeextremeklimaatpieken(-30ºC)wordenopgevangen.
TU DELFT COMPLEX PROJECTS AFSTUDEER STUDIO
11
12
Public transportWork
Health
Art
Housing
EducationHolistic city
(South Works)
13
14
GSEducationalVersion
1
1
4
4
2
2
3
3
F
AA
B B
C
D
C
D
E
F
E
07
10.800 17.000 10.800
8.300
8.300
8.300
8.300
5.400
ExhibitionStorage KitchenWardrobe
Exhibitionspace
Restaurant
Foyer
GSEducationalVersion
1
1
4
4
2
2
3
3
F
AA
B B
C
D
C
D
E
F
E
05
06
10.800 17.000 10.800
8.300
8.300
8.300
8.300
5.400
Storage
Locker roomArchive
Youmediachill out
YoumediaWorkshop
Media Library
Media Library
Storage
YoumediaWorkshop
YoumediaWorkshop
YoumediaWorkshop
YoumediaStudio
1ste verdieping
2e verdieping
A
A
15
GSEducationalVersion
E
10.800 17.000 10.800
8.300
8.300
8.300
8.300
5.400
Storage Print room
Meetingroom
office
officeofficeofficeoffice
office
office
office
office
office
office
office
office office
Openoffice
square
1
1
4
4
2
2
3
3
F
AA
B B
C
D
C
D
E
F
GSEducationalVersion
1
1
4
4
2
2
3
3
F
AA
B B
C
D
C
D
E
F
E
05
06
10.800 17.000 10.800
8.300
8.300
8.300
8.300
5.400
Storage
Locker roomArchive
Youmediachill out
YoumediaWorkshop
Media Library
Media Library
Storage
YoumediaWorkshop
YoumediaWorkshop
YoumediaWorkshop
YoumediaStudio
GSEducationalVersion
E B AB B B
±0
+3.000
+7.500
+13.500
+17.500
+21.500
+25.500
+29.500
+33.500
+37.560
GSEducationalVersion
E
10.800 17.000 10.800
8.300
8.300
8.300
8.300
5.400
Storage Print room
Meetingroom
office
officeofficeofficeoffice
office
office
office
office
office
office
office
office office
Openoffice
square
1
1
4
4
2
2
3
3
F
AA
B B
C
D
C
D
E
F
GSEducationalVersion
E
10.800 17.000 10.800
8.300
8.300
8.300
8.300
5.400
Storage Print room
Meetingroom
office
officeofficeofficeoffice
office
office
office
office
office
office
office
office office
Openoffice
square
1
1
4
4
2
2
3
3
F
AA
B B
C
D
C
D
E
F
GSEducationalVersion
E
10.800 17.000 10.800
8.300
8.300
8.300
8.300
5.400
Storage Print room
Meetingroom
office
officeofficeofficeoffice
office
office
office
office
office
office
office
office office
Openoffice
square
1
1
4
4
2
2
3
3
F
AA
B B
C
D
C
D
E
F
GSEducationalVersion
E
10.800 17.000 10.800
8.300
8.300
8.300
8.300
5.400
Storage Print room
Meetingroom
office
officeofficeofficeoffice
office
office
office
office
office
office
office
office office
Openoffice
square
1
1
4
4
2
2
3
3
F
AA
B B
C
D
C
D
E
F
Doorsnede AA
5e verdieping
16
SECTION AND FACADE 1:50
GSEducationalVersion
4
01
03
04
+7.500
+13.500
+17.500
+21.500
+25.500
+29.500
+33.500
+37.560+37.746
8.300
D CD C A
17
18
INFORMEER BRUSSELPROJECT INFORMATIE
Locatie: BrusselDatum: februari - juli 2012
Programma: Informatie paviljoen Oppervlakte: 450m2
Software: Archicad Artlantis Photoshop Illustator IndesignEindcijfer: 8,5
TU DELFT MSC1 MATERIALISATION STUDIO
OMSCHRIJVING
Voor de nieuwe ontwikkeling van het Europees kwartier is een nieuw masterplan door Christian de Portzamparc ontworpen. Ech-ter,doordathetgebiedenkelzakelijkgebruiktwordtishet’savondleeg en splitst het gebied de aangrenzende wijken op in tweeën. Dit plan introduceert nieuwe routes en een programmatische di-versiteit in het gebied die de connectie met de rest van de stad versterkt.
Om de bewoners te informeren over de toekomstige ontwikkeling, wordt een tijdelijk informatiepaviljoen geplaatst. Het nieuwe pa-viljoen introduceert één van de nieuwe routes; door omhoog en omlaag te golven ontstaan er diverse binnenruimtes, dakterrassen en een openlucht theater. Zo ontstaat een heldere beweging waar men zich over, onder en doorheen kan bewegen.
Door het tijdelijke karakter van het programma zijn zoveel mogelijk duurzame en herbruikbare materialen toegepast. Zo bestaat het paviljoen uit een stalen constructie, bekleed met houten latten, die veelal in geprefabriceerde panelen kunnen worden aangebracht. Daarnaast zijn de binnenruimtes allemaal zelfstandig geklimati-seerd.
19
0
636
3.900
4.554
5.292
2.000
2.636
5.900
6.554
7.292
2.780
3.278
1.320
FACADE(curved) Beams 80x80Plywood 18mmHollow section 80x50x5Water-resistand plywood 18mmVapour permeable foilHE260ARecycled cotton isolation 100mmBeams 100x50Vapour proof foilMDF plate 18mm white
Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Isolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white
TerraceBeams 80x80Water-resistant plywoodIPE 400Beams 240x70
1 2
1:20
636
3.900
4.554
5.292
Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Isolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white
FACADE(curved) Beams 80x80Plywood 18mmHollow section 80x50x5Water-resistand plywood 18mmVapour permeable foilHE260ARecycled cotton isolation 100mmBeams 100x50Vapour proof foilMDF plate 18mm white
Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Isolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white
TerraceBeams 80x80Water-resistant plywoodIPE 400Beams 240x70
RoofBitumenFlameproof Isolation 150mmVapour proof foilHE260AMDF plate 18mm white
TerraceBeams 80x80Water-resistant plywoodIPE 400Beams 240x70
doorsnede 1:100
doorsnede 1:100
636
3.900
4.554
5.292
Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Isolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white
FACADE(curved) Beams 80x80Plywood 18mmHollow section 80x50x5Water-resistand plywood 18mmVapour permeable foilHE260ARecycled cotton isolation 100mmBeams 100x50Vapour proof foilMDF plate 18mm white
Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Isolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white
TerraceBeams 80x80Water-resistant plywoodIPE 400Beams 240x70
RoofBitumenFlameproof Isolation 150mmVapour proof foilHE260AMDF plate 18mm white
TerraceBeams 80x80Water-resistant plywoodIPE 400Beams 240x70
doorsnede 1:100
doorsnede 1:100
Programme
< 15 M
15 M - 30 M
30 M - 55M
55 M - 75 M
75 M - 100 M100 M - 200 M
Morphology Location
Existing morphology
Morphology part demolished
Morphology future with realised masterplan
Heights future with realised masterplan
rue de la loi
rue de la loi
rue de la loi
location
Scale 1:2500 | Dead end pedestrian routes
Current situation
The ongoing pedestrian routes on the Wetstraat are currently blocked by closed building blocks.
Scale 1:2500 | Connecting pedestrian routes
Current situation
Future connection
By opening up the building blocks on the Wetstraat the pedes-trian routes are connected. Important advantages are the linking of public spaces Nord and South of the Wetstraat and the redress-ing of the claustrophobic atmosphere of the Wetstraat.
Second nature: Technical networks Pedestrian and cycle traffic | PEDESTRIAn RoUTES
SCALE 1: 20.000 Current situation
The ongoing pedestrian routes on the Wetstraat are currently blocked by closed building blocks.
SCALE 1:20.000 | ConnECTInG PEDESTRIAn RoUTES
Current situation future connection
by opening up the building blocks on the Wetstraat the pedestrian routes are connected. Important advantages are the linking of public spaces nord and South of the Wetstraat and the redressing of the claustrophobic atmosphere of the Wetstraat
connecting ribbon
200
1392
Lunch room
Bar
Berging
Exposition room
Terras
Open air theatre
Interactive
exposition room
10° 10°
10°
10°
10°
16,67°
16,6
7°
16,6
7°
13,3
3°
13,3
3°
13,33
°
FACADE(curved) Beams 80x80Plywood 18mmHollow section 80x50x5Water-resistand plywood 18mmVapour permeable foilHE260ARecycled cotton isolation 100mmBeams 100x50Vapour proof foilMDF plate 18mm white
A
B
B
B
B
B
B
B
B
B
B
B
B
BB
B
B
Programmameeting room
interactive exposition space
exposition space
lunch room
Programme
connecting to the park perpendicular to the Wetstraat
connecting the roofslab to the ground level. making space for the future and presant residents
Floorplan
Section 1
Section 2 east facade
Section 1:20location connections “open block”
robertus de Bruin4111370
20
200
1392
Lunch room
Bar
Berging
Exposition room
Terras
Open air theatre
Interactive
exposition room
10° 10°
10°
10°
10°
16,67°
16,6
7°
16,6
7°
13,3
3°
13,3
3°
13,33
°
A
B
1
2
3
4
5
6
7
8
9
10
11
1213
14
15
5'
4'
1'
8'
11'
12'
21
200
1392
Lunch room
Bar
Berging
Exposition room
Terras
Open air theatre
Interactive
exposition room
10° 10°
10°
10°
10°
16,67°
16,6
7°
16,6
7°
13,3
3°
13,3
3°
13,33
°
A
B
1
2
3
4
5
6
7
8
9
10
11
1213
14
15
5'
4'
1'
8'
11'
12'
22
01
02636
3.900
4.554
5.292
Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white
A B
doorsnede 1:100
doorsnede 1:100
1.39218
109
250
1810
049
3080
738
80
R= 1592
80 18 80 813 18 135 130 100 18
FACADE(curved) Beams 80x80
Plywood 18mmHollow section 80x50x5
Water-resistand plywood 18mmVapour permeable foil
HE260ARecycled cotton insolation 100mm
Beams 100x50Vapour proof foil
MDF plate 18mm white
Terrace/roofCurved beams 80x80mmAluminium frame 30x50x3mmBeams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70mmMDF plate 18mm white
FACADEBeams 80x80
water-resistant plywood 18mmHollow section 80x50x5
Thermal separation
5'
1.392
1810
925
018
100
4930
8073
8
80
R= 1592
80 18 80 813 18 135 130 100 18
FACADE(curved) Beams 80x80
Plywood 18mmHollow section 80x50x5
Water-resistand plywood 18mmVapour permeable foil
HE260ARecycled cotton insolation 100mm
Beams 100x50Vapour proof foil
MDF plate 18mm white
Terrace/roofCurved beams 80x80mmAluminium frame 30x50x3mmBeams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70mmMDF plate 18mm white
FACADEBeams 80x80
water-resistant plywood 18mmHollow section 80x50x5
Thermal separation
5'
1.392
1810
925
018
100
4930
8073
8
80
R= 1592
80 18 80 813 18 135 130 100 18
FACADE(curved) Beams 80x80
Plywood 18mmHollow section 80x50x5
Water-resistand plywood 18mmVapour permeable foil
HE260ARecycled cotton insolation 100mm
Beams 100x50Vapour proof foil
MDF plate 18mm white
Terrace/roofCurved beams 80x80mmAluminium frame 30x50x3mmBeams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70mmMDF plate 18mm white
FACADEBeams 80x80
water-resistant plywood 18mmHollow section 80x50x5
Thermal separation
5'
1.392
1810
925
018
100
4930
8073
8
80
R= 1592
80 18 80 813 18 135 130 100 18
FACADE(curved) Beams 80x80
Plywood 18mmHollow section 80x50x5
Water-resistand plywood 18mmVapour permeable foil
HE260ARecycled cotton insolation 100mm
Beams 100x50Vapour proof foil
MDF plate 18mm white
Terrace/roofCurved beams 80x80mmAluminium frame 30x50x3mmBeams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70mmMDF plate 18mm white
FACADEBeams 80x80
water-resistant plywood 18mmHollow section 80x50x5
Thermal separation
5'1.392
1810
925
018
100
4930
8073
8
80
R= 1592
80 18 80 813 18 135 130 100 18
FACADE(curved) Beams 80x80
Plywood 18mmHollow section 80x50x5
Water-resistand plywood 18mmVapour permeable foil
HE260ARecycled cotton insolation 100mm
Beams 100x50Vapour proof foil
MDF plate 18mm white
Terrace/roofCurved beams 80x80mmAluminium frame 30x50x3mmBeams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70mmMDF plate 18mm white
FACADEBeams 80x80
water-resistant plywood 18mmHollow section 80x50x5
Thermal separation
5'
23
01
02636
3.900
4.554
5.292
Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white
A B
doorsnede 1:100
doorsnede 1:100
1810
925
018
100
5030
8073
8
900 128 24
27
80
1.39
2
Terrace/roofCurved beams 80x80
Aluminium frame 30x50x3Beams on rubber
BitumenFlameproof Isolation 150mm
Vapour proof foilHE260A
Beams 240x70MDF plate 18mm white
Prefabricated curved wood panelCurved oak beams 80x80mm
nailed on 18mm waterproof multiplex
Prefabricated steel frameworkHollow section 80x50mm
steel reinforcing strip 8mmUNP 240
Thermal separation
Adjustable steel profile for construction ofterrace structure
1810
925
018
100
5030
8073
8
900 128 24
27
80
1.39
2
Terrace/roofCurved beams 80x80
Aluminium frame 30x50x3Beams on rubber
BitumenFlameproof Isolation 150mm
Vapour proof foilHE260A
Beams 240x70MDF plate 18mm white
Prefabricated curved wood panelCurved oak beams 80x80mm
nailed on 18mm waterproof multiplex
Prefabricated steel frameworkHollow section 80x50mm
steel reinforcing strip 8mmUNP 240
Thermal separation
Adjustable steel profile for construction ofterrace structure
1810
925
018
100
5030
8073
8
900 128 24
27
80
1.39
2
Terrace/roofCurved beams 80x80
Aluminium frame 30x50x3Beams on rubber
BitumenFlameproof Isolation 150mm
Vapour proof foilHE260A
Beams 240x70MDF plate 18mm white
Prefabricated curved wood panelCurved oak beams 80x80mm
nailed on 18mm waterproof multiplex
Prefabricated steel frameworkHollow section 80x50mm
steel reinforcing strip 8mmUNP 240
Thermal separation
Adjustable steel profile for construction ofterrace structure
1810
925
018
100
5030
8073
8900 12
8 2427
80
1.39
2
Terrace/roofCurved beams 80x80
Aluminium frame 30x50x3Beams on rubber
BitumenFlameproof Isolation 150mm
Vapour proof foilHE260A
Beams 240x70MDF plate 18mm white
Prefabricated curved wood panelCurved oak beams 80x80mm
nailed on 18mm waterproof multiplex
Prefabricated steel frameworkHollow section 80x50mm
steel reinforcing strip 8mmUNP 240
Thermal separation
Adjustable steel profile for construction ofterrace structure
1810
925
018
100
5030
8073
8
900 128 24
27
80
1.39
2
Terrace/roofCurved beams 80x80
Aluminium frame 30x50x3Beams on rubber
BitumenFlameproof Isolation 150mm
Vapour proof foilHE260A
Beams 240x70MDF plate 18mm white
Prefabricated curved wood panelCurved oak beams 80x80mm
nailed on 18mm waterproof multiplex
Prefabricated steel frameworkHollow section 80x50mm
steel reinforcing strip 8mmUNP 240
Thermal separation
Adjustable steel profile for construction ofterrace structure
1810
925
018
100
5030
8073
8
900 128 24
27
80
1.39
2
Terrace/roofCurved beams 80x80
Aluminium frame 30x50x3Beams on rubber
BitumenFlameproof Isolation 150mm
Vapour proof foilHE260A
Beams 240x70MDF plate 18mm white
Prefabricated curved wood panelCurved oak beams 80x80mm
nailed on 18mm waterproof multiplex
Prefabricated steel frameworkHollow section 80x50mm
steel reinforcing strip 8mmUNP 240
Thermal separation
Adjustable steel profile for construction ofterrace structure
1810
925
018
100
5030
8073
8
900 128 24
27
80
1.39
2
Terrace/roofCurved beams 80x80
Aluminium frame 30x50x3Beams on rubber
BitumenFlameproof Isolation 150mm
Vapour proof foilHE260A
Beams 240x70MDF plate 18mm white
Prefabricated curved wood panelCurved oak beams 80x80mm
nailed on 18mm waterproof multiplex
Prefabricated steel frameworkHollow section 80x50mm
steel reinforcing strip 8mmUNP 240
Thermal separation
Adjustable steel profile for construction ofterrace structure
1810
925
018
100
5030
8073
8
900 128 24
27
80
1.39
2
Terrace/roofCurved beams 80x80
Aluminium frame 30x50x3Beams on rubber
BitumenFlameproof Isolation 150mm
Vapour proof foilHE260A
Beams 240x70MDF plate 18mm white
Prefabricated curved wood panelCurved oak beams 80x80mm
nailed on 18mm waterproof multiplex
Prefabricated steel frameworkHollow section 80x50mm
steel reinforcing strip 8mmUNP 240
Thermal separation
Adjustable steel profile for construction ofterrace structure
1810
925
018
100
5030
8073
8
900 128 24
27
80
1.39
2
Terrace/roofCurved beams 80x80
Aluminium frame 30x50x3Beams on rubber
BitumenFlameproof Isolation 150mm
Vapour proof foilHE260A
Beams 240x70MDF plate 18mm white
Prefabricated curved wood panelCurved oak beams 80x80mm
nailed on 18mm waterproof multiplex
Prefabricated steel frameworkHollow section 80x50mm
steel reinforcing strip 8mmUNP 240
Thermal separation
Adjustable steel profile for construction ofterrace structure
24
FMR HU UTRECHTPROJECT INFORMATIE
Locatie: Utrecht, Uithof
Datum: september 2011- januari 2012
Programma: Facultiet maatschapij en recht
Oppervlakte: 16.500m2
Software: Archicad Artlantis Photoshop Illustrator IndesignNominatie: holland-ontwerp Award
Eindcijfer: 8
HOGESCHOOL UTRECHT AFSTUDEER PROJECT
OMSCHRIJVING
De ambitie van dit project was om een duurzaam, energie neutraal gebouw te realiseren. Studie liet blijken dat dit niet realistisch was voor deze locatie op dit schaalniveau. Door de schaal te vergroten voor deze ontwikkeling – door de gehele Uithof incl. het medisch centrum erbij te betrekken – is het mogelijk om energiebronnen als geo-warmte toe te passen. Deze warmte wordt op ongeveer 5 km diepte uit een aquifer gehaald. Hoewel de techniek zeer kostbaar is, is het rendabel op deze schaal.
Naast het energie vraagstuk, dient de faculteit duurzamer gemaakt te worden. Om dit te bewerkstelligen is er rekening gehouden met onderwijsveranderingen,energieefficiëntieenstedenbouwkundi-ge inpassing. Zo wordt de hoofdentree verplaatst naar de hoofdas van de Uithof en wordt het interieur aangepast om toekomstige onderwijsveranderingenoptekunnenvangen.Specifiek,wordenonderwijsruimtes kleiner gemaakt en collegezalen groter. Tevens worden er meer zelfstandige werkplekken gerealiseerd voor stu-denten?enzullen(gast)docentengebruikmakenvanflexplekkenomderuimteefficiëntertegebruiken.
25
6.1 Noordgevel vanaf het westen
63
26
Projectnaam
Adres
Opdrachtgever
TekeningnummerFormaat Schaal Datum
FACULTEIT MAATSCHAPPIJ EN RECHT
HEIDELBERGLAAN 7, UTRECHT
A1 1:200 03/01/2012
PLATTEGROND
Studenten
DORIS HARDING 1519470
ROBERTUS DE BRUIN 1528918
S ruimte 01M ruimte 02XL ruimte 03WC 04Berging 05Onderwijsbureau 06Repro 07ICT balie 08Winkel 09Bilbitheek 10Espressobar 11Restaurant 12Keuken 13Receptie 14Studielandschap 15docentenwerkplek 16Trolley ruimte 17Toneelzaal 18Kleedkamer 19Overlegruimte 20Fietsenstalling 21Technische ruimte 22Overig 23
RUIMTENUMMERS
14
7.200 7.200 7.200 7.200 7.200 7.200 7.200 3.600
7.200 7.200 7.200 7.200 7.200 21.600 7.200 3.600
4.500 4.500 4.500
+3400
A
+3400
+3400
+3400
+3400P = 0
B
B
1234567891011
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
S
T
U
H'
G'
10' 9'12131415161718
R
192021
S'
2.10
05.
100
5.10
05.
100
3.60
07.
200
7.20
03.
600
7.20
07.
200
7.20
03.
600
7.20
07.
200
10.8
005.
100
5.10
0
4.500 4.500 4.500 4.500 3.600 3.600 3.600 3.600 7.200 3.600
7.20
03.
000
7.20
0
4.500 4.500 4.500 4.500 3.600 3.600 3.600 3.600 7.200 3.600
04
+3400
+3400
+3400
+3400
+3400
+3400
+3400
+3400
+3400
+3400
Lift
Lift
02
01
01
01 01
01 01
020202
03 03
03
02
01
01
02
04
0404
04
15
16
15
04
10
17
2222
20 20
18
19
19
05
05
2222
05
02
23
04
04
1515
Lift
03
1E VERDIEPING
Projectnaam
Adres
Opdrachtgever
TekeningnummerFormaat Schaal Datum
FACULTEIT MAATSCHAPPIJ EN RECHT
HEIDELBERGLAAN 7, UTRECHT
A3 1:200 03/01/2012
DOORSNEDE AA & BB
Studenten
DORIS HARDING 1519470
ROBERTUS DE BRUIN 1528918
ALUMINIUM WATERSLAG MET KOPSCHOT
±0
+3.400
+6.800
+10.200
+13.600
+17.000
+17.493
2.100 5.100 5.100 5.100 3.600 7.200 7.200 3.600 7.200 7.200 7.200 3.600 7.200 7.200 3.600 7.200 5.100 5.100
BB1 BB2
A B C D E F G H J K L M N P Q R S T U
20
22
21
±0
+3.400
+6.800
+10.200
+13.600
+17.000
3.600 7.200 7.200 7.200 7.200 7.200 7.200 7.200 7.200 3.600
1234567891010'
DOORSNEDE BB
DOORSNEDE AA
27Projectnaam
Adres
Opdrachtgever
TekeningnummerFormaat Schaal Datum
FACULTEIT MAATSCHAPPIJ EN RECHT
HEIDELBERGLAAN 7, UTRECHT
A3 1:40 03/01/2012
DOORSNEDE BB1 & BB2
Studenten
DORIS HARDING 1519470
ROBERTUS DE BRUIN 1528918
ALUMINIUM WATERSLAG MET KOPSCHOT
BA
01
02
03
04
05
06
08
07
+2.921
+3.450
+4.297
+5.610
+7.697
+9.010
+9.752
+10.250
+11.097
+13.600
+12.410
+13.900
+14.093
P=0
+6.850
MV=0
Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc
Gevelopbouw:Composietplaat 15mmFlexibele lijm 3mmAluminium achterconstructieWaterkerende dampopen folieAerowool 190mmDampdichte foliePrefab betonnen binnenblad 130mmstuc
U
11
12
13
15
16
P=0
+3.450
+4.297
+5.610
+6.850
+7.697
+9.010
+10.250
+11.097
+12.410
+13.650
+14.497
+15.810
+17.000
+17.300
MV=-50
+17.493
Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc
Deur, geperforeerd aluminium en staalVliesgevel CW 60
DOORSNEDE BB1 DOORSNEDE BB2
Projectnaam
Adres
Opdrachtgever
TekeningnummerFormaat Schaal Datum
FACULTEIT MAATSCHAPPIJ EN RECHT
HEIDELBERGLAAN 7, UTRECHT
A3 1:40 03/01/2012
DOORSNEDE BB1 & BB2
Studenten
DORIS HARDING 1519470
ROBERTUS DE BRUIN 1528918
ALUMINIUM WATERSLAG MET KOPSCHOT
BA
01
02
03
04
05
06
08
07
+2.921
+3.450
+4.297
+5.610
+7.697
+9.010
+9.752
+10.250
+11.097
+13.600
+12.410
+13.900
+14.093
P=0
+6.850
MV=0
Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc
Gevelopbouw:Composietplaat 15mmFlexibele lijm 3mmAluminium achterconstructieWaterkerende dampopen folieAerowool 190mmDampdichte foliePrefab betonnen binnenblad 130mmstuc
U
11
12
13
15
16
P=0
+3.450
+4.297
+5.610
+6.850
+7.697
+9.010
+10.250
+11.097
+12.410
+13.650
+14.497
+15.810
+17.000
+17.300
MV=-50
+17.493
Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc
Deur, geperforeerd aluminium en staalVliesgevel CW 60
DOORSNEDE BB1 DOORSNEDE BB2
Projectnaam
Adres
Opdrachtgever
TekeningnummerFormaat Schaal Datum
FACULTEIT MAATSCHAPPIJ EN RECHT
HEIDELBERGLAAN 7, UTRECHT
A3 1:40 03/01/2012
DOORSNEDE BB1 & BB2
Studenten
DORIS HARDING 1519470
ROBERTUS DE BRUIN 1528918
ALUMINIUM WATERSLAG MET KOPSCHOT
BA
01
02
03
04
05
06
08
07
+2.921
+3.450
+4.297
+5.610
+7.697
+9.010
+9.752
+10.250
+11.097
+13.600
+12.410
+13.900
+14.093
P=0
+6.850
MV=0
Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc
Gevelopbouw:Composietplaat 15mmFlexibele lijm 3mmAluminium achterconstructieWaterkerende dampopen folieAerowool 190mmDampdichte foliePrefab betonnen binnenblad 130mmstuc
U
11
12
13
15
16
P=0
+3.450
+4.297
+5.610
+6.850
+7.697
+9.010
+10.250
+11.097
+12.410
+13.650
+14.497
+15.810
+17.000
+17.300
MV=-50
+17.493
Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc
Deur, geperforeerd aluminium en staalVliesgevel CW 60
DOORSNEDE BB1 DOORSNEDE BB2
Projectnaam
Adres
Opdrachtgever
TekeningnummerFormaat Schaal Datum
FACULTEIT MAATSCHAPPIJ EN RECHT
HEIDELBERGLAAN 7, UTRECHT
A3 1:40 03/01/2012
DOORSNEDE BB1 & BB2
Studenten
DORIS HARDING 1519470
ROBERTUS DE BRUIN 1528918
ALUMINIUM WATERSLAG MET KOPSCHOT
BA
01
02
03
04
05
06
08
07
+2.921
+3.450
+4.297
+5.610
+7.697
+9.010
+9.752
+10.250
+11.097
+13.600
+12.410
+13.900
+14.093
P=0
+6.850
MV=0
Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc
Gevelopbouw:Composietplaat 15mmFlexibele lijm 3mmAluminium achterconstructieWaterkerende dampopen folieAerowool 190mmDampdichte foliePrefab betonnen binnenblad 130mmstuc
U
11
12
13
15
16
P=0
+3.450
+4.297
+5.610
+6.850
+7.697
+9.010
+10.250
+11.097
+12.410
+13.650
+14.497
+15.810
+17.000
+17.300
MV=-50
+17.493
Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc
Deur, geperforeerd aluminium en staalVliesgevel CW 60
DOORSNEDE BB1 DOORSNEDE BB2
28
GROEI EN TRANSFORMATIEPROJECT INFORMATIE
Locatie: Leidschendam
Datum: februari - juli 2011
Programma: Basisschool en BSO
Oppervlakte: 4.200m2
Software: Archicad Artlantis Photoshop Illustator IndesignEindcijfer: 8
TU DELFT PRE-MASTER
OMSCHRIJVING
Basisschool‘develden’teLeidschendam(CieArchitecten)isaanuitbreiding toe en moet worden voorzien van een buitenschoolse opvang. Zodoende wordt het gehele gebouw verbreed en zorgen tweepatio’svoorlichttoetreding.Beidepatio’shebbenhuneigendoel en identiteit.Eén vandepatio’s vormteengecontroleerdebuitenruimte voor de jongere kinderen. Door één hoek van het ge-bouw omhoog te trekken ontstaat een helder stedenbouwkundig gebaar en kan de entree, via de tweede patio, in het hart van het gebouw worden geplaatst.
Flexibele ruimtes die gemakkelijk van onderwijsruimte tot BSOruimte kunnen worden getransformeerd vormen het uitgangspunt van het interieur. Lokalen worden in groepen van twee of drie ge-clusterd en grenzen aan een tussenruimte. Deze tussenruimte kan tijdens lesuren voor individueel werk worden gebruikt. Terwijl detussenruimte,tijdensBSOuren,d.m.v.flexibelewandenbijhetlokaal wordt betrokken. Hierdoor ontstaat een andere ruimte die een duidelijk onderscheid maakt tussen de BSO en onderwijs pe-riode. Iets wat erg belangrijk is voor de ervaring van de kinderen.
29
Huidige situatie
Toe te voegen programma
Veranderen richten
Met het programma de vorm sluitenen beide patio’s een andere indentiteit geven en twee patio’s creërenOpenen naar de wijk door de kop op te tillen
Bestaande situatie
Toe te voegen programma
Het gebouw verbreden
Patio’smakenhetgebouwbruikbaar
Het gebouw opent zich naar de wijkenbeidepatio’skrijgenhuneigen identiteit
30
Bijlage 1 Plattegronden
31
top related