Studi Dan Detail Desain
Waduk Diponegoro
DAFTAR ISI
Halaman
KATA PENGANTAR........................................................................................... i
DAFTAR ISI ......................................................................................................... ii
DAFTAR GAMBAR ............................................................................................ vi
DAFTAR TABEL ................................................................................................ vii
BAB I. PENDAHULUAN
1. 1. Latar Belakang ......................................................................... I - 1
1. 2. Maksud, Tujuan dan Sasaran Pekerjaan ................................... I - 1
1. 3. Lingkup Kegiatan ..................................................................... I - 2
1.3.1. Kegiatan Persiapan........................................................ I - 2
1.3.2. Kegiatan Pengumpulan Data......................................... I - 2
1.3.3. Kegiatan Survey / Investigasi ....................................... 1 - 2
1.3.4. Kegiatan Pra Rencana ................................................... 1 - 2
1.3.5. Kegiatan Studi Kelayakan............................................. 1 - 2
1.3.6. Kegiatan Detail Desain ................................................. 1 - 3
1.3.7. Kegiatan Uji Model Fisik/ Model Test ......................... 1 - 3
1.3.8. Kegiatan Pelaporan ....................................................... 1 - 3
1.3.9. Kegiatan Diskusi ........................................................... 1 - 3
1. 4. Deskripsi Pekerjaan ................................................................. 1 - 4
1. 5. Lokasi Pekerjaan....................................................................... 1 - 4
DAFTAR ISI
BAB II. GAMBARAN LOKASI PEKERJAAN
2. 1. Kondisi Daerah Pengaliran Sungai Krengseng ........................ II - 1
2. 2. Iklim ......................................................................................... II - 5
2. 3. Curah Hujan ............................................................................. II - 5
2. 4. Debit Sungai ............................................................................ II - 5
2. 5. Geologi Regional ...................................................................... II - 6
2.5.1. Fisiografi dan Morfologi............................................... II - 6
2.5.2. Geologi ......................................................................... II - 7
2.5.3. Tektonik dan Struktur Geologi .................................... II - 10
2.5.4. Geologi Teknik ............................................................. II - 10
2.5.5. Erosi dan Sedimentasi................................................... II - 14
2.5.6. Quarry ........................................................................... II - 15
2.5.7. Kegempaan .................................................................. II - 15
2. 6. Kondisi Tanah........................................................................... II - 19
2. 7. Kondisi Lingkungan Keairan.................................................... II - 21
2.7.1. Hidrologi Permukaan .................................................... II - 21
2.7.2. Hidrologi Bawah Permukaan........................................ II - 22
2.7.3. Kualitas Air ................................................................... II - 24
2. 8. Sosial Ekonomi ........................................................................ II - 25
2.8.1. Demografi ..................................................................... II - 25
2.8.2. Sebaran dan Kepadatan Penduduk................................ II - 25
2.8.3. Kondisi Perekonomian.................................................. II - 26
2.8.4. Tataguna Lahan............................................................. II - 26
2. 9. Konservasi ................................................................................ II - 27
2.9.1. Daerah Aliran Sungai Kali Krengseng ......................... II - 28
2.9.2. Kondisi Biofisik Terkait Erosi Tanah ........................... II - 29
2.9.3. Erosi Tanah ................................................................... II - 34
2.9.4. Konservasi Waduk Diponegoro.................................... II - 37
2.9.5. Fokus Kjian Konservasi Diponegoro............................ II - 37
2. 10. Kondisi Tataguna Lahan ........................................................... II - 39
DAFTAR ISI
BAB III. RENCANA KERJA
3. 1. Pekerjaan Persiapan .................................................................. III - 1
3.1.1. Persiapan Administrasi / Kantor .................................. III - 1
3.1.2. Pekerjaan Persiapan Teknis .......................................... III - 1
3.1.3. Pekerjaan Survey Pendahuluan..................................... III - 2
3.1.4. Kegiatan Pengumpulan Data ........................................ III - 2
3. 2. Pekerjaan Survey ..................................................................... III - 3
3.2.1. Survey Topografi ......................................................... III - 3
3.2.2. Survey Geologi ............................................................ III - 12
3.2.3. Survey Mekanika Tanah .............................................. III - 12
3.2.4. Survey Hidrologi .......................................................... III - 13
3.2.5. Survey Sosial Ekonomi ................................................ III - 13
3.2.6. Survey Lingkungan ...................................................... III - 13
3. 3. Analisa Data ............................................................................. III - 15
3.3.1. Analisa Data Topografi ................................................ III - 15
3.3.2. Analisa Data Geologi ................................................... III - 23
3.3.3. Analisa Data Mekanika Tanah ..................................... III - 42
3.3.4. Analisa Hidrologi ......................................................... III - 64
3.3.5. Analisa Lingkungan dan Kualitas Air .......................... III - 92
3. 4. Perencanaan Bendungan, Bangunan Pelimpah dan Bangunan
Pelengkap.................................................................................. III - 96
3. 5. Model Test Fisik Pelimpah ....................................................... III - 97
3. 6. Penyusunan Laporan ................................................................ III - 99
3. 7. Kegiatan Diskusi ...................................................................... III - 99
DAFTAR ISI
BAB IV. KRITERIA DESAIN
4. 1. Desain Tubuh Bendungan ........................................................ IV - 1
4. 2. Desain Bangunan Pelimpah ..................................................... IV - 7
4. 3. Desain Bangunan Pelengkap .................................................... IV - 10
4. 4. Desain Bangunan Penyadap (Intake) ....................................... IV - 13
4. 5. Desain Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) .... IV - 14
BAB. V ORGANISASI DAN JADWAL PELAKSANAAN
5. 1. Struktur Organisasi Pemilik Pekerjaan .................................... V - 1
5. 2. Uraian Tugas Pemilik Pekerjaan .............................................. V - 3
5. 3. Struktur Organisasi Penyedia Jasa ........................................... V - 8
5. 4. Uraian Tugas Penyedia Jasa ..................................................... V - 10
5.4.1. Tugas dan Tanggung Jawab Penyedia Jasa ............... V - 10
5.4.2 Tugas dan Tanggung Jawab Tenaga Ahli .................. V - 13
5.4.3 Tugas dan Tanggung Jawab Asisten Ahli.................. V - 18
5. 5. Struktur Organisasi Keterkaitan Pemilik Pekerjaan
Dan Penyedia Jasa .................................................................... V - 19
5.6. Jadual Pelaksanaan Pekerjaan................................................... V - 23
5.7. Kurva S Pelaksanaan Pekerjaan................................................ V - 23
BAB VI. KESIMPULAN DAN SARAN
6. 1. Kesimpulan ............................................................................... VI - 1
6. 2. Saran ........................................................................................ VI - 2
PENDAHULUAN
1. Nama Pekerjaan : Studi dan Detail Desain Waduk Diponegoro
2. Nama Pelaksana Kegiatan : SATUAN KERJA BALAI BESAR WILAYAH
SUNGAI PEMALI – JUANA.
3. Lokasi Pekerjaan : Kecamatan Tembalang, Kota Semarang
4. Thn Anggaran Proyek : 2008
5. No.Kontrak : KU.08.08 / PERPROG / BBWSPJ / 08 / 2008
6. Tanggal Kontrak : 30 April 2008
7. Nomor SPMK : No. 08/SPMK/Perprog/BBWSPJ/V/2008
8. Tanggal SPMK : 2 Mei 2008
9. Waktu Pelaksanaan : 210 (dua ratus sepuluh) hari kalender
(2 Mei 2008 s/d 27 November 2008)
PENDAHULUAN
PENDAHULUAN
Pekerjaan Studi dan Detail Desain Waduk Diponegoro di Kecamatan Tembalang, Kota
Semarang dengan maksud untuk memperoleh gambaran data secara lengkap di
sekitar lokasi rencana waduk serta mengamanatkan UU No.7 Tahun 2004 tentang
Pengelolaan Sumber Daya Air.
Tujuan dari pekerjaan diatas adalah untuk menampung kelebihan air hujan dan air
permukaan (run off) di musim hujan dan memanfaatkannya di musim kemarau
dengan pengelolaan yang baik terutama untuk kebutuhan air baku masyarakat
disekitarnya serta pembangkit listrik tenaga air.
Sasaran dari pekerjaan ini yaitu tersedianya gambaran yang lengkap berdasarkan
kajian terkini, berdasarkan pertimbangan-pertimbangan teknis, ekonomi, sosial
budaya dan lingkungan, sehingga dari pekerjaan ini dihasilkan detail desain
bendungan secara lengkap yang memenuhi ketentuan keamanan bendungan
Mengingat lahan waduk terdapat didalam kawasan Kampus Universitas Diponegoro
maka selain untuk keperluan diatas, waduk ini diharapkan juga dapat berguna untuk
keperluan-keperluan sarana pendidikan, seperti untuk penelitian perikanan,
lingkungan, elektrikal, laboratorium hidrolika dan lain-lain
I. KEGIATAN PERSIAPAN
1). Persiapan Administrasi, Personil, dan Peralatan
2). Penyusunan Rencana Mutu Kontrak Desain
3). Survey Lapangan Pendahuluan
II. KEGIATAN PENGUMPULAN DATA
1). Pengumpulan Data Sekunder
2). Pengumpulan Data Pendukung
III. KEGIATAN SURVEY/ INVESTIGASI
1). Pengukuran Topografi
2). Investigasi Geologi
3). Investigasi Mekanika Tanah
4). Survey Hidrologi
5). Survey Sosial Ekonomi
6). Survey Lingkungan
IV. KEGIATAN PRA RENCANA
V. KEGIATAN STUDI KELAYAKAN
VI. KEGIATAN DETAIL DESAIN
1). Tubuh Bendungan
2). Bangunan Pelimpah
3). Mekanikal – Elektrikal
4). Bangunan Pelengkap
5). Penggambaran Desain
VII. KEGIATAN UJI MODEL FISIK/ MODEL TEST
PENDAHULUAN
VIII. KEGIATAN PELAPORAN
1). Laporan Pendahuluan
2). Laporan Bulanan
3). Laporan Kriteria Perencanaan
4). Laporan Antara/ Interim
5). Laporan Akhir Sementara
6). Laporan Akhir
a). Laporan Utama
b). Laporan Ringkasan (Bahasa Indonesia)
c). Executive Summary (Bahasa Inggris)
d). Laporan Penunjang
Laporan Hasil Model Test
Laporan Geologi dan Mekanika Tanah
Laporan Survey Topografi
Laporan Hidrologi
Laporan Kajian Pembebasan Tanah
Laporan Rekomendasi Konservasi DTA Waduk
Laporan Nota Perencanaan
Laporan Pedoman Operasi dan Pemeliharaan
Laporan Sosial Ekonomi dan Lingkungan
e). Rencana Anggaran Biaya
f). Dokumen Pengadaan Jasa Pemborongan
g). CD (File laporan, gambar, foto-foto dll.)
IX. KEGIATAN DISKUSI
1). Diskusi Laporan Pendahuluan
2). Diskusi Laporan Antara/ Interim
3). Diskusi Konsep Laporan Akhir
PENDAHULUAN
Lokasi pekerjaan adalah Daerah
Aliran Sungai (DAS) Krengseng
/ Seketak di Kecamatan
Tembalang dan Banyumanik,
Kota Semarang
LOKASI PEKERJAAN
PENDAHULUAN
GAMBARAN UMUM
LOKASI PEKERJAAN
Kali Krengseng / Seketak
Bermuara di Kali Pengkol
Panjang lebih kurang 15 Km
Luas DAS sekitar 1.700 Ha
Hulu di Kel. Pudakpayung, Kec. Banyumanik (± 300 m DPL)
Bermuara pada Kali Pengkol di Kel. Meteseh, Kec. Tembalang (± 37,5 DPL)
Letak Geografis :
10O 24’ 20’’ sampai 110 O 28’ 54” Bujur Timur dan
7 O 02’ 30” sampai 7 O 05’ 34” Lintang Selatan.
Letak daerah pengaliran Kali Krengseng / Seketak dibatasi oleh,
Sebelah Barat : Daerah Pengaliran Kali Garang,
Sebelah Timur : Daerah Pengaliran Kali Pengkol,
Sebelah Utara : Daerah Pengaliran Kali Sambiroto dan
Sebelah Selatan : Daerah Pengaliran Kali Ketokan.
GAMBARAN UMUM LOKASI PEKERJAAN
Kali Krengseng / Seketak sampai pada lokasi rencana Waduk Diponegoro
Luas Daerah Aliran Sungai (DAS) 777 Ha
Panjang Aliran Sungai ± 8 Km
IKLIM
• Suhu udara rata-rata harian berkisar antara 26 - 29 oC
• Temperatur udara pada bulan terdingin sebesar 21,5 oC dan temperatur
udara pada bulan terpanas sebesar 35,0 oC.
• Kelembaban udara rata-rata bervariasi dari 63 % sampai dengan 87 %.
• Arah angin sebagian besar bergerak dari arah Tenggara menuju Barat Laut
dengan kecepatan rata-rata berkisar antara 36 km/hari – 194 km/hari.
CURAH HUJAN
•Iklim tropis 2 (dua) jenis yaitu , musim kemarau dan
musim hujan yang memiliki siklus pergantian ± 6
bulan.
•Hujan sepanjang tahun, dengan curah hujan
tahunan yang bervariasi dari tahun ke tahun
rata-rata 1.300 mm sampai dengan 3.650 mm
•Maksimum bulanan terjadi pada bulan Desember
sampai bulan Januari.
DEBIT ALIRAN
•Di lokasi rencana tidak ada data
pengamatan duga air
•Debit dihitung berdasarkan data curah
hujan
GAMBARAN UMUM LOKASI PEKERJAAN
Waduk Diponegoro rencananya akan dibangun di Kali Krengseng / Seketak yang
berada dalam wilayah Kampus Universitas Diponegoro dan lokasinya kurang
lebih 250 m sebelah Utara Stadion UNDIP
GAMBARAN UMUM LOKASI PEKERJAAN
Kondisi Kali Krengseng sekitar As Genangan
Daerah tampungan waduk berbentuk V dan agak
melandai pada sisi kanan Pengambilan sampel air di Jembatan untuk dites di
Laboratorium
GAMBARAN UMUM LOKASI PEKERJAAN
Peta Satuan Morfologi Lembar Magelang dan Semarang
GAMBARAN UMUM LOKASI PEKERJAAN
Lokasi Studi
Formasi Gunungapi Kaligesik
Aluvium Dataran Pantai, Sungai dan Danau
Formasi Kali Getas
Formasi Kerek
Formasi Kalibeng
Andesit
Formasi Damar
LOKASI STUDI
Peta Geologi Regional Skala 1:100.000
Sumber : Pusat Survey Geologi 2006,(Lembar Magelang dan Semarang, Jawa 1996)
GAMBARAN UMUM LOKASI PEKERJAAN
Satuan Pasir
Pasir Lempungan
Lempung Pasiran
Sumber : Direktorat Geologi Tata Lingkungan, Bandung 1997, Peta Geologi Lembar Magelang dan Semarang )
Lempung Lanauan
Lempung Pasiran
Berkerikil
Pasir Lempungan
Berkerikil
Batu Pasir
Lava-Breksi
LOKASI
STUDI
Peta Geologi Teknik. Skala 1:100.000
GAMBARAN UMUM LOKASI PEKERJAAN
Peta Zona Gempa Indonesia (Puslitbang Air,1999)
LOKASI
STUDI
GAMBARAN UMUM LOKASI PEKERJAAN
GAMBARAN UMUM LOKASI PEKERJAAN
LOKASI
PENGAMBILAN
SAMPLE
HASIL ANALISA LABORATORIUM TERHADAP KUALITAS AIR LOKASI PEKERJAAN
Kriteria Mutu Air Berdasarkan Kelas dari PP No. 82/2001
GAMBARAN UMUM LOKASI PEKERJAAN
GAMBARAN UMUM LOKASI PEKERJAAN
TABEL LUAS WILAYAH KOTA SEMARANG PER KECAMATAN
1. Pertumbuhan penduduk rata-rata wilayah Kota
Semarang adalah sebesar 1,02%/tahun
2. Pertumbuhan perekonomian Kota Semarang
pada tahun 2006 adalah sebesar 5,34%,
sedangkan sumbangan PDRB Kota Semarang
terhadap PDRB Jawa Tengah adalah sebesar
11,24%.
TABEL JUMLAH PENDUDUK PER KECAMATAN KOTA SEMARANG TABEL TATAGUNA LAHAN KOTA SEMARANG
KONSERVASI DAERAH TANGKAPAN (DTA) WADUK DIPONEGORO DIPERLUKAN UNTUK
MENINGKATKAN UMUR EKONOMIS WADUK
1. DAS BABON: WADUK DIPONEGORO KALI KRENGSENG MASUK
SUB DAS KALI PENGKOL
PEMBAGIAN DAS BABON: SUB DAS BABON HILIR
SUB DAS PENGKOL (TENGAH)
SUB DAS GUNG (BAG.HULU)
GAMBARAN UMUM LOKASI PEKERJAAN
TABEL LUAS DAN PEMBAGIAN DAS KALI BABON
Sumber : Diolah dari data Badan pengelolaan dan Pengendalian
Dampak Lingkungan Hidup -Jateng
100.0014,357Jumlah
Ekosistem Hulu29.304,207Sub DAS Gung3
Ekosistem Tengah23.953,438Sub DAS Pengkol2
Ekosistem Hilir46.756,712Sub DAS Babon Hilir1
KeteranganPersentase (%)Luas HaSub DASNo
100.0014,357Jumlah
Ekosistem Hulu29.304,207Sub DAS Gung3
Ekosistem Tengah23.953,438Sub DAS Pengkol2
Ekosistem Hilir46.756,712Sub DAS Babon Hilir1
KeteranganPersentase (%)Luas HaSub DASNo
SUNGAI UTAMA DAN ANAK SUNGAI PER SUB DAS TABEL KELURAHAN DALAM DAS KALI KRENGSENG
No Kabupaten/Kota Kecamatan Kelurahan
Kota Semarang Banyumanik Banyumanik
Srondol Wetan
Padalangan
Tembalang Meleseh
Kramas
Tembalang
Bulusan
Sendang Mulyo
GAMBARAN UMUM LOKASI PEKERJAAN
Das Krengseng
GAMBARAN UMUM LOKASI PEKERJAAN
2. KONDISI TERKAIT KONSERVASI
a. JENIS TANAH ERODIBILITAS
LITOSOL SANGAT PEKA EROSI
REGOSOL SANGAT PEKA EROSI
KAMBISOL PEKA EROSI
LATOSOL AGAK PEKA EROSI
ALUVIAL TIDAK PEKA EROSI
b. CURAH HUJAN
CURAH HUJAN EROSIVITAS
CURAH HUJAN TAHUNAN TINGGI : 2.202 MM - 2.770 MM
AGAK BASAH HINGGA BASAH (SCHMIDT DAN FERGUSON),
c. KEMIRINGAN LAHAN
d. TATAGUNA LAHAN
e. JENIS FLORA
SAWAH PADI
POL0WIJO KACANG TANAH, LOMBOK, KACANG PANJANG,
TERONG, DAN JAGUNG
BUAH-BUAHAN PISANG, MANGGA, JAMBU AIR, NANGKA,
BELIMBING, RAMBUTAN DAN SIRSAT.
TANAMAN MUSIMAN KETELA POHON, DAN UMBI-UMBIAN.
TANAMAN KEHUTANAN SONO, AKASIA, JATI, PINUS SERTA
DAMAR.
f. JENIS FAUNA
JENIS MAMLIA, REPTIL DAN AVES.
DOMINAN JENIS AVES /BURUNG
1 0 0 ,0 0J u m la hJ u m la h
0 ,0 9 > 4 0> 4 0S A N G A T C U R A M
0 ,8 4 2 52 5 -- 4 04 0C U R A M
2 ,8 3 1 51 5 -- 2 52 5B E R G E L O M B A N G
6 ,8 4 88 -- 1 51 5L A N D A I
8 9 ,3 9 00 -- 88D A T A R
P re s e n ta s eP re s e n ta s e
(% )(% )K e la sK e la sK e m ir in g a nK e m ir in g a n
1 0 0 ,0 0J u m la hJ u m la h
0 ,0 9 > 4 0> 4 0S A N G A T C U R A M
0 ,8 4 2 52 5 -- 4 04 0C U R A M
2 ,8 3 1 51 5 -- 2 52 5B E R G E L O M B A N G
6 ,8 4 88 -- 1 51 5L A N D A I
8 9 ,3 9 00 -- 88D A T A R
P re s e n ta s eP re s e n ta s e
(% )(% )K e la sK e la sK e m ir in g a nK e m ir in g a n
TABEL PROSENTASE LUAS KEMIRINGAN LAHAN
DAS RENCANA WADUK DIPONEGORO
Hasil analisis Kontur Peta RBI BAKOSURTANAL, Skala 1 : 25.000
Lembar JATINGALEH, dengan menggunakan Program ArcView GIS 3.3.
1 0 0 ,0 0J u m la hJ u m la h
0 ,0 9 > 4 0> 4 0S A N G A T C U R A M
0 ,8 4 2 52 5 -- 4 04 0C U R A M
2 ,8 3 1 51 5 -- 2 52 5B E R G E L O M B A N G
6 ,8 4 88 -- 1 51 5L A N D A I
8 9 ,3 9 00 -- 88D A T A R
P re s e n ta s eP re s e n ta s e
(% )(% )K e la sK e la sK e m ir in g a nK e m ir in g a n
1 0 0 ,0 0J u m la hJ u m la h
0 ,0 9 > 4 0> 4 0S A N G A T C U R A M
0 ,8 4 2 52 5 -- 4 04 0C U R A M
2 ,8 3 1 51 5 -- 2 52 5B E R G E L O M B A N G
6 ,8 4 88 -- 1 51 5L A N D A I
8 9 ,3 9 00 -- 88D A T A R
P re s e n ta s eP re s e n ta s e
(% )(% )K e la sK e la sK e m ir in g a nK e m ir in g a n
TABEL PROSENTASE LUAS KEMIRINGAN LAHAN
DAS RENCANA WADUK DIPONEGORO
1 0 0 ,0 0J u m la hJ u m la h
0 ,0 9 > 4 0> 4 0S A N G A T C U R A M
0 ,8 4 2 52 5 -- 4 04 0C U R A M
2 ,8 3 1 51 5 -- 2 52 5B E R G E L O M B A N G
6 ,8 4 88 -- 1 51 5L A N D A I
8 9 ,3 9 00 -- 88D A T A R
P re s e n ta s eP re s e n ta s e
(% )(% )K e la sK e la sK e m ir in g a nK e m ir in g a n
1 0 0 ,0 0J u m la hJ u m la h
0 ,0 9 > 4 0> 4 0S A N G A T C U R A M
0 ,8 4 2 52 5 -- 4 04 0C U R A M
2 ,8 3 1 51 5 -- 2 52 5B E R G E L O M B A N G
6 ,8 4 88 -- 1 51 5L A N D A I
8 9 ,3 9 00 -- 88D A T A R
P re s e n ta s eP re s e n ta s e
(% )(% )K e la sK e la sK e m ir in g a nK e m ir in g a n
TABEL PROSENTASE LUAS KEMIRINGAN LAHAN
DAS RENCANA WADUK DIPONEGORO
Hasil analisis Kontur Peta RBI BAKOSURTANAL, Skala 1 : 25.000
Lembar JATINGALEH, dengan menggunakan Program ArcView GIS 3.3.
TABEL LUAS KEMIRINGAN LAHAN DAS WADUK RENCANA
1 0 0 ,0 0J U M L A HJ U M L A H
5 ,3 0T A N A H K O S O N GT A N A H K O S O N G
0 ,2 2S E M A K B E L U K A RS E M A K B E L U K A R
0 ,5 4S A W A H T A D A H H U J A N
1 3 ,4 6S A W A H IR IG A S I
8 ,1 0A R E A L P E R K E B U N A N
5 4 ,5 4A R E A L P E M U K IM A N
1 7 ,8 5T E G A L A N /L A D A N G
P R E S E N T A S EP R E S E N T A S E
(% )(% )T A T A G U N A L A H A NT A T A G U N A L A H A N
1 0 0 ,0 0J U M L A HJ U M L A H
5 ,3 0T A N A H K O S O N GT A N A H K O S O N G
0 ,2 2S E M A K B E L U K A RS E M A K B E L U K A R
0 ,5 4S A W A H T A D A H H U J A N
1 3 ,4 6S A W A H IR IG A S I
8 ,1 0A R E A L P E R K E B U N A N
5 4 ,5 4A R E A L P E M U K IM A N
1 7 ,8 5T E G A L A N /L A D A N G
P R E S E N T A S EP R E S E N T A S E
(% )(% )T A T A G U N A L A H A NT A T A G U N A L A H A N
TABEL LUAS TATAGUNA LAHAN DAS RENCANA WADUK
Hasil analisis Peta RBI BAKOSURTANAL, Skala 1 : 25.000
Lembar JATINGALEH, dengan menggunakan Program ArcView GIS 3.3.
1 0 0 ,0 0J U M L A HJ U M L A H
5 ,3 0T A N A H K O S O N GT A N A H K O S O N G
0 ,2 2S E M A K B E L U K A RS E M A K B E L U K A R
0 ,5 4S A W A H T A D A H H U J A N
1 3 ,4 6S A W A H IR IG A S I
8 ,1 0A R E A L P E R K E B U N A N
5 4 ,5 4A R E A L P E M U K IM A N
1 7 ,8 5T E G A L A N /L A D A N G
P R E S E N T A S EP R E S E N T A S E
(% )(% )T A T A G U N A L A H A NT A T A G U N A L A H A N
1 0 0 ,0 0J U M L A HJ U M L A H
5 ,3 0T A N A H K O S O N GT A N A H K O S O N G
0 ,2 2S E M A K B E L U K A RS E M A K B E L U K A R
0 ,5 4S A W A H T A D A H H U J A N
1 3 ,4 6S A W A H IR IG A S I
8 ,1 0A R E A L P E R K E B U N A N
5 4 ,5 4A R E A L P E M U K IM A N
1 7 ,8 5T E G A L A N /L A D A N G
P R E S E N T A S EP R E S E N T A S E
(% )(% )T A T A G U N A L A H A NT A T A G U N A L A H A N
TABEL LUAS TATAGUNA LAHAN DAS RENCANA WADUK
Hasil analisis Peta RBI BAKOSURTANAL, Skala 1 : 25.000
Lembar JATINGALEH, dengan menggunakan Program ArcView GIS 3.3.
TABEL LUAS TATAGUNA LAHAN DAS WADUK RENCANA
A. PERMASALAHAN EROSI
BENTUK-BENTUK EROSI :
EROSI JURANG
EROSI PARIT
EROSI ALUR,
EROSI LEMBAR
SUB DAS PENGKOL MERUPAKAN SALAH SATU PENYUMBANG
EROSI DAN SEDIMEN YANG TERBESAR
DATA BPDAS PEMALI –JRATUN PROVINSI JATENG
SUB DAS PENGKOL POTENSI EROSINYA = 265 TON/HA/TAHUN
(22 MM/TAHUN TANAH HILANG),
SUB DAS GUNG = 149,77 TON/HA/TAHUN ATAU SEKITAR
12 MM/TAHUN )
SUB DAS BABON HILIR SEKITAR 7,59 TON/HA/TAHUN ATAU SEKITAR
1,47 MM/TAHUN)
TINGGI TEKANAN PENDUDUK PADA SUB DAS PENGKOL
PERKEMBANGAN PERMUKINAN TINGGI MENONJOL ALIH FUNGSI
LAHAN DARI TEGALAN MENJADI KAWASAN PERMUKIMAN
TERUTAMA PADA LERENG-LERENG PERBUKITAN ANTARA 8-15%
B. TINGKAT BAHAYA EROSI
TINGKAT BAHAYA EROSI SANGAT BERAT PADA SUB DAS PENGKOL
(EKOSISTEM TENGAH)
TINGKAT BAHAYA EROSI SANGAT TINGGI PADA SUB DAS GUNG
(EKOSISTEM HULU)
LIHAT PETA TINGKAT BAHAYA EROSI (TBE)
Tabel Pembagian Klas Tingkat Bahaya Erosi
Sumber : BRLKT (1991)
Keterangan : SR = Sangat ringan R = Ringan S = Sedang
B = Berat S = Sangat Berat
GAMBARAN UMUM LOKASI PEKERJAAN
3. EROSI
4. PERMASALAHAN KONSERVASI
PENINGKATAN EROSI DAN SEDIMENTASI
TEKANAN PENDUDUK
5. UPAYA KONSERVASI
PENDEKATAN VEGETATIF
PENDEKATAN SIPIL TEKNIS
PENINGKATAN PERAN SERTA MASYARAKAT
GAMBARAN UMUM LOKASI PEKERJAAN
Konservasi Tanah dan Air Untuk Peningkatan Kelestaian
Pembangunan Waduk Diponegoro
Erodibilitas Tanah
SUB DAS PENGKOL DAN
SUB DAS GUNG
Pengelolaan Lahan
Kemiringan dan Panjang Lereng Tindakan Konservasi Tanah
TINGKAT BAHAYA EROSI
ANALISIS
KELESTARIAN WADUK
DIPONEGORO
Erosivitas Curah Hujan
KELESTARIAN WADUK TERGANGGU (UMUR EKONOMIS TIDAK TERCAPAI)
KONSERVASI DTA -VEGETATIF -SIPIL TEKNIS - PARTISIPASI
DTA KALI KRENGSENG
Penggunaan lahan di Kec Tembalang Dirinci per Kelurahan (tahun 2006)
Penggunaan lahan di Kec Banyumanik Dirinci per Kelurahan (tahun 2006)
GAMBARAN UMUM LOKASI PEKERJAAN
RENCANA KERJA
RENCANA KERJA
Penyusunan RENCANA
MUTU KONTRAK
DESAIN
Tid
ak
Ya
Penyusunan LAPORAN PENDAHULUAN
Tid
ak
Ya
SURVEY / INVESTIGASI
Pengukuran Topografi
Daerah genangan As waduk,
pelimpah, power house
Quarry Disposal area
Investigasi Geologi Pemboran inti, SPT,
Packer Test, sampling
Pemboran quarry Pemboran pelimpah Pemboran inti intake Rock Mechanical
Test Water / Groundwater
Test
Survey Hidrologi Pengukuran Debit Bed load,
suspended load
Survey Sosek Data sekunder
Wawancara
Survey Lingkungan Data sekunder Pengambilan
contoh
STUDI KELAYAKAN (RPL DAN RKL)
Investigasi Mektan Test pit material
timbunan
Sampling aggregate kasar dan halus
Pengujian Laboratorium : Material survey, Index Test dan Mechanical Properties.
MULAI
Pekerjaan Persiapan Persiapan Administrasi,
personil dan peralatan Survey Lapangan Awal Pengumpulan Data
LAPORAN PENDAHULUAN
RENCANA MUTU KONTRAK
DESAIN
CEK
Ya
Tid
ak
Tid
ak
Ya
I.(1).SP.1 – SP.34
I.(3).SP.1
II.(1).SP.1 – II.(2).SP.1 I.(2).SP.1
VIII.(2).SP.1
IX.(1).SP.1
Pekerjaan Persiapan Mobilisasi Personil, Alat & Bahan Dok. Administrasi & Perizinan Data Primer & Sekunder
DISKUSI / ASISTENSI
CEK
Tid
ak
Tid
ak
Tid
ak
Analisis Topografi Pengolahan data Penggambaran
situasi, profil memanjang, melintang
Laporan Topografi
Analisis Hidrologi Pemilihan Sta. Hujan Pengisian Data Hujan
Yang Kosong Volume Sedimen Laporan Hidrologi
Ya
Analisis Sosek Kondisi Sosial
Ekonomi Kajian Pembebasan
Lahan Laporan Sosek
Ya
Analisis Lingkungan Standar Kebutuhan
Air Kondisi Lingkungan
dan Kualitas Air Laporan Lingkungan
Ya T
idak
Ya
Tid
ak
Analisis Geologi Test Pit, Bor Inti Rock Mevhanical
Test, Agregat & Filter
Groundwater Test Permeabilitas Laporan Geologi
Analisis Mektan Daya
Dukung,Stabilitas Penurunan Uji Lab. Mektan Laporan Mektan
Ya
Cek / Asisten
si
Cek / Asisten
si
Cek / Asisten
si
Cek / Asisten
si
Cek / Asisten
si
Tid
ak
Ya
Cek / Asisten
si
Cek / Asisten
si
I.(1).SD.1 – SD.34
I.(3).SD.1
II.(1).SP.1 – II.(2).SP.1
I.(2).SD.1
III.(1).SP.1 – SP.2 III.(4).SP.1 – SP.3 III.(5).SP.1 III.(6).SP.1
III.(2).SP.1 – SP.4 III.(3).SP.1 – SP.2
IV.(1).SP.1 IV.(2).SP.1
IV.(5).SP.1 – SP.3 IV.(8).SP.1 IV.(9).SP.1
IV.(6).SP.1 IV.(7).SP.1
IV.(4).SP.1 – SP.4
V.(1).SP.1
V.(2).SP.1
Ya
A
IV.(3).SP.1 – SP.5
Penyusunan LAPORAN AKHIR
SEMENTARA
SELESAI
Cek / Asistensi
LAPORAN AKHIR
DISKUSI / ASISTENSI
Pembuatan LAPORAN AKHIR
Penyusunan LAPORAN ANTARA
Laporan ANTARA
DISKUSI / ASISTENSI
Tid
ak
Ya
DETAIL DESAIN
Desain Rinci
Analisa Tubuh Bendungan & Bangunan Pelengkap
Bangunan Pelimpah
Mekanikal – Elektrikal
Penggambaran
Perhitungan BOQ & RAB
Cek / Asistensi
Cek / Asistensi
Laporan Model Test Fisik
Laporan BOQ & RAB
Uji Model Fisik
Cek / Asistensi
Stabilitas Bendung
Proyek Listrik Tenaga Mikro
Gambar Desain
A
Tid
ak
Ya
Tid
ak
Ya
Tid
ak
Ya
VIII.(5).SP.1
IX.(1).SP.1
Tid
ak
Ya
Tid
ak
Ya
IX.(1).SP.1
VII.(1).SP.1
VIII.(7).SP.4
VI.(1).SP.1 VI.(1).SP.2
VIII.(7).SP.5
VIII.(7).SP.1
LAPORAN AKHIR SEMENTARA
VIII.(6).SP.1
VI.(1).SP.1
START
Persiapan Personil pelaksana Peralatan survey
topografi
Orientasi Lapangan dan Penetapan Titik Referensi
Pemasangan : Bench Mark dan
Patok Kayu
PENGUKURAN
Kerangka Horisontal Kerangka Ve rtikal Pengamatan Matahari
Pengukuran Site Waduk &
Situasi Genangan
ANALISIS
Hitungan Pengamatan
Matahari
Hitungan Kerangka Horisontal
Hitungan Kerangka Vertikal
Hitungan Titik Detail
Cek Tidak
Cek Tid ak
Gambar Site Waduk 1:500
Gambar Situasi Genangan 1:1000
Situasi Borrow & Quarry Area 1:1000
Ya Ya
Ya
LAPORAN PENGUKURAN & DESKRIPSI BM
Cek
BAGAN ALIR KEGIATAN PEMETAAN DAN TOPOGRAFI
RENCANA KERJA
Skema Pengujian Permeabilitas Dengan Alat Packer
WATER IS PUMPED INTO THE TEST
SECTION UNDER PRESSURE
WATER ENTERS THE ROCK
AT A RATE PROPORTIONAL
TO PERMEABILITY
HYDRAULICALLY EXPANSIBLE
PACKER SEALS OFF THE BORE
HOLE ABOVE THE TEST SECTION
SURVEY :
1). Investigasi lapangan
a. Pemboran inti (quarry), 2 (dua) lubang : @ 15 m
b. Packer test : 33 kali
c. SPT : 83 kali
2). Pondasi Bendungan
a. Pemboran pelimpah, 2 (dua) lubang : @ 35 m
b. Pemboran inti intake, 2 (dua) lubang : @ 30 m
3). Rock Mechanical Test, Aggregate, dan Filter
a. Direct Shear Test : 5 (lima) kali
b. Unconfined Compresive Strength (Dry and Saturated) : 5 (lima) kali
c. Sonic Velocity Test : 5 (lima) kali
d. Petrographic Analysis (untuk 1 jenis batuan) : 1 (satu) nos
e. Los Angeles Abrasion Test : 2 (dua)nos
f. Young Modulus & Poisson’s Ratio : 3 (tiga) nos
g. Specific Gravity (selected sample) : 3 (tiga) nos
h. Bulk Density : 5 (lima) nos
i. Moisture Content & Water Absorption : 5 (lima) nos
ANALISIS
1) Penggambaran Log of Bor Hole
Hasil pemerian (deskripsi) hasil bor tangan dicatat dalam Tabel Log of Bor Hole.
2) Analisis Test Pit
3) Analisis Rock Mechanical Test, Aggregat, dan Filter
4) Analisis Groundwater Test
5) Analisis Permeabilitas
6) Rekomendasi Bahan Bangunan
RENCANA KERJA
SURVEY
1). Investigasi lapangan
a. Test pit (borrow area) : 6 (enam) lubang
b. Sampling aggregate kasar dan halus : 2 (dua) sampel
2). Pengujian laboratorium
a. Material Survey
Sampling Borrow Area : 6 (enam) sampel
Sampling Pasir Filter : 2 (dua) sampel
Sampling Pasir Beton : 2 (dua) sampel
Sampling Agregat Kasar : 2 (dua) sampel
b. Index Test (untuk material timbunan)
Natural Water Content : 6 (enam) sampel
Unit Weight : 6 (enam) sampel
Natural Density (Insitu Test) : 6 (enam) sampel
Atterberg Limit : 6 (enam) sampel
Grain Size Analysis : 6 (enam) sampel
Specific Gravity : 6 (enam) sampel
c. Mechanical Properties (untuk material timbunan)
Compaction Test : 6 (enam) sampel
Triaxial Comp. Test : 6 (enam) sampel
Consolidation Test : 6 (enam) sample
Permeability Test : 6 (enam) sampel
Direct Shear Test : 4 (empat) sampel
ANALISIS
1). Analisis Daya Dukung Tanah
2). Analisis Stabilitas Bangunan
3). Analisis Penurunan berdasarkan uji konsolidasi
4). Analisis hasil uji laboratorium mekanika tanah
RENCANA KERJA
1. SURVEY
2. ANALISA
• PENGUMPULAN DATA TOPOGRAFI, TATAGUNA LAHAN, CURAH HUJAN, KLIMATOLOGI
DAN DEBIT ALIRAN
• PENENTUAN LOKASI POS DUGA AIR BIASA (PEILSKAL)
• PENGUKURAN DEBIT ALIRAN KALI KRENGSENG
• PENGAMBILAN SAMPLE SUSPENDED LOAD
• PENGAMBILAN SAMPLE BED LOAD
• ANALISA CURAH HUJAN DAN KLIMATOLOGI
• CURAH HUJAN HARIAN, BULANAN
• CURAH HUJAN RENCANA JAM-JAMAN
• UJI KONSISTENSI DATA DAN PENGISIAN DATA HUJAN YANG KOSONG
• ANALISA DATA KLIMATOLOGI EVAPOTRANSPIRASI DAN TRANSPIRASI AKTUAL
• ANALISA DEBIT DEBIT ANDALAN
DEBIT BANJIR RENCANA
• ANALISA KESEIMBANGAN AIR
• ANALISA ANGKUTA SEDIMEN MELAYANG
HIDROLOGI
RENCANA KERJA
Periode Pengamatan Data Hidrologi di DAS K.Krengseng-Rencana Waduk
No. Nama Pos Hujan Nomor Pos 85 86 87 88 89 90 91 92 93 94 95 96
1 Susukan SE 64
2 Ungaran SE 65
3 Kelepu SE 68
4 Plamongan SE 97
5 Pucanggading SE 98
1 Semarang I
2 Ungaran
Klimatologi
2007
21621949119325482006
1564117012362005
74621422004
1829987211513182003
17862002
3294267922602001
343027392370235039032000
350824382126213526601999
30582275189323981998
115821081603122228691997
163334562573129252231996
237239572677241836551995
1487304225491994
1740272425461993
186225241992
254536501991
28541990
Kelepu
SE 68
Ungaran
SE
65
Plamonga
n SE
97
Pucanggadin
g SE 98
Susukan
SE 64Tahun
Tabel Data Hujan di DAS K.Pengkal Takunang (mm)
2007
21621949119325482006
1564117012362005
74621422004
1829987211513182003
17862002
3294267922602001
343027392370235039032000
350824382126213526601999
30582275189323981998
115821081603122228691997
163334562573129252231996
237239572677241836551995
1487304225491994
1740272425461993
186225241992
254536501991
28541990
Kelepu
SE 68
Ungaran
SE
65
Plamonga
n SE
97
Pucanggadin
g SE 98
Susukan
SE 64Tahun
Tabel Data Hujan di DAS K.Pengkal Takunang (mm)
HIDROLOGI
RENCANA KERJA
Bagan Alir Analisis Hidrologi
HIDROLOGI
RENCANA KERJA
Bagan Alir Kesesuaian Hidrologi
HIDROLOGI
RENCANA KERJA
Bagan Perhitungan Debit Banjir Rencana
HIDROLOGI
RENCANA KERJA
Bagan Alir Perhitungan Debit Proses Perhitungan Debit pada Akhir Periode
HIDROLOGI
RENCANA KERJA
Bagan Alir Perhitungan Model Mock
SOSIAL EKONOMI
1. Survey Pengumpulan data (sekunder dan primer) berupa
kondisi sosial dan ekonomi masyarakat di wilayah studi.
Pengumpulan data Sarana dan prasarana.
Persepsi masyarakat terhadap pembangunan.
Inventarisasi kondisi lahan.
2. Analisa Gambaran kondisi sosial ekonomi masyarakat yang
mencakup antara lain perekonomian, Kependudukan dan kondisi sosial ekonomi.
Jumlah dan perkembangan penduduk yang ada di daerah studi.
Keinginan masyarakat mengenai pengembangan potensi sumber daya air.
Analisa kondisi lahan eksisting calon lokasi bendungan.
RENCANA KERJA
BAGAN ALIR PELAKSANAAN SURVEY SOSEK
START
SURVEY LAPANGAN
Pengumpulan Data Sekunder Pengumpulan Data Primer
(Wawancara)
Inventarisasi data sekunder dan primer
Evaluasi Kondisi Sosek dan
Kondisi lahan :
- Evaluasi Kondisi Sosek
- Evaluasi Kondisi Lahan
Kesimpulan
Rekomendasi
Penyusunan Laporan
RENCANA KERJA
KRITERIA DESAIN
Alas kedap air
Batas penggalian pondasi
Permukaan tanah asli
Kemiringan rata-rata
lereng hilir
Berm
Kemiringan lereng hilir
Kemiringan lereng hilir
Tumit lereng hilir
Tinggi
Bendungan
Lebar mercu
Timbunan ekstraMercu bendungan
Tinggi jagaan
HWL
Permukaan air
maksimum rencana
Mercu bangunan pelimpah
Tumit lereng udik
Kemiringan rata-rata lereng udik
Kemiringan lereng udik
Hamparan pelindung
Lebar dasar galian
pondasi zone kedap air
KRITERIA DESAIN
Beberapa istilah untuk bendungan urugan
Chut spillway
Anak sungai yangtergenang oleh Waduk
Bendungan
Side Spillway
Chute
Sungai
Terowongan
Chute Spillway
Side Spillway
Shaft Spillway
KRITERIA DESAIN
Tipe Bangunan Peredam Energi USBR
KRITERIA DESAIN
Ruang Operasi
Jembatan
Penghubung
Pintu, Saringan
Pd. Lubang
Penyadap
Katup
Pengatur
Pintu, Katup, Saringan
Pd. Lubang Pengglontor
sedimen
Lubang
Udara
Penyadap
Penghubung
Menara Terowongan penyalur
Pipa
Pipa
Penghubung
Terowongan
Penyalur
Menara
Penyadap
Jembatan
Penghubung
Komposisi dari bangunan penyadap menara
Pintu dan saringan
pada lubang penyadap
Terowongan penyadap sandar
kili - kili
Pintu pengglontorsedimen
Saluran pengelak
Penyemprot
PengglontorSedimen
Penyalur Pipa
Pipa penghubung
Lubang udara
Trap
Ruang
Operasi
Terowongan penyadap
Saluran
PenyalurPengglontorSedimen
Pipa
penghubung
Trap Ruang Operasi
Pengelak
Komponen dari bangunan penyadap sandar
KRITERIA DESAIN
Tampungan (reservoir)
(Regulating Reservoir)Sungai
Bendungan
Outlet
Tailrace
Ruang Turbin
Pipa pesat (Penstock)
IntakeBendungan
Power Station
Outlet
Total tinggi energi
Tailrace
Pipa pesat (penstock)
Power Station
(Regulating Reservoir)
Tampungan (reservoir)
Intake
Tata letak PLTMH
KRITERIA DESAIN
ORGANISASI DAN
JADWAL
PELAKSANAAN
HUBUNGAN KERJA ANTARA PEMILIK PEKERJAAN DAN PENYEDIA JASA
ORGANISASI DAN JADWAL PELAKSANAAN
= Garis Koordinasi
= Garis Komando
Keterangan
DIRUT. PT. JASAPATRIA GUNATAMA
Ir. Rini Kosasih
KETUA TIM
Ir. Sampudjo K., M.Eng.
Lili
k F
ajar
R.,S
T.
Agu
stia
n H
, AM
d.
AS
IST
EN
AH
LI G
EO
DE
SI
AS
IST
EN
AH
LI H
IDR
OL
OG
I
Dha
ni R
uchi
mat
S.,S
T.
AS
IST
EN
AH
LI H
IDR
OL
IKA
Riz
ky V
ansu
ri, S
T.
AS
IST
EN
AH
LI M
EK
AN
IKA
TA
NA
H
Mas
turi
, ST
.
AS
IST
EN
AH
LI B
AN
GU
NA
N A
IR
KEPALA SATKER
BBWS PEMALI - JUANA
Ir.Hartanto, Dipl.HE
Bambang Supardjono, SE.
BENDAHARA
Sulistyo Sulcan, SE.
PENGUJI SPM
PPK PERENCANAAN
DAN PROGRAM
Agus Sigit, S.ST.
PUMK
Sulismiyati
Dra. Suprapti
URUSAN ADM. TEKNIK
Sri Supriyono, ST.
URUSAN ADM. UMUM
Ir. M. Mazid, SP1.
Ir. Panca Hermawan, SP1.
Bambang Astoto, SP1.
Ir. Rudi Pristono, MT.
Bambang Sulaksono, BSc.
DIREKSI PEKERJAAN
Ir. Yudi Pratondo, MM.
PENGARAH
P E
N
Y
E
D
I A
J
A
S
A
P E
M
I L
I K
P
E
K
E
R
J
A
A
N
Stefanus N, Amd.
Ir. A
sria
l M. S
jaf
AH
LI K
ON
SE
RV
AS
I SD
A
AH
LI H
IDR
OL
IKA
Ir. A
bim
anyu
AH
LI H
IDR
OL
OG
I
AH
LI M
EK
AN
IKA
TA
NA
H
AH
LI G
EO
LO
GI
AH
LI G
EO
DE
SI
AH
LI P
LT
A
AH
LI E
LE
KT
RIK
AL
ME
KA
NIK
AL
AH
LI O
PE
RA
SI D
AN
PE
ME
LIH
AR
AA
N
AH
LI P
ER
MO
DE
LA
N
AH
LI B
EN
DU
NG
AN
AH
LI B
AN
GU
NA
N A
IR
AH
LI C
OS
T E
ST
IMA
TO
R
AH
LI C
ON
ST
RU
CT
ION
PL
AN
NE
R
AH
LI S
OS
IAL
EK
ON
OM
I
AH
LI D
OK
UM
EN
TE
ND
ER
AH
LI L
ING
KU
NG
AN
Agu
s D
arm
adji,
ST
.
Ir. Y
oyok
Tri
Pra
sety
o
Ir. D
edy
Ant
oni
Ir. T
atan
g P
rata
nggo
pati
Ir. S
ugan
di K
arta
send
jaja
Ir. S
urya
di
Ir. H
erm
anto
Sub
agijo
, MT
.
Ir.J
ohnn
y G
unaw
an
Dra
. Mel
iaw
ati K
urni
a
Ir. J
ames
Nob
elia
I.,
MT
.
Ir. P
aulu
s Su
djae
no
Ir. S
oni W
ahyu
di, M
T.
Ir. A
gung
Sar
won
o
Ir. T
aufa
n Ja
ya S
ento
sa
Ir. H
erya
nto
Suta
nto
TENAGA PENDUKUNG
ADMINISTRASI
TENAGA PENDUKUNG TEKNIK
Koordinator Surveyor, Koordinator Juru Gambar, Bor Master, Mekanik Bor, Operator Komputer (2), Operator CAD (2), Surveyor Topografi (4), Supir (1), Pesuruh Kantor (1)
DIREKSI PEKERJAAN
Ir. Panca Hermawan, SP1
Bulan
MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER
30
Apr8 16 24 1 8 15 23 1 9 17 24 1 9 17 25 1 8 15 23 1 9 17 25 1 8 15 22
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
7 15 23 31 7 14 22 30 8 16 23 31 8 16 24 31 7 14 22 30 8 16 24 31 7 14 21 25
FEASIBILITY STUDY DETAIL DESIGN
I PEKERJAAN PERSIAPAN
0.56
0.1 0.15
0.24
II PENGUMPULAN DATA
0.35 0.35 0.35 0.35
0.4 0.4
III KEGIATAN SURVEY/INVESTIGASI
III.1 PENGUKURAN TOPOGRAFI1.33 1.33 1.34 1.34
0.26 0.26 0.26 0.27 0.27 0.27
III.2 INVESTIGASI GEOTEK./MEKTAN
0.62 0.62 0.62 0.62 0.63 0.63
0.07 0.07
0.16 0.16 0.17 0.17 0.17 0.17 0.17 0.17
III.3 SURVEY HIDROLOGI
0.26
0.26
0.26
0.26
0.35 0.35 0.35 0.35
0.47 0.47 0.47 0.47 0.47 0.48 0.48 0.48
VI KEGIATAN DETAIL DESAIN
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.29 0.29
3.07 3.07 3.07 3.07 3.07 3.08
VIII PELAPORAN
0.4 0.4 0.4
0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6 0.6 0.6
0.53 0.53 0.54
0.52 0.52
0.6 0.6
0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6
0.64
IX DISKUSI
0.3
0.3
0.5
Waktu
(hari)
I.1 Persiapan Administrasi, Personil & Peralatan 7
No. Uraian Kegiatan
I.2 Penyusunan Rencana Mutu Kontrak 15
I.3 Survey Lapangan Pendahuluan 3
II.1 Pengumpulan Data Sekunder 30
II.2 Pengumpulan Peta Pendukung 15
III.1aPengukuran Situasi Bendungan/ Bang.
Pelengkap/ Genangan/ Quarry/ Disposal Area30
III.1b Pengolahan Data dan Penggambaran 45
III.2a Bor Inti/Sampling/SPT/Packer Test 45
III.2b Test Pit 15
III.2cPekerjaan Laboratorium (Mekanika Tanah dan
Batuan )60
III.3a Pengukuran Arus Sungai 7
III.3b Pengambilan Bed Load/Suspended Load 7
III.4 SURVEY SOSIAL EKONOMI 7
III.5 SURVEY LINGKUNGAN 7
IV KEGIATAN PRA RENCANA 30
V KEGIATAN STUDI KELAYAKAN 60
VI.1 Tubuh Bendungan 30
VI.2 Bangunan Pelimpah 30
VI.3 Mekanikal - Elektrikal 30
VI.4 Bangunan Pelengkap 30
VI.5 Penggambaran Desain 120
VII UJI MODEL FISIK/MODEL TEST 45
VIII.1 Laporan Pendahuluan 23
VIII.2 Laporan Bulanan 21
VIII.3 Laporan Kriteria Perencanaan 30
VIII.4 Laporan Antara/Interim 30
VIII.5 Laporan Akhir Sementara 60
VIII.6 Laporan Akhir :
VIII.6a Laporan Utama 20
VIII.6b Laporan Ringkasan (bahasa Indonesia ) 13
VIII.6c Executive Summary (bahasa Inggris ) 15
VIII.6d Laporan Hasil Model Test 15
VIII.6e Laporan Geotek dan Mektan 30
VIII.6f Laporan Survey Topografi 30
VIII.6g Laporan Hidrologi 45
VIII.6h Laporan Kajian Pembebasan Tanah 30
VIII.6i Laporan Rekomendasi Konservasi DTA Waduk 45
VIII.6j Laporan Nota Perencanaan 30
VIII.6k Laporan Pedoman Operasi dan Pemeliharaan 30
VIII.6l Laporan Sosial Ekonomi dan Lingkungan 30
VIII.6m Rencana Anggaran Biaya 30
VIII.6n Dokumen Pengadaan Jasa Pemborongan 45
VIII.6o CD (File laporan, gambar, foto-foto dll.) 8
IX.1 Laporan Pendahuluan (Semarang) 1
IX.2 Laporan Antara/Interim (Semarang ) 1
IX.3 Konsep Laporan Akhir (Jakarta ) 2
ORGANISASI DAN JADWAL PELAKSANAAN
JADWAL PELAKSANAAN
Bulan
MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER
30
Apr8 16 24 1 8 15 23 1 9 17 24 1 9 17 25 1 8 15 23 1 9 17 25 1 8 15 22
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
7 15 23 31 7 14 22 30 8 16 23 31 8 16 24 31 7 14 22 30 8 16 24 31 7 14 21 25
FEASIBILITY STUDY DETAIL DESIGN
I PEKERJAAN PERSIAPAN
0.56
0.1 0.15
0.24
II PENGUMPULAN DATA
0.35 0.35 0.35 0.35
0.4 0.4
III KEGIATAN SURVEY/INVESTIGASI
III.1 PENGUKURAN TOPOGRAFI1.33 1.33 1.34 1.34
0.26 0.26 0.26 0.27 0.27 0.27
III.2 INVESTIGASI GEOTEK./MEKTAN
0.62 0.62 0.62 0.62 0.63 0.63
0.07 0.07
0.16 0.16 0.17 0.17 0.17 0.17 0.17 0.17
III.3 SURVEY HIDROLOGI
0.26
0.26
0.26
0.26
0.35 0.35 0.35 0.35
0.47 0.47 0.47 0.47 0.47 0.48 0.48 0.48
VI KEGIATAN DETAIL DESAIN
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.29 0.29
3.07 3.07 3.07 3.07 3.07 3.08
VIII PELAPORAN
0.4 0.4 0.4
0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6 0.6 0.6
0.53 0.53 0.54
0.52 0.52
0.6 0.6
0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6
0.64
IX DISKUSI
0.3
0.3
0.5
Waktu
(hari)
I.1 Persiapan Administrasi, Personil & Peralatan 7
No. Uraian Kegiatan
I.2 Penyusunan Rencana Mutu Kontrak 15
I.3 Survey Lapangan Pendahuluan 3
II.1 Pengumpulan Data Sekunder 30
II.2 Pengumpulan Peta Pendukung 15
III.1aPengukuran Situasi Bendungan/ Bang.
Pelengkap/ Genangan/ Quarry/ Disposal Area30
III.1b Pengolahan Data dan Penggambaran 45
III.2a Bor Inti/Sampling/SPT/Packer Test 45
III.2b Test Pit 15
III.2cPekerjaan Laboratorium (Mekanika Tanah dan
Batuan )60
III.3a Pengukuran Arus Sungai 7
III.3b Pengambilan Bed Load/Suspended Load 7
III.4 SURVEY SOSIAL EKONOMI 7
III.5 SURVEY LINGKUNGAN 7
IV KEGIATAN PRA RENCANA 30
V KEGIATAN STUDI KELAYAKAN 60
VI.1 Tubuh Bendungan 30
VI.2 Bangunan Pelimpah 30
VI.3 Mekanikal - Elektrikal 30
VI.4 Bangunan Pelengkap 30
VI.5 Penggambaran Desain 120
VII UJI MODEL FISIK/MODEL TEST 45
VIII.1 Laporan Pendahuluan 23
VIII.2 Laporan Bulanan 21
VIII.3 Laporan Kriteria Perencanaan 30
VIII.4 Laporan Antara/Interim 30
VIII.5 Laporan Akhir Sementara 60
VIII.6 Laporan Akhir :
VIII.6a Laporan Utama 20
VIII.6b Laporan Ringkasan (bahasa Indonesia ) 13
VIII.6c Executive Summary (bahasa Inggris ) 15
VIII.6d Laporan Hasil Model Test 15
VIII.6e Laporan Geotek dan Mektan 30
VIII.6f Laporan Survey Topografi 30
VIII.6g Laporan Hidrologi 45
VIII.6h Laporan Kajian Pembebasan Tanah 30
VIII.6i Laporan Rekomendasi Konservasi DTA Waduk 45
VIII.6j Laporan Nota Perencanaan 30
VIII.6k Laporan Pedoman Operasi dan Pemeliharaan 30
VIII.6l Laporan Sosial Ekonomi dan Lingkungan 30
VIII.6m Rencana Anggaran Biaya 30
VIII.6n Dokumen Pengadaan Jasa Pemborongan 45
VIII.6o CD (File laporan, gambar, foto-foto dll.) 8
IX.1 Laporan Pendahuluan (Semarang) 1
IX.2 Laporan Antara/Interim (Semarang ) 1
IX.3 Konsep Laporan Akhir (Jakarta ) 2
Bulan
MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER
30
Apr8 16 24 1 8 15 23 1 9 17 24 1 9 17 25 1 8 15 23 1 9 17 25 1 8 15 22
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
7 15 23 31 7 14 22 30 8 16 23 31 8 16 24 31 7 14 22 30 8 16 24 31 7 14 21 25
FEASIBILITY STUDY DETAIL DESIGN
I PEKERJAAN PERSIAPAN
0.56
0.1 0.15
0.24
II PENGUMPULAN DATA
0.35 0.35 0.35 0.35
0.4 0.4
III KEGIATAN SURVEY/INVESTIGASI
III.1 PENGUKURAN TOPOGRAFI1.33 1.33 1.34 1.34
0.26 0.26 0.26 0.27 0.27 0.27
III.2 INVESTIGASI GEOTEK./MEKTAN
0.62 0.62 0.62 0.62 0.63 0.63
0.07 0.07
0.16 0.16 0.17 0.17 0.17 0.17 0.17 0.17
III.3 SURVEY HIDROLOGI
0.26
0.26
0.26
0.26
0.35 0.35 0.35 0.35
0.47 0.47 0.47 0.47 0.47 0.48 0.48 0.48
VI KEGIATAN DETAIL DESAIN
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.29 0.29
3.07 3.07 3.07 3.07 3.07 3.08
VIII PELAPORAN
0.4 0.4 0.4
0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6 0.6 0.6
0.53 0.53 0.54
0.52 0.52
0.6 0.6
0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.6 0.6 0.6 0.6
0.59 0.6 0.6 0.6 0.6 0.6
0.64
IX DISKUSI
0.3
0.3
0.5
Waktu
(hari)
I.1 Persiapan Administrasi, Personil & Peralatan 7
No. Uraian Kegiatan
I.2 Penyusunan Rencana Mutu Kontrak 15
I.3 Survey Lapangan Pendahuluan 3
II.1 Pengumpulan Data Sekunder 30
II.2 Pengumpulan Peta Pendukung 15
III.1aPengukuran Situasi Bendungan/ Bang.
Pelengkap/ Genangan/ Quarry/ Disposal Area30
III.1b Pengolahan Data dan Penggambaran 45
III.2a Bor Inti/Sampling/SPT/Packer Test 45
III.2b Test Pit 15
III.2cPekerjaan Laboratorium (Mekanika Tanah dan
Batuan )60
III.3a Pengukuran Arus Sungai 7
III.3b Pengambilan Bed Load/Suspended Load 7
III.4 SURVEY SOSIAL EKONOMI 7
III.5 SURVEY LINGKUNGAN 7
IV KEGIATAN PRA RENCANA 30
V KEGIATAN STUDI KELAYAKAN 60
VI.1 Tubuh Bendungan 30
VI.2 Bangunan Pelimpah 30
VI.3 Mekanikal - Elektrikal 30
VI.4 Bangunan Pelengkap 30
VI.5 Penggambaran Desain 120
VII UJI MODEL FISIK/MODEL TEST 45
VIII.1 Laporan Pendahuluan 23
VIII.2 Laporan Bulanan 21
VIII.3 Laporan Kriteria Perencanaan 30
VIII.4 Laporan Antara/Interim 30
VIII.5 Laporan Akhir Sementara 60
VIII.6 Laporan Akhir :
VIII.6a Laporan Utama 20
VIII.6b Laporan Ringkasan (bahasa Indonesia ) 13
VIII.6c Executive Summary (bahasa Inggris ) 15
VIII.6d Laporan Hasil Model Test 15
VIII.6e Laporan Geotek dan Mektan 30
VIII.6f Laporan Survey Topografi 30
VIII.6g Laporan Hidrologi 45
VIII.6h Laporan Kajian Pembebasan Tanah 30
VIII.6i Laporan Rekomendasi Konservasi DTA Waduk 45
VIII.6j Laporan Nota Perencanaan 30
VIII.6k Laporan Pedoman Operasi dan Pemeliharaan 30
VIII.6l Laporan Sosial Ekonomi dan Lingkungan 30
VIII.6m Rencana Anggaran Biaya 30
VIII.6n Dokumen Pengadaan Jasa Pemborongan 45
VIII.6o CD (File laporan, gambar, foto-foto dll.) 8
IX.1 Laporan Pendahuluan (Semarang) 1
IX.2 Laporan Antara/Interim (Semarang ) 1
IX.3 Konsep Laporan Akhir (Jakarta ) 2
ORGANISASI DAN JADWAL PELAKSANAAN
JADWAL PELAKSANAAN
PEKERJAAN PERSIAPAN
1. Pengumpulan dan inventarisasi data sekunder dan laporan/studi terdahulu
serta perijinan awal
2. Dua minggu setelah terbit SPMK dilakukan penyerahan Laporan RMK
(dibahas tanggal 16 Mei 2008)
3. Data awal dan peta yang diperoleh adalah :
• Peta Rupa Bumi Indonesia skala 1 : 25.000 dalam bentuk hard
copy (lembar 1408 – 544)
• Peta Topografi skala 1 : 100.000 dalam bentuk soft copy
• Peta Geologi lembar Magelang – Semarang skala 1 : 100.000
• Peta Geologi Teknik skala 1 : 100.000
• Peta Gempa skala 1 : 100.000
• Data tataguna lahan
• Data kepemilikan laha
• Data statistik, terdiri dari :
• Kota Semarang dalam angka, tahun 2006
• Kecamatan Tembalang dalam angka, tahun 2006
• Kecamatan Banyumanik dalam angka, tahun 2006
• Produk Domestik Regional Bruto Kota Semarang, tahun 2006
PENINJAUAN LAPANG DAN SURVEY IDENTIFIKASI
1. Orientasi dan pengenalan lapangan pada minggu pertama Mei 2008 berkoordinasi
dengan BBWS Pemali-Juana, Universitas Diponegoro.
2. Berdasarkan identifikasi pada Peta Rupa Bumi dengan memperhatikan bentuk
kontur-kontur dimungkinkan pembangunan waduk dan dapat diperkirakan batas-
batas tangkapan air (DTA), perkiraan volume genangan, tinggi bendungan.
3. Kondisi batuan lokasi as bendung tufa breksi (laharic), lokasi digeser 400 m ke arah
hilir sehingga didapat bentang bendungan yang lebih sempit (menyempit), dengan
tumpuan kiri dan kanan bendungan terdiri dari batuan tufa breksi (laharic).
4. Pengumpulan dan Analisa Data
Hidrologi
Nama stasiun curah hujan dan ketersediaan dari stasiun-stasiun dapat dilihat pada
tabel data hujan di DAS K.Pengkal Takunang.
Lingkungan
Dilakukan pengambilan contoh air Sungai Krengseng di hulu genangan (jembatan
masuk ke Universitas Diponegoro) pada bulan Mei 2008, dan telah dilakukan tes
laboratorium Sucofindo di Semarang dengan hasil seperti terlampir.
1. Akan dilakukan pengukuran topografi detail pada rencana
as bendung dan alternatifnya.
2. Pengukuran area genangan waduk, sebagai refernsi X, Y, Z pekerjaan
pengukuran ini akan mengacu pada BM yang sudah ada di sekitar
Kampus Universitas Diponegoro.
3. Analisa data curah hujan untuk mendapatkan data banjir, perhitungan
neraca air dan perhitungan operasi waduk.
4. Penentuan titik-titik bor.
KESIMPULAN
DAN SARAN
KESIMPULAN
1. Secara visual, Spillway (pelimpah) diletakan pada sisi sebelah kiri. Spillway (pelimpah)
dibuat dari beton bertulang dengan perbaikan daya dukung pondasi , dilakukan
consolidation grouting.
2. Untuk mempermudah dalam pelaksanaan konstruksi dibuat division tunnel (terowong
pengelak) yang direncanakan pada sisi sebelah kanan, dan nantinya akan digunakan
sebagai bangunan intake (jika memungkinkan).
3. Perlu direncanakan lokasi untuk Borrow Area dan Quarry serta sebelum dilakukan
penggalian harus dilakukan stripping untuk membuang kandungan bahan organik yang
tinggi.
4. Pada sungai Krengseng/Seketak belum dijumpai alat pengukur debit sungai.
5. Gambaran data teknis Waduk Diponegoro
Sumber air : Mata air dan air hujan
Luas DAS : 777 Ha
Panjang Sungai : 8 Km
Elevasi muka air normal : + 190 m
Elevasi muka air banjir : + 191 m
Luas genangan : 15 Ha
Volume genangan : 1.420.000 m³
Bendungan Utama
Bahan bangunan : Urugan tanah (earthfill dam) atau urugan batu dengan inti kedap (rockfill dam)
Tinggi bendungan : 35 m
Elevasi puncak bendung : + 195 m
Lebar mercu : 8 m
Kemiringan lereng hulu : 1 :3
Kemiringan lereng hilir : 1 : 2,5
Bangunan Pengelak (diversion)
Type : Terowongan (tunnel) atau sudetan (cut off) tergantung jenis batuan
Penampang galian : Tapal Kuda
Banjir desain : Q10 atau Q25
Bangunan Pelimpah (spill way)
Type : Overflow tanpa pintu
Lebar : 18 meter
Elevasi mercu : + 190 meter
Bangunan Operasi
Type inlet : Kisi-kisi vertikal dan culvert horizontal
Type bangunan : Beton bertulang dan pipa baja
Pembangkit Listrik Tenaga Hidro (PLTH)
Type : Penstok dan surge tank
Tinggi jatuh : 30 m
Peruntukan / manfaat Waduk Diponegoro
•Konservasi sumber daya air dan pengisian (recharge) air tanah
•Waduk sarana pendidikan
•Penyediaan air baku untuk laboratorium hidrolika
•Laboratorium perikanan
•Laboratorium teknik lingkungan
•Laboratorium hidrografi
•Air baku penduduk sekitar
•Pembangkit listrik tenaga air (mikro hidro)
•Rekreasi
SARAN
1. Lokasi as waduk pada maket Universitas Diponegoro perlu ditinjau ulang,
jika memungkinkan as digeser kesebelah hilir ± 300 – 400 m.
2. Mengingat tinggi bendung ± 30 m disarankan menggunakan bendungan
type urugan tanah tidak homogen atau type urugan batu (Rockfill Dam)
dengan inti kedap dari tanah.
3. Pada bagian tanggul penutup perlu dilakukan certain grout untuk
memperbaiki permeabilitas yang penyebaran titiknya disesuaikan dengan
hasil test lugeon.
4. Perlu dilakukan penelitian geologi untuk mengetahui kondisi batuan serta
nilai permeabilitasnya, terutama pada bagian tengah dan bagian tumpuan-
tumpuan Dam.
5. Memasang alat pengukur debit dan diamati selama ± 2 bulan untuk men
generate curah hujan yang ada.
6. Untuk memonitor pergerakan tubuh bendung perlu dipasang instrumentasi.
SEKIAN
DAN
TERIMAKASIH