www.arup.com

T +44(0)121 213 3000 F +44(0)121 213 3001

Solihull, West Midlands B90 8AE

The Arup Campus, Blythe Gate, Blythe Valley Park

Feasibility Study

High Speed 2

Sheet 28 of 33

Plan and Profile

Rail

209742-00

HS2-ARP-00-DR-RW-05028 3.0

As Shown

/ /2212 11 CO

For Coordination

2.0 CLMP

/ /05 0112 CO MP CL

3.0

Post Consultation Route

J:\209000\2

09742-0

0\4 Intern

al Project

Data\4-1

0 P

ost

Consultation Dra

win

gs\0

_Dra

win

gs\H

S2-A

RP-0

0-D

R-R

W-0

5028.d

gn

Approved

Approved

80

80

8080

80

80

80

80

80

8080

80

80

80

80 80

8080

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

80

8080

80

80

80

80

80 8

0

80

80

80

100

100

100

100

100

100

100

100

100

100

100100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100 1

00

100

100

100

100

100

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

120

140

140

140140

140 1

40

140

140

140

140

140

140

140

140

172+000

173+000

174+000

175+000

176+000

177+000

178+000

179+000

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0160.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0160.0

Chainage

172+800

172+900

173+000

173+100

173+200

173+300

173+400

173+500

173+600

173+700

173+800

173+900

174+000

174+100

174+200

174+300

174+400

174+500

174+600

174+700

174+800

174+900

175+000

175+100

175+200

175+300

175+400

175+500

175+600

175+700

175+800

175+900

176+000

176+100

176+200

176+300

176+400

176+500

176+600

176+700

176+800

176+900

177+000

177+100

177+200

177+300

177+400

177+500

177+600

177+700

177+800

177+900

178+000

178+100

178+200

178+300

178+400

178+500

178+600

178+700

178+800

178+900

179+000

179+100

179+200

Horizontal Alignment L=375.0L=2249.5

L=280.0R=6290.0

L=4022.2

Vertical Alignment L=953.7

G=0.59%

L=331.2

R=56000.0

L=2746.3

G=-0.00%

L=638.2

R=56000.0L=595

.4

G=-1.14%

L=909.7

R=-56000.0

L=2331.2G=0.48%

Existing Level 81.1

81.8

83.6

84.3

84.4

85.9

87.7

90.6

94.3

95.7

95.1

97.6

100.2

103.5

105.8

107.7

109.8

110.8

110.7

105.5

100.1

96.0

97.0

97.0

96.2

96.7

100.0

101.8

100.4

93.7

90.4

92.5

92.6

90.8

94.0

101.3

107.8

110.2

102.5

98.8

97.2

95.1

93.7

90.8

88.5

84.2

85.4

84.9

83.3

80.1

79.7

83.0

94.1

97.3

94.5

95.0

92.4

95.6

95.6

94.8

95.1

97.3

100.8

100.6

99.3

Proposed Level 88.3

88.8

89.4

90.0

90.6

91.2

91.8

92.4

93.0

93.5

94.1

94.4

94.6

94.6

94.6

94.6

94.6

94.6

94.6

94.6

94.6

94.6

94.6

94.6

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.5

94.4

94.1

93.6

93.0

92.2

91.2

90.0

88.9

87.7

86.6

85.4

84.3

83.2

82.3

81.5

81.0

80.6

80.4

80.4

80.5

80.8

81.3

81.8

82.3

+7.2

+7.0

+5.8

+5.7

+6.2

+5.3

+4.1

+1.8

+0.8

+4.1

+2.0

+1.9

+3.7

+0.5

+0.4

+2.8

+4.5

+8.0

+5.8

+5.1

+5.6

+7.6

+6.9

+2.4

Cut and Fill -1.3

-2.2

-1.0

-3.2

-5.6

-8.9

-11.2

-13.1

-15.2

-16.2

-16.1

-10.9

-5.5

-1.4

-2.4

-2.4

-1.7

-2.2

-5.5

-7.3

-5.9

-6.8

-13.3

-15.7

-8.0

-4.3

-2.7

-0.7

-9.8

-14.1

-12.2

-13.5

-11.4

-15.0

-15.2

-14.4

-14.6

-16.5

-19.5

-18.8

-17.0

Design Speed 350km/h

Ch.1

73714.5

42

TP.9

3.6

30

Ch.1

74045.7

00

TP.9

4.5

95

Ch.1

76791.9

56

TP.9

4.4

79

Ch.1

77430.1

42

TP.9

0.8

16

Ch.1

78025.5

81

TP.8

4.0

05

Ch.1

78935.2

51

TP.8

0.9

88

New Possible Permanent Waggoner’s

Lane Diversion over HS2

Possible Road Closure

New Possible Permanent

Waggoner’s Lane Diversion

over HS2

New Possible Permanent Shirral

Drive Diversion

New Rock Hill

Bridge over HS2

New A5 Bridge

over HS2

New Cranebrook Hill

Bridge over HS2

New HS2 Viaduct over Flood Plain 255m

New HS2 Viaduct overFlood Plain 160m New Possible Permanent Rookery

Lane Diversion under HS2

(Agricultural Underpass)

New Possible Permanent Drayton

Lane and Shirral Lane Diversion over HS2

New HS2 Viaduct over Flood Plain

New A5 Bridge

over HS2

New HS2 Viaduct over Flood Plain

New Rock Hill Bridge

over HS2

New Possible Permanent Rookery

Lane Diversion under HS2

(Agricultural Underpass)

New HS2 RetainingStructure

New Possible Permanent

Drayton Lane and Shirral Lane

Diversion over HS2New Cranebrook Hill

Bridge over HS2

New HS2 Retaining

Structure Possible Road

Closure

PlanScale 1:10000

ProfileScale H 1:10000 V 1:1000

N

For

Continuation R

efer To H

S2-A

RP-D

R-R

W-0

5029

For C

ontin

uatio

n R

efer T

o H

S2-A

RP-D

R-R

W-0

5027

Legend National Parks

Flood Risk Zones

Special Areas of Conservation

Special Protection Areas

National Nature Reserves

Parks and Gardens

Scheduled Ancient Monuments

Historical Battlefields

Listed buildings

Area of Outstanding Natural Beauty

RAMSAR

World Heritage Site

SSSI

A1 A

9

B C D E F G H I J K L M N O P

Drawing No

Drawing Status

Discipline

Scale at A1

Job No

Issue

Drawing Title

Issue Date By Chkd Appd

Job TitleClient

10

8

7

6

5

4

2

1

3

' Arup

' Crown copyright and database rights 2011 Ordnance Survey 10049190

0.040.02 0.030 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur)

Railway

Embankment

Highway

Embankment

Highway

Cutting

Railway

Cutting