Simpler & Faster Deployment of Small Cell Networks: LampSite Case Studies with iBwave Planning

2

ContentsHuawei LampSite Solution and Case Study1

iBwave Tools Solution 32

3

LampSite: Innovative Solution for Indoor MBB

Busy hour

Traditional solution

MBB traffic

Busy hour

Current Situation of Indoor MBB

Unleash The Suppressed Traffic

BBU RHUB pRRU

Superiority Challenge

Larger & Flexible Capacity pRRU level Capacity Allocation. Dynamic Capacity Adjustment.

Easier Deployment Simple Architecture. Smaller & Lighter.

Accurate Design Simplify by Professional

Tool, for example:

Enhanced SON feature.

Specification Checklist / Validation Tools.

Integrated to Design Tools.

More Product Specifications

Complex Configuration

4

Case1: LampSite Deployed in Stadium Scenario

Initial Period(SFN) - Cell resources saved. - Interference reduced.

Later Period(Cell splitting) - Remote expansion. - Capacity N times increased.

Cell 1

Cell 2

Cell 3

Cell 4

Cell 1 Cell 2

Cell 3

Cell 4Cell 5Cell 6

Cell 7

Cell 8

Dynamic Capacity

Description High complexity and functionality in Europe. Support nearly 15,000 spectators.

System design: 30 hours. Venue construction: 7 days.

Time cost of LampSite solution

Minsk-Arena Complex in Belarus

5

Case1: Accurate Design with iBwave Tools

Interference analyze. Antenna type select.

Interference

Step 2

Quick location and routing design. Coverage confirm by simulations.

Topology check & correct.

Performance OptimizationInterference

Shaped Antenna

Directional Antenna

Step 1 Step 3

Step 4

Call completion rate 100%

HSDPA peak rate 28Mbps

PS call drop rate 0.18%

PS traffic increased to 336%

6

Case2: LampSite Deployed in Hotel Scenario

BBU

pRRU

RHUBCarrier 1

Carrier 2

LTE 2CCs CA On 1 pRRU

Description The first integrated resorts in Singapore. LampSite target: 2 basement in MBS Retail area.

System design: 16 hours. Venue construction: 14 days.

Time cost of LampSite solution

Marina Bay Sands

7

Basement1

Basement2

Case2: Simpler & Faster Design

Simulation: Good Coverage Performance: Excellent

Average DL speed: 239Mbps CSFB success rate: 100% VoLTE & SRVCC handover

success rate: 100%

Average RSRP -76dBm

8

ContentsHuawei LampSite Solution and Case Study1

iBwave Tools Solution 32

WORLDWIDE STANDARDfor in-building network design and documentation

TRUSTED BY 700+ CUSTOMERSin more than 87 countries

CONTINUOUS INNOVATIONadapting quickly to a dynamic and rapidly-evolving industry

INDOOR WIRELESSPLANNING & DESIGN

FIELD-BASED SURVEYSCOLLABORATION PLATFORM

EXPERT TRAINING & CERTIFICATION

About iBwave

Enabling in-building networking excellence

Feb 22, 2016 10

Enterprises Large venuesTransportationHospitality

SC design case studies

Network architecture with automated RF calculations

Floor plans with propagation results

Small cell deployment process

11

DOCUMENT

SURVEY

Client &Site info

DESIGN

Planning& Design

MAINTAIN

MaintenanceUpgrades

BUILD

Install &Commission

Feb 22, 2016SC design case studies

Design tool objectives for small cells

12

PORTABLE: Easy to carry on-site

INTUITIVE: RF expertise not required

AFFORDABLE: Accessible to all field personnel

COMPLETE & ACCURATE: Getting it right the 1st time

INTEGRATED: Complete end-to-end workflow

LOW TCOSCALING

Feb 22, 2016SC design case studies

Product Suite

IN-BUILDINGCOLLABORATIONPLATFORM

FIELD-BASED SURVEYS &DESIGNS

TRAINING & CERTIFICATION

DATABASE OF COMPONENTS(20,000 +)

RF PLANNING AND DESIGN SOFTWARE

13Feb 22, 2016SC design case studies

Network architecture with automated RF calculations

Floor plans with propagation results

Case study – sports complex

14

Minsk Arena Complex, Belarus(15,000 seats)

Primary criteria: capacity

Number of small cells: 4 8

Design time: 30 hrs (50% less)

Tool: iBwave Design

Feb 22, 2016SC design case studies

Network architecture with automated RF calculations

Floor plans with propagation results

Case study – shopping mall

15

Shopping mall, Manila (240K sq ft)

Number of small cells: 8

Survey & design time: 4.5 hrs

Time savings: 5 hrs (55%)

Tool: iBwave Mobile Planner

Feb 22, 2016SC design case studies

Network architecture with automated RF calculations

Floor plans with propagation results

Summary

16

• 4-step deployment process for enterprise small cells

• Key objective for design toolkit: Low TCO & ability to scale

• Design case studies: single sites to nationwide deployments

• Benefits: >50% time savings & getting it right the 1st time

• Collaboration & documentation needed for maintainability

Feb 22, 2016SC design case studies

Benoit Fleurybenoit.fleury@ibwave.com

Salessales_americas@ibwave.com1.855.4.IBWAVE (Toll free)

Support support@ibwave.com1.855.4.IBWAVE (Toll free)

AMERICAS

Salessales_emea@ibwave.com+ 33 3 44 57 75 90 (office)+ 33 6 19 19 97 13 (mobile)

Support support@ibwave.com+ 20 111 0777 833

EMEA

Salessales_apac@ibwave.com+ 60 3 2298 7298 (office)+ 60 3 2298 7333 (fax)

Support support@ibwave.com+ 6012 285 6875

APAC

THANK YOU !STAND 7C71 | HALL 7

top related