SPECIALIZED INDUSTRIAL SERVICES CO. LTD. (SISCO)

WELCOMES YOUTO THE PRESENTATION ON

CORPORATE PROFILE Re: SABIC General Construction

Services (Global Contract 2014 - 19)

DATE: 07 JAN 2015

INDEX Introduction / Overview Company at a Glance Area of Business Resources Capability & Clientele Equipment, Vehicles & Facilities Highlights Contract Features Project Organogram & Work Flow Diagram Mobilization Plan Your Feed Back

INTRODUCTION / OVERVIEW SISCO is a 100% Saudi Owned Limited Liability Company

established in the year 1990, growing with 30% CAGR

Strategically located Offices, Laydown Yards and Camps

An ISO 9000 accredited company, executing projects in Plant Construction, Piping, Pipe Line & Maintenance

With 2000 skilled manpower; 700 light & heavy equipment and vehicles, SISCO operates in CMEI areas in Oil & Gas Sector – Refineries, Petrochemical, Fertilizer and Utility Plants

COMPANY AT A GLANCE

INDUSTRIAL CONSTRUCTION

SHUTDOWN, OPERATION & MAINTENANCE

CROSS COUNTRY PIPELINE & IN-PLANT PIPING PROJECTS

ENGINEERING & TECHNICAL SUPPORT

AREA OF BUSINESS / SECTORS Civil, Mechanical, Electrical & Instrumentation on LSTK basis

Cross-country Pipeline, In-Plant Piping & Industrial Construction

Plant - Operation, Maintenance & Turn Around

Refineries, Petrochemical, Fertilizer & GOSPs

Power, Water & Civil Infrastructure

RESOURCES

Employees

Equipment & Vehicles

Laydown Yard

Block Visas

Camp Facilities

Jubail Rahima YanbuKhafji Jeddah Riyadh

Camp & Office Locations

2000 Nos.

700 Nos.

50,000 SqM at Jubail & Ras Tanura

Accommodate Over 4,500 Senior & Junior Staff

400 Nos.

SAUDI ARAMCO

SABIC

SATORP

SADARA

KJO

CAPABILITIES

Pipe Erection & Welding 35,000 Ø Inch / Month

Steel Fabrication & Erection 300 Ton / Month

Reinforced Concreting 1,500 CM / Month

TASNEE

SAUDI CHEVRON

MA’ADEN

JANA

MARAFIQ

CLIENTELE JESCO

APPC

SIPCHEM

SASREF

SAHARA

EQUIPMENT & VEHICLES

FACILITIES

HIGHLIGHTS SAUDI ARAMCO

1. Northern Area (NAPD) 2005-12 : General Construction Services2. RT Terminal 2011-16 : General Maintanence of Onshore Plants 3. RT Refinery 2006-13 : Mechanical & Civil Maintenance Services4. Riyadh Refinery 2008-12 : Mechanical Pipeline & Plant Maint. Services5. Install Sanitary Waste Water Facilities @ Ras Tanura (12 KM RTR Piping)6. Safaniyah Tank Farm : 9,000 CM Concrete Paving & Dykewall7. Khurzaniya Gas Plant : Slope Protection (65,000 CM Marl) 8. Southern Area : Flare Up-gradation of 29 GOSPs 9. RT Refinery: Replace Control System; Crude Oil & Sulfur Recovery System10. Riyadh Refinery Chlorination & Condensate System Upgrade 11. FCV Piping Replacement Work at Abu-Ali Plant12. Plant-471 Shutdown Activities @ Berri Gas Plant13. Install Fuel Metering Station for AAC Block Factory, Jubail Ind. City14. Demolish/Relocate Loads of MCC-01,9&10 @ Air & Water Plt. Abqaiq15. Various Short Form /Mid Form/Shutdown Project at Northern & Sothern Area

HIGHLIGHTS SATORP (JV SAUDI ARAMCO & TOTAL)

1. Jubail Export Refinery Package - 8 Piping - Install & Weld 150 KM 6”Ø - 36”Ø CS Pipelines Included 300,000 Ø Inch Welding

2. 150 KM Heat Tubes Installation 3. Repair / Replace 6.5 KM X 36ӯ Crude Oil Pipe Line4. Piping & Structural Works at KFIP Sea-Port, JUBAIL5. 8" & 6" Propylene Line from JERP to APPC & TASNEE6. 6" Benzene Line at Saudi Chevron Site, JUBAIL7. Dismantling of Naphtha/ Diesel Jump Over @ SASREF

SADARA (JV SAUDI ARAMCO & DOW CHEMICALS)1. PE LSPB-1, Train-01, Aboveground Piping Erection Works2. In Plant Work Support Services (2014-2016)3. M E I Construction of RO Plant Facilities (DOW/FLUOR)

SABIC (SAUDI BASIC INDUSTRIES CORPORATION)1. IBN-BAYTAR : Installation & Commissioning of HD Crusher2. SHARQ : Isolation Valve Tie-In for LP De-Ethanizer Reboiler Column3. SHARQ: Gas Cooler Drill 3" & Nozzle Welding (Shutdown) 4. IBN-ZAHR : Demolish & Reconstruct 4 Ea. Culverts & Channel Covers

HIGHLIGHTS

TASNEE 1. Purging Speed up & Installation of C-2 Bypass Strainers for De-Ethanizer2. Install Duplex Filters & Replace Slice Gate @ SW Return3. Install Ammonia & Water Pumps

JANA1. LSTK Civil & MEI Works for New NACL Incinerator Plant 2. Electrical & Instrumentation work for CCL Plant 3. Piping Works & Supports For Foam & Fire Water Sprinkler Systems -

SABIC (Contin’d…)5. SAFCO: M Port Deducting System Modification in truck unloading Section 6. SAUDI KAYAN: Structural & Deluge Sys. for Tanks & Piping for U&O Nest7. AR-RAZI & IBN-ZAHR: Utilities & Yard Development8. HADEED : Mech Maint, FMT / BMT (2009, 2010, 2011, 2013)9. IBN-ZAHR : Repairs of MTBE-1 & 2 Catofin Reactor Header (2007, 2009)10. SHARQ Shipping & Logistics Support (1996-2014)11. Global Contract Mobile Workforce (2007-14)12. UNITED Golden Sand Housing Maint (2007-14)

ISO CERTIFICATE

CREDENTIALS

CREDENTIALS

CREDENTIALS

CREDENTIALS

CREDENTIALS

Contract Title : SABIC General Construction Services (Global Contract)

Client : All SABIC Affiliates

Project Duration : 5 Years (From 22 July 2014 To 21 July 2019)

Scope of Work : Civil, Structural, Mechanical, Piping, Static & Rotating Equipment, Electrical, Instrumentation

Painting & Insulation including Material supply.

Mode of Contract : Work Unit Rates, Material, Time Unit Rates and Equipment Rates for undertaking construction activities in all SABIC affiliates.

Other : Special Material & Services as may be required

CONTRACT FEATURES

PROJECT ORGANOGRAM

Project Manager

Construction Manager

(Civil)

Proj. Engr. (Civil) Nos. to Depend on

the Workload

Supervisor Civil

Work Permit Receiver

Surveyor

Mason-1Carpenter-1Steel Fixer-1Plumber-1Helper-1

Supervisor Structural

Work permit Receiver

Structural Fabricator-1

Erector-1Fitter-1

Helper-2

Construction Manger (Mech.)

Proj. Engr. (Mech.) Nos. to Depend

on Workload

Supervisor Piping

Work permit Receiver

Pipe Fabricator-1 Welder-4 (CS/ SS/AS/Monel)Pipe Fitter-1RTR Fitter-1

RTR Bonder-1Rigger-1Helper-2

Supervisor Static Eqpt.

Work permit Receiver

Millwright-1Helpers-2

Supervisor Rotat’g Eqpt

Work Permit Receiver

Millwright-1Helpers-2

Supervisor Paint/Insul’n

Work Permit Receiver

Sand Blaster-2

Spray Painter-1

Brush Painter-1

Insulators-2Helpers-2

Construction Manager

(E&I)

Proj. Engr. (E&I) Nos. to Depend on

Workload

Supervisor Electrical

Work Permit Receiver

Industrial Elctrician-2Electrical

Technician-2Fitter-1

Helpers-2

Supervisor Instrument’n

Work Permit Receiver

Instrument Technician-2Instr. Fitter-2

Splicers-2Helpers-2

QC Manager

Civil & Structural

Inspectors - 2

Mech. QC – 2 Piping QC – 2

Welding QC - 2

E & I Inspectors - 2

HSE Manager

Safety Supervisor -2

Safety Officer - 6

Fire Watch /Flag man

Planning & Coordination

Planning Engineer

Documentation/ Document

Controller - 2

Quantity Surveyor

PRO ID Coordinator

Procurement Manager

Procurement Coordination

Material Coordinator

Store Keeper

WORK FLOW DIAGRAM

Introduction/Marketing(BD/PM)

Assignment in Estimation Dept.

(Biju/John)

Recieve Scope(PM/CM/CD)

Job Ex / Site Visit(Est./Exec. Dept.)

Preparation of BOQ

Approval From

Client (SABIC)

Sub-Contracts Rates/

Quotations Recieving

Budget Preparation &Manpower &

Equip. Finalzation

If Not Approved By Client the process

will repeat

Preparation Tech. Documents & Mobilization

Activites

Specific Project Quality

Plan

SHE Documentation

Qualifying SHE Personnel

Planning & Scheduling

Direct & Indirect

Manpower Allocation

Equipment Inspection &

Approval

Material Approval & Placing P.O

Materials Store in

Central Store

ID Processing

Approved & Service Order

Release

Mobilization

Hand Over of Site & QC Dossier Submission &

Approval

Execution of Works as per Scope

QC Inspections

Punch List Clearence &

Approval of Work

Invoicing(Incl.Retention &

Warranty)

End of Work Flow and repeats for every S.O

BASIC WORK FLOW CHART FOR SABIC GLOBAL GENERAL CONTRUCTION CONTRACT

Variations & Change orders

(If Any)

G C S PROJECTS IN PROGRESSAffiliate AF # Project Title Value (SR)HADEED AF-1221089 Upgrade Power Stack Fan for DR

Module A/B 17,950,000.00

KEMYA AF-1215004 Alkyl Waste Handling Project 3,318,751.93

AF-1315021 Install Higher Capacity Fuel Gas Knock-Out Drum (TD-12A)

1,626,752.06

AF-1315032 Medium Pressue Steam to Condensate Pump

95,404.79

SHARQ AF-1112020 AF-1212057

Replace Drip Vessels in EG 1&3 1,650,693.08

AF-1112033 SHARQ Ethylene Sulfur Guard Bed in EG-4

2,650,000.00

SAUDI KAYAN

AF-1219022 Spare Guard Dryer Tie-In Installation 716,861.70

AF-1319001 Butane Line (Mercury bed) Tie-in 169,547.75

AF-1219038 Offload/Preserve Cold Box 160,171.60

Current Manpower : 2000 Nos. Engineers 500, Skilled 700

Block Visa Availability : 400 Nos.

Mobilization Phase-1 : 350 Employees Currently Working

Phase-2 : 150 Employees throgh Demobilization

Phase-3 : 200 Employees by 01 February 2015

Phase-4 : Fresh Recruits depending on Additional Visa Recommendation from SABIC

Equipment : Adequate Vehicles & Equipment available for mobilization (Phase1 & 2).

We are capable to meet any additional Requirements as and when required.

MOBILIZATION PLAN

How will the Affiliate utilize this Contract?

Affiliates Planned Work Load for Next Two (2) Years

Provision for Office, Laydown & Fabrication Facility

Suggestions for effective utilization of this Contract

Any Comments / Recommendations !

YOUR FEED BACK

We Continually Strive to Improve our Performance

for the Betterment of all the Stakeholders.

Thank You!